CN104452833A - 一种模型桩埋设方法 - Google Patents
一种模型桩埋设方法 Download PDFInfo
- Publication number
- CN104452833A CN104452833A CN201410725491.6A CN201410725491A CN104452833A CN 104452833 A CN104452833 A CN 104452833A CN 201410725491 A CN201410725491 A CN 201410725491A CN 104452833 A CN104452833 A CN 104452833A
- Authority
- CN
- China
- Prior art keywords
- pile
- burying
- pvc sleeve
- sleeve pipe
- mold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
本发明公开了一种模型桩埋设方法,包括如下步骤:将PVC套管竖向切为两半,然后试桩装进PVC套管,在上中下三个位置由金属卡扣固定;放入模型桩位,分层埋设;每层埋设后,将PVC套管拔出一部分,边拔套管边进行桩周地基击实,以免因套管缝隙使得桩周土不够密实;将模型桩埋设至标高后,将金属卡扣解开,将PVC套管拔出,进行模型试验。本发明采用PVC套管对模型桩进行保护,在埋设过程中套管承担了绝大部分桩侧土压力,从而有效的保护了模型桩。经试验表明,这种方法埋设模型桩,效果良好,埋设中无断裂现象,满足试验要求。
Description
技术领域
本发明涉及地基模型试验领域,具体涉及一种模型桩埋设方法。
背景技术
对于长细比较大的实体桩在模型试验中的埋设,一般没有保护措施,这样造成模型桩在埋设过程中受到桩侧土不均匀的侧向压力,使得模型桩极易断裂,而无法进行模型试验。
发明内容
为解决上述问题,本发明提供了一种模型桩埋设方法,采用PVC套管对模型桩进行保护,在埋设过程中套管承担了绝大部分桩侧土压力,从而有效的保护了模型桩。
为实现上述目的,本发明采取的技术方案为:
一种模型桩埋设方法,包括如下步骤:
S1、将PVC套管竖向切为两半,然后试桩装进PVC套管,在上中下三个位置由金属卡扣固定;
S2、将步骤S1所得的试桩放入模型桩位,分层埋设;
S3、每层埋设后,将PVC套管拔出一部分,边拔套管边进行桩周地基击实,以免因套管缝隙使得桩周土不够密实;
S4、将模型桩埋设至标高后,将金属卡扣解开,将PVC套管拔出,进行模型试验。
本发明具有以下有益效果:
上述方案,采用PVC套管对模型桩进行保护,在埋设过程中套管承担了绝大部分桩侧土压力,从而有效的保护了模型桩。经试验表明,这种方法埋设模型桩,效果良好,埋设中无断裂现象,满足试验要求。
具体实施方式
为了使本发明的目的及优点更加清楚明白,以下结合实施例对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。
本发明实施例提供了一种模型桩埋设方法,包括如下步骤:
S1、将PVC套管竖向切为两半,然后试桩装进PVC套管,在上中下三个位置由金属卡扣固定;
S2、将步骤S1所得的试桩放入模型桩位,分层埋设;
S3、每层埋设后,将PVC套管拔出一部分,边拔套管边进行桩周地基击实,以免因套管缝隙使得桩周土不够密实;
S4、将模型桩埋设至标高后,将金属卡扣解开,将PVC套管拔出,进行模型试验。
实施例1
2014年5月3日,水泥搅拌桩模型试验采用该方法埋设模型桩,成桩40根,桩径5cm,桩长1.5m,无断裂现象,下桩效果良好。
实施例2
2014年8月5日,CFG桩模型试验采用该方法埋设模型桩,成桩40根,桩径5cm,桩长1.5m,无断裂现象,下桩效果良好。
综上所述,本发明效果良好,埋设中无断裂现象,满足试验要求。
以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以作出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。
Claims (1)
1.一种模型桩埋设方法,其特征在于,包括如下步骤:
S1、将PVC套管竖向切为两半,然后试桩装进PVC套管,在上中下三个位置由金属卡扣固定;
S2、将步骤S1所得的试桩放入模型桩位,分层埋设;
S3、每层埋设后,将PVC套管拔出一部分,边拔套管边进行桩周地基击实,以免因套管缝隙使得桩周土不够密实;
S4、将模型桩埋设至标高后,将金属卡扣解开,将PVC套管拔出,进行模型试验。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410725491.6A CN104452833B (zh) | 2014-11-28 | 2014-11-28 | 一种模型桩埋设方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410725491.6A CN104452833B (zh) | 2014-11-28 | 2014-11-28 | 一种模型桩埋设方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104452833A true CN104452833A (zh) | 2015-03-25 |
CN104452833B CN104452833B (zh) | 2016-06-01 |
Family
ID=52899533
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410725491.6A Expired - Fee Related CN104452833B (zh) | 2014-11-28 | 2014-11-28 | 一种模型桩埋设方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104452833B (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1078281A (zh) * | 1992-05-08 | 1993-11-10 | 深圳市建筑科学中心 | 桩基消除负摩阻力装置 |
CN201411685Y (zh) * | 2009-05-21 | 2010-02-24 | 朱奎 | 一种防止负摩阻力的装置 |
JP2012184596A (ja) * | 2011-03-07 | 2012-09-27 | Taisei Corp | 杭の載荷試験方法 |
CN203452069U (zh) * | 2013-09-05 | 2014-02-26 | 长沙学院 | 一种能减少灌注桩负摩阻力的装置 |
-
2014
- 2014-11-28 CN CN201410725491.6A patent/CN104452833B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1078281A (zh) * | 1992-05-08 | 1993-11-10 | 深圳市建筑科学中心 | 桩基消除负摩阻力装置 |
CN201411685Y (zh) * | 2009-05-21 | 2010-02-24 | 朱奎 | 一种防止负摩阻力的装置 |
JP2012184596A (ja) * | 2011-03-07 | 2012-09-27 | Taisei Corp | 杭の載荷試験方法 |
CN203452069U (zh) * | 2013-09-05 | 2014-02-26 | 长沙学院 | 一种能减少灌注桩负摩阻力的装置 |
Non-Patent Citations (1)
Title |
---|
江浩等: "钙质砂中模型桩的试验研究", 《岩土力学》, vol. 31, no. 3, 31 March 2010 (2010-03-31) * |
Also Published As
Publication number | Publication date |
---|---|
CN104452833B (zh) | 2016-06-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104278993B (zh) | 一种偏压隧道斜交进洞的施工方法 | |
CN102996136A (zh) | 盾构近距离下穿复合地基建筑物的变形控制方法 | |
PH12018550061A1 (en) | Method for forming a stable foundation ground | |
CN103590836A (zh) | 一种浅埋暗挖隧道塌方处理方法 | |
MX2019002727A (es) | Cinta de señalización. | |
CN104404960B (zh) | 一种地下连续墙接缝注浆装置及施工方法 | |
CN105672326A (zh) | 一种露天矿边坡治理方法 | |
CN104452833A (zh) | 一种模型桩埋设方法 | |
CN104912122B (zh) | 基坑工程监测数据报警级别的判定方法 | |
CN104372801A (zh) | 一种边坡防滑构件 | |
CN203891045U (zh) | 深基坑围护桩间的堵漏注浆装置 | |
CN104452827B (zh) | 一种混凝土坝坝基泉眼的处理方法 | |
CN208762896U (zh) | 一种大流量地下水引排结构 | |
Kang | Behavior of buried geo-structures due to increase of excess pore water pressure ratio during earthquakes | |
CN204266257U (zh) | 一种应力释放孔的支护装置 | |
Chuan-zheng et al. | Deformation analysis of foundation pit of a subject station of Metro Line 6 in Wuhan | |
Dzyuba et al. | Experience of designing natural gas transmission pipelines in super challenging geological and environmental conditions of eastern siberia and the far east | |
Nicolas et al. | Geotechnical Mitigation Strategies for Earthquake Surface Fault Rupture | |
Wang et al. | Notice of Retraction: The study on supervision in deep foundation excavation | |
CN103541370A (zh) | 地源热泵垂直地埋管系统的导槽施工法 | |
Kim et al. | A Study on the Gap Parameter in Sand by Scale Model Test | |
Sáez Robert et al. | Liquefaction mitigation using secant piles wall under a large water tank | |
PL410478A1 (pl) | Sposób zabezpieczenia wałów przeciwpowodziowych | |
Yu et al. | Finite Layer Method for Solving Ground Subsidence Induced by Dewatering in Deep Excavation | |
Liang et al. | Analysis of Effect Factors about the Ground Settlement during Foundation Pit Excavation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160601 Termination date: 20161128 |
|
CF01 | Termination of patent right due to non-payment of annual fee |