CN104457047B - Operation of air conditioning systems - Google Patents
Operation of air conditioning systems Download PDFInfo
- Publication number
- CN104457047B CN104457047B CN201410736096.8A CN201410736096A CN104457047B CN 104457047 B CN104457047 B CN 104457047B CN 201410736096 A CN201410736096 A CN 201410736096A CN 104457047 B CN104457047 B CN 104457047B
- Authority
- CN
- China
- Prior art keywords
- pipeline
- way valve
- heat exchanger
- valve
- compression mechanism
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B41/00—Fluid-circulation arrangements
- F25B41/20—Disposition of valves, e.g. of on-off valves or flow control valves
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B13/00—Compression machines, plants or systems, with reversible cycle
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B29/00—Combined heating and refrigeration systems, e.g. operating alternately or simultaneously
- F25B29/003—Combined heating and refrigeration systems, e.g. operating alternately or simultaneously of the compression type system
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B41/00—Fluid-circulation arrangements
- F25B41/30—Expansion means; Dispositions thereof
- F25B41/31—Expansion valves
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Thermal Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Air-Conditioning For Vehicles (AREA)
- Compression-Type Refrigeration Machines With Reversible Cycles (AREA)
Abstract
The invention discloses a kind of operation of air conditioning systems, including the first compression mechanism, the second compression mechanism, the first four-way valve, the second four-way valve, First Heat Exchanger, the second heat exchanger, the 3rd heat exchanger, first throttle mechanism, second throttle body, the 3rd throttle mechanism, the first check valve and the second check valve;The low pressure node of first four-way valve is connected by the 65th pipeline with the low pressure node of second four-way valve, the high voltage nodes of first four-way valve pass sequentially through the 60th pipeline, the second compression mechanism port of export, the second compression mechanism arrival end and are connected with the 65th pipeline between the low pressure node of the first four-way valve and the low pressure node of the second four-way valve, and the high voltage nodes of second four-way valve are connected by the 62nd pipeline with the first compression mechanism port of export.Simple in construction, reliable operation, cost is cheap, can realize in the process of running dual temperature cooling or (and) heat supply, be avoided that delay of the refrigerant in heat exchanger, reduce cold-producing medium stream dynamic resistance.
Description
Technical field
The present invention relates to a kind of operation of air conditioning systems, belong to refrigeration technology field.
Background technology
Present invention applicant in 01 month 2013 disclosed in 02 day, the patent of invention of Application No. 201210381271.7 with
And in disclosed in 25 days December in 2013, the claims 1 to 3 of the patent of invention of Application No. 201310422163.4 carries respectively
A kind of operation of air conditioning systems scheme is gone out, its system forms difference as shown in Figure 4,5, 6 (i.e.:Patent of invention
201210381271.7 the Figure of description 1 to 3 with 201310422163.4).It was found from foregoing invention patent specification:Fig. 4,
5th, 6 (i.e.:The Figure of description 1 to 3 of patent of invention 201210381271.7 and 201310422163.4) scheme that is respectively shown in
Available for the thermostatic and humidistatic air conditioning unit group of processing air, for the annual occasion for having refrigeration, heating and dehumidification.
It was found from Fig. 4, Fig. 5 and foregoing invention patent specification:When scheme shown in Fig. 4, Fig. 5 is in refrigerated dehumidification and sky
When being worked under gas reheat function, the 3rd heat exchanger 8 uses as condenser, and for the reheating of air, and reheating amount needs to lead to
Overregulate the 3rd throttle mechanism 7 to be controlled, it is well known that when the 3rd throttle mechanism 7 turns down, refrigerant circulation mistake can be increased
Resistance in journey, causes compressor power consumption to increase, and on the other hand when the 3rd throttle mechanism 7 turns down, also results in a part of system
Cryogen liquid holdup causes circulating mass of refrigerant to change in the 3rd heat exchanger 8, and air conditioner refrigerating can be set under serious conditions
Standby normal operation adversely affects, and in order to overcome this influence, certainly will increase the charging amount of refrigerant again.
In addition, also known from Fig. 4, Fig. 5 and foregoing invention patent specification:When scheme shown in Fig. 4, Fig. 5 is independent
During the three times work of scheme of refrigerating function, the second heat exchanger 4 and the 3rd heat exchanger 8 can only be entered using same evaporating temperature to air
Row cooling or dehumidifying;And air can not be cooled down or dehumidified using different evaporating temperatures, i.e., in air conditioner unit,
Second heat exchanger 4 is first cooled down or dehumidified to air using higher evaporating temperature, and then the 3rd heat exchanger 8 is again using relatively low
Evaporating temperature air is further cooled down or dehumidified, to reach the purpose of energy-conservation.
The problem of similar, there is also it was found from foregoing invention patent specification in scheme shown in Fig. 6:When shown in Fig. 6
When scheme works under refrigerated dehumidification and air reheat function, First Heat Exchanger 3 uses as condenser, for air again
Heat, and reheating amount needs to be controlled by adjusting first throttle mechanism 5, therefore, when first throttle mechanism 5 turns down,
The resistance in refrigerant circulating process can be increased, cause compressor power consumption to increase, on the other hand when first throttle mechanism 5 turns down
When, also result in a part of refrigerant liquid and be trapped in First Heat Exchanger 3, cause circulating mass of refrigerant to change, it is right
The normal operation of operation of air conditioning systems adversely affects.Scheme shown in Fig. 6 in the work of scheme three times of separate refrigeration function,
The heat exchanger 4 of First Heat Exchanger 3 and second also can only be cooled down or dehumidified to air using same evaporating temperature;And it can not use
Different evaporating temperatures is cooled down or dehumidified to air, and the energy consumption for causing air to cool down or dehumidify is larger.
The content of the invention
It is an object of the invention to provide one kind can reduce compressor power consumption in the course of the work, avoid refrigerant liquid from changing
Be detained in hot device, and can simultaneously using two different evaporating temperatures or (and) condensation temperature is operated, and simple in construction
Operation of air conditioning systems.
The problem of in order to overcome above-mentioned technology to exist, the technical scheme that the present invention solves technical problem are:
1st, a kind of operation of air conditioning systems, including the first compression mechanism (1), the first four-way valve (70), the second four-way valve (80),
First Heat Exchanger (3), the second heat exchanger (4), the 3rd heat exchanger (8), first throttle mechanism (5), second throttle body (6),
Three throttle mechanisms (7), the first check valve (21) and the second check valve (22), it is characterized in that:The operation of air conditioning systems also includes the
Two compression mechanisms (2);The low pressure node (73) of first four-way valve (70) passes through the 65th pipeline (65) and described second
The low pressure node (83) of four-way valve (80) is connected, and the high voltage nodes (71) of first four-way valve (70) pass sequentially through the 60th pipe
Road (60), the second compression mechanism (2) port of export, the second compression mechanism (2) arrival end, the 68th pipeline (68) and described first
The 65th pipeline (65) between the low pressure node (73) of four-way valve (70) and the low pressure node (83) of the second four-way valve (80)
It is connected, the high voltage nodes (81) of second four-way valve (80) pass sequentially through the 62nd pipeline (62), the first compression mechanism (1)
The port of export, the first compression mechanism (1) arrival end, the 63rd pipeline (63) the also low pressure node with first four-way valve (70)
(73) the 65th pipeline (65) between the low pressure node (83) of the second four-way valve (80) is connected, second four-way valve
Any one commutation node (84) in (80) two commutation nodes passes sequentially through the 67th pipeline (67), the 3rd heat exchanger
(8), the 3rd throttle mechanism (7), the 58th pipeline (58), first throttle mechanism (5), First Heat Exchanger (3), the 64th pipe
Road (64) is connected with any one commutation node (74) in described (70) two commutation nodes of first four-way valve, and the described 2nd 4
Another commutation node (82) of port valve (80) passes sequentially through the 66th pipeline (66), the first check valve (21) arrival end, the
One check valve (21) port of export, the 69th pipeline (69) are connected with the 64th pipeline (64), first four-way valve (70)
Another commutation node (72) pass sequentially through the 61st pipeline (61), the second check valve (22) arrival end, the second check valve
(22) port of export, the 59th pipeline (59) are connected with the 67th pipeline (67), and one end of second heat exchanger (4) is successively
By second throttle body (6), the 52nd pipeline (52) and the first throttle mechanism (5) and the 3rd throttle mechanism (7) it
Between the 58th pipeline (58) be connected, the other end of second heat exchanger (4) by the 51st pipeline (51) with it is described
The 65th pipeline between the low pressure node (73) of first four-way valve (70) and the low pressure node (83) of the second four-way valve (80)
(65) it is connected.
2nd, a kind of operation of air conditioning systems, including the first compression mechanism (1), the first four-way valve (70), the second four-way valve (80),
First Heat Exchanger (3), the second heat exchanger (4), the 3rd heat exchanger (8), first throttle mechanism (5), second throttle body (6),
Three throttle mechanisms (7), the first check valve (21) and the second check valve (22), it is characterized in that:The operation of air conditioning systems also includes the
Two compression mechanisms (2);The low pressure node (73) of first four-way valve (70) passes through the 65th pipeline (65) and described second
The low pressure node (83) of four-way valve (80) is connected, and the high voltage nodes (71) of first four-way valve (70) pass sequentially through the 60th pipe
Road (60), the second compression mechanism (2) port of export, the second compression mechanism (2) arrival end, the 68th pipeline (68) and described first
The 65th pipeline (65) between the low pressure node (73) of four-way valve (70) and the low pressure node (83) of the second four-way valve (80)
It is connected, the high voltage nodes (81) of second four-way valve (80) pass sequentially through the 62nd pipeline (62), the first compression mechanism (1)
The port of export, the first compression mechanism (1) arrival end, the 63rd pipeline (63) the also low pressure node with first four-way valve (70)
(73) the 65th pipeline (65) between the low pressure node (83) of the second four-way valve (80) is connected, second four-way valve
Any one commutation node (84) in (80) two commutation nodes passes sequentially through the 67th pipeline (67), the 3rd heat exchanger
(8), the 3rd throttle mechanism (7), the 58th pipeline (58), first throttle mechanism (5), First Heat Exchanger (3), the 64th pipe
Road (64) is connected with any one commutation node (74) in described (70) two commutation nodes of first four-way valve, and the described 2nd 4
Another commutation node (82) of port valve (80) passes sequentially through the 66th pipeline (66), the first check valve (21) arrival end, the
One check valve (21) port of export, the 69th pipeline (69) are connected with the 64th pipeline (64), first four-way valve (70)
Another commutation node (72) pass sequentially through the 61st pipeline (61), the second check valve (22) arrival end, the second check valve
(22) port of export, the 59th pipeline (59) are connected with the 67th pipeline (67), and one end of second heat exchanger (4) is successively
By second throttle body (6), the 52nd pipeline (52) and the first throttle mechanism (5) and the 3rd throttle mechanism (7) it
Between the 58th pipeline (58) be connected, the other end of second heat exchanger (4) passes through the 51st pipeline (51) and the 6th
13 pipelines (63) are connected.
3rd, a kind of operation of air conditioning systems, including the first compression mechanism (1), the first four-way valve (70), the second four-way valve (80),
First Heat Exchanger (3), the second heat exchanger (4), the 3rd heat exchanger (8), first throttle mechanism (5), second throttle body (6),
Three throttle mechanisms (7), the first check valve (21) and the second check valve (22), it is characterized in that:The operation of air conditioning systems also includes the
Two compression mechanisms (2);The low pressure node (73) of first four-way valve (70) passes through the 65th pipeline (65) and described second
The low pressure node (83) of four-way valve (80) is connected, and the high voltage nodes (71) of first four-way valve (70) pass sequentially through the 60th pipe
Road (60), the second compression mechanism (2) port of export, the second compression mechanism (2) arrival end, the 68th pipeline (68) and described first
The 65th pipeline (65) between the low pressure node (73) of four-way valve (70) and the low pressure node (83) of the second four-way valve (80)
It is connected, the high voltage nodes (81) of second four-way valve (80) pass sequentially through the 62nd pipeline (62), the first compression mechanism (1)
The port of export, the first compression mechanism (1) arrival end, the 63rd pipeline (63) the also low pressure node with first four-way valve (70)
(73) the 65th pipeline (65) between the low pressure node (83) of the second four-way valve (80) is connected, second four-way valve
Any one commutation node (84) in (80) two commutation nodes passes sequentially through the 67th pipeline (67), the 3rd heat exchanger
(8), the 3rd throttle mechanism (7), the 58th pipeline (58), first throttle mechanism (5), First Heat Exchanger (3), the 64th pipe
Road (64) is connected with any one commutation node (74) in described (70) two commutation nodes of first four-way valve, and the described 2nd 4
Another commutation node (82) of port valve (80) passes sequentially through the 66th pipeline (66), the first check valve (21) arrival end, the
One check valve (21) port of export, the 69th pipeline (69) are connected with the 64th pipeline (64), first four-way valve (70)
Another commutation node (72) pass sequentially through the 61st pipeline (61), the second check valve (22) arrival end, the second check valve
(22) port of export, the 59th pipeline (59) are connected with the 67th pipeline (67), and one end of second heat exchanger (4) is successively
By second throttle body (6), the 52nd pipeline (52) and the first throttle mechanism (5) and the 3rd throttle mechanism (7) it
Between the 58th pipeline (58) be connected, the other end of second heat exchanger (4) passes through the 51st pipeline (51) and the 6th
18 pipelines (68) are connected.
4th, a kind of operation of air conditioning systems, including the first compression mechanism (1), the first four-way valve (70), the second four-way valve (80),
First Heat Exchanger (3), the second heat exchanger (4), the 3rd heat exchanger (8), first throttle mechanism (5), second throttle body (6),
Three throttle mechanisms (7) and the first check valve (21), it is characterized in that:The operation of air conditioning systems also includes the second compression mechanism (2);Institute
The low pressure node (73) for stating the first four-way valve (70) passes through the 65th pipeline (65) and the low pressure of second four-way valve (80)
Node (83) is connected, and the high voltage nodes (71) of first four-way valve (70) pass sequentially through the 60th pipeline (60), the second compression
Mechanism (2) port of export, the second compression mechanism (2) arrival end, the 68th pipeline (68) are low with first four-way valve (70)
The 65th pipeline (65) between node (73) and the low pressure node (83) of the second four-way valve (80) is pressed to be connected, the described 2nd 4
The high voltage nodes (81) of port valve (80) pass sequentially through the 62nd pipeline (62), the first compression mechanism (1) port of export, the first compression
Mechanism (1) arrival end, the 63rd pipeline (63) the also low pressure node (73) and the second four-way with first four-way valve (70)
The 65th pipeline (65) between the low pressure node (83) of valve (80) is connected, described (80) two commutation nodes of second four-way valve
In any one commutation node (84) pass sequentially through the 67th pipeline (67), the 3rd heat exchanger (8), the 3rd throttle mechanism
(7), the 58th pipeline (58), first throttle mechanism (5), First Heat Exchanger (3), the 64th pipeline (64) and described first
Any one commutation node (74) in the commutation nodes of four-way valve (70) two is connected, second four-way valve (80) another
Commutation node (82) passes sequentially through the 66th pipeline (66), the first check valve (21) arrival end, the first check valve (21) outlet
End, the 69th pipeline (69) are connected with the 64th pipeline (64), another commutation node of first four-way valve (70)
(72) pass sequentially through the 61st pipeline (61), the second heat exchanger (4), second throttle body (6), the 52nd pipeline (52) with
The 58th pipeline (58) between the first throttle mechanism (5) and the 3rd throttle mechanism (7) is connected.
Compared with prior art, its advantage is the present invention:
1. delay of the refrigerant in heat exchanger operationally, can be avoided, compressor power consumption can be reduced;
2. can simultaneously using two different evaporating temperatures or (and) condensation temperature is operated;
It is 3. simple in construction;
4. the present invention is applied to industrial and civilian operation of air conditioning systems, especially suitable for there is different temperatures to need to cold and hot amount
The occasion asked.
Brief description of the drawings
Fig. 1 is the structural representation of the embodiment of the present invention 1;
Fig. 2 is the structural representation of the embodiment of the present invention 2;
Fig. 3 is the structural representation of the embodiment of the present invention 3;
Fig. 4 is prior art construction schematic diagram;
Fig. 5 is prior art construction schematic diagram;
Fig. 6 is prior art construction schematic diagram.
Embodiment
Present invention is described in further detail below in conjunction with the accompanying drawings.
Embodiment 1
As shown in figure 1, the present embodiment is a kind of the temperature of air, humidity while the air conditioner refrigerating that is controlled to be set
It is standby, there is the occasion of refrigeration, heating and dehumidification for whole year.Whole equipment includes consisting of part:First compression mechanism
1st, the second compression mechanism 2, the first four-way valve 70, the second four-way valve 80, first throttle mechanism 5, second throttle body 6, Section three
Flow mechanism 7, First Heat Exchanger 3, the second heat exchanger 4, the 3rd heat exchanger 8, the first check valve 21 and the second check valve 22;First segment
It is all electric expansion valve to flow mechanism 5, second throttle body 6, the 3rd throttle mechanism 7.
Second heat exchanger 4, the 3rd heat exchanger 8 are arranged in same air conditioner unit 10, and along the flow direction of air,
3rd heat exchanger 8 is in the downwind side of the second heat exchanger 4;There are two temperature-detecting devices, its set-up mode is:Along the stream of air
Dynamic direction, the first temperature-detecting device 31 are arranged at the inlet side of the second heat exchanger 4, empty for detecting the entrance of the second heat exchanger 4
Gas dry-bulb temperature, second temperature detection means 32 are also disposed on the inlet side of the second heat exchanger 4, for detecting the second heat exchanger 4
Intake air wet-bulb temperature.Air handled by air conditioner unit 10 is indoor circulation air.
The operation of air conditioning systems is in annual running, it is possible to achieve multiple functions.During work, First Heat Exchanger 3 is
Heat source side heat exchanger, summer and spring and autumn distribute caused condensation heat in refrigeration or dehumidification process as condenser, to environment,
Winter as evaporator, absorbs heat, for heating air from environment;Second heat exchanger 4 is in air conditioner unit 10
Cooler, it is possible to achieve the cooling or dehumidifying of air;3rd heat exchanger 8 is heater or cooling in air conditioner unit 10
Device, during as heater, it is possible to achieve the heating of air or reheating, wind pushing temperature is controlled, during as cooler, it is possible to achieve empty
The cooling or dehumidifying of gas.Workflow difference under each function is as described below.
(1) separate refrigeration function
During work, the high voltage nodes 71 of the first four-way valve 70 communicate with the first four-way valve 70 commutation node 74, the first four-way valve
70 commutation nodes 72 communicate with the low pressure node 73 of the first four-way valve 70.The high voltage nodes 81 of second four-way valve 80 and the second four-way valve 80
Commutation node 82 communicates, and the second four-way valve 80 commutation node 84 communicates with the low pressure node 83 of the second four-way valve 80.
Scheme one:First compression mechanism 1 does not work, the normal work of the second compression mechanism 2;In air conditioner unit 10,
Second heat exchanger 4 works, and the 3rd heat exchanger 8 does not work.
Under this scheme, condensation heat caused by refrigeration all by First Heat Exchanger 3 be discharged into environment (outdoor air or
Cooling water or soil etc.), air is cooled down the second heat exchanger 4 or cool-down dehumidification.
During work, the standard-sized sheet of first throttle mechanism 5, the normal work of second throttle body 6, the 3rd throttle mechanism 7 closes.
Its workflow is:Refrigerant from the port of export of the second compression mechanism 2 discharge after, successively by the 60th pipeline 60,
The high voltage nodes 71 of first four-way valve 70, the first four-way valve 70 commutation node 74, the 64th pipeline 64, First Heat Exchanger 3, first
Throttle mechanism 5, the 58th pipeline 58, the 52nd pipeline 52, second throttle body 6, the second heat exchanger the 4, the 51st pipe
Road 51, the 65th pipeline 65, the 68th pipeline 68, the arrival end of the second compression mechanism 2 is returned to, into the second compression mechanism 2
Compressed, complete one cycle.
Scheme two:First compression mechanism 1 does not work, the normal work of the second compression mechanism 2;In air conditioner unit 10,
Second heat exchanger 4 does not work, the normal work of the 3rd heat exchanger 8.
Under this scheme, condensation heat caused by refrigeration all by First Heat Exchanger 3 be discharged into environment (outdoor air or
Cooling water or soil etc.), air is cooled down the 3rd heat exchanger 8 or cool-down dehumidification.
During work, the standard-sized sheet of first throttle mechanism 5, second throttle body 6 is closed, the normal work of the 3rd throttle mechanism 7.
Its workflow is:Refrigerant from the port of export of the second compression mechanism 2 discharge after, successively by the 60th pipeline 60,
The high voltage nodes 71 of first four-way valve 70, the first four-way valve 70 commutation node 74, the 64th pipeline 64, First Heat Exchanger 3, first
Throttle mechanism 5, the 58th pipeline 58, the 3rd throttle mechanism 7, the 3rd heat exchanger 8, the 67th pipeline 67, the second four-way valve
80 commutation nodes 84, the low pressure node 83 of the second four-way valve 80, the 65th pipeline 65, the 68th pipeline 68, return to the second pressure
The arrival end of contracting mechanism 2, compressed into the second compression mechanism 2, complete one cycle.
Scheme three:First compression mechanism 1 does not work, the normal work of the second compression mechanism 2;In air conditioner unit 10,
Second heat exchanger 4, the 3rd heat exchanger 8 all work.
Under this scheme, condensation heat caused by refrigeration all by First Heat Exchanger 3 be discharged into environment (outdoor air or
Cooling water or soil etc.), the second heat exchanger 4, air is cooled down the 3rd heat exchanger 8 or cool-down dehumidification.
During work, the standard-sized sheet of first throttle mechanism 5, second throttle body 6, the normal work of the 3rd throttle mechanism 7.
Its workflow is:Refrigerant from the port of export of the second compression mechanism 2 discharge after, successively by the 60th pipeline 60,
The high voltage nodes 71 of first four-way valve 70, the first four-way valve 70 commutation node 74, the 64th pipeline 64, First Heat Exchanger 3, first
Throttle mechanism 5, it is divided into two-way into the 58th pipeline 58;The first via throttles by the 52nd pipeline 52, second successively
Mechanism 6, the second heat exchanger 4, the 51st pipeline 51, into the 65th pipeline 65;Second tunnel is successively by the 58th pipe
Road 58, the 3rd throttle mechanism 7, the 3rd heat exchanger 8, the 67th pipeline 67, the second four-way valve 80 commutation node 84, the second four-way
The low pressure node 83 of valve 80, also into the 65th pipeline 65;Two-way is after the mixing of the 65th pipeline 65, by the 68th pipe
Road 68, the arrival end of the second compression mechanism 2 is returned to, compressed into the second compression mechanism 2, complete one cycle.
Scheme four:First compression mechanism 1, the second compression mechanism 2 all normal works;In air conditioner unit 10, second
Heat exchanger 4 works, and the 3rd heat exchanger 8 does not work.
Under this scheme, condensation heat caused by refrigeration all by First Heat Exchanger 3 be discharged into environment (outdoor air or
Cooling water or soil etc.), air is cooled down the second heat exchanger 4 or cool-down dehumidification.
During work, the standard-sized sheet of first throttle mechanism 5, the normal work of second throttle body 6, the 3rd throttle mechanism 7 closes.
Its workflow is:Refrigerant into the 65th pipeline 65 is divided into two-way;The first via passes through the 68th
After pipeline 68, compressed into the second compression mechanism 2, after the discharge of the port of export of the second compression mechanism 2, successively by the 60th pipe
Road 60, the high voltage nodes 71 of the first four-way valve 70, the first four-way valve 70 commutation node 74, into the 64th pipeline 64;Second tunnel
After the 63rd pipeline 63, compressed into the first compression mechanism 1, after the discharge of the port of export of the first compression mechanism 1, successively
By the 62nd pipeline 62, the high voltage nodes 81 of the second four-way valve 80, the second four-way valve 80 commutation node 82, the 66th pipeline
66th, the first check valve 21, the 69th pipeline 69, also into the 64th pipeline 64;Two-way mixes in the 64th pipeline 64
Afterwards, then successively by First Heat Exchanger 3, first throttle mechanism 5, the 58th pipeline 58, the throttling of the 52nd pipeline 52, second
Mechanism 6, the second heat exchanger 4, the 51st pipeline 51, are divided into two-way into the 65th pipeline 65;Enter two once more
Compression mechanism is compressed, and completes one cycle.
Scheme five:First compression mechanism 1, the second compression mechanism 2 all normal works;In air conditioner unit 10, second
Heat exchanger 4 does not work, the normal work of the 3rd heat exchanger 8.
Under this scheme, condensation heat caused by refrigeration all by First Heat Exchanger 3 be discharged into environment (outdoor air or
Cooling water or soil etc.), air is cooled down the 3rd heat exchanger 8 or cool-down dehumidification.
During work, the standard-sized sheet of first throttle mechanism 5, second throttle body 6 is closed, the normal work of the 3rd throttle mechanism 7.
Its workflow is:Refrigerant into the 65th pipeline 65 is divided into two-way;The first via passes through the 68th
After pipeline 68, compressed into the second compression mechanism 2, after the discharge of the port of export of the second compression mechanism 2, successively by the 60th pipe
Road 60, the high voltage nodes 71 of the first four-way valve 70, the first four-way valve 70 commutation node 74, into the 64th pipeline 64;Second tunnel
After the 63rd pipeline 63, compressed into the first compression mechanism 1, after the discharge of the port of export of the first compression mechanism 1, successively
By the 62nd pipeline 62, the high voltage nodes 81 of the second four-way valve 80, the second four-way valve 80 commutation node 82, the 66th pipeline
66th, the first check valve 21, the 69th pipeline 69, also into the 64th pipeline 64;Two-way mixes in the 64th pipeline 64
Afterwards, then successively by First Heat Exchanger 3, first throttle mechanism 5, the 58th pipeline 58, the heat exchange of the 3rd throttle mechanism the 7, the 3rd
Device 8, the 67th pipeline 67, the second four-way valve 80 commutation node 84, the low pressure node 83 of the second four-way valve 80, into the 65th
Pipeline 65 is divided into two-way, is compressed once more into two compressor structures, completes one cycle.
Scheme six:First compression mechanism 1, the second compression mechanism 2 all normal works;In air conditioner unit 10, second
Heat exchanger 4, the 3rd heat exchanger 8 also all work.
Under this scheme, condensation heat caused by refrigeration all by First Heat Exchanger 3 be discharged into environment (outdoor air or
Cooling water or soil etc.), the second heat exchanger 4, air is cooled down the 3rd heat exchanger 8 or cool-down dehumidification.
During work, the standard-sized sheet of first throttle mechanism 5, second throttle body 6, the normal work of the 3rd throttle mechanism 7.
Its workflow is:Refrigerant into the 65th pipeline 65 is divided into two-way;The first via passes through the 68th
After pipeline 68, compressed into the second compression mechanism 2, after the discharge of the port of export of the second compression mechanism 2, successively by the 60th pipe
Road 60, the high voltage nodes 71 of the first four-way valve 70, the first four-way valve 70 commutation node 74, into the 64th pipeline 64;Second tunnel
After the 63rd pipeline 63, compressed into the first compression mechanism 1, after the discharge of the port of export of the first compression mechanism 1, successively
By the 62nd pipeline 62, the high voltage nodes 81 of the second four-way valve 80, the second four-way valve 80 commutation node 82, the 66th pipeline
66th, the first check valve 21, the 69th pipeline 69, also into the 64th pipeline 64;Two-way mixes in the 64th pipeline 64
Afterwards, then successively by First Heat Exchanger 3, first throttle mechanism 5, it is divided into two-way again into the 58th pipeline 58;The first via
Successively by the 52nd pipeline 52, second throttle body 6, the second heat exchanger 4, the 51st pipeline 51, into the 65th
Pipeline 65;Second tunnel successively by the 58th pipeline 58, the 3rd throttle mechanism 7, the 3rd heat exchanger 8, the 67th pipeline 67,
Second four-way valve 80 commutation node 84, the low pressure node 83 of the second four-way valve 80, also into the 65th pipeline 65;Two-way is the 6th
After 15 pipelines 65 are mixed, it is divided into two-way once more, respectively enters two compressor structures and compressed, completes one cycle.
(2) refrigerated dehumidification and air reheat function
Under this function, the second heat exchanger 4 carries out cool-down dehumidification to air, and condensation heat caused by dehumidifying is a part of to be utilized
First Heat Exchanger 3 is discharged into environment, and another part is used for the reheating of air in the 3rd heat exchanger 8.
During work, first throttle mechanism 5, the standard-sized sheet of the 3rd throttle mechanism 7, the normal work of second throttle body 6;First compression
Mechanism 1, the second compression mechanism 2 all normal works.
During work, the high voltage nodes 71 of the first four-way valve 70 communicate with the first four-way valve 70 commutation node 74, the first four-way valve
70 commutation nodes 72 communicate with the low pressure node 73 of the first four-way valve 70.The high voltage nodes 81 of second four-way valve 80 and the second four-way valve 80
Commutation node 84 communicates, and the second four-way valve 80 commutation node 82 communicates with the low pressure node 83 of the second four-way valve 80.
Its workflow is:Refrigerant into the 65th pipeline 65 is divided into two-way;The first via passes through the 68th
After pipeline 68, compressed into the second compression mechanism 2, after the discharge of the port of export of the second compression mechanism 2, successively by the 60th pipe
Road 60, the high voltage nodes 71 of the first four-way valve 70, the first four-way valve 70 commutation node 74, the 64th pipeline 64, First Heat Exchanger
3rd, first throttle mechanism 5, into the 58th pipeline 58;Second tunnel is after the 63rd pipeline 63, into the first compressor
Structure 1 is compressed, after the discharge of the port of export of the first compression mechanism 1, successively by the 62nd pipeline 62, the high pressure of the second four-way valve 80
Node 81, the second four-way valve 80 commutation node 84, the 67th pipeline 67, the 3rd heat exchanger 8, the 3rd throttle mechanism 7, also enter
58th pipeline 58;Two-way is after the mixing of the 58th pipeline 58, then passes through the 52nd pipeline 52, second throttling machine successively
Structure 6, the second heat exchanger 4, the 51st pipeline 51, are divided into two-way into the 65th pipeline 65;Two are respectively enterd once more
Compressor structure is compressed, and completes one cycle.
In the course of work, the control strategy of the intake air dry-bulb temperature of air conditioner unit 10 is:Controller 30 is according to setting
The entrance of the second heat exchanger 4 that the fixed intake air dry-bulb temperature of air conditioner unit 10 and the first temperature-detecting device 31 is detected
The actual dry-bulb temperature of air, the refrigerant output flow of the first compression mechanism 1 is controlled, realized empty to the entrance of air conditioner unit 10
The control of gas dry-bulb temperature.
When the first compression mechanism 1 is frequency-changeable compressor, in the course of work, the intake air dry bulb temperature of air conditioner unit 10
The control strategy of degree is:Controller 30 is according to the intake air dry-bulb temperature of air conditioner unit 10 of setting and the first temperature detection
The actual dry-bulb temperature of the intake air of the second heat exchanger 4 that device 31 is detected, the working frequency of the first compression mechanism 1 is controlled, it is real
Now to the control of the intake air dry-bulb temperature of air conditioner unit 10.Specifically control process is:When the first temperature-detecting device
Air conditioner unit 10 intake air dry bulb of the 31 actual dry-bulb temperatures of the intake air of the second heat exchanger 4 detected less than setting
During temperature, increase the working frequency of the first compression mechanism 1;When the second heat exchanger 4 that the first temperature-detecting device 31 is detected enters
When the actual dry-bulb temperature of mouth air is higher than the 10 intake air dry-bulb temperature of air conditioner unit set, reduce the first compression mechanism
1 working frequency.
In the course of work, the control strategy of the intake air wet-bulb temperature of air conditioner unit 10 is:Controller 30 is according to setting
The entrance of the second heat exchanger 4 that the fixed intake air wet-bulb temperature of air conditioner unit 10 and second temperature detection means 32 are detected
The actual wet-bulb temperature of air, the refrigerant output flow of the second compression mechanism 2 is controlled, realized empty to the entrance of air conditioner unit 10
The control of gas wet-bulb temperature.
When the second compression mechanism 2 is frequency-changeable compressor, in the course of work, the intake air wet bulb temperature of air conditioner unit 10
The control strategy of degree is:Controller 30 detects according to the intake air wet-bulb temperature of air conditioner unit 10 and second temperature of setting
The actual wet-bulb temperature of the intake air of the second heat exchanger 4 that device 32 is detected, the working frequency of the second compression mechanism 2 is controlled, it is real
Now to the control of the intake air wet-bulb temperature of air conditioner unit 10.Specifically control process is:When second temperature detection means
Air conditioner unit 10 intake air wet bulb of the 32 actual wet-bulb temperature of the intake air of the second heat exchanger 4 detected less than setting
During temperature, reduce the working frequency of the second compression mechanism 2;When the second heat exchanger 4 that second temperature detection means 32 is detected enters
When the actual wet-bulb temperature of mouth air is higher than the 10 intake air wet-bulb temperature of air conditioner unit set, increase the second compression mechanism
2 working frequency.
(3) winter air heating function
Under this function, the draw heat from environment of First Heat Exchanger 3, the heat drawn, used in the 3rd heat exchanger 8
In the heating of air, the second heat exchanger 4 does not work.
During work, the high voltage nodes 71 of the first four-way valve 70 communicate with the first four-way valve 70 commutation node 72, the first four-way valve
70 commutation nodes 74 communicate with the low pressure node 73 of the first four-way valve 70.The high voltage nodes 81 of second four-way valve 80 and the second four-way valve 80
Commutation node 84 communicates, and the second four-way valve 80 commutation node 82 communicates with the low pressure node 83 of the second four-way valve 80.
Scheme one:The normal work of first compression mechanism 1, the second compression mechanism 2 do not work.
During work, the normal work of first throttle mechanism 5, second throttle body 6 is closed, the standard-sized sheet of the 3rd throttle mechanism 7.
Its workflow is:Refrigerant is after the discharge of the port of export of the first compression mechanism 1, successively by the 62nd pipeline
62nd, the high voltage nodes 81 of the second four-way valve 80, the second four-way valve 80 commutation node 84, the 67th pipeline 67, the 3rd heat exchanger 8,
3rd throttle mechanism 7, the 58th pipeline 58, first throttle mechanism 5, First Heat Exchanger 3, the 64th pipeline the 64, the 1st
Port valve 70 commutates node 74, the low pressure node 73 of the first four-way valve 70, the 65th pipeline 65, the 63rd pipeline 63, returns to the
The arrival end of one compression mechanism 1, compressed into the first compression mechanism 1, complete one cycle.
Scheme two:First compression mechanism 1, the second compression mechanism 2 all normal works.
During work, the normal work of first throttle mechanism 5, second throttle body 6 is closed, the standard-sized sheet of the 3rd throttle mechanism 7.
Its workflow is:Refrigerant into the 65th pipeline 65 is divided into two-way;The first via passes through the 68th
After pipeline 68, compressed into the second compression mechanism 2, after the discharge of the port of export of the second compression mechanism 2, successively by the 60th pipe
Road 60, the high voltage nodes 71 of the first four-way valve 70, the first four-way valve 70 commutation node 72, the 61st pipeline 61, the second check valve
22 arrival ends, the port of export of the second check valve 22, the 59th pipeline 59, into the 67th pipeline 67;Second tunnel passes through the 6th
After 13 pipelines 63, compressed into the first compression mechanism 1, after the discharge of the port of export of the first compression mechanism 1, successively by the 6th
12 pipelines 62, the high voltage nodes 81 of the second four-way valve 80, the second four-way valve 80 commutation node 84, also into the 67th pipeline
67;Two-way is managed after the mixing of the 67th pipeline 67, then successively by the 3rd heat exchanger 8, the 3rd throttle mechanism the 7, the 58th
Road 58, first throttle mechanism 5, First Heat Exchanger 3, the 64th pipeline 64, the first four-way valve 70 commutation node 74, the first four-way
The low pressure node 73 of valve 70, is divided into two-way into the 65th pipeline 65;Two compressor structures are respectively enterd once more to be compressed,
Complete one cycle.
(4) winter dehumidifying and heating function
In this function, the draw heat from environment of First Heat Exchanger 3, the second heat exchanger 4 carries out cool-down dehumidification to air,
Condensation heat caused by dehumidifying and the heat drawn from environment, the heating of air to be all used in the 3rd heat exchanger 8.
During work, the high voltage nodes 71 of the first four-way valve 70 communicate with the first four-way valve 70 commutation node 72, the first four-way valve
70 commutation nodes 74 communicate with the low pressure node 73 of the first four-way valve 70.The high voltage nodes 81 of second four-way valve 80 and the second four-way valve 80
Commutation node 84 communicates, and the second four-way valve 80 commutation node 82 communicates with the low pressure node 83 of the second four-way valve 80.
Scheme one:The normal work of first compression mechanism 1, the second compression mechanism 2 do not work.
During work, first throttle mechanism 5, the normal work of second throttle body 6, the standard-sized sheet of the 3rd throttle mechanism 7.
Its workflow is:Refrigerant is after the discharge of the port of export of the first compression mechanism 1, successively by the 62nd pipeline
62nd, the high voltage nodes 81 of the second four-way valve 80, the second four-way valve 80 commutation node 84, the 67th pipeline 67, the 3rd heat exchanger 8,
3rd throttle mechanism 7, it is divided into two-way into the 58th pipeline 58;The first via is changed by first throttle mechanism 5, first successively
Hot device 3, the 64th pipeline 64, the first four-way valve 70 commutation node 74, the low pressure node 73 of the first four-way valve 70, into the 60th
Five pipelines 65;Second tunnel is successively by the 52nd pipeline 52, second throttle body 6, the second heat exchanger 4, the 51st pipeline
51, also into the 65th pipeline 65;Two-way enters after the mixing of the 65th pipeline 65, then by the 63rd pipeline 63
First compression mechanism 1 is compressed, and completes one cycle.
Scheme two:First compression mechanism 1, the second compression mechanism 2 all normal works.
During work, first throttle mechanism 5, the normal work of second throttle body 6, the standard-sized sheet of the 3rd throttle mechanism 7.
Its workflow is:Refrigerant into the 65th pipeline 65 is divided into two-way;The first via passes through the 68th
After pipeline 68, compressed into the second compression mechanism 2, after the discharge of the port of export of the second compression mechanism 2, successively by the 60th pipe
Road 60, the high voltage nodes 71 of the first four-way valve 70, the first four-way valve 70 commutation node 72, the 61st pipeline 61, the second check valve
22 arrival ends, the port of export of the second check valve 22, the 59th pipeline 59, into the 67th pipeline 67;Second tunnel passes through the 6th
After 13 pipelines 63, compressed into the first compression mechanism 1, after the discharge of the port of export of the first compression mechanism 1, successively by the 6th
12 pipelines 62, the high voltage nodes 81 of the second four-way valve 80, the second four-way valve 80 commutation node 84, also into the 67th pipeline
67;Two-way is after the mixing of the 67th pipeline 67, then passes through the 3rd heat exchanger 8, the 3rd throttle mechanism 7 successively, into the 50th
Eight pipelines 58 are divided into two-way again;The first via successively by first throttle mechanism 5, First Heat Exchanger 3, the 64th pipeline 64,
First four-way valve 70 commutation node 74, the low pressure node 73 of the first four-way valve 70, into the 65th pipeline 65;Second tunnel passes through successively
The 52nd pipeline 52, second throttle body 6, the second heat exchanger 4, the 51st pipeline 51 are crossed, also into the 65th pipeline
65;Two-way is divided into two-way, respectively enters two compressor structures again and compressed again after the mixing of the 65th pipeline 65, complete
Into one cycle.
(5) winter frost removing function
Under this function, the first compression mechanism 1 does not work, the normal work of the second compression mechanism 2;In air conditioner unit 10
In, the second heat exchanger 4 works, and the 3rd heat exchanger 8 does not work;Second heat exchanger 4 is inhaled from the air in air conditioner unit 10
Heat, the heat absorbed are used for the defrosting of First Heat Exchanger 3.
During work, the standard-sized sheet of first throttle mechanism 5, the normal work of second throttle body 6, the 3rd throttle mechanism 7 closes.Its work
It is identical with the scheme one of the present embodiment separate refrigeration function to make flow.
In scheme shown in Fig. 1, the connection scheme of the second heat exchanger 4 in systems is:The one end of second heat exchanger 4 leads to successively
The 58th pipe crossed between second throttle body 6, the 52nd pipeline 52 and the throttle mechanism 7 of first throttle mechanism 5 and the 3rd
Road 58 is connected, and the other end of the second heat exchanger 4 passes through the 51st pipeline 51 and the low pressure node 73 and the 2nd 4 of the first four-way valve 70
The 65th pipeline 65 between the low pressure node 83 of port valve 80 is connected.
In addition to such scheme, the second heat exchanger 4 also has two following connection schemes in systems:
1) one end of the second heat exchanger 4 passes sequentially through second throttle body 6, the 52nd pipeline 52 and first throttle mechanism 5
And the 3rd the 58th pipeline 58 between throttle mechanism 7 is connected, the other end of the second heat exchanger 4 by the 51st pipeline 51 with
63rd pipeline 63 is connected.
2) one end of the second heat exchanger 4 passes sequentially through second throttle body 6, the 52nd pipeline 52 and first throttle mechanism 5
And the 3rd the 58th pipeline 58 between throttle mechanism 7 is connected, the other end of the second heat exchanger 4 by the 51st pipeline 51 with
68th pipeline 68 is connected.
Embodiment 2
As shown in Fig. 2 the present embodiment is also that a kind of the temperature of air, humidity while the air conditioner refrigerating that is controlled can be set
It is standby, there is the occasion of refrigeration, heating and dehumidification for whole year.The difference of scheme shown in Fig. 2 and scheme shown in Fig. 1 is:No
Second check valve 22, while the connection scheme of the second heat exchanger 4 in systems is different.
Whole equipment shown in Fig. 2 includes consisting of part:First compression mechanism 1, the second compression mechanism the 2, the 1st
Port valve 70, the second four-way valve 80, first throttle mechanism 5, second throttle body 6, the 3rd throttle mechanism 7, First Heat Exchanger 3,
Two heat exchangers 4, the 3rd heat exchanger 8, the first check valve 21.First throttle mechanism 5, second throttle body 6, the 3rd throttle mechanism 7
All it is electric expansion valve.
Second heat exchanger 4, the 3rd heat exchanger 8 are arranged in same air conditioner unit 10, and along the flow direction of air,
3rd heat exchanger 8 is in the downwind side of the second heat exchanger 4;There are two temperature-detecting devices, its set-up mode is:Along the stream of air
Dynamic direction, the first temperature-detecting device 31 are arranged at the inlet side of the second heat exchanger 4, empty for detecting the entrance of the second heat exchanger 4
Gas dry-bulb temperature, second temperature detection means 32 are also disposed on the inlet side of the second heat exchanger 4, for detecting the second heat exchanger 4
Intake air wet-bulb temperature.Air handled by air conditioner unit 10 is indoor circulation air.
The operation of air conditioning systems is in annual running, it is possible to achieve multiple functions.During work, First Heat Exchanger 3 is
Heat source side heat exchanger, summer and spring and autumn distribute caused condensation heat in refrigeration or dehumidification process as condenser, to environment,
Winter as evaporator, absorbs heat, for heating air from environment.
Second heat exchanger 4 is cooler or heater in air conditioner unit 10, during as cooler, summer or transition
Season can realize the cooling or dehumidifying of air;During as heater, winter can realize the heating of air.
3rd heat exchanger 8 is heater or cooler in air conditioner unit 10, during as heater, it is possible to achieve empty
The heating of gas or reheating, wind pushing temperature is controlled, during as cooler, it is possible to achieve the cooling or dehumidifying of air.Under each function
Workflow difference is as described below.
(1) separate refrigeration function
During work, the high voltage nodes 71 of the first four-way valve 70 communicate with the first four-way valve 70 commutation node 74, the first four-way valve
70 commutation nodes 72 communicate with the low pressure node 73 of the first four-way valve 70.The high voltage nodes 81 of second four-way valve 80 and the second four-way valve 80
Commutation node 82 communicates, and the second four-way valve 80 commutation node 84 communicates with the low pressure node 83 of the second four-way valve 80.
Scheme one:First compression mechanism 1 does not work, the normal work of the second compression mechanism 2;In air conditioner unit 10,
Second heat exchanger 4 works, and the 3rd heat exchanger 8 does not work.
Under this scheme, condensation heat caused by refrigeration all by First Heat Exchanger 3 be discharged into environment (outdoor air or
Cooling water or soil etc.), air is cooled down the second heat exchanger 4 or cool-down dehumidification.
During work, the standard-sized sheet of first throttle mechanism 5, the normal work of second throttle body 6, the 3rd throttle mechanism 7 closes.
Its workflow is:Refrigerant from the port of export of the second compression mechanism 2 discharge after, successively by the 60th pipeline 60,
The high voltage nodes 71 of first four-way valve 70, the first four-way valve 70 commutation node 74, the 64th pipeline 64, First Heat Exchanger 3, first
Throttle mechanism 5, the 58th pipeline 58, the 52nd pipeline 52, second throttle body 6, the second heat exchanger the 4, the 61st pipe
Road 61, the first four-way valve 70 commutation node 72, the low pressure node 73 of the first four-way valve 70, the 65th pipeline the 65, the 68th pipe
Road 68, the arrival end of the second compression mechanism 2 is returned to, compressed into the second compression mechanism 2, complete one cycle.
Scheme two:First compression mechanism 1 does not work, the normal work of the second compression mechanism 2;In air conditioner unit 10,
Second heat exchanger 4 does not work, and the 3rd heat exchanger 8 works.
Under this scheme, condensation heat caused by refrigeration all by First Heat Exchanger 3 be discharged into environment (outdoor air or
Cooling water or soil etc.), air is cooled down the 3rd heat exchanger 8 or cool-down dehumidification.
During work, the standard-sized sheet of first throttle mechanism 5, second throttle body 6 is closed, the normal work of the 3rd throttle mechanism 7.
Its workflow is:Refrigerant from the port of export of the second compression mechanism 2 discharge after, successively by the 60th pipeline 60,
The high voltage nodes 71 of first four-way valve 70, the first four-way valve 70 commutation node 74, the 64th pipeline 64, First Heat Exchanger 3, first
Throttle mechanism 5, the 58th pipeline 58, the 3rd throttle mechanism 7, the 3rd heat exchanger 8, the 67th pipeline 67, the second four-way valve
80 commutation nodes 84, the low pressure node 83 of the second four-way valve 80, the 65th pipeline 65, the 68th pipeline 68, return to the second pressure
The arrival end of contracting mechanism 2, compressed into the second compression mechanism 2, complete one cycle.
Scheme three:First compression mechanism 1 does not work, the normal work of the second compression mechanism 2;In air conditioner unit 10,
Second heat exchanger 4, the 3rd heat exchanger 8 all work.
Under this scheme, condensation heat caused by refrigeration all by First Heat Exchanger 3 be discharged into environment (outdoor air or
Cooling water or soil etc.), the second heat exchanger 4, air is cooled down the 3rd heat exchanger 8 or cool-down dehumidification.
During work, the standard-sized sheet of first throttle mechanism 5, second throttle body 6, the normal work of the 3rd throttle mechanism 7.
Its workflow is:Refrigerant from the port of export of the second compression mechanism 2 discharge after, successively by the 60th pipeline 60,
The high voltage nodes 71 of first four-way valve 70, the first four-way valve 70 commutation node 74, the 64th pipeline 64, First Heat Exchanger 3, first
Throttle mechanism 5, it is divided into two-way into the 58th pipeline 58;The first via throttles by the 52nd pipeline 52, second successively
Mechanism 6, the second heat exchanger 4, the 61st pipeline 61, the first four-way valve 70 commutation node 72, the low pressure node of the first four-way valve 70
73, into the 65th pipeline 65;Second tunnel successively by the 58th pipeline 58, the 3rd throttle mechanism 7, the 3rd heat exchanger 8,
67th pipeline 67, the second four-way valve 80 commutation node 84, the low pressure node 83 of the second four-way valve 80, also into the 65th pipe
Road 65;Two-way, by the 68th pipeline 68, returns to the arrival end of the second compression mechanism 2, entered after the mixing of the 65th pipeline 65
Enter the second compression mechanism 2 to be compressed, complete one cycle.
Scheme four:First compression mechanism 1, the second compression mechanism 2 all normal works;In air conditioner unit 10, second
Heat exchanger 4 works, and the 3rd heat exchanger 8 does not work.
Under this scheme, condensation heat caused by refrigeration all by First Heat Exchanger 3 be discharged into environment (outdoor air or
Cooling water or soil etc.), air is cooled down the second heat exchanger 4 or cool-down dehumidification.
During work, the standard-sized sheet of first throttle mechanism 5, the normal work of second throttle body 6, the 3rd throttle mechanism 7 closes.
Its workflow is:Refrigerant into the 65th pipeline 65 is divided into two-way;The first via passes through the 68th
After pipeline 68, compressed into the second compression mechanism 2, after the discharge of the port of export of the second compression mechanism 2, successively by the 60th pipe
Road 60, the high voltage nodes 71 of the first four-way valve 70, the first four-way valve 70 commutation node 74, into the 64th pipeline 64;Second tunnel
After the 63rd pipeline 63, compressed into the first compression mechanism 1, after the discharge of the port of export of the first compression mechanism 1, successively
By the 62nd pipeline 62, the high voltage nodes 81 of the second four-way valve 80, the second four-way valve 80 commutation node 82, the 66th pipeline
66th, the first check valve 21, the 69th pipeline 69, also into the 64th pipeline 64;Two-way mixes in the 64th pipeline 64
Afterwards, then successively by First Heat Exchanger 3, first throttle mechanism 5, the 58th pipeline 58, the throttling of the 52nd pipeline 52, second
Mechanism 6, the second heat exchanger 4, the 61st pipeline 61, the first four-way valve 70 commutation node 72, the low pressure node of the first four-way valve 70
73, it is divided into two-way into the 65th pipeline 65;Respectively enter two compressor structures once more to be compressed, completion once follows
Ring.
Scheme five:First compression mechanism 1, the second compression mechanism 2 all normal works;In air conditioner unit 10, second
Heat exchanger 4 does not work, the normal work of the 3rd heat exchanger 8.
Under this scheme, condensation heat caused by refrigeration all by First Heat Exchanger 3 be discharged into environment (outdoor air or
Cooling water or soil etc.), air is cooled down the 3rd heat exchanger 8 or cool-down dehumidification.
During work, the standard-sized sheet of first throttle mechanism 5, second throttle body 6 is closed, the normal work of the 3rd throttle mechanism 7.
Its workflow is:Refrigerant into the 65th pipeline 65 is divided into two-way;The first via passes through the 68th
After pipeline 68, compressed into the second compression mechanism 2, after the discharge of the port of export of the second compression mechanism 2, successively by the 60th pipe
Road 60, the high voltage nodes 71 of the first four-way valve 70, the first four-way valve 70 commutation node 74, into the 64th pipeline 64;Second tunnel
After the 63rd pipeline 63, compressed into the first compression mechanism 1, after the discharge of the port of export of the first compression mechanism 1, successively
By the 62nd pipeline 62, the high voltage nodes 81 of the second four-way valve 80, the second four-way valve 80 commutation node 82, the 66th pipeline
66th, the first check valve 21, the 69th pipeline 69, also into the 64th pipeline 64;Two-way mixes in the 64th pipeline 64
Afterwards, then successively by First Heat Exchanger 3, first throttle mechanism 5, the 58th pipeline 58, the heat exchange of the 3rd throttle mechanism the 7, the 3rd
Device 8, the 67th pipeline 67, the second four-way valve 80 commutation node 84, the low pressure node 83 of the second four-way valve 80, into the 65th
Pipeline 65 is divided into two-way, respectively enters two compressor structures once more and is compressed, and completes one cycle.
Scheme six:First compression mechanism 1, the second compression mechanism 2 all normal works;In air conditioner unit 10, second
Heat exchanger 4, the 3rd heat exchanger 8 also all work.
Under this scheme, condensation heat caused by refrigeration all by First Heat Exchanger 3 be discharged into environment (outdoor air or
Cooling water or soil etc.), the second heat exchanger 4, air is cooled down the 3rd heat exchanger 8 or cool-down dehumidification.,
During work, the standard-sized sheet of first throttle mechanism 5, second throttle body 6, the normal work of the 3rd throttle mechanism 7.
Its workflow is:Refrigerant into the 65th pipeline 65 is divided into two-way;The first via passes through the 68th
After pipeline 68, compressed into the second compression mechanism 2, after the discharge of the port of export of the second compression mechanism 2, successively by the 60th pipe
Road 60, the high voltage nodes 71 of the first four-way valve 70, the first four-way valve 70 commutation node 74, into the 64th pipeline 64;Second tunnel
After the 63rd pipeline 63, compressed into the first compression mechanism 1, after the discharge of the port of export of the first compression mechanism 1, successively
By the 62nd pipeline 62, the high voltage nodes 81 of the second four-way valve 80, the second four-way valve 80 commutation node 82, the 66th pipeline
66th, the first check valve 21, the 69th pipeline 69, also into the 64th pipeline 64;Two-way mixes in the 64th pipeline 64
Afterwards, then successively by First Heat Exchanger 3, first throttle mechanism 5, it is divided into two-way again into the 58th pipeline 58;The first via
Successively by the 52nd pipeline 52, second throttle body 6, the second heat exchanger 4, the 61st pipeline 61, the first four-way valve 70
Commutate node 72, the low pressure node 73 of the first four-way valve 70, into the 65th pipeline 65;Second tunnel is successively by the 58th pipe
Road 58, the 3rd throttle mechanism 7, the 3rd heat exchanger 8, the 67th pipeline 67, the second four-way valve 80 commutation node 84, the second four-way
The low pressure node 83 of valve 80, also into the 65th pipeline 65;Two-way is distinguished once more after the 65th pipeline 65 is mixed
Compressed into two compressor structures, complete one cycle.
(2) refrigerated dehumidification and air reheat function
Under this function, the second heat exchanger 4 carries out cool-down dehumidification to air, and condensation heat caused by dehumidifying is a part of to be utilized
First Heat Exchanger 3 is discharged into environment, and another part is used for the reheating of air in the 3rd heat exchanger 8.
During work, first throttle mechanism 5, the standard-sized sheet of the 3rd throttle mechanism 7, the normal work of second throttle body 6.First compression
Mechanism 1, the second compression mechanism 2 all normal works.
During work, the high voltage nodes 71 of the first four-way valve 70 communicate with the first four-way valve 70 commutation node 74, the first four-way valve
70 commutation nodes 72 communicate with the low pressure node 73 of the first four-way valve 70.The high voltage nodes 81 of second four-way valve 80 and the second four-way valve 80
Commutation node 84 communicates, and the second four-way valve 80 commutation node 82 communicates with the low pressure node 83 of the second four-way valve 80.
Its workflow is:Refrigerant into the 65th pipeline 65 is divided into two-way;The first via passes through the 68th
After pipeline 68, compressed into the second compression mechanism 2, after the discharge of the port of export of the second compression mechanism 2, successively by the 60th pipe
Road 60, the high voltage nodes 71 of the first four-way valve 70, the first four-way valve 70 commutation node 74, the 64th pipeline 64, First Heat Exchanger
3rd, first throttle mechanism 5, into the 58th pipeline 58;Second tunnel is after the 63rd pipeline 63, into the first compressor
Structure 1 is compressed, after the discharge of the port of export of the first compression mechanism 1, successively by the 62nd pipeline 62, the high pressure of the second four-way valve 80
Node 81, the second four-way valve 80 commutation node 84, the 67th pipeline 67, the 3rd heat exchanger 8, the 3rd throttle mechanism 7, also enter
58th pipeline 58;Two-way is after the mixing of the 58th pipeline 58, then passes through the 52nd pipeline 52, second throttling machine successively
Structure 6, the second heat exchanger 4, the 61st pipeline 61, the first four-way valve 70 commutation node 72, the low pressure node 73 of the first four-way valve 70,
It is divided into two-way into the 65th pipeline 65;Two compressor structures are respectively enterd once more to be compressed, and complete one cycle.
In the course of work, under this function, the regulation control of air conditioner unit 10 intake air dry-bulb temperature, wet-bulb temperature
Method of the system strategy with embodiment 1 under this function is identical.
(3) winter air heating function
Scheme one:First compression mechanism 1 does not work, the normal work of the second compression mechanism 2;First Heat Exchanger 3, second exchanges heat
Device 4 works, and the 3rd heat exchanger 8 does not work.
Under this scheme, First Heat Exchanger 3 is used for the draw heat from environment, and the second heat exchanger 4 is used to heat for air.
During work, the normal work of first throttle mechanism 5, the standard-sized sheet of second throttle body 6, the 3rd throttle mechanism 7 closes.
During work, the high voltage nodes 71 of the first four-way valve 70 communicate with the first four-way valve 70 commutation node 72, the first four-way valve
70 commutation nodes 74 communicate with the low pressure node 73 of the first four-way valve 70.The high voltage nodes 81 of second four-way valve 80 and the second four-way valve 80
Commutation node 82 communicates, and the second four-way valve 80 commutation node 84 communicates with the low pressure node 83 of the second four-way valve 80.
Its workflow is:Refrigerant from the port of export of the second compression mechanism 2 discharge after, successively by the 60th pipeline 60,
The high voltage nodes 71 of first four-way valve 70, the first four-way valve 70 commutation node 72, the 61st pipeline 61, the second heat exchanger 4, second
Throttle mechanism 6, the 52nd pipeline 52, the 58th pipeline 58, first throttle mechanism 5, First Heat Exchanger the 3, the 64th are managed
Road 64, the first four-way valve 70 commutation node 74, the low pressure node 73 of the first four-way valve 70, the 65th pipeline the 65, the 68th pipe
Road 68, the arrival end of the second compression mechanism 2 is returned to, is compressed into the second compression mechanism 2, complete one cycle.
Scheme two:First compression mechanism 1, the second compression mechanism 2 all normal works;First Heat Exchanger 3, the second heat exchanger 4,
3rd heat exchanger 8 also all works.
Under this scheme, the draw heat from environment of First Heat Exchanger 3, the heat drawn, in the second heat exchanger 4,
It is used for the heating of air in three heat exchangers 8.
During work, the normal work of first throttle mechanism 5, second throttle body 6, the 3rd throttle mechanism 7 all standard-sized sheets.
During work, the high voltage nodes 71 of the first four-way valve 70 communicate with the first four-way valve 70 commutation node 72, the first four-way valve
70 commutation nodes 74 communicate with the low pressure node 73 of the first four-way valve 70.The high voltage nodes 81 of second four-way valve 80 and the second four-way valve 80
Commutation node 84 communicates, and the second four-way valve 80 commutation node 82 communicates with the low pressure node 83 of the second four-way valve 80.
Its workflow is:Refrigerant into the 65th pipeline 65 is divided into two-way;The first via passes through the 68th
After pipeline 68, compressed into the second compression mechanism 2, after the discharge of the port of export of the second compression mechanism 2, successively by the 60th pipe
Road 60, the high voltage nodes 71 of the first four-way valve 70, the first four-way valve 70 commutation node 72, the 61st pipeline 61, the second heat exchanger
4th, second throttle body 6, the 52nd pipeline 52, into the 58th pipeline 58;Second tunnel after the 63rd pipeline 63,
Compressed into the first compression mechanism 1, after the discharge of the port of export of the first compression mechanism 1, successively by the 62nd pipeline 62, the
The high voltage nodes 81 of two four-way valve 80, the second four-way valve 80 commutation node 84, the 67th pipeline 67, the 3rd heat exchanger 8, Section three
Mechanism 7 is flowed, also into the 58th pipeline 58;Two-way is after the mixing of the 58th pipeline 58, then passes through first throttle machine successively
Structure 5, First Heat Exchanger 3, the 64th pipeline 64, the first four-way valve 70 commutation node 74, the low pressure node 73 of the first four-way valve 70,
It is divided into two-way into the 65th pipeline 65;Two compressors are respectively enterd once more to be compressed, and complete one action circulation.
Scheme three:First compression mechanism 1, the second compression mechanism 2 all normal works;First Heat Exchanger 3, the second heat exchanger 4,
3rd heat exchanger 8 also all works.
Under this scheme, the draw heat from environment of First Heat Exchanger 3, the second heat exchanger 4, the 3rd heat exchanger 8 are in difference
Condensation temperature under work, heat air.I.e.:Second heat exchanger 4 is first using relatively low condensation temperature to air conditioner unit 10
Intake air heated;Then, the 3rd heat exchanger 8 is continued to from the second heat exchanger 4 using higher condensation temperature again
Air heated.So as to improve the operating efficiency of the present invention, reach the purpose of energy-conservation.
During work, the normal work of first throttle mechanism 5, the standard-sized sheet of second throttle body 6, the 3rd throttle mechanism 7 is for controlling
The pressure at expulsion of first compression mechanism 1.
During work, the high voltage nodes 71 of the first four-way valve 70 communicate with the first four-way valve 70 commutation node 72, the first four-way valve
70 commutation nodes 74 communicate with the low pressure node 73 of the first four-way valve 70.The high voltage nodes 81 of second four-way valve 80 and the second four-way valve 80
Commutation node 84 communicates, and the second four-way valve 80 commutation node 82 communicates with the low pressure node 83 of the second four-way valve 80.Its workflow
It is identical with the scheme two of the present embodiment winter heating function.
In the course of work of this programme, the first compression mechanism 1, the second compression mechanism 2 can use variable conpacitance compressor,
Air themperature point of the method to the 3rd heat exchanger 8, the downwind side of the second heat exchanger 4 of refrigerant flow is exported by changing compressor
It is not controlled.Specifically, when the first compression mechanism 1, the second compression mechanism 2 are frequency-changeable compressors, the second compression mechanism 2
The air dry-bulb temperature of the downwind side of the second heat exchanger 4 is controlled by the method for changing its working frequency;First compressor
Structure 1 is controlled by changing the method for its working frequency to the air dry-bulb temperature of the downwind side of the 3rd heat exchanger 8.
In the course of work, the 3rd throttle mechanism 7 is used for the pressure at expulsion for controlling the first compression mechanism 1, its specific control
Method is as follows:In the desired downwind side air themperature of 3rd heat exchanger 8 (i.e.:The setting value of controller setting) on the basis of, add
A upper heat transfer temperature difference, as saturation temperature value corresponding to the desired pressure at expulsion of first compression mechanism 1, according to the saturation temperature
Value determines 1 desired pressure at expulsion of the first compression mechanism, and during work, controller passes through the valve for adjusting the 3rd throttle mechanism 7
Aperture, it is desired value by the actual pressure at expulsion control of the first compression mechanism 1.Specifically adjusting method is:When the first compressor
The actual pressure at expulsion of structure 1 is more than desired value, and when exceeding allowed band, then the valve opening of the 3rd throttle mechanism 7 of increase;When
The actual pressure at expulsion of first compression mechanism 1 is less than desired value, and when exceeding allowed band, then the 3rd throttle mechanism 7 of reduction
Valve opening;When the deviation between the first compression mechanism 1 actual pressure at expulsion and desired value is in allowed band, then keep
The valve opening of 3rd throttle mechanism 7 is constant.
(4) winter frost removing function
Under this function, the first compression mechanism 1 does not work, the normal work of the second compression mechanism 2;In air conditioner unit 10
In, the second heat exchanger 4 works, and the 3rd heat exchanger 8 does not work;Second heat exchanger 4 is inhaled from the air in air conditioner unit 10
Heat, the heat absorbed are used for the defrosting of First Heat Exchanger 3.
During work, the standard-sized sheet of first throttle mechanism 5, the normal work of second throttle body 6, the 3rd throttle mechanism 7 closes.Its work
It is identical with the scheme one of the present embodiment separate refrigeration function to make flow.
Embodiment 3
As shown in figure 3, the present embodiment is a kind of operation of air conditioning systems with double evaporating temperatures and condensation temperature, for complete
There are refrigeration and the occasion of heating demands in year.Whole equipment includes consisting of part:First compression mechanism 1, the second compression mechanism
2nd, the first four-way valve 70, the second four-way valve 80, first throttle mechanism 5, second throttle body 6, the 3rd throttle mechanism 7, first are changed
Hot device 3, the second heat exchanger 4, the 3rd heat exchanger 8, the first check valve 21 and flow direction control valve 40;First throttle mechanism 5, second saves
Flow mechanism 6, the 3rd throttle mechanism 7 is all electric expansion valve.Operation of air conditioning systems shown in the present embodiment Fig. 3 is on system composition
Difference with operation of air conditioning systems shown in the Fig. 2 of embodiment 2 is:On the basis of operation of air conditioning systems shown in the Fig. 2 of embodiment 2, Fig. 3
Add a flow direction control valve 40 in shown operation of air conditioning systems, the set-up mode in the system of flow direction control valve 40 is:Stream
It is arranged on to control valve 40 on the 65th pipeline 65, and the one end of flow direction control valve 40 is connected with the 63rd pipeline 63, flow direction
The other end of control valve 40 is connected with the 68th pipeline 68.
During work, the First Heat Exchanger 3 in operation of air conditioning systems shown in Fig. 3 is heat source side heat exchanger, summer and spring and autumn
During as condenser, caused condensation heat in process of refrigerastion is distributed to environment, winter as evaporator, absorbs heat from environment
Amount, the heating for user.
Second heat exchanger 4 and the 3rd heat exchanger 8 be all user side heat exchanger, summer and spring and autumn as evaporator when, use
In to user's cooling, winter as condenser, for being heated for user.
Workflow difference under each function is as described below.
(1) refrigerating function
During work, the high voltage nodes 71 of the first four-way valve 70 communicate with the first four-way valve 70 commutation node 74, the first four-way valve
70 commutation nodes 72 communicate with the low pressure node 73 of the first four-way valve 70.The high voltage nodes 81 of second four-way valve 80 and the second four-way valve 80
Commutation node 82 communicates, and the second four-way valve 80 commutation node 84 communicates with the low pressure node 83 of the second four-way valve 80.
Scheme one:First compression mechanism 1 does not work, the normal work of the second compression mechanism 2;Flow direction control valve 40 is opened;The
One heat exchanger 3, the second heat exchanger 4 work, and the 3rd heat exchanger 8 does not work.
Under this scheme, condensation heat caused by refrigeration all by First Heat Exchanger 3 be discharged into environment (outdoor air or
Cooling water or soil etc.), the second heat exchanger 4 freezes for user.
During work, the standard-sized sheet of first throttle mechanism 5, the normal work of second throttle body 6, the 3rd throttle mechanism 7 closes.
Its workflow is:Refrigerant from the port of export of the second compression mechanism 2 discharge after, successively by the 60th pipeline 60,
The high voltage nodes 71 of first four-way valve 70, the first four-way valve 70 commutation node 74, the 64th pipeline 64, First Heat Exchanger 3, first
Throttle mechanism 5, the 58th pipeline 58, the 52nd pipeline 52, second throttle body 6, the second heat exchanger the 4, the 61st pipe
Road 61, the first four-way valve 70 commutation node 72, the low pressure node 73 of the first four-way valve 70, the 65th pipeline the 65, the 68th pipe
Road 68, the arrival end of the second compression mechanism 2 is returned to, compressed into the second compression mechanism 2, complete one cycle.
Scheme two:First compression mechanism 1 does not work, the normal work of the second compression mechanism 2;Flow direction control valve 40 is opened;The
Two heat exchangers 4 do not work, and First Heat Exchanger 3, the 3rd heat exchanger 8 work.
Under this scheme, condensation heat caused by refrigeration all by First Heat Exchanger 3 be discharged into environment (outdoor air or
Cooling water or soil etc.), the 3rd heat exchanger 8 freezes for user.
During work, the standard-sized sheet of first throttle mechanism 5, second throttle body 6 is closed, the normal work of the 3rd throttle mechanism 7.
Its workflow is:Refrigerant from the port of export of the second compression mechanism 2 discharge after, successively by the 60th pipeline 60,
The high voltage nodes 71 of first four-way valve 70, the first four-way valve 70 commutation node 74, the 64th pipeline 64, First Heat Exchanger 3, first
Throttle mechanism 5, the 58th pipeline 58, the 3rd throttle mechanism 7, the 3rd heat exchanger 8, the 67th pipeline 67, the second four-way valve
80 commutation nodes 84, the low pressure node 83 of the second four-way valve 80, the 65th pipeline 65, flow direction control valve 40, the 68th pipeline
68, the arrival end of the second compression mechanism 2 is returned to, is compressed into the second compression mechanism 2, completes one cycle.
Scheme three:First compression mechanism 1 does not work, the normal work of the second compression mechanism 2;Flow direction control valve 40 is opened;The
One heat exchanger 3, the second heat exchanger 4, the 3rd heat exchanger 8 all work.
Under this scheme, condensation heat caused by refrigeration all by First Heat Exchanger 3 be discharged into environment (outdoor air or
Cooling water or soil etc.), the second heat exchanger 4, the 3rd heat exchanger 8 work under same evaporating temperature, freeze for user.
During work, the standard-sized sheet of first throttle mechanism 5, second throttle body 6, the normal work of the 3rd throttle mechanism 7.
Its workflow is:Refrigerant from the port of export of the second compression mechanism 2 discharge after, successively by the 60th pipeline 60,
The high voltage nodes 71 of first four-way valve 70, the first four-way valve 70 commutation node 74, the 64th pipeline 64, First Heat Exchanger 3, first
Throttle mechanism 5, it is divided into two-way into the 58th pipeline 58;The first via throttles by the 52nd pipeline 52, second successively
Mechanism 6, the second heat exchanger 4, the 61st pipeline 61, the first four-way valve 70 commutation node 72, the low pressure node of the first four-way valve 70
73, into the 65th pipeline 65;Second tunnel successively by the 58th pipeline 58, the 3rd throttle mechanism 7, the 3rd heat exchanger 8,
67th pipeline 67, the second four-way valve 80 commutation node 84, the low pressure node 83 of the second four-way valve 80, the 65th pipeline 65,
Flow direction control valve 40, after being mixed with first via refrigerant;Pass through the 68th pipeline 68 again, return to the entrance of the second compression mechanism 2
End, is compressed into the second compression mechanism 2, completes one cycle.
Scheme four:First compression mechanism 1, the second compression mechanism 2 all normal works;Flow direction control valve 40 is opened;First changes
Hot device 3, the second heat exchanger 4 work, and the 3rd heat exchanger 8 does not work.
Under this scheme, condensation heat caused by refrigeration all by First Heat Exchanger 3 be discharged into environment (outdoor air or
Cooling water or soil etc.), the second heat exchanger 4 freezes for user.
During work, the standard-sized sheet of first throttle mechanism 5, the normal work of second throttle body 6, the 3rd throttle mechanism 7 closes.
Its workflow is:Refrigerant into the 65th pipeline 65 is divided into two-way;The first via passes through the 68th
After pipeline 68, compressed into the second compression mechanism 2, after the discharge of the port of export of the second compression mechanism 2, successively by the 60th pipe
Road 60, the high voltage nodes 71 of the first four-way valve 70, the first four-way valve 70 commutation node 74, into the 64th pipeline 64;Second tunnel
After the 63rd pipeline 63, compressed into the first compression mechanism 1, after the discharge of the port of export of the first compression mechanism 1, successively
By the 62nd pipeline 62, the high voltage nodes 81 of the second four-way valve 80, the second four-way valve 80 commutation node 82, the 66th pipeline
66th, the first check valve 21, the 69th pipeline 69, also into the 64th pipeline 64;Two-way mixes in the 64th pipeline 64
Afterwards, then successively by First Heat Exchanger 3, first throttle mechanism 5, the 58th pipeline 58, the throttling of the 52nd pipeline 52, second
Mechanism 6, the second heat exchanger 4, the 61st pipeline 61, the first four-way valve 70 commutation node 72, the low pressure node of the first four-way valve 70
73, it is divided into two-way into the 65th pipeline 65;The first via passes through the 68th pipeline 68, is returned to the second compression mechanism 2
Arrival end;Second tunnel by flow direction control valve 40, the 63rd pipeline 63, is returned to the arrival end of the first compression mechanism 1 successively;Again
The secondary two compressor structures that respectively enter are compressed, and complete one cycle.
Scheme five:First compression mechanism 1, the second compression mechanism 2 all normal works;Flow direction control valve 40 is opened;Second changes
Hot device 4 does not work, First Heat Exchanger 3, the normal work of the 3rd heat exchanger 8.
Under this scheme, condensation heat caused by refrigeration all by First Heat Exchanger 3 be discharged into environment (outdoor air or
Cooling water or soil etc.), the 3rd heat exchanger 8 freezes for user.
During work, the standard-sized sheet of first throttle mechanism 5, second throttle body 6 is closed, the normal work of the 3rd throttle mechanism 7.
Its workflow is:Refrigerant into the 65th pipeline 65 is divided into two-way;The first via passes through the 68th
After pipeline 68, compressed into the second compression mechanism 2, after the discharge of the port of export of the second compression mechanism 2, successively by the 60th pipe
Road 60, the high voltage nodes 71 of the first four-way valve 70, the first four-way valve 70 commutation node 74, into the 64th pipeline 64;Second tunnel
After the 63rd pipeline 63, compressed into the first compression mechanism 1, after the discharge of the port of export of the first compression mechanism 1, successively
By the 62nd pipeline 62, the high voltage nodes 81 of the second four-way valve 80, the second four-way valve 80 commutation node 82, the 66th pipeline
66th, the first check valve 21, the 69th pipeline 69, also into the 64th pipeline 64;Two-way mixes in the 64th pipeline 64
Afterwards, then successively by First Heat Exchanger 3, first throttle mechanism 5, the 58th pipeline 58, the heat exchange of the 3rd throttle mechanism the 7, the 3rd
Device 8, the 67th pipeline 67, the second four-way valve 80 commutation node 84, the low pressure node 83 of the second four-way valve 80, into the 65th
Pipeline 65 is divided into two-way;The first via by flow direction control valve 40, the 68th pipeline 68, is returned to the second compression mechanism successively
2 arrival ends;The 63rd pipeline 63 is passed through on second tunnel, is returned to the arrival end of the first compression mechanism 1;It is again introduced into two compressors
Structure is compressed, and completes one cycle.
Scheme six:First compression mechanism 1, the second compression mechanism 2 all normal works;Flow direction control valve 40 is opened;First changes
Hot device 3, the second heat exchanger 4, the 3rd heat exchanger 8 all work.
Under this scheme, condensation heat caused by refrigeration all by First Heat Exchanger 3 be discharged into environment (outdoor air or
Cooling water or soil etc.), the second heat exchanger 4, the 3rd heat exchanger 8 work under same evaporating temperature, freeze for user.
During work, the standard-sized sheet of first throttle mechanism 5, second throttle body 6, the normal work of the 3rd throttle mechanism 7.
Its workflow is:Refrigerant into the 65th pipeline 65 is divided into two-way;The first via passes through the 68th
After pipeline 68, compressed into the second compression mechanism 2, after the discharge of the port of export of the second compression mechanism 2, successively by the 60th pipe
Road 60, the high voltage nodes 71 of the first four-way valve 70, the first four-way valve 70 commutation node 74, into the 64th pipeline 64;Second tunnel
After the 63rd pipeline 63, compressed into the first compression mechanism 1, after the discharge of the port of export of the first compression mechanism 1, successively
By the 62nd pipeline 62, the high voltage nodes 81 of the second four-way valve 80, the second four-way valve 80 commutation node 82, the 66th pipeline
66th, the first check valve 21, the 69th pipeline 69, also into the 64th pipeline 64;Two-way mixes in the 64th pipeline 64
Afterwards, then successively by First Heat Exchanger 3, first throttle mechanism 5, it is divided into two-way again into the 58th pipeline 58;The first via
Successively by the 52nd pipeline 52, second throttle body 6, the second heat exchanger 4, the 61st pipeline 61, the first four-way valve 70
Commutate node 72, the low pressure node 73 of the first four-way valve 70, into the 65th pipeline 65;Second tunnel is successively by the 58th pipe
Road 58, the 3rd throttle mechanism 7, the 3rd heat exchanger 8, the 67th pipeline 67, the second four-way valve 80 commutation node 84, the second four-way
The low pressure node 83 of valve 80, also into the 65th pipeline 65;After being mixed in the 65th pipeline 65 via flow direction control valve 40,
It is divided into two-way once more, the first via passes through the 68th pipeline 68, is returned to the arrival end of the second compression mechanism 2;Second tunnel passes through
The 63rd pipeline 63 is crossed, is returned to the arrival end of the first compression mechanism 1;It is again introduced into two compressor structures to be compressed, completes one
Secondary circulation.
Scheme seven:First compression mechanism 1, the second compression mechanism 2 all normal works;Flow direction control valve 40 is closed;First changes
Hot device 3, the second heat exchanger 4, the 3rd heat exchanger 8 all work.
Under this scheme, condensation heat caused by refrigeration all by First Heat Exchanger 3 be discharged into environment (outdoor air or
Cooling water or soil etc.), the second heat exchanger 4, the 3rd heat exchanger 8 work under different evaporating temperatures, freeze for user;Example
Such as:In the air-conditioning system of independent temperature-humidity control, the second heat exchanger 4 is used to produce high temperature chilled water, for meeting air-conditioned room
Between sensible heat demand, the 3rd heat exchanger 8 be used for produce low temperature chilled water, for meeting the dehumidification of fresh air.
During work, the standard-sized sheet of first throttle mechanism 5, second throttle body 6, the normal work of the 3rd throttle mechanism 7.
Its workflow is:Flow direction control valve 40 is closed during due to work, via the low pressure node 73 of the first four-way valve 70, the
The low pressure node 83 of two four-way valve 80 enters the refrigerant of the 65th pipeline 65, is divided into independent two-way;The first via is by the
After 68 pipelines 68, compressed into the second compression mechanism 2, after the discharge of the port of export of the second compression mechanism 2, successively by the
60 pipelines 60, the high voltage nodes 71 of the first four-way valve 70, the first four-way valve 70 commutation node 74, into the 64th pipeline 64;
Second tunnel is compressed after the 63rd pipeline 63 into the first compression mechanism 1, is discharged from the port of export of the first compression mechanism 1
Afterwards, successively by the 62nd pipeline 62, the high voltage nodes 81 of the second four-way valve 80, the second four-way valve 80 commutation node the 82, the 6th
16 pipelines 66, the first check valve 21, the 69th pipeline 69, also into the 64th pipeline 64;Two-way is in the 64th pipe
After road 64 mixes, then it is divided into two again into the 58th pipeline 58 by First Heat Exchanger 3, first throttle mechanism 5 successively
Road;The first via is successively by the 52nd pipeline 52, second throttle body 6, the second heat exchanger 4, the 61st pipeline 61, first
The commutation of four-way valve 70 node 72, the low pressure node 73 of the first four-way valve 70, the 65th pipeline 65, the 68th pipeline 68, are returned again
To the arrival end of the second compression mechanism 2;Second tunnel successively by the 58th pipeline 58, the 3rd throttle mechanism 7, the 3rd heat exchanger 8,
67th pipeline 67, the second four-way valve 80 commutation node 84, the low pressure node 83 of the second four-way valve 80, the 65th pipeline 65,
63rd pipeline 63, it is returned to the arrival end of the first compression mechanism 1;Two-way refrigerant respectively enters two compressor structures once more
Compressed, complete one cycle.
(2) winter heating function
Scheme one:First compression mechanism 1 does not work, the normal work of the second compression mechanism 2;Flow direction control valve 40 is opened;The
One heat exchanger 3, the second heat exchanger 4 work, and the 3rd heat exchanger 8 does not work.
Under this scheme, First Heat Exchanger 3 is used for the draw heat from environment, and the second heat exchanger 4 is used to heat for user.
During work, the normal work of first throttle mechanism 5, the standard-sized sheet of second throttle body 6, the 3rd throttle mechanism 7 closes.
During work, the high voltage nodes 71 of the first four-way valve 70 communicate with the first four-way valve 70 commutation node 72, the first four-way valve
70 commutation nodes 74 communicate with the low pressure node 73 of the first four-way valve 70.The high voltage nodes 81 of second four-way valve 80 and the second four-way valve 80
Commutation node 82 communicates, and the second four-way valve 80 commutation node 84 communicates with the low pressure node 83 of the second four-way valve 80.
Its workflow is:Refrigerant from the port of export of the second compression mechanism 2 discharge after, successively by the 60th pipeline 60,
The high voltage nodes 71 of first four-way valve 70, the first four-way valve 70 commutation node 72, the 61st pipeline 61, the second heat exchanger 4, second
Throttle mechanism 6, the 52nd pipeline 52, the 58th pipeline 58, first throttle mechanism 5, First Heat Exchanger the 3, the 64th are managed
Road 64, the first four-way valve 70 commutation node 74, the low pressure node 73 of the first four-way valve 70, the 65th pipeline the 65, the 68th pipe
Road 68, the arrival end of the second compression mechanism 2 is returned to, is compressed into the second compression mechanism 2, complete one cycle.
Scheme two:First compression mechanism 1, the second compression mechanism 2 all normal works;Flow direction control valve 40 is opened;First changes
Hot device 3, the second heat exchanger 4, the 3rd heat exchanger 8 all work.
Under this scheme, the draw heat from environment of First Heat Exchanger 3, the second heat exchanger 4, the 3rd heat exchanger 8 are same
Work under condensation temperature, heated for user.
During work, the normal work of first throttle mechanism 5, second throttle body 6, the 3rd throttle mechanism 7 all standard-sized sheets.
During work, the high voltage nodes 71 of the first four-way valve 70 communicate with the first four-way valve 70 commutation node 72, the first four-way valve
70 commutation nodes 74 communicate with the low pressure node 73 of the first four-way valve 70.The high voltage nodes 81 of second four-way valve 80 and the second four-way valve 80
Commutation node 84 communicates, and the second four-way valve 80 commutation node 82 communicates with the low pressure node 83 of the second four-way valve 80.
Its workflow is:Refrigerant into the 65th pipeline 65 is divided into two-way;The first via passes through the 68th
After pipeline 68, compressed into the second compression mechanism 2, after the discharge of the port of export of the second compression mechanism 2, successively by the 60th pipe
Road 60, the high voltage nodes 71 of the first four-way valve 70, the first four-way valve 70 commutation node 72, the 61st pipeline 61, the second heat exchanger
4th, second throttle body 6, the 52nd pipeline 52, into the 58th pipeline 58;Second tunnel after the 63rd pipeline 63,
Compressed into the first compression mechanism 1, after the discharge of the port of export of the first compression mechanism 1, successively by the 62nd pipeline 62, the
The high voltage nodes 81 of two four-way valve 80, the second four-way valve 80 commutation node 84, the 67th pipeline 67, the 3rd heat exchanger 8, Section three
Mechanism 7 is flowed, also into the 58th pipeline 58;Two-way is after the mixing of the 58th pipeline 58, then passes through first throttle machine successively
Structure 5, First Heat Exchanger 3, the 64th pipeline 64, the first four-way valve 70 commutation node 74, the low pressure node 73 of the first four-way valve 70,
It is divided into two-way into the 65th pipeline 65;The first via passes through the 68th pipeline 68, is returned to the entrance of the second compression mechanism 2
End;Second tunnel by flow direction control valve 40, the 63rd pipeline 63, is returned to the arrival end of the first compression mechanism 1 successively;Respectively again
It is secondary to be compressed into two compressor structures, complete one cycle.
Scheme three:First compression mechanism 1, the second compression mechanism 2 all normal works;Flow direction control valve 40 is opened;First changes
Hot device 3, the second heat exchanger 4, the 3rd heat exchanger 8 all work.
Under this scheme, the draw heat from environment of First Heat Exchanger 3, the second heat exchanger 4, the 3rd heat exchanger 8 are in difference
Condensation temperature under work, for user heat.Such as:Second heat exchanger 4 is used to produce low-temperature water heating, and the 3rd heat exchanger 8 is used for
Produce high-temperature-hot-water.
During work, the normal work of first throttle mechanism 5, the standard-sized sheet of second throttle body 6, the 3rd throttle mechanism 7 is for controlling
The pressure at expulsion of first compression mechanism 1.
During work, the high voltage nodes 71 of the first four-way valve 70 communicate with the first four-way valve 70 commutation node 72, the first four-way valve
70 commutation nodes 74 communicate with the low pressure node 73 of the first four-way valve 70.The high voltage nodes 81 of second four-way valve 80 and the second four-way valve 80
Commutation node 84 communicates, and the second four-way valve 80 commutation node 82 communicates with the low pressure node 83 of the second four-way valve 80.Its workflow
It is identical with the scheme two of the present embodiment winter heating function.
In the course of work of this programme, the first compression mechanism 1, the second compression mechanism 2 can use variable conpacitance compressor,
The method that refrigerant flow is exported by changing compressor is respectively controlled to the temperature of height warm water.Specifically, when
When first compression mechanism 1, the second compression mechanism 2 are frequency-changeable compressors, the second compression mechanism 2 is by changing the side of its working frequency
The low-temperature water heating temperature that method exports to the second heat exchanger 4 is controlled;First compression mechanism 1 is by changing the side of its working frequency
The high-temperature-hot-water temperature that method exports to the 3rd heat exchanger 8 is controlled.
In the course of work, the 3rd throttle mechanism 7 is used for the pressure at expulsion for controlling the first compression mechanism 1, its specific control
Method is as follows:High-temperature-hot-water temperature is exported in desired 3rd heat exchanger 8 (i.e.:The setting value of controller setting) on the basis of,
Plus a heat transfer temperature difference, as saturation temperature value corresponding to the desired pressure at expulsion of first compression mechanism 1, according to the saturation temperature
Angle value determines 1 desired pressure at expulsion of the first compression mechanism, and during work, controller passes through the valve for adjusting the 3rd throttle mechanism 7
Door aperture, it is desired value by the actual pressure at expulsion control of the first compression mechanism 1.Specifically adjusting method is:When the first compression
The actual pressure at expulsion of mechanism 1 is more than desired value, and when exceeding allowed band, then the valve opening of the 3rd throttle mechanism 7 of increase;
When the actual pressure at expulsion of the first compression mechanism 1 is less than desired value, and exceedes allowed band, then reduce the 3rd throttle mechanism 7
Valve opening;When the deviation between the first compression mechanism 1 actual pressure at expulsion and desired value is in allowed band, then protect
The valve opening for holding the 3rd throttle mechanism 7 is constant.
(3) winter frost removing function
Under this function, the second heat exchanger 4 absorbs heat at user, the defrost for First Heat Exchanger 3.
During work, the first compression mechanism 1 does not work, the normal work of the second compression mechanism 2;Flow direction control valve 40 is opened;The
One heat exchanger 3, the second heat exchanger 4 work, and the 3rd heat exchanger 8 does not work.The standard-sized sheet of first throttle mechanism 5, second throttle body 6 is just
Often work, the 3rd throttle mechanism 7 are closed.Under this function, its workflow and the phase of scheme one under the present embodiment refrigerating function
Together.
Installation method of the flow direction control valve 40 in scheme shown in the Fig. 3 of embodiment 3 and effect at work are also suitable
In the Fig. 1 of embodiment 1.When increasing a flow direction control valve 40 in scheme shown in the Fig. 1 of embodiment 1, now, flow direction control valve 40
Specific mounting means in scheme shown in Fig. 1 is:Flow direction control valve 40 is arranged on the 65th pipeline 65, and traffic organising
The one end of valve 40 is connected with the 63rd pipeline 63, the other end of flow direction control valve 40 and the 68th pipeline 68 and the 51st pipeline
51 are connected.
For scheme shown in the Fig. 1 of embodiment 1, when it is in the six times work of scheme of separate refrigeration function, and flow direction control valve
During 40 closing, as shown in figure 1, in air conditioner unit 10, difference can be respectively adopted in the second heat exchanger 4, the 3rd heat exchanger 8
Evaporating temperature be operated;I.e.:Second heat exchanger 4 is first empty to the entrance of air conditioner unit 10 using higher evaporating temperature
Gas is cooled down and dehumidified;Then, the 3rd heat exchanger 8 is continued to from the second heat exchanger 4 using relatively low evaporating temperature again
Air is cooled down and dehumidified.So as to improve the operating efficiency of the present invention, reach the purpose of energy-conservation.
Mounting means and method of work and effect of the flow direction control valve 40 in scheme shown in the Fig. 1 of embodiment 1 are also applied for
The change programme of scheme shown in Fig. 1 described in embodiment 1.
Installation method of the flow direction control valve 40 in scheme shown in the Fig. 3 of embodiment 3 and effect at work are equally
Suitable for scheme shown in the Fig. 2 of embodiment 2.Now, specific mounting means of the flow direction control valve 40 in scheme shown in Fig. 2 is:Stream
It is arranged on to control valve 40 on the 65th pipeline 65, and the one end of flow direction control valve 40 is connected with the 63rd pipeline 63, flow direction
The other end of control valve 40 is connected with the 68th pipeline 68.
For scheme shown in the Fig. 2 of embodiment 2, when it is in the six times work of scheme of separate refrigeration function, and flow direction control valve
During 40 closing, as shown in Fig. 2 in air conditioner unit 10, different steamings is respectively adopted in the second heat exchanger 4, the 3rd heat exchanger 8
Hair temperature is operated;I.e.:Second heat exchanger 4 is first entered using higher evaporating temperature to the intake air of air conditioner unit 10
Row cooling and dehumidifying;Then, the 3rd heat exchanger 8 is continued to the air from the second heat exchanger 4 using relatively low evaporating temperature again
Cooled down and dehumidified.So as to improve the operating efficiency of the present invention, reach the purpose of energy-conservation.
In addition, flow direction control valve 40 also has following mounting means in scheme shown in the Fig. 1 of embodiment 1, i.e.,:Traffic organising
Valve 40 is arranged on the 65th pipeline 65, and the one end of flow direction control valve 40 and the 63rd pipeline 63 and the 51st pipeline 51
It is connected, the other end of flow direction control valve 40 is connected with the 68th pipeline 68.Under this scheme, when scheme shown in Fig. 1 is removed in the winter time
Worked under wet and heating function, and when flow direction control valve 40 is closed, the first compression mechanism 1 can be by changing the side of its working frequency
Method, the wet-bulb temperature of air handled by air conditioner unit 10 is controlled, the second compression mechanism 2 can be by changing its work
The method of frequency, the dry-bulb temperature of air handled by air conditioner unit 10 is controlled.Refrigerant work under this scheme
Make flow and scheme shown in the Fig. 1 of embodiment 1 dehumidify in the winter time and heating function under workflow it is essentially identical, unique difference
It is:On the 65th pipeline 65, because flow direction control valve 40 is closed, therefore the 65th pipeline 65 be divided into it is separate
Two parts.When being worked under other functions of this scheme, flow direction control valve 40 is in opening.Flow direction control valve 40 is being implemented
Mounting means described above in scheme shown in the Fig. 1 of example 1, it is also applied for the change side of scheme shown in Fig. 1 described in embodiment 1
Case.
Embodiment 4
Scheme shown in the Fig. 1 of embodiment 1 has following further improvement project in actual use:Increase by one in systems
Individual liquid reservoir 50.The connected mode of liquid reservoir 50 in systems is:A liquid reservoir 50 is provided with the 58th pipeline 58, the
The one end of one throttle mechanism 5 is connected with First Heat Exchanger 3, and the other end of first throttle mechanism 5 passes through the 58th pipeline 58 and reservoir
Device 50 is connected;The one end of 3rd throttle mechanism 7 is connected with the 3rd heat exchanger 8, and the other end of the 3rd throttle mechanism 7 is also by the 58th
Pipeline 58 is connected with liquid reservoir 50;The one end of second throttle body 6 is connected with the second heat exchanger 4, and the other end of second throttle body 6 leads to
The 52nd pipeline 52 is crossed with the pipeline 58 of liquid reservoir 50 or the 58th to be connected.
The connection method of the above-described liquid reservoir 50 of the present embodiment in systems, suitable for all embodiments of the present invention
The scheme.
On the basis of embodiment 4, all embodiments of the present invention can be made by increasing the 4th throttle mechanism 9
It is further to improve, now, the 4th throttle mechanism 9 in system (i.e.:The present invention air conditioner refrigerating it is standby) in connection method have with
Lower five kinds of modes:
1) one end of the 4th throttle mechanism 9 is connected with liquid reservoir 50, the other end of the 4th throttle mechanism 9 and the first compression mechanism 1
Intermediate fill gas mouth be connected.2) one end of the 4th throttle mechanism 9 is connected with liquid reservoir 50, the other end of the 4th throttle mechanism 9 and second
The intermediate fill gas mouth of compression mechanism 2 is connected.3) one end of the 4th throttle mechanism 9 is connected with liquid reservoir 50, and the 4th throttle mechanism 9 is another
End is connected with the 65th pipeline 65.4) one end of the 4th throttle mechanism 9 is connected with liquid reservoir 50, the other end of the 4th throttle mechanism 9
It is connected with the 63rd pipeline 63.5) one end of the 4th throttle mechanism 9 is connected with liquid reservoir 50, the other end of the 4th throttle mechanism 9 with
68th pipeline 68 is connected.
It is any one in first check valve 21, the second check valve 22 in the scheme of the above-mentioned all embodiments of the present invention
Individual check valve can use magnetic valve, have turn-off function throttle mechanism (such as:Electric expansion valve) or Flow-rate adjustment machine
Any one replacement in structure.Flow direction control valve 40 can use magnetic valve, or other Flow-rate adjustment machines with turn-off function
Structure.
Any one in the scheme of the above-mentioned all embodiments of the present invention, in the first compression mechanism 1, the second compression mechanism 2
Or two simultaneously, can use following compressor in any one:Screw compressor, helical-lobe compressor, rolling rotor-type
Compressor, sliding-vane compressor, rotary blade type compressor, centrifugal compressor, digital scroll compressor;First compression mechanism 1, second
Any one or two in compression mechanism 2 it is also possible to be variable conpacitance compressor (such as:Frequency-changeable compressor, digital vortex
Compressor), or constant speed compressor.
In the scheme of the above-mentioned all embodiments of the present invention, the first compression mechanism 1, the second compression mechanism 2 can also be by extremely
The compressor set of few two variable conpacitance compressors composition, or by compressor set that at least two constant speed compressors form;Separately
Outside, the first compression mechanism 1, the second compression mechanism 2 can also be an at least variable conpacitance compressor and an at least constant speed compression
The compressor set of machine composition.
In the scheme of the above-mentioned all embodiments of the present invention, in First Heat Exchanger 3, the second heat exchanger 4 or the 3rd heat exchanger 8
Any one is in addition to it can be refrigerant-air heat exchanger or refrigerant-water- to-water heat exchanger or other species are changed
Hot device;During as refrigerant-water- to-water heat exchanger, volumetric heat exchanger, plate type heat exchanger, shell and tube exchanger or bushing type can be used
Any one in heat exchanger.Any one in First Heat Exchanger 3, the second heat exchanger 4 or the 3rd heat exchanger 8 is as refrigeration
During agent-air heat exchanger, generally use finned heat exchanger, the fin of the finned heat exchanger is generally aluminum or aluminum alloy material
Matter, copper material is also used in some special occasions.
In the scheme of the above-mentioned all embodiments of the present invention, first throttle mechanism 5, second throttle body 6, the 3rd throttle mechanism
7th, one or more, even all throttle mechanisms in the 4th throttle mechanism 9 can use the throttling with turn-off function
Mechanism (such as:Electric expansion valve) substituted.
In the scheme of the above-mentioned all embodiments of the present invention, described all pipelines are all copper pipes.
Claims (11)
1. a kind of operation of air conditioning systems, including the first compression mechanism (1), the first four-way valve (70), the second four-way valve (80), first
Heat exchanger (3), the second heat exchanger (4), the 3rd heat exchanger (8), first throttle mechanism (5), second throttle body (6), Section three
Mechanism (7), the first check valve (21) and the second check valve (22) are flowed, it is characterized in that:The operation of air conditioning systems also includes the second pressure
Contracting mechanism (2);The low pressure node (73) of first four-way valve (70) passes through the 65th pipeline (65) and second four-way
The low pressure node (83) of valve (80) is connected, and the high voltage nodes (71) of first four-way valve (70) pass sequentially through the 60th pipeline
(60), the second compression mechanism (2) port of export, the second compression mechanism (2) arrival end, the 68th pipeline (68) and the described 1st
The 65th pipeline (65) phase between the low pressure node (73) of port valve (70) and the low pressure node (83) of the second four-way valve (80)
Even, the high voltage nodes (81) of second four-way valve (80) pass sequentially through the 62nd pipeline (62), the first compression mechanism (1) goes out
Mouthful end, the first compression mechanism (1) arrival end, the 63rd pipeline (63) the also low pressure node with first four-way valve (70)
(73) the 65th pipeline (65) between the low pressure node (83) of the second four-way valve (80) is connected, second four-way valve
Any one commutation node (84) in (80) two commutation nodes passes sequentially through the 67th pipeline (67), the 3rd heat exchanger
(8), the 3rd throttle mechanism (7), the 58th pipeline (58), first throttle mechanism (5), First Heat Exchanger (3), the 64th pipe
Road (64) is connected with any one commutation node (74) in described (70) two commutation nodes of first four-way valve, and the described 2nd 4
Another commutation node (82) of port valve (80) passes sequentially through the 66th pipeline (66), the first check valve (21) arrival end, the
One check valve (21) port of export, the 69th pipeline (69) are connected with the 64th pipeline (64), first four-way valve (70)
Another commutation node (72) pass sequentially through the 61st pipeline (61), the second check valve (22) arrival end, the second check valve
(22) port of export, the 59th pipeline (59) are connected with the 67th pipeline (67), and one end of second heat exchanger (4) is successively
By second throttle body (6), the 52nd pipeline (52) and the first throttle mechanism (5) and the 3rd throttle mechanism (7) it
Between the 58th pipeline (58) be connected, the other end of second heat exchanger (4) by the 51st pipeline (51) with it is described
The 65th pipeline between the low pressure node (73) of first four-way valve (70) and the low pressure node (83) of the second four-way valve (80)
(65) it is connected.
2. a kind of operation of air conditioning systems, including the first compression mechanism (1), the first four-way valve (70), the second four-way valve (80), first
Heat exchanger (3), the second heat exchanger (4), the 3rd heat exchanger (8), first throttle mechanism (5), second throttle body (6), Section three
Mechanism (7), the first check valve (21) and the second check valve (22) are flowed, it is characterized in that:The operation of air conditioning systems also includes the second pressure
Contracting mechanism (2);The low pressure node (73) of first four-way valve (70) passes through the 65th pipeline (65) and second four-way
The low pressure node (83) of valve (80) is connected, and the high voltage nodes (71) of first four-way valve (70) pass sequentially through the 60th pipeline
(60), the second compression mechanism (2) port of export, the second compression mechanism (2) arrival end, the 68th pipeline (68) and the described 1st
The 65th pipeline (65) phase between the low pressure node (73) of port valve (70) and the low pressure node (83) of the second four-way valve (80)
Even, the high voltage nodes (81) of second four-way valve (80) pass sequentially through the 62nd pipeline (62), the first compression mechanism (1) goes out
Mouthful end, the first compression mechanism (1) arrival end, the 63rd pipeline (63) the also low pressure node with first four-way valve (70)
(73) the 65th pipeline (65) between the low pressure node (83) of the second four-way valve (80) is connected, second four-way valve
Any one commutation node (84) in (80) two commutation nodes passes sequentially through the 67th pipeline (67), the 3rd heat exchanger
(8), the 3rd throttle mechanism (7), the 58th pipeline (58), first throttle mechanism (5), First Heat Exchanger (3), the 64th pipe
Road (64) is connected with any one commutation node (74) in described (70) two commutation nodes of first four-way valve, and the described 2nd 4
Another commutation node (82) of port valve (80) passes sequentially through the 66th pipeline (66), the first check valve (21) arrival end, the
One check valve (21) port of export, the 69th pipeline (69) are connected with the 64th pipeline (64), first four-way valve (70)
Another commutation node (72) pass sequentially through the 61st pipeline (61), the second check valve (22) arrival end, the second check valve
(22) port of export, the 59th pipeline (59) are connected with the 67th pipeline (67), and one end of second heat exchanger (4) is successively
By second throttle body (6), the 52nd pipeline (52) and the first throttle mechanism (5) and the 3rd throttle mechanism (7) it
Between the 58th pipeline (58) be connected, the other end of second heat exchanger (4) passes through the 51st pipeline (51) and the 6th
13 pipelines (63) are connected.
3. a kind of operation of air conditioning systems, including the first compression mechanism (1), the first four-way valve (70), the second four-way valve (80), first
Heat exchanger (3), the second heat exchanger (4), the 3rd heat exchanger (8), first throttle mechanism (5), second throttle body (6), Section three
Mechanism (7), the first check valve (21) and the second check valve (22) are flowed, it is characterized in that:The operation of air conditioning systems also includes the second pressure
Contracting mechanism (2);The low pressure node (73) of first four-way valve (70) passes through the 65th pipeline (65) and second four-way
The low pressure node (83) of valve (80) is connected, and the high voltage nodes (71) of first four-way valve (70) pass sequentially through the 60th pipeline
(60), the second compression mechanism (2) port of export, the second compression mechanism (2) arrival end, the 68th pipeline (68) and the described 1st
The 65th pipeline (65) phase between the low pressure node (73) of port valve (70) and the low pressure node (83) of the second four-way valve (80)
Even, the high voltage nodes (81) of second four-way valve (80) pass sequentially through the 62nd pipeline (62), the first compression mechanism (1) goes out
Mouthful end, the first compression mechanism (1) arrival end, the 63rd pipeline (63) the also low pressure node with first four-way valve (70)
(73) the 65th pipeline (65) between the low pressure node (83) of the second four-way valve (80) is connected, second four-way valve
Any one commutation node (84) in (80) two commutation nodes passes sequentially through the 67th pipeline (67), the 3rd heat exchanger
(8), the 3rd throttle mechanism (7), the 58th pipeline (58), first throttle mechanism (5), First Heat Exchanger (3), the 64th pipe
Road (64) is connected with any one commutation node (74) in described (70) two commutation nodes of first four-way valve, and the described 2nd 4
Another commutation node (82) of port valve (80) passes sequentially through the 66th pipeline (66), the first check valve (21) arrival end, the
One check valve (21) port of export, the 69th pipeline (69) are connected with the 64th pipeline (64), first four-way valve (70)
Another commutation node (72) pass sequentially through the 61st pipeline (61), the second check valve (22) arrival end, the second check valve
(22) port of export, the 59th pipeline (59) are connected with the 67th pipeline (67), and one end of second heat exchanger (4) is successively
By second throttle body (6), the 52nd pipeline (52) and the first throttle mechanism (5) and the 3rd throttle mechanism (7) it
Between the 58th pipeline (58) be connected, the other end of second heat exchanger (4) passes through the 51st pipeline (51) and the 6th
18 pipelines (68) are connected.
4. the operation of air conditioning systems according to any claim in claims 1 to 3 a, it is characterised in that flow direction control valve
(40) it is arranged on the 65th pipeline (65), and the flow direction control valve (40) one end is connected with the 63rd pipeline (63),
Flow direction control valve (40) other end is connected with the 68th pipeline (68) and the 51st pipeline (51).
5. the operation of air conditioning systems according to any claim in claims 1 to 3 a, it is characterised in that flow direction control valve
(40) it is arranged on the 65th pipeline (65), and the flow direction control valve (40) one end and the 63rd pipeline (63) and the 5th
11 pipelines (51) are connected, and flow direction control valve (40) other end is connected with the 68th pipeline (68).
6. a kind of operation of air conditioning systems, including the first compression mechanism (1), the first four-way valve (70), the second four-way valve (80), first
Heat exchanger (3), the second heat exchanger (4), the 3rd heat exchanger (8), first throttle mechanism (5), second throttle body (6), Section three
Mechanism (7) and the first check valve (21) are flowed, it is characterized in that:The operation of air conditioning systems also includes the second compression mechanism (2);Described
The low pressure node (73) of one four-way valve (70) passes through the 65th pipeline (65) and the low pressure node of second four-way valve (80)
(83) it is connected, the high voltage nodes (71) of first four-way valve (70) pass sequentially through the 60th pipeline (60), the second compression mechanism
(2) port of export, the second compression mechanism (2) arrival end, the 68th pipeline (68) and the low pressure section of first four-way valve (70)
The 65th pipeline (65) between point (73) and the low pressure node (83) of the second four-way valve (80) is connected, second four-way valve
(80) high voltage nodes (81) pass sequentially through the 62nd pipeline (62), the first compression mechanism (1) port of export, the first compression mechanism
(1) arrival end, the 63rd pipeline (63) the also low pressure node (73) and the second four-way valve with first four-way valve (70)
(80) the 65th pipeline (65) between low pressure node (83) is connected, in described (80) two commutation nodes of second four-way valve
Any one commutation node (84) pass sequentially through the 67th pipeline (67), the 3rd heat exchanger (8), the 3rd throttle mechanism (7),
58th pipeline (58), first throttle mechanism (5), First Heat Exchanger (3), the 64th pipeline (64) and first four-way
Any one commutation node (74) in (70) two commutation nodes of valve is connected, another commutation of second four-way valve (80)
Node (82) passes sequentially through the 66th pipeline (66), the first check valve (21) arrival end, the first check valve (21) port of export,
69 pipelines (69) are connected with the 64th pipeline (64), first four-way valve (70) another commutation node (72) according to
It is secondary to pass through the 61st pipeline (61), the second heat exchanger (4), second throttle body (6), the 52nd pipeline (52) and described the
The 58th pipeline (58) between one throttle mechanism (5) and the 3rd throttle mechanism (7) is connected.
7. operation of air conditioning systems according to claim 6 a, it is characterised in that flow direction control valve (40) is arranged on the 60th
On five pipelines (65), and the flow direction control valve (40) one end is connected with the 63rd pipeline (63), the flow direction control valve
(40) other end is connected with the 68th pipeline (68).
8. according to the operation of air conditioning systems described in any claim in claim 1,2,3,6, it is characterised in that described first
Any one in compression mechanism (1) and the second compression mechanism (2) is variable conpacitance compressor.
9. operation of air conditioning systems according to claim 4, it is characterised in that described flow direction control valve (40) is magnetic valve.
10. operation of air conditioning systems according to claim 5, it is characterised in that described flow direction control valve (40) is electromagnetism
Valve.
11. operation of air conditioning systems according to claim 7, it is characterised in that described flow direction control valve (40) is electromagnetism
Valve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410736096.8A CN104457047B (en) | 2014-11-29 | 2014-11-29 | Operation of air conditioning systems |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410736096.8A CN104457047B (en) | 2014-11-29 | 2014-11-29 | Operation of air conditioning systems |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104457047A CN104457047A (en) | 2015-03-25 |
CN104457047B true CN104457047B (en) | 2017-11-24 |
Family
ID=52903503
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410736096.8A Active CN104457047B (en) | 2014-11-29 | 2014-11-29 | Operation of air conditioning systems |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104457047B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104764241A (en) * | 2015-03-30 | 2015-07-08 | 珠海格力电器股份有限公司 | Air conditioner |
CN104764249A (en) * | 2015-04-07 | 2015-07-08 | 珠海格力电器股份有限公司 | Air-conditioning hot water system |
CN104879950A (en) * | 2015-05-26 | 2015-09-02 | 珠海格力电器股份有限公司 | Air conditioner all-in-one machine system and control method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05215420A (en) * | 1992-02-05 | 1993-08-24 | Matsushita Electric Ind Co Ltd | Double-staged compression freezing cycle apparatus |
CN2636160Y (en) * | 2003-04-30 | 2004-08-25 | 熊晓强 | Air conditioner with double compressors |
CN101017039A (en) * | 2006-02-07 | 2007-08-15 | 上海日立电器有限公司 | Oil balancing unit of double-compressor air-conditioning |
CN101625175A (en) * | 2009-08-04 | 2010-01-13 | 刘雄 | Multifunctional air-condition heat pump device of single-double level compression and capable of free switch |
CN102538327A (en) * | 2012-02-03 | 2012-07-04 | 海尔集团公司 | Defrosting method and one-driving-two dual-compressor air-conditioning system adopting defrosting method |
CN204438618U (en) * | 2014-11-29 | 2015-07-01 | 刘雄 | Operation of air conditioning systems |
-
2014
- 2014-11-29 CN CN201410736096.8A patent/CN104457047B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05215420A (en) * | 1992-02-05 | 1993-08-24 | Matsushita Electric Ind Co Ltd | Double-staged compression freezing cycle apparatus |
CN2636160Y (en) * | 2003-04-30 | 2004-08-25 | 熊晓强 | Air conditioner with double compressors |
CN101017039A (en) * | 2006-02-07 | 2007-08-15 | 上海日立电器有限公司 | Oil balancing unit of double-compressor air-conditioning |
CN101625175A (en) * | 2009-08-04 | 2010-01-13 | 刘雄 | Multifunctional air-condition heat pump device of single-double level compression and capable of free switch |
CN102538327A (en) * | 2012-02-03 | 2012-07-04 | 海尔集团公司 | Defrosting method and one-driving-two dual-compressor air-conditioning system adopting defrosting method |
CN204438618U (en) * | 2014-11-29 | 2015-07-01 | 刘雄 | Operation of air conditioning systems |
Also Published As
Publication number | Publication date |
---|---|
CN104457047A (en) | 2015-03-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103353147B (en) | The full heat treatment multi-online air-conditioning system of three control and humiture method for independently controlling | |
CN102589059B (en) | Double-effect heat-pump type total-heat recovery fresh air processor | |
CN201302243Y (en) | Energy-saving full fresh air dehumidifier machine | |
CN203132011U (en) | Liquid desiccant regeneration heat-and-humidity independent treatment air-conditioner device | |
CN207035387U (en) | A kind of multifunctional split-type fresh air air conditioner for machine | |
CN106196380A (en) | A kind of cold-producing medium heat of subcooling recycling recuperation of heat air-treatment unit | |
CN208595631U (en) | Fresh air dehumidification air conditioning system | |
CN102853594A (en) | Refrigeration equipment for air conditioner | |
CN103615916A (en) | Efficient air dehumidification and stepless temperature regulation device | |
CN110360833A (en) | A kind of varying duty dehumidifying heat pump drying system | |
CN205957353U (en) | Air treatment device | |
CN102620477A (en) | Double-cold-source full fresh air heat pump dehumidification unit | |
CN107575967A (en) | A kind of heat pump type air conditioning system and its operation method suitable for annual operating mode | |
CN109780640A (en) | A kind of connected radiant heating refrigerated air-conditioning system and operation method | |
CN106766336A (en) | A kind of online defrosting air source heat pump system | |
CN104534722B (en) | Operation of air conditioning systems | |
CN204345961U (en) | Independent temperature-humidity control refrigeration system | |
CN104457047B (en) | Operation of air conditioning systems | |
CN216281897U (en) | Fresh air equipment | |
CN103925657B (en) | It arranges wind source heat pump and drives fresh air system | |
CN201289322Y (en) | Air conditioner watch cooling device with improved dehumidification and energy-saving effect | |
CN108105917B (en) | Combined air conditioner | |
CN108443997A (en) | A kind of single machine dual system dehumidification air conditioner | |
CN206449929U (en) | A kind of online defrosting air source heat pump system | |
CN203413735U (en) | Three-pipe full thermal treatment multi-split air conditioning system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |