CN104419386A - Workover fluid for high-viscosity medium-depth oil wells - Google Patents

Workover fluid for high-viscosity medium-depth oil wells Download PDF

Info

Publication number
CN104419386A
CN104419386A CN201310398228.6A CN201310398228A CN104419386A CN 104419386 A CN104419386 A CN 104419386A CN 201310398228 A CN201310398228 A CN 201310398228A CN 104419386 A CN104419386 A CN 104419386A
Authority
CN
China
Prior art keywords
workover fluid
oil
depth
oil pipe
workover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310398228.6A
Other languages
Chinese (zh)
Inventor
苑新红
党智龙
殷红
传平
刘永旗
许广平
窦军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Karamay Xinke'ao Petroleum & Natural Gas Technology Co Ltd
Original Assignee
Karamay Xinke'ao Petroleum & Natural Gas Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Karamay Xinke'ao Petroleum & Natural Gas Technology Co Ltd filed Critical Karamay Xinke'ao Petroleum & Natural Gas Technology Co Ltd
Priority to CN201310398228.6A priority Critical patent/CN104419386A/en
Publication of CN104419386A publication Critical patent/CN104419386A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/02Well-drilling compositions
    • C09K8/04Aqueous well-drilling compositions
    • C09K8/06Clay-free compositions
    • C09K8/12Clay-free compositions containing synthetic organic macromolecular compounds or their precursors
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/52Compositions for preventing, limiting or eliminating depositions, e.g. for cleaning
    • C09K8/524Compositions for preventing, limiting or eliminating depositions, e.g. for cleaning organic depositions, e.g. paraffins or asphaltenes

Landscapes

  • Chemical & Material Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Lubricants (AREA)

Abstract

The invention provides a workover fluid for high-viscosity medium-depth oil wells. The workover fluid is prepared from the following components: 0.1%-10% of petroleum sulfonate, 0.2%-1% of potassium chloride, 0.1%-5% of polyquaternary ammonium salt, 1%-2% of aromatic hydrocarbon, 0.1%-5% of polyisobutylene succinimide, 0.01-0.1% of polymethacrylate and the balance of water; all the components are added to a proper amount of water and just stirred evenly, and then can be used. The workover fluid for the high-viscosity medium-depth oil wells is suitable for oil pipe extracting or setting operations of heavy oil wells having the viscosity of crude oil of 10000mpa.s to 15000mpa.s and the well depth of greater than 1000m. The oil pipe extracting or setting operations of the high-viscosity medium-depth oil wells can be performed smoothly and the workover fluid injection pumping pressure can be reduced by more than 70%; the temperature of the workover fluid is reduced, the energy consumption is reduced, the operation speed is high, and one oil pipe can be extracted or set only by about 0.1 minute; the workover fluid can be reused by 8 times; when the effect of the workover fluid becomes poor, the components are properly supplemented and then the initial effect of the workover fluid can be recovered.

Description

Dark oil well workover fluid in high thickness
Technical field
The present invention relates to the composition technology of International Classification of Patents C09K8/00 for drilling well, dark oil well workover fluid in especially high thickness.
Background technology
For oil well dark in high thickness, existing conventional heat flush technology cannot complete the lower oil tube operation of workover treatment at all, and the viscosity of super-viscous oil reduces flex point generally more than 90 DEG C.
When well depth is more than 800 meters, once viscous crude is full of pit shaft, well workover can not be carried out substantially, can only cause closing well, scrap.
When the well that well depth is less than 800 meters, can injecting steam.But it is general in multilayer position, indivedual heavy oil wells in thin oil block, there is no steam, conventional workover fluid, well control fluid or anti-swollen liquid are heated to more than 100 DEG C by existing oil field 300 type deep fat pump trucks, then be injected in oil well with 700 type pump trucks by oil pipe column, high temperature workover fluid makes viscous crude thinning and discharges, and oil pipe column can slowly propose or RIH.5 ~ 15 minutes consuming time of next root oil pipe, consuming workover fluid is 2 ~ 5 sides.But, for in dark high viscosity heavy oil well, namely viscosity of thickened oil is greater than 10000mpa.s, well depth is when being greater than 1000 meters, propose or under the workover fluid entered needed for oil pipe inject pump pressure and will be greater than inlet device pressure-bearing limit value, dark high viscosity heavy oil well during conventional Heavy Oil well lower oil tube technology cannot be applied to.Patents document discloses less, as:
Chinese patent application 201210528367.1 is based on the constructional method of liquid polymers preparation workover fluid, step one, in Agitation Tank or dosing pond, add water, start agitator or recycle pump, polymkeric substance is added in the water of flowing, working concentration≤30% of polymkeric substance in water, dissolution time is about 2-10min, and viscosity > 10mpa.s after dissolving, can obtain workover fluid after stirring; Step 2, enter truck-mounted blender with the workover fluid of the direct extraction step one of pump, be mixed into propping agent simultaneously, the mass ratio of propping agent and workover fluid and sand, than≤250%, stir 30s mono-2min, pump into stratum after mixing in truck-mounted blender.
Chinese patent application 88108894.3 discloses a kind of oil in water liquid for repairing well; solve oil field pollution problem to oil reservoir in workover operation construction preferably; its main technical schemes is: add in one ton of water: wilkinite 80 ~ 145 kilograms; 34 ~ 36 kilograms, machine oil; Polyanionic Cellulose 2 ~ 4.5 kilograms; 3.4 ~ 3.6 kilograms, washing powder, ground barium sulfate 0-920 kilogram (volume density requires and determines); Its compound method: the ground barium sulfate in proportion after mixing, wilkinite and Polyanionic Cellulose add in pond slowly, after stirring, under agitation add machine oil according to quantity successively again, washing powder, fully after mixing, vigorous stirring more than 20 minutes again under spray gun coordinates.
Summary of the invention
The object of the invention is to propose dark oil well workover fluid in a kind of high thickness, reduce workover fluid and inject pump pressure, to make in high thickness dark oil well proposition or under enter that oil pipe is smooth and easy to carry out fast.
The object of the invention is realized by following technical measures: workover fluid forms component and is: sulfonated petro-leum 0.1% ~ 10%, Repone K 0.2% ~ 1%, polyquaternium 0.1% ~ 5%, aromatic hydrocarbon 1 ~ 2%, polyisobutene succinimide 0.1% ~ 5%, polymethacrylate 0.01 ~ 0.1%, all the other are water; Each component is added in appropriate water, stirs and can use.
Especially, be applicable to viscosity of crude 10000mpa.s ~ 15000mpa.s, well depth be greater than 1000m heavy oil wells propose or under enter oil pipe operation.
Especially, method for implanting is: with 300 type deep fat pump trucks, this workover fluid is heated to 30 DEG C ~ 80 DEG C, then with 700 type pump trucks by wait to propose or under the oil pipe column that enters this workover fluid is injected oil well.
The invention has the beneficial effects as follows: dark oil well in high thickness can be made to propose or under enter that oil pipe is smooth and easy to carry out, workover fluid can be reduced and inject pump pressure more than 70%, not only reduce workover fluid temperature, reduce energy consumption, meanwhile, reduce job safety risk, operating speed is fast, propose or under enter an oil pipe only about 0.1 minute consuming time, this workover fluid is reusable reaches 8 times, and when deleterious, suitable supplemental components can recover initial effect.This patent workover fluid, at viscosity break ratio >=90% of 50 DEG C, anti-clayswelling rate >=90%.
Embodiment
The present invention is applicable to viscosity of crude 10000mpa.s ~ 15000mpa.s, well depth be greater than 1000m heavy oil wells propose or under enter oil pipe operation.
In height thickness of the present invention, dark oil well workover fluid formation component is: sulfonated petro-leum 0.1% ~ 10%, Repone K 0.2% ~ 1%, polyquaternium 0.1% ~ 5%, aromatic hydrocarbon 1 ~ 2%, polyisobutene succinimide 0.1% ~ 5%, polymethacrylate 0.01 ~ 0.1%, all the other are water; Each component is added in appropriate water, stirs and can use.
When the present invention applies, method for implanting is: with 300 type deep fat pump trucks, this workover fluid is heated to 30 DEG C ~ 80 DEG C, then with 700 type pump trucks by wait to propose or under the oil pipe column that enters this workover fluid is injected oil well.Thus make oil pipe viscous crude thinning rapidly and discharge from oil jacket annular space and the annular space between oil pipe and sleeve pipe, well workover machinery can be proposed smoothly rapidly or under enter oil pipe column.
Application of the present invention, dark oil well in high thickness can be made to propose or under enter that oil pipe is smooth and easy to carry out, workover fluid can be reduced and inject pump pressure more than 70%, not only reduce workover fluid temperature, reduce energy consumption, simultaneously, reduce job safety risk, operating speed is fast, propose or under enter an oil pipe only about 0.1 minute consuming time, this workover fluid is reusable reaches 8 times, and when deleterious, suitable supplemental components can recover initial effect.At viscosity break ratio >=90% of 50 DEG C, anti-clayswelling rate >=90%.

Claims (3)

1. dark oil well workover fluid in high thickness, it is characterized in that, workover fluid forms component: sulfonated petro-leum 0.1% ~ 10%, Repone K 0.2% ~ 1%, polyquaternium 0.1% ~ 5%, aromatic hydrocarbon 1 ~ 2%, polyisobutene succinimide 0.1% ~ 5%, polymethacrylate 0.01 ~ 0.1%, all the other are water; Each component is added in appropriate water, stirs and can use.
2. dark oil well workover fluid in high thickness as claimed in claim 1, is characterized in that, be applicable to viscosity of crude 10000mpa.s ~ 15000mpa.s, well depth be greater than 1000m heavy oil wells propose or under enter oil pipe operation.
3. dark oil well workover fluid in high thickness as claimed in claim 1, it is characterized in that, method for implanting is: with 300 type deep fat pump trucks, this workover fluid is heated to 30 DEG C ~ 80 DEG C, then with 700 type pump trucks by wait to propose or under the oil pipe column that enters this workover fluid is injected oil well.
CN201310398228.6A 2013-09-05 2013-09-05 Workover fluid for high-viscosity medium-depth oil wells Pending CN104419386A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310398228.6A CN104419386A (en) 2013-09-05 2013-09-05 Workover fluid for high-viscosity medium-depth oil wells

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310398228.6A CN104419386A (en) 2013-09-05 2013-09-05 Workover fluid for high-viscosity medium-depth oil wells

Publications (1)

Publication Number Publication Date
CN104419386A true CN104419386A (en) 2015-03-18

Family

ID=52969519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310398228.6A Pending CN104419386A (en) 2013-09-05 2013-09-05 Workover fluid for high-viscosity medium-depth oil wells

Country Status (1)

Country Link
CN (1) CN104419386A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070060482A1 (en) * 2005-09-13 2007-03-15 Halliburton Energy Services, Inc. Methods and compositions for controlling the viscosity of viscoelastic surfactant fluids
CN101235279A (en) * 2007-02-02 2008-08-06 富顺集团控股有限公司 Highly effective viscosity-reducing agent for thermodynamic oil extraction process
CN101768462A (en) * 2008-12-31 2010-07-07 中国石油化工股份有限公司 Emulsifying and viscosity-decreasing method of thick oil
CN102876310A (en) * 2011-07-14 2013-01-16 中国石油化工股份有限公司 Viscous oil emulsification and viscosity reduction agent

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070060482A1 (en) * 2005-09-13 2007-03-15 Halliburton Energy Services, Inc. Methods and compositions for controlling the viscosity of viscoelastic surfactant fluids
CN101235279A (en) * 2007-02-02 2008-08-06 富顺集团控股有限公司 Highly effective viscosity-reducing agent for thermodynamic oil extraction process
CN101768462A (en) * 2008-12-31 2010-07-07 中国石油化工股份有限公司 Emulsifying and viscosity-decreasing method of thick oil
CN102876310A (en) * 2011-07-14 2013-01-16 中国石油化工股份有限公司 Viscous oil emulsification and viscosity reduction agent

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵凤兰等: "用于预防和解除有机垢的修井液添加剂", 《钻井液与完井液》 *

Similar Documents

Publication Publication Date Title
CN101323780B (en) Low pervasion oilfield thermochemical cleanup additive and use thereof
CN102996107A (en) Fracturing process for online continuous preparation based on liquid polymer
CN105112040B (en) A kind of fracturing process of the recyclable clean fracturing fluid of gas well high temperature resistant
CN102423655B (en) Large-flow fracturing fluid preparation system and method
CN103321606A (en) Low-permeability fractured reservoir oil well water-plugging and screening method
CN108517204A (en) A kind of three-in-one acidification blocking remover and its application process for de-plugging of well
CN104031625A (en) Blocking remover used for hypotonic inhomogeneous sandstone reservoir and using method of blocking remover
CN103603644B (en) Fracturing process for Recyclable fracturing fluid used for fracturing construction of sandstone gas reservoir
CN105134110B (en) A kind of cleaning method of high density drilling fluid mud cake
CN109723423A (en) It is a kind of to utilize the up-front compound acid fracturing method of phase-change material supporting crack
CN104388066A (en) Preparation method of plugging agent for drilling fluid
CN110804431A (en) Thickening autogenous acid generating system for oil-gas reservoir acid fracturing production increasing measures and preparation method
CN109826590A (en) A kind of old well water blockoff fracturing process of hypotonic oil gas field High water cut
CN106753299A (en) A kind of thin oil well selective water shutoff agent and preparation method and application
CN108949132B (en) Sand consolidation and blockage removal treatment fluid for sand prevention of fine silt reservoir oil well, sand prevention treatment fluid system and sand prevention method using sand consolidation and blockage removal treatment fluid system
CN115703962A (en) Blocking remover and construction method thereof
CN105985764A (en) Fracturing fluid, and preparation method and application thereof
CN104419386A (en) Workover fluid for high-viscosity medium-depth oil wells
CN110094190B (en) Wellhead injection device and injection method for skid-mounted jelly dispersion soft heterogeneous composite oil displacement system and application
CN204646207U (en) A kind of integrated acidification to dispel block application system that offshore oilfield is provided
CN110358514A (en) A kind of accumulation type water solubility diverting agent and preparation method thereof
CN110643337A (en) Degradation agent for removing polymer blockage of sand control well near wellbore zone of screen pipe in polymer injection zone and preparation method and application thereof
CN102061153B (en) Crude oil emulsifying agent for water plugging of oil well and preparation method thereof
CN109575908A (en) A kind of fracturing fluid and the preparation method and application thereof of self-generating proppant
CN203448043U (en) Underground synthetic gel profile control matching device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150318

WD01 Invention patent application deemed withdrawn after publication