CN104458427B - A kind of assembled duct test device - Google Patents

A kind of assembled duct test device Download PDF

Info

Publication number
CN104458427B
CN104458427B CN201410734747.XA CN201410734747A CN104458427B CN 104458427 B CN104458427 B CN 104458427B CN 201410734747 A CN201410734747 A CN 201410734747A CN 104458427 B CN104458427 B CN 104458427B
Authority
CN
China
Prior art keywords
pipe
valve
water
well
test device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410734747.XA
Other languages
Chinese (zh)
Other versions
CN104458427A (en
Inventor
王广林
王超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Jinyuan Engineering Testing Co., Ltd
Original Assignee
ASCG Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ASCG Co Ltd filed Critical ASCG Co Ltd
Priority to CN201410734747.XA priority Critical patent/CN104458427B/en
Publication of CN104458427A publication Critical patent/CN104458427A/en
Application granted granted Critical
Publication of CN104458427B publication Critical patent/CN104458427B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Examining Or Testing Airtightness (AREA)

Abstract

The invention discloses a kind of assembled duct test device, including the steel mesh in pond, the right side of steel mesh is provided with seepage well, the bottom of seepage well is provided with submersible sewage pump, submersible sewage pump passes through feed pipe UNICOM with the water tank outside pond, pump of pouring water also is linked with by water-supply-pipe on the right side of water tank, pour water and be provided with valve well on the right side of pump, flexible interface pipe is extended transversely through in valve well, the steel pipe being connected is installed in the middle part of flexible interface pipeline in valve well, separated in the through hole of steel pipe by dividing plate, pressure gauge of the interval installed in dividing plate both sides is provided with the top of outer wall of steel pipe, steel pipe bottom passes through irrigation pipe UNICOM by two branch pipes with filling pump outlet, first check-valve is mounted on two branch pipes, the steel pipe side wall of dividing plate both sides also passes through communicating pipe UNICOM, second check-valve is interval with communicating pipe.Inventive pipeline interrupted construction becomes continuous construction, accelerates construction speed;Pressure testing section water circulation use, insufficient water sources area is especially suitable along arid, waterline.

Description

A kind of assembled duct test device
Technical field:
The present invention relates to pipeline pressure detection, more particularly to a kind of assembled duct test device.
Background technology:
After typically requiring Pipe installing, pressure test should be carried out to pipe-line system by design requirement.By the mesh of experiment Be divided into check mechanics properties ofpiping strength test, check pipeline quality of connection leak test, check pipe-line system The vacuum test of Vacuum maintenance energy and leak test of progress etc. based on fire safety consideration.Except vacuum pipe system and have Outside the pipe-line system of fire protection requirement, most pipelines only do strength test and leak test.The strength test of pipe-line system with it is tight Tightness test, typically using the water pressure test, such as because of design structure or other reasonses, it is impossible to during using the water pressure test, gas can be used Pressure experiment.
Traditional long-distance large-caliber waterline is because the water pressure test needs interrupted construction, while the division of duct test section is reserved Excavation section needs precast concrete backrest and installation, making and the installation needs of large-scale backrest take a substantial amount of time as back And expense;The adverse effect such as water source, geology, meteorological condition factor restricts during by the water pressure test so that the detection of hydraulic pressure becomes Obtain and be quite not easy.
The content of the invention:
In order to make up prior art problem, it is an object of the invention to provide a kind of assembled duct test device, structure is set Meter is novel, overcomes the disadvantage that usual long-distance large-caliber waterline needs interrupted construction to bring because of the water pressure test, makes pipeline enclosure Disconnected construction becomes continuous construction, accelerates construction speed, also overcomes and overcomes water source, geology, gas during the water pressure test As unfavorable factors such as conditions.
Technical scheme is as follows:
Assembled duct test device, it is characterised in that:Including the steel mesh in pond, the right side of steel mesh, which is provided with, oozes Well, the bottom of seepage well are provided with submersible sewage pump, and submersible sewage pump is with the water tank outside pond by feed pipe UNICOM, and water tank right side is also by defeated Water pipe is linked with pump of pouring water, and pours water and is provided with valve well on the right side of pump, extends transversely through flexible interface pipe in valve well, in valve well Flexible interface pipeline in the middle part of the steel pipe being connected is installed, is separated in the through hole of steel pipe by dividing plate, is set at the top of outer wall of steel pipe There is pressure gauge of the interval installed in dividing plate both sides, steel pipe bottom is joined by two branch pipes with filling pump outlet by irrigation pipe It is logical, first check-valve is mounted on two branch pipes, the steel pipe side wall of described dividing plate both sides also passes through communicating pipe UNICOM, connection Second check-valve is interval with pipe.
Described assembled duct test device, it is characterised in that:Described seepage well in the side wall of steel mesh side from Bottom is supreme to be interval with reserved water seepage hole successively.
Described assembled duct test device, it is characterised in that:Described feed pipe rises along inwall on the right side of seepage well And using pipe clamp and expansion bolt is coordinated to fix.
Described assembled duct test device, it is characterised in that:Be installed in series on described water-supply-pipe have the first gate valve, 3rd check-valves.
Described assembled duct test device, it is characterised in that:Set on the outer wall of described flexible interface pipe ends There is dilatory pier.
Described assembled duct test device, it is characterised in that:Described irrigation pipe is by upper horizontal extension, edge to the right Valve well left side wall to stretch into the vertical section of bottom straight down, form along horizontal-extending section under valve bottom, upper water Flat extension water inlet to the right with filling pump outlet UNICOM, upper level be installed in series on extension to the right have the 4th check-valves, Second gate valve, vertical section is using pipe clamp and coordinates expansion bolt to be fixed on valve well inwall, under horizontal-extending section of port of export with Branch pipe UNICOM.
Described assembled duct test device, it is characterised in that:Described steel pipe both ends are provided with adpting flange, connection method Orchid is connected with flexible interface pipeline by tray short tube.
It is an advantage of the invention that:
Novel in structural design of the present invention, usual long-distance large-caliber waterline is overcome because the water pressure test needs interrupted construction The disadvantage brought, pipeline interrupted construction is become continuous construction, accelerate construction speed;Overcome water pressure test process reclaimed water The unfavorable factors such as source, geology, meteorological condition, pressure testing section water circulation use, the insufficient water sources area along arid, waterline It is especially suitable.
Brief description of the drawings:
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the partial schematic diagram of lengths of steel pipes of the present invention.
Embodiment:
Referring to accompanying drawing:
Assembled duct test device, including the steel mesh 2 in pond 1, the right side of steel mesh 2 are provided with seepage well 3, seepage well 3 Bottom submersible sewage pump 4 is installed, submersible sewage pump 4 also passes through water delivery with the water tank 5 outside pond by the UNICOM of feed pipe 6, the right side of water tank 5 Pipe 7 is linked with pump 8 of pouring water, and the right side of pump 8 of pouring water is provided with valve well 9, and flexible interface pipe 10, valve are extended transversely through in valve well 9 The middle part of flexible interface pipeline 10 in door well 9 is provided with the steel pipe 11 being connected, and is separated in the through hole of steel pipe 11 by dividing plate 12, Pressure gauge 13 of the interval installed in the both sides of dividing plate 12 is provided with the top of the outer wall of steel pipe 11, the bottom of steel pipe 11 is by two branch pipes 14 with filling The delivery port of water pump 8 is mounted on first check-valve 16, the steel pipe of the both sides of dividing plate 12 by the UNICOM of irrigation pipe 15 on two branch pipes 14 Side wall 11 is interval with second check-valve 18 also by the UNICOM of communicating pipe 17 on communicating pipe 17.
Seepage well 3 is interval with reserved water seepage hole 19 successively in the side wall of steel mesh side from bottom is supreme.
Feed pipe 6 is soaring along inwall on the right side of seepage well and using pipe clamp and coordinates expansion bolt to fix, and pays attention to during installation swollen Swollen bolt position, ensure the perpendicularity and flatness of the annexes such as the valve installed after bolt hole and the water pressure test.
Being installed in series on water-supply-pipe 7 has the first gate valve 20, the 3rd check-valves 21.
The outer wall at the both ends of flexible interface pipeline 10 is provided with dilatory pier 22.
Irrigation pipe 15 stretched into straight down by upper horizontal extension to the right, along the left side wall of valve well 9 bottom vertical section, Horizontal-extending section of composition under along the bottom of valve well 9, upper horizontal extension water inlet to the right and the port of export UNICOM of pump 8 of pouring water, Upper level is installed in series to the right on extension the 4th check-valves 23, the second gate valve 24, and vertical section is using pipe clamp and coordinates expansion It is bolted on the inwall of valve well 9, expansion bolt position is paid attention to during installation, ensures bolt hole and the valve installed after the water pressure test The perpendicularity and flatness of the annexes such as door, under horizontal-extending section of port of export and the UNICOM of branch pipe 14.
The both ends of steel pipe 11 are provided with adpting flange, and adpting flange is connected with flexible interface pipeline 10 by tray short tube 25.
The present invention is supported using the frictional force between the deadweight, pipeline and the soil that control pressure testing section safe pressure differential and pipeline Disappear pressure, eliminates the making and installation of large-scale backrest, improves safety coefficient using the dilatory pier for overhauling valve well both sides, substitutes Conventional double backrest tradition pressure-measuring methods.
In implementation process of the present invention, cause axial shifting because both sides pressure difference is excessive to ensure assembled pressure testing device not It is dynamic, it should strictly control the pressure at both sides of steel diaphragm 12, the both sides pressure difference of steel diaphragm 12 is normally controlled in the range of 0.3MPA during implementation.
The present invention reserves interface of pouring water when waterline is attached to suitable water source position, is taken during the water pressure test " once pour water, overall boosting, pipe section pressure test, each other back " method, by submersible sewage pump, pump of pouring water by whole pressure testing section pressure liters The minimum test section operating pressure into pressure testing section, the by-passing valve closed afterwards between each pressure testing section by design idea division, so Afterwards by transferring formula integration hydraulic pressure testing equipment, the test pressure of each pressure testing section is forced into paragraph by paragraph, overcomes usual long range Heavy caliber waterline needs the disadvantage that interrupted construction brings because of the water pressure test, pipeline interrupted construction is become continuous construction, adds Fast construction speed.

Claims (7)

  1. A kind of 1. assembled duct test device, it is characterised in that:Including the steel mesh in pond, the right side of steel mesh, which is provided with, oozes Well, the bottom of seepage well are provided with submersible sewage pump, and submersible sewage pump is with the water tank outside pond by feed pipe UNICOM, and water tank right side is also by defeated Water pipe is linked with pump of pouring water, and pours water and is provided with valve well on the right side of pump, extends transversely through flexible interface pipe in valve well, in valve well Flexible interface pipeline in the middle part of the steel pipe being connected is installed, is separated in the through hole of steel pipe by dividing plate, is set at the top of outer wall of steel pipe There is pressure gauge of the interval installed in dividing plate both sides, steel pipe bottom is joined by two branch pipes with filling pump outlet by irrigation pipe It is logical, first check-valve is mounted on two branch pipes, the steel pipe side wall of described dividing plate both sides also passes through communicating pipe UNICOM, connection Second check-valve is interval with pipe.
  2. 2. assembled duct test device according to claim 1, it is characterised in that:Described seepage well is close to steel mesh side Side wall on from bottom is supreme be interval with reserved water seepage hole successively.
  3. 3. assembled duct test device according to claim 1, it is characterised in that:Described feed pipe is right along seepage well Side inwall is soaring and using pipe clamp and coordinates expansion bolt to fix.
  4. 4. assembled duct test device according to claim 1, it is characterised in that:It is installed in series on described water-supply-pipe There are the first gate valve, the 3rd check-valves.
  5. 5. assembled duct test device according to claim 1, it is characterised in that:Described flexible interface pipe ends Outer wall be provided with dilatory pier.
  6. 6. assembled duct test device according to claim 1, it is characterised in that:Described irrigation pipe from it is upper it is horizontal to Right extension, the vertical section for stretching into along valve well left side wall bottom straight down, along horizontal-extending under valve bottom Section is formed, and upper horizontal extension water inlet to the right is installed in series on extension has to the right with filling pump outlet UNICOM, upper level 4th check-valves, the second gate valve, vertical section is using pipe clamp and coordinates expansion bolt to be fixed on valve well inwall, under it is horizontal-extending The section port of export and branch pipe UNICOM.
  7. 7. assembled duct test device according to claim 1, it is characterised in that:Described steel pipe both ends are provided with connection Flange, adpting flange are connected with flexible interface pipeline by tray short tube.
CN201410734747.XA 2014-12-05 2014-12-05 A kind of assembled duct test device Active CN104458427B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410734747.XA CN104458427B (en) 2014-12-05 2014-12-05 A kind of assembled duct test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410734747.XA CN104458427B (en) 2014-12-05 2014-12-05 A kind of assembled duct test device

Publications (2)

Publication Number Publication Date
CN104458427A CN104458427A (en) 2015-03-25
CN104458427B true CN104458427B (en) 2018-01-19

Family

ID=52904841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410734747.XA Active CN104458427B (en) 2014-12-05 2014-12-05 A kind of assembled duct test device

Country Status (1)

Country Link
CN (1) CN104458427B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105570533A (en) * 2015-12-11 2016-05-11 安徽水安建设集团股份有限公司 Continuous laying and water-saving pressure testing construction method of long-distance water pipe
CN105890851A (en) * 2016-04-18 2016-08-24 中国冶集团有限公司 Large-caliber cast iron pipe pressure testing device without backrest, and large-caliber cast iron pipe pressure testing method without backrest
CN116148083B (en) * 2022-12-02 2024-04-09 英立(江苏)机电有限公司 Device and process for testing tensile strength of BWFRP cable protection tube

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4430887A (en) * 1982-03-15 1984-02-14 Hydra Systems Mfg, Inc. Pipe tester with multiple fluid source connections
US5072622A (en) * 1990-06-04 1991-12-17 Roach Max J Pipeline monitoring and leak containment system and apparatus therefor
CN100357721C (en) * 2004-01-19 2007-12-26 徐州建筑职业技术学院 Middle pressure test technology and device for widebore pipeline construction
CN203465152U (en) * 2013-09-27 2014-03-05 杜培文 Water pressure test device for large-caliber socket-spigot type pressure pipeline
CN203490041U (en) * 2013-10-21 2014-03-19 杜培文 Pressure testing device of water transmission pipeline
CN203758705U (en) * 2014-02-24 2014-08-06 中国十七冶集团有限公司 Underground pipeline pressure test detection apparatus
CN204241322U (en) * 2014-12-05 2015-04-01 安徽水安建设集团股份有限公司 A kind of assembled duct test device

Also Published As

Publication number Publication date
CN104458427A (en) 2015-03-25

Similar Documents

Publication Publication Date Title
CN105570533A (en) Continuous laying and water-saving pressure testing construction method of long-distance water pipe
CN104458427B (en) A kind of assembled duct test device
CN204241322U (en) A kind of assembled duct test device
CN105332384B (en) Super pressure inhales joint pumping system and its method of work
CN109736757B (en) Production increasing method for reducing pressure loss in gas well by using compressor
CN105649084A (en) Self-lifting type steel protection cylinder uplifting device and construction method thereof
CN105225593A (en) For simulating the culvert system of groundwater environment in ground stratum
CN103114553B (en) Earth and rockfill dam piping burst field test method
CN108591838A (en) A kind of Buried Oil Pipelines Release and dispersion migration experiment porch based on light transmission method
CN204479417U (en) A kind of rock gas station process pipe gas pressure test system
CN205475234U (en) Bootstrapping formula steel protects a pull -out device
CN207392286U (en) A kind of eddy current type gas disturbs Fine Sediments in Estuaries dredger
CN203758705U (en) Underground pipeline pressure test detection apparatus
CN102062123A (en) Energy-saving and environmentally-friendly self-sucking water pump
CN205188984U (en) Joint pumping system is inhaled to super pressure
CN104612240A (en) Method for blocking large-pipe-diameter rainwater pipeline through short air bag
CN204591837U (en) A kind of lifting machine hydraulic system
CN210567572U (en) Underground pipeline air tightness checking device
CN202349600U (en) Gas pipeline drainer with functions of current limiting and blockage preventing
CN206844229U (en) A kind of blower pump for pipeline position is higher than the fire cistern of water level
CN205188985U (en) Joint pumping system is inhaled to super pressure
CN205477724U (en) Automatic ware that drains of self -control
CN104695538A (en) Automatic water-supplementing water seal technology of water-seal well
CN205576873U (en) Fill water surge suppressor suitable for major diameter conduit valve
CN205348220U (en) Double -barrelled and plastics well leak hunting facility of collapsible loess area plastics

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200521

Address after: 230601 Ziyun Road, Hefei economic and Technological Development Zone, Anhui 1288

Patentee after: Anhui Jinyuan Engineering Testing Co., Ltd

Address before: 230601, Ziyun Road, Hefei, Anhui Province, No. 1288

Patentee before: ASCG Co.,Ltd.

TR01 Transfer of patent right