CN1044205C - Full-floating plug continuously rolling process - Google Patents

Full-floating plug continuously rolling process Download PDF

Info

Publication number
CN1044205C
CN1044205C CN95109769A CN95109769A CN1044205C CN 1044205 C CN1044205 C CN 1044205C CN 95109769 A CN95109769 A CN 95109769A CN 95109769 A CN95109769 A CN 95109769A CN 1044205 C CN1044205 C CN 1044205C
Authority
CN
China
Prior art keywords
frame
rolling
roll
adjustment amount
pair rolling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN95109769A
Other languages
Chinese (zh)
Other versions
CN1119562A (en
Inventor
潘克云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoshan Iron and Steel Co Ltd
Original Assignee
Baoshan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoshan Iron and Steel Co Ltd filed Critical Baoshan Iron and Steel Co Ltd
Priority to CN95109769A priority Critical patent/CN1044205C/en
Publication of CN1119562A publication Critical patent/CN1119562A/en
Application granted granted Critical
Publication of CN1044205C publication Critical patent/CN1044205C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Metal Rolling (AREA)

Abstract

The present invention discloses a full-floating core rod continuous rolling technology which comprises: the roll pass, the rolling speed and the roll gap preliminary adjustment quantity parameters of each machine frame, which are designed according to the normal rolling following the principle that in the process of continuous rolling, the flow per second of the metal of each machine frame is equal, are used as basic technology parameters, the basic technology parameters are adjusted, so that the principal strain machine frame realizes rolling by thrust force in the rolling process, and except the principal strain machine frame, a machine frame close to an outlet realizes tension rolling. In the technology, equipment does not need to be reformed, and rings can be effectively controlled; the ring value is controlled to be within 8%, and the product success ratio is greatly increased.

Description

Full-floating plug continuously rolling process
The present invention relates to a kind of full-floating plug continuously rolling process, belong to the hot continuous rolling tube side method in Metal Forming field.
Full-floating plug continuously rolling process of the prior art, the general pair rolling scheme of following each frame metal mass flow equal principle design in the tandem rolling that all adopts, see " steel pipe theory of plastic deformation " first volume that metallurgical industry publishing house publishes, the control of the roll pass design of its every rolling mill, mill speed and roll gap pre-adjustment amount, follow at each frame metal mass flow of stable state rolling sequence and equate, the operation of rolling had not only had tension force but also had not had the principle of thrust.But because of the limited length of pipe, the unstable state of nipping and dishing out is rolling to account for the over half of the operation of rolling.The variation of stage plug speed owing to nip and dish out causes that the metal mass flow of each frame changes, and it is rolling to have formed thrust, makes that the head and tail wall thickness and the diameter of pipe increases behind the tandem rolling, produces so-called " ring " phenomenon.When ring>10%, causing behind stretch reducing pipe end to cut to decrease increases, and greatly reduces the lumber recovery of product.Conventional ring control measure are the suitable speed that reduces some frame of the stage of nipping and dish out at pipe, but the control effect is undesirable.At present to produce the effective measures of ring be that hydraulic pressure is depressed the application on continuous rolling-tube unit to the control full-floating plug, but the investment of scrap build is quite big.
The purpose of this invention is to provide a kind of full-floating plug continuously rolling process, this technology need not be transformed equipment, can effectively control the generation of ring, improves the lumber recovery of product.
The object of the present invention is achieved like this: to follow in the continuous rolling process, the pair rolling of each frame metal mass flow equal principle is designed, it is the basic process parameter that the roll of each frame rolls type, mill speed and roll gap pre-adjustment amount parameter, it is adjusted, make the operation of rolling realize that in main transformer shape frame thrust is rolling, frame near outlet beyond main transformer shape frame realizes tension-rolling, and concrete method of adjustment is as follows:
(1) be the benchmark frame with frame second from the bottom, this frame adopts roll pass, mill speed and the roll gap pre-adjustment amount of pair rolling;
(2) the frame frame does not adopt the roll pass and the roll gap pre-adjustment amount of pair rolling, and mill speed reduces 0.2%-1% than pair rolling speed;
(3) the roll gap pre-adjustment amount of each frame employing pair rolling of approaching outlet beyond the main transformer shape frame, export to Way in by rolled piece, the roll pass of each frame, on pair rolling roll pass basis, increase the pass width by frame, recruitment is for increasing progressively 2%-3% by frame, each frame mill speed reduces by frame than pair rolling speed, and the reduction amount is the 0.5%-3% that successively decreases by frame;
(4) first frames adopt the roll pass of pair rolling, and mill speed improves 1%-6% than pair rolling speed, and roll gap pre-adjustment amount reduces (5%-10%) P than the roll gap pre-adjustment amount of pair rolling 0/ K;
(5) other each main transformer shape frame, its roll pass is on pair rolling roll pass basis, the pass width increases 5%-10%, enter the mouth to Way out by rolled piece, the mill speed of each frame reduces by frame than pair rolling speed, its reduction amount is the 0-5% that successively decreases by frame, and the roll gap pre-adjustment amount of each frame reduces (5%-20%) P than the roll gap pre-adjustment amount of pair rolling 0/ K;
P wherein 0Be the roll-force of place frame pair rolling, K is the stiffness coefficient of place frame.
Adopt process of the present invention, after adjusting according to roll pass, mill speed and the roll gap pre-adjustment amount of each designed frame of pair rolling, between main transformer shape frame, realized that thrust is rolling, make the stable state rolling sequence cause that because of thrust is rolling pipe degree of filling in pass increases, wall thickness increases, caliber increases, and nip and relative the reducing of this phenomenon of the stage of dishing out, also promptly increase the wall thickness at tandem rolling pipe middle part, and reduced pipe wall thickness end to end relatively.This effect is just opposite with the phenomenon that the full-floating plug continuously rolling process generation increases end to end, and the result of both stacks is under control the ring of full-floating plug tandem rolling pipe.And the frame near outlet has realized tension-rolling beyond main transformer shape frame, to eliminate because of adopting the rolling pipe wall thickness that causes of thrust to increase and the caliber increase between main transformer shape frame, the caliber of the tandem rolling pipe that assurance is obtained is the same with the pipe that conventional full-floating plug tandem rolling is obtained with wall thickness.Because of these frames are non-main transformer shape frame, lengthening coefficient is little, thereby little to the pipe influence of wall thickness, and the ring increase that causes and main transformer shape frame thrust is rolling, and that the ring decrease is compared is much smaller.
The mill speed of last rolling mill is reduced 0.2%-1% than the mill speed of pair rolling, and it is rolling to form microthrust between rolling mill second from the bottom and last rolling mill, makes the degree of filling increase of pipe in roll pass, produces the gap between pipe and the plug.
The advantage that the present invention is compared with prior art had is: need not equipment is transformed, can effectively control the generation of ring phenomenon, the ring value can be controlled in 8%, improved the lumber recovery of product greatly.There is the gap between pipe and the plug behind the tandem rolling, helps taking off rod, reduce the generation of resolving excellent phenomenon.
Be that example describes in detail embodiments of the invention with eight frame full-floating plug tandem rolling pipes below.
On 140 units, eight frame Tandem Tube Rolling Mill with Full Floating Mandrel, be the pipe material of 177 * 11.75 millimeters of Φ with raw material, production specification is 152.5 * 4.0 millimeters pipes of Φ.According to process of the present invention, adjust as follows to 8 frames according to the designed roll pass of the pair rolling of prior art, mill speed, roll gap pre-adjustment amount respectively:
The roll pass of the 8th frame and roll gap pre-adjustment amount are constant, and mill speed reduces by 0.5%;
The roll pass of the 7th frame, mill speed, roll gap pre-adjustment amount are all constant;
The 6th frame, roll gap pre-adjustment amount is constant, and the roll pass width increases by 2%, and mill speed reduces by 2%;
The 5th frame, roll gap pre-adjustment amount is constant, and the roll pass width increases by 4%, and mill speed reduces by 4%;
The 4th frame, the roll pass width increases by 8%, and mill speed reduces by 7%, and roll gap pre-adjustment amount reduces 8%P 0/ K;
The 3rd frame, the roll pass width increases by 10%, and mill speed reduces by 4%, and roll gap pre-adjustment amount reduces 20%P 0/ K;
The 2nd frame, the roll pass width increases by 10%, and mill speed is constant, and roll gap pre-adjustment amount reduces 15%P 0/ K;
The 1st frame, roll pass is constant, and mill speed improves 4%, and roll gap pre-adjustment amount reduces 5%P 0/ K;
After adjusting, between 1-2 frame, 2-3 frame, these main transformer shape frames of 3-4 frame, realized that thrust is rolling, controlled ring effectively.Between 4-5 frame, 5-6 frame, 6-7 frame, realized tension-rolling, constant with the dimensions that guarantees its finished product tubing.Between the 7-8 frame of rolling outlet, realized that microthrust is rolling, made between pipe and plug and produce the gap.
Rolling the back assay shows: the pipe sizing of producing meets the specification of 152.5 * 4.0 millimeters of Φ.The average thick of pipe middle part is S In=4.06 millimeters, head thickest Smax 1=4.28 millimeters, afterbody thickest Smax 2=4.34 millimeters,
Figure C9510976900051
All less than 8%.

Claims (1)

1. full-floating plug continuously rolling process, it is characterized in that: designed with the pair rolling of following each frame metal mass flow equal principle in the continuous rolling process, the roll pass of each frame, mill speed and roll gap pre-adjustment amount parameter are the basic process parameter, it is adjusted, make the operation of rolling realize that in main transformer shape frame thrust is rolling, frame near outlet beyond main transformer shape frame realizes tension-rolling, and concrete method of adjustment is as follows:
(1) be the benchmark frame with frame second from the bottom, this frame adopts roll pass, mill speed and the roll gap pre-adjustment amount of pair rolling;
(2) the frame frame does not adopt the roll pass and the roll gap pre-adjustment amount of pair rolling, and mill speed reduces 0.2%-1% than pair rolling speed;
(3) the roll gap pre-adjustment amount of each frame employing pair rolling of approaching outlet beyond the main transformer shape frame, export to Way in by rolled piece, the roll pass of each frame, on pair rolling roll pass basis, increase the pass width by frame, recruitment is for increasing progressively 2%-3% by frame, each frame mill speed reduces by frame than pair rolling speed, and the reduction amount is the 0.5%-3% that successively decreases by frame;
(4) first frames adopt the roll pass of pair rolling, and mill speed improves 1%-6% than pair rolling speed, and roll gap pre-adjustment amount reduces (5%-10%) P than the roll gap pre-adjustment amount of pair rolling 0/ K;
(5) other each main transformer shape frame, its roll pass is on pair rolling roll pass basis, the pass width increases 5%-10%, enter the mouth to Way out by rolled piece, the mill speed of each frame reduces by frame than pair rolling speed, its reduction amount is the 0-5% that successively decreases by frame, and the roll gap pre-adjustment amount of each frame reduces (5%-20%) P than the roll gap pre-adjustment amount of pair rolling 0/ K;
P wherein 0Be the roll-force of place frame pair rolling, K is the stiffness coefficient of place frame.
CN95109769A 1995-08-22 1995-08-22 Full-floating plug continuously rolling process Expired - Fee Related CN1044205C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN95109769A CN1044205C (en) 1995-08-22 1995-08-22 Full-floating plug continuously rolling process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN95109769A CN1044205C (en) 1995-08-22 1995-08-22 Full-floating plug continuously rolling process

Publications (2)

Publication Number Publication Date
CN1119562A CN1119562A (en) 1996-04-03
CN1044205C true CN1044205C (en) 1999-07-21

Family

ID=5077352

Family Applications (1)

Application Number Title Priority Date Filing Date
CN95109769A Expired - Fee Related CN1044205C (en) 1995-08-22 1995-08-22 Full-floating plug continuously rolling process

Country Status (1)

Country Link
CN (1) CN1044205C (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102873100B (en) * 2011-07-13 2014-12-17 中冶东方工程技术有限公司 Three-roller full-floating mandrel continuous pipe rolling mill and rolling process thereof
CN106944484B (en) * 2017-03-27 2018-10-12 内蒙古包钢钢联股份有限公司 A kind of method that mandrel mill roll hides plug

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1093622A (en) * 1992-12-11 1994-10-19 住友金属工业株式会社 Method and apparatus with plug tandem rolling tube machine stretching metal tube

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1093622A (en) * 1992-12-11 1994-10-19 住友金属工业株式会社 Method and apparatus with plug tandem rolling tube machine stretching metal tube

Also Published As

Publication number Publication date
CN1119562A (en) 1996-04-03

Similar Documents

Publication Publication Date Title
EP1000676A3 (en) Bending rolls, and pipe formed thereby
CN110000209B (en) 4-pass rolling method for aluminum foil with thickness of 0.005mm
CN109550791B (en) Tension system optimization method of cold continuous rolling unit with cavity opening prevention and control as target
CN1044205C (en) Full-floating plug continuously rolling process
AU2006326711B2 (en) Method for the continuous casting of thin metal strip and continuous casting installation
US4409810A (en) Process for manufacturing seamless metal tubes
CN1014500B (en) Apparatus and technology for cold-rolling steel reinforcement with thread
SE448525B (en) SET TO FORM THE TOPIC
CN1608759A (en) Rolling pass system for deformed channel steel
CN101683661B (en) Method for improving rolling quality of barrel-shaped puncher for rolling hollow billet
CN2229932Y (en) Coiler
GB1563920A (en) Tube rolling
CN1020072C (en) Continuous rotting mill for cold-roeled threaded reinforcing bar
US5156035A (en) Method and apparatus for manufacturing seamless tubes
US4414832A (en) Start-up and steady state process control for cooperative rolling
CN116140352A (en) Control method for preventing small-size wire rod from reducing sizing and leaving tail
JPS6035206B2 (en) Seamless steel pipe manufacturing method
CN205309023U (en) A format roll for producing novel steel band reinforcing polyethylene helical bellows
CN2248100Y (en) New-type multi-roll cold-reducing mill head
RU2331492C2 (en) Method of manufacturing screw and section pipes with hollow screw crimps
CN102873100B (en) Three-roller full-floating mandrel continuous pipe rolling mill and rolling process thereof
SU1007771A1 (en) Pilgrim roll groove
JP2541326B2 (en) Shaped steel rolling method
CN1100010A (en) Trommel rolling method for tail end of continuously rolled pipe
SU1696019A1 (en) Blank for helical piercing of sleeves

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: BAOSHAN IRON & STEEL CO., LTD.

Free format text: FORMER NAME OR ADDRESS: SHANGHAI BAO STEEL GROUP IRON AND STEEL CO LTD

Owner name: SHANGHAI BAO STEEL GROUP IRON AND STEEL CO LTD

Free format text: FORMER NAME OR ADDRESS: BAOSHAN STEEL GROUP IRON AND STEEL CO LTD

CP03 Change of name, title or address

Address after: 201900, Fujin Road, Shanghai, Baoshan District orchard

Patentee after: BAOSHAN IRON & STEEL Co.,Ltd.

Address before: 200122 No. 370 Pu circuit, Shanghai, Pudong New Area

Patentee before: BAOSHAN IRON & STEEL CO.,LTD.

Address after: 200122 No. 370 Pu circuit, Shanghai, Pudong New Area

Patentee after: BAOSHAN IRON & STEEL CO.,LTD.

Address before: 201900 No. 1, Middle Road, Baoshan District, Shanghai

Patentee before: Baosteel Group Corporation

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 19990721

Termination date: 20130822