CN104459540A - 一种无电网冲击的双馈风力发电机组低电压穿越功能的检测方法 - Google Patents
一种无电网冲击的双馈风力发电机组低电压穿越功能的检测方法 Download PDFInfo
- Publication number
- CN104459540A CN104459540A CN201410773697.6A CN201410773697A CN104459540A CN 104459540 A CN104459540 A CN 104459540A CN 201410773697 A CN201410773697 A CN 201410773697A CN 104459540 A CN104459540 A CN 104459540A
- Authority
- CN
- China
- Prior art keywords
- low voltage
- voltage
- function
- grid
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Control Of Eletrric Generators (AREA)
Abstract
一种无电网冲击的双馈风电机组低电压穿越功能的检测方法,其特征在于:该检测方法在进行双馈风电机组低电压穿越功能检测时,双馈风电机组的定子侧与电网始终处于断开状态,通过阻抗值可调节的电抗器的投入来模拟不同类型和不同电压跌落深度的电网故障,检测双馈风电机组的变流器和发电机各物理量的输出波形,从而判断该双馈风电机组是否满足国家标准要求的低电压穿越功能。该检测方法能有效验证双馈风电机组是否具备低电压穿越功能,并能快速获得双馈风电机组低电压穿越的性能指标,其检测过程对无电网冲击,检测方法简单易行,检测结果直观准确,检测成本低,特别适用于双馈风电机组低电压穿越功能的风电场在线检测领域。
Description
技术领域
本发明涉及一种风电机组低电压穿越功能的检测方法,特别是涉及一种无电网冲击的双馈风电机组低电压穿越功能的检测方法。
背景技术
随着风电装机容量的快速提升,风电机组与电网之间的相互影响日趋突出,由于双馈风电机组的定子侧直接与电网连接,与其它风电机组机型相比,其低电压穿越能力较差。当电网出现短路故障时,双馈发电机的定子电压也会发生突变,发电机定子磁链中将包含暂态直流分量、正序和负序分量,这些磁链分量的共同作用将造成发电机转子出现过电压和过电流。在这种情况下,如果双馈机组不具备低电压穿越功能,双馈机组将会出现切机保护,使风电机组脱网,极有可能造成电网事故的扩大,因此目前接入电网的双馈风电机组均要求具有不脱网运行的低电压穿越功能。我国于2012年颁布了新版国家标准《风电场接入电力系统技术规定》(GB/T 19963-2011),国家标准对低电压穿越期间,风电机组的有功和无功支撑功能都提出了明确要求。
基于以上要求,目前亟需寻求一种针对双馈风电机组是否具备低电压穿越功能的在线检测方法。实现对风电机组低电压穿越功能的检测的关键是模拟各类电网故障的产生和消除,使风电机组感知各类电网故障,而现有技术需要采用大量用于模拟电网短路故障的电抗器装置,且检测过程中也会对电网造成冲击。
针对现有技术的不足,在工程实际运用中,进行双馈风电机组低电压穿越功能检测时,应尽量减小对电网的冲击,降低检测装置的经济成本,亟需一种高效实用的无电网冲击的双馈风电机组低电压穿越功能的检测方法。
发明内容
本发明的目的是提供一种无电网冲击的双馈风电机组低电压穿越功能的检测方法。该检测方法的原理为:在进行双馈风电机组低电压穿越功能检测时,双馈风电机组的定子侧与电网始终处于断开状态,通过阻抗值可调节的电抗器的投入来模拟不同类型和不同电压跌落深度的电网故障,检测双馈风电机组的 变流器和发电机各物理量的输出波形,从而判断该双馈风电机组是否满足国家标准要求的低电压穿越功能。
为实现上述发明目的,本发明的技术方案是通过以下方式来实现的:
1)首先断开双馈风电机组的定子并网开关,使双馈电机的定子在整个低电压穿越功能检测过程中均与电网脱开,转子侧通过功率变换器(由机侧变换器、直流母线、网侧变换器构成)与电网保持连接。
2)通过风机主控制器发出风电机组建压指令,双馈风电机组首先运行网侧变换器控制直流母线电压,然后运行机侧变换器进行励磁调节控制,直到发电机定子电压满足并网条件。
3)电网故障模拟,通过电抗器短路双馈发电机定子绕组,模拟电网电压跌落故障,调节电抗器的阻抗值可模拟不同的电压跌落深度和不同的故障类型。
4)波形记录,模拟电网电压跌落故障过程中观测并记录定子电压、定子电流、转子电压、转子电流、定子有功功率、无功功率、电磁转矩、发电机转速、网侧电流、直流母线电压的波形,评估不同电网故障对双馈风电机组和电网的冲击。
5)低电压穿越功能判定,当定子电流进入短路稳态后(定子暂态电流衰减完全后),断开定子短路电抗器,若此时双馈机组的网侧变换器仍然能够正常建立直流侧电压,机侧变换器仍然能够调节定子电压满足并网条件,则证明此次模拟电网故障过程中该双馈机组具备低电压穿越功能,反之则不具备低电压穿越功能。
6)低电压穿越功能的性能指标计算,若双馈机组具备低电压穿越功能,根据4)中记录的波形,计算低电压穿越的性能指标,其性能指标包括:
a)直流链电压的上升幅度;
b)转子过电压倍数;
c)转子过电流倍数;
d)变流器过电流倍数;
e)电压支撑能力,即电网电压跌落稳态时发无功能力;
f)频率支撑能力,即电网电压跌落稳态时发有功能力;
g)电网电压故障消除后的电压恢复时间。
通过对以上性能指标的检测,可以充分判断该双馈风电机组能否实现低电压穿越和实现低电压穿越的性能。
7)正常停机,低电压穿越检测试验过程结束。
本发明的有益效果是:
本发明提供的一种无电网冲击的双馈风电机组低电压穿越功能的检测方法,无需大量的用于模拟电网短路故障的电抗器装置,整个试验过程中双馈电机定子侧与电网脱开,对电网无冲击,因此该检测方法简单易行、检测结果直观准确、成本低、对电网友好;能有效验证双馈风电机组是否具备低电压穿越功能,并能快速获得双馈风电机组低电压穿越的性能指标。
附图说明
图1为本发明提供的一种无电网冲击的双馈风电机组低电压穿越功能的检测方法的系统结构图。
图2为本发明提供的一种无电网冲击的双馈风电机组低电压穿越功能的检测方法的试验流程图。
具体实施方式
以下结合附图1、附图2对本发明的技术方案作进一步说明。
本发明通过以下步骤来加以具体实施:
1)断开附图1中的并网开关,双馈电机(DFIG)的定子侧与电网脱开,转子侧通过附图1中的机侧变换器、直流母线、网侧变换器、升压变压器与电网连接。
2)接收风电主控制器建压指令,风电机组控制器首先控制附图1中的网侧变换器来稳定直流母线电压,然后控制附图1中的机侧变换器进行励磁调节。
3)双馈电机(DFIG)的定子电压满足并网条件后,通过接入附图1中的电抗器进行短路故障模拟,调节电抗器的阻抗值来模拟电网不同的电压跌落深度和不同的故障类型。
4)在接入电抗器进行短路故障模拟的过程中,通过波形记录仪保存定子电压、定子电流、转子电压、转子电流、网侧变换器电流、直流母线电压和发电机转速等波形数据,并计算双馈电机的有功功率、无功功率和电磁转矩数据。
5)当定子电流进入短路稳态后,断开附图1中的电抗器开关,通过直流母线电压能保持设定值以及定子端电压能满足并网条件等判据来确定双馈机组具备低电压穿越功能,若不满足判据则不具备低电压穿越功能。
6)判断双馈机组具备低电压穿越功能后,根据4)中记录的数据,所计算 的低电压穿越的性能指标如下:
a)根据直流母线电压的数据计算直流链电压的上升幅度;
b)根据转子电压的数据计算转子过电压倍数;
c)根据转子电流的数据计算转子过电流倍数;
d)根据网侧电流的数据计算变流器过电流倍数;
e)根据无功功率的数据计算电压支撑能力;
f)根据有功功率的数据计算频率支撑能力;
g)根据定子电压的数据计算电压恢复时间。
7)接收正常停机指令后,风电机组正常停机,检测过程结束。
Claims (1)
1.一种无电网冲击的双馈风电机组低电压穿越功能的检测方法,其特征在于,该检测方法包括以下步骤:
1)首先断开双馈风电机组的定子并网开关,使双馈电机的定子在整个低电压穿越功能检测过程中均与电网脱开,转子侧通过功率变换器(由机侧变换器、直流母线、网侧变换器构成)与电网保持连接;
2)通过风机主控制器发出风电机组建压指令,双馈风电机组首先运行网侧变换器控制直流母线电压,然后运行机侧变换器进行励磁调节控制,直到发电机定子端电压满足并网条件;
3)电网故障模拟,通过电抗器短路双馈发电机定子绕组,模拟电网电压跌落故障,调节电抗器的阻抗值可模拟不同的电压跌落深度和不同的故障类型;
4)波形记录,模拟电网电压跌落故障过程中观测并记录定子电压、定子电流、转子电压、转子电流、定子有功功率、无功功率、电磁转矩、发电机转速、网侧电流、直流母线电压的波形,评估不同电网故障对双馈风电机组和电网的冲击;
5)低电压穿越功能判定,当定子电流进入短路稳态后(定子暂态电流衰减完全后),断开定子短路电抗器,若此时双馈机组的网侧变换器仍然能够正常建立直流侧电压,机侧变换器仍然能够调节定子端电压满足并网条件,则证明此次模拟电网故障过程中该双馈机组具备低电压穿越功能,反之则不具备低电压穿越功能;
6)低电压穿越功能的性能指标计算,若双馈机组具备低电压穿越功能,根据4)中记录的波形,计算低电压穿越的性能指标,其性能指标包括:
a)直流链电压的上升幅度;
b)转子过电压倍数;
c)转子过电流倍数;
d)变流器过电流倍数;
e)电压支撑能力,即电网电压跌落稳态时发无功能力;
f)频率支撑能力,即电网电压跌落稳态时发有功能力;
g)电网电压故障消除后的电压恢复时间。
7)正常停机,低电压穿越检测试验过程结束。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410773697.6A CN104459540B (zh) | 2014-12-15 | 2014-12-15 | 一种无电网冲击的双馈风力发电机组低电压穿越功能的检测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410773697.6A CN104459540B (zh) | 2014-12-15 | 2014-12-15 | 一种无电网冲击的双馈风力发电机组低电压穿越功能的检测方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104459540A true CN104459540A (zh) | 2015-03-25 |
CN104459540B CN104459540B (zh) | 2017-02-22 |
Family
ID=52905897
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410773697.6A Active CN104459540B (zh) | 2014-12-15 | 2014-12-15 | 一种无电网冲击的双馈风力发电机组低电压穿越功能的检测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104459540B (zh) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104793091A (zh) * | 2015-05-13 | 2015-07-22 | 中国航空工业集团公司北京长城计量测试技术研究所 | 一种双馈变流器的现场测试与评估方法 |
CN104979848A (zh) * | 2015-06-11 | 2015-10-14 | 深圳市长昊机电有限公司 | 一种变流器系统及双馈式风力发电机组停机方法 |
CN106483461A (zh) * | 2017-01-05 | 2017-03-08 | 深圳市双合电气股份有限公司 | 电机节能分析及故障状态监测系统 |
CN106505609A (zh) * | 2015-09-08 | 2017-03-15 | 通用电气公司 | 风力涡轮机及风力涡轮机的保护系统 |
CN106499586A (zh) * | 2015-09-08 | 2017-03-15 | 通用电气公司 | 风力涡轮机、风力涡轮机的制动系统和操作风力涡轮机的方法 |
CN107911054A (zh) * | 2017-12-01 | 2018-04-13 | 许继电气股份有限公司 | 一种变速抽水蓄能机组用交流励磁系统及机组自启动方法 |
CN108344943A (zh) * | 2018-01-10 | 2018-07-31 | 云南电网有限责任公司电力科学研究院 | 一种dfig低电压穿越测试方法及装置 |
CN110289636A (zh) * | 2019-06-28 | 2019-09-27 | 东方电气风电有限公司 | 一种基于分频/低频电网运行的直驱式双馈风力发电机组 |
CN110794231A (zh) * | 2019-10-25 | 2020-02-14 | 上海电气集团股份有限公司 | 一种用于风电变桨系统的高低电压穿越试验装置 |
CN112260225A (zh) * | 2020-09-08 | 2021-01-22 | 中国电力科学研究院有限公司 | 一种基于组合模型的双馈风电机组三相短路电流计算方法及系统 |
CN113806907A (zh) * | 2021-08-02 | 2021-12-17 | 国网冀北电力有限公司电力科学研究院 | 双馈风电机组机电暂态数据处理方法及装置 |
CN113917249A (zh) * | 2021-09-08 | 2022-01-11 | 东方电气集团科学技术研究院有限公司 | 一种风电机组高低电压故障穿越监测方法及系统 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP4120547A1 (en) * | 2021-07-14 | 2023-01-18 | Siemens Gamesa Renewable Energy Innovation & Technology S.L. | A wind power facility and method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080157529A1 (en) * | 2006-12-29 | 2008-07-03 | Ingeteam, S.A. | Low voltage ride through system for a variable speed wind turbine having an exciter machine and a power converter not connected to the grid |
US7535120B2 (en) * | 2003-05-07 | 2009-05-19 | Chipper Windpower Technology, Inc. | Power system with low voltage ride-through capability |
CN101566672A (zh) * | 2009-06-01 | 2009-10-28 | 浙江海得新能源有限公司 | 模拟电网跌落的实验方法 |
CN101753086A (zh) * | 2010-01-12 | 2010-06-23 | 福建省电力有限公司福州电业局 | 双馈风力发电机的故障穿越性能模拟系统 |
US7919879B2 (en) * | 2006-05-31 | 2011-04-05 | Wisconsin Alumni Research Foundation | Power conditioning architecture for a wind turbine |
CN102121966A (zh) * | 2010-01-07 | 2011-07-13 | 华北电力科学研究院有限责任公司 | 风力发电机低电压穿越能力的测量方法和分析系统 |
-
2014
- 2014-12-15 CN CN201410773697.6A patent/CN104459540B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7535120B2 (en) * | 2003-05-07 | 2009-05-19 | Chipper Windpower Technology, Inc. | Power system with low voltage ride-through capability |
US7919879B2 (en) * | 2006-05-31 | 2011-04-05 | Wisconsin Alumni Research Foundation | Power conditioning architecture for a wind turbine |
US20080157529A1 (en) * | 2006-12-29 | 2008-07-03 | Ingeteam, S.A. | Low voltage ride through system for a variable speed wind turbine having an exciter machine and a power converter not connected to the grid |
CN101566672A (zh) * | 2009-06-01 | 2009-10-28 | 浙江海得新能源有限公司 | 模拟电网跌落的实验方法 |
CN102121966A (zh) * | 2010-01-07 | 2011-07-13 | 华北电力科学研究院有限责任公司 | 风力发电机低电压穿越能力的测量方法和分析系统 |
CN101753086A (zh) * | 2010-01-12 | 2010-06-23 | 福建省电力有限公司福州电业局 | 双馈风力发电机的故障穿越性能模拟系统 |
Non-Patent Citations (2)
Title |
---|
GRAHAM PANNELL 等: "Evaluation of the Performance of a DC-Link Break Chopper as a DFIG Low-Voltage Fault-Ride-Through Device", 《IEEE TRANSACTION ON ENERGY CONVERSION》 * |
胡家兵 等: "双馈风力发电系统的低压穿越运行与控制", 《电力系统自动化》 * |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104793091A (zh) * | 2015-05-13 | 2015-07-22 | 中国航空工业集团公司北京长城计量测试技术研究所 | 一种双馈变流器的现场测试与评估方法 |
CN104979848A (zh) * | 2015-06-11 | 2015-10-14 | 深圳市长昊机电有限公司 | 一种变流器系统及双馈式风力发电机组停机方法 |
CN106505609A (zh) * | 2015-09-08 | 2017-03-15 | 通用电气公司 | 风力涡轮机及风力涡轮机的保护系统 |
CN106499586A (zh) * | 2015-09-08 | 2017-03-15 | 通用电气公司 | 风力涡轮机、风力涡轮机的制动系统和操作风力涡轮机的方法 |
CN106483461A (zh) * | 2017-01-05 | 2017-03-08 | 深圳市双合电气股份有限公司 | 电机节能分析及故障状态监测系统 |
CN107911054B (zh) * | 2017-12-01 | 2020-04-28 | 许继电气股份有限公司 | 一种变速抽水蓄能机组用交流励磁系统及机组自启动方法 |
CN107911054A (zh) * | 2017-12-01 | 2018-04-13 | 许继电气股份有限公司 | 一种变速抽水蓄能机组用交流励磁系统及机组自启动方法 |
CN108344943A (zh) * | 2018-01-10 | 2018-07-31 | 云南电网有限责任公司电力科学研究院 | 一种dfig低电压穿越测试方法及装置 |
CN110289636A (zh) * | 2019-06-28 | 2019-09-27 | 东方电气风电有限公司 | 一种基于分频/低频电网运行的直驱式双馈风力发电机组 |
CN110794231A (zh) * | 2019-10-25 | 2020-02-14 | 上海电气集团股份有限公司 | 一种用于风电变桨系统的高低电压穿越试验装置 |
CN112260225A (zh) * | 2020-09-08 | 2021-01-22 | 中国电力科学研究院有限公司 | 一种基于组合模型的双馈风电机组三相短路电流计算方法及系统 |
CN112260225B (zh) * | 2020-09-08 | 2023-08-18 | 中国电力科学研究院有限公司 | 一种基于组合模型的双馈风电机组三相短路电流计算方法及系统 |
CN113806907A (zh) * | 2021-08-02 | 2021-12-17 | 国网冀北电力有限公司电力科学研究院 | 双馈风电机组机电暂态数据处理方法及装置 |
CN113806907B (zh) * | 2021-08-02 | 2024-03-01 | 国网冀北电力有限公司电力科学研究院 | 双馈风电机组机电暂态数据处理方法及装置 |
CN113917249A (zh) * | 2021-09-08 | 2022-01-11 | 东方电气集团科学技术研究院有限公司 | 一种风电机组高低电压故障穿越监测方法及系统 |
Also Published As
Publication number | Publication date |
---|---|
CN104459540B (zh) | 2017-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104459540B (zh) | 一种无电网冲击的双馈风力发电机组低电压穿越功能的检测方法 | |
Liu et al. | A multiagent system-based protection and control scheme for distribution system with distributed-generation integration | |
CN102799722B (zh) | 一种风电场低电压穿越能力仿真验证方法 | |
Chandrasekar et al. | Dynamic phasor modeling of type 3 DFIG wind generators (including SSCI phenomenon) for short-circuit calculations | |
CN102593865B (zh) | 一种风电接入电网的动态模拟系统和模拟方法 | |
CN104215904B (zh) | 一种全功率变流器风电机组低电压穿越测试系统及方法 | |
CN105205232A (zh) | 基于rtds的微网系统稳定性仿真测试平台 | |
CN107766596B (zh) | 一种基于典型故障工况集的低电压穿越能力仿真评价方法 | |
Farantatos et al. | Short-circuit current contribution of converter interfaced wind turbines and the impact on system protection | |
Zhao et al. | Assessment of wind farm models from a transmission system operator perspective using field measurements | |
Zhang et al. | Power hardware-in-the-loop test for cyber physical renewable energy infeed: Retroactive effects and an optimized power hardware-in-the-loop interface algorithm | |
CN106897514B (zh) | 一种全功率变换型新能源场站的短路电流计算模型的建立方法 | |
Zhu et al. | Equivalent modeling of DFIG-based wind power plant considering crowbar protection | |
CN103138289B (zh) | 一种高渗透率风电场的实时数字仿真建模的方法 | |
Elizondo et al. | Model reduction, validation, and calibration of wind power plants for dynamic studies | |
Shukla et al. | Low voltage ride through (LVRT) ability of DFIG based wind energy conversion system II | |
Yang et al. | The influences and countermeasures of wind farm access to transmission line differential protection | |
CN107453389A (zh) | 一种组串式光伏逆变器机电暂态模型建模方法 | |
Li et al. | DFIG-based wind farm electromagnetic dynamic model and impact on protection relay of transmission network | |
CN110165644B (zh) | 一种基于暂态电流时频特性的新能源场站纵联保护方法 | |
Sarkar et al. | Distance relay performance in future converter dominated power systems | |
Park et al. | Voltage transient analysis of a PMSG wind power system using controller-hardware-in-the loops | |
Wang et al. | Adaptability analysis for fault component protection under large scale wind power penetration | |
Zhou et al. | Research of Impact of the Direct Drive Wind Farm on Power System Relay Protection | |
Dicorato et al. | Voltage compensation for wind integration in power systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |