CN104404894A - High-speed rail bridge wind shielding structure wind shielding plate - Google Patents
High-speed rail bridge wind shielding structure wind shielding plate Download PDFInfo
- Publication number
- CN104404894A CN104404894A CN201410706131.1A CN201410706131A CN104404894A CN 104404894 A CN104404894 A CN 104404894A CN 201410706131 A CN201410706131 A CN 201410706131A CN 104404894 A CN104404894 A CN 104404894A
- Authority
- CN
- China
- Prior art keywords
- wind
- wind shielding
- board
- shielding structure
- speed rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F7/00—Devices affording protection against snow, sand drifts, side-wind effects, snowslides, avalanches or falling rocks; Anti-dazzle arrangements ; Sight-screens for roads, e.g. to mask accident site
- E01F7/02—Snow fences or similar devices, e.g. devices affording protection against sand drifts or side-wind effects
- E01F7/025—Devices specially adapted for protecting against wind, e.g. screens, deflectors or attenuators at tunnel or lock entrances
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
The invention relates to a high-speed rail bridge wind shielding structure wind shielding plate. The existing ordinary-speed rail bridge wind shielding measures cannot satisfy a windproof requirement of a high-speed rail bridge in a strong wind area. The wind shielding plate is spliced by a plurality of wind shielding unit plates which are parallel up and down, the wind shielding unit plates are cross corrugated steel plates, the height of every plate is 0.5m, the length is 1.5 to 2m, the thickness is 3 to 4mm, and the wave height is 70mm; wind shielding plate opening holes are formed in the wind shielding unit plates; the wind shielding plate opening holes comprise long circular end holes and short circular end holes which are arranged with intervals and the opening percentage is 10% or 20%; the left ends and the right ends of the wind shielding unit plates are provided with clamping grooves which are used for being fixed with vertical columns and bolt holes which are used for arranging wind screening plate fixing bolts are reserved. The high-speed rail bridge wind shielding structure wind shielding plate is fixed between the vertical columns 4 which are arranged on a windward side of the bridge with intervals to form into a wind shielding structure for the bridge, the wind reduction effect is good, the rigidity and the intensity are high, the installation is easy, and a high-speed rail bridge requirement for wind proof can be suitable.
Description
Technical field
the invention belongs to the windproof technical field of high-speed railway, be specifically related to a kind of high-speed railway bridge wind shielding structure verge board.
Background technology
Be positioned at the railway in strong wind area, the situation that train is turned over by large wind often occurs.The Bai Lifeng district that wherein Xinjiang is domestic, three Shi Lifeng districts are one of China and even railway disaster caused by a windstorm is the most serious in the world area.Repeatedly there is the accident that train is turned over by large wind for many years, bring huge economic loss and serious social influence to the transport production of railway.
High Speed Railway Trains, because speed is fast, axle heavy and light, more easily topples under horizontal high wind effect; Train aerodynamic-force is much larger than general fast railroad train simultaneously, therefore by needing extensive installation bridge wind shielding structure during wind district.But at present existing general fast bridge wind shielding structure, all can not meet the instructions for use of high-speed railway in make an uproar control, durability, degree easy for installation of checking effect, the rigidity of structure, stress, wind.
Summary of the invention
The object of this invention is to provide a kind of high-speed railway bridge wind shielding structure verge board, checking better effects if, rigidity and intensity are higher, installation is easier.
The technical solution adopted in the present invention is:
High-speed railway bridge wind shielding structure verge board, is characterized in that:
Described verge board is spliced by some unit boards that keeps out the wind parallel up and down and forms, and is transverse wave steel plate, every plate hight 0.5m, long 1.5-2m, thick 3-4mm, wave height 70mm;
The described unit board that keeps out the wind is provided with verge board perforate, is nose circle perforate, comprise oval stomidium and short nose circle hole, and interval is arranged.
Described two ends, unit board left and right of keeping out the wind are provided with the draw-in groove for fixing with column, and are reserved with bolt hole for arranging verge board set bolt.
The percent opening of the described unit board that keeps out the wind is 10% or 20%;
During 20% percent opening, every block keeps out the wind on unit board waveform hypotenuse and offers 3 rows of openings, flat section offers 1 round;
During 10% percent opening, every block keeps out the wind on unit board waveform hypotenuse and offers 1 rows of openings.
Described oval stomidium and short nose circle hole height are 14mm, and length is respectively 45mm and 22mm, hole center distance 51mm.
The present invention has the following advantages:
1) verge board is separated into the unit board that keeps out the wind by the present invention, by optimizing the technical data of verge board, makes wind shielding structure on wind field guiding, sea land distribution, material usage, construction and installation and environmental noise abatement, reach optimum.
2) in conjunction with the change of wind outside ambient wind velocity and bridge height, by choose reasonable wave height, thickness of slab, percent opening, in the visual field effect ensureing under the beam wind of structure topples safe prerequisite to rigidity and train, decrease materials'use amount, improve passenger simultaneously, improve level of comfort.
3) perforate mode is oval stomidium and short nose circle hole interlaced arrangement, by the change of this pass, reduce incoming flow wind speed, on the other hand incoming flow wind on the one hand by after wind shielding structure unit board, form turbulent flow and change wind direction, thus reduce the horizontal kinetic energy of wind greatly, reduce beam wind to the impact of train, thus reach the object of keeping out the wind.
4) unit board two ends of keeping out the wind are provided with draw-in groove, are connected with column by the draw-in groove of plate end, are more convenient for installing, and reduce the problem of unit board stress raisers.Adopt the connected mode of overlap joint between plate and plate, decrease wind and make an uproar.
5) the overall percent opening of unit board can need flexible combination according to windproof
Verge board vertically arranges the windproof needs according to train, adopts 10% percent opening verge board and 20% percent opening verge board vertically to combine, and the overall percent opening of unit board can need flexible combination according to windproof.Adopt 10% percent opening verge board within the scope of the above 1-2m of bridge floor, within the scope of all the other 3.0-2.0m, adopt 20% percent opening verge board.Combination percent opening not only ensure that the overall percent opening of structure is less than 20%, meanwhile, reduces perforate, can further improve checking effect for the downside of train checking most pronounced effects.
6) utilize the change of percent opening, rationally solve the wind field transition of Qiao Lu, bridge tunnel changeover portion.
The changeover portion that abutment is connected with roadbed and tunnel, the percent opening of bridge road wind shielding structure is adjusted to 10%, achieves the windproof effect transition of solid windbreak or roadbed open cut tunnel wind shielding structure with roadbed smoothly, avoids wind field sudden change, on the impact of train operation.Through the test of motor-car real vehicle strong wind, respond well.
7) adopt weathering steel, reduce maintenance workload
Corrugated sheet steel considers that Xinjiang region lacks rainwater, evaporation capacity is large, serious natural characteristic of simultaneously eroding, and adopts weathering steel.Utilize the air weather resisteant of weathering steel, reduce maintenance workload.
8) set up draw-in groove outside unit board, improve unit board rigidity, ensure that in transport, installation and can not deform; Draw-in groove and unit board with bolts, and arrange segmentation weld seam in the end be connected with draw-in groove, ensure that the reliable power transmission of unit board and draw-in groove, and avoid open elliptical aperture on unit board, the stress causing unit board locally to weaken to bring is concentrated.
9) draw-in groove arranges elliptical aperture, and double nut and locking pin are set, meet and install and screw retention requirement, for adapting to the needs of alignment error, draw-in groove arranging elliptical aperture, and increases the scope of tolerance fit, adapt to column interval error preferably.The connection of unit board and column adopts the mode arranging check washer, double nut and locking pin, solves bolt and loosens problem.The nut of unit board and column of keeping out the wind in installation is positioned at away from line side, and has draw-in groove to stop, ensure that bolt accidental removal, train also can not occur and adsorb the safety problem caused.Draw-in groove and column easy to connect, the installation of bolt and safeguarding all is carried out inside circuit, when more the connection avoiding corrugated sheet and column adopts and directly connects, install and the operation of the plug-in construction of maintenance personnel need inconvenient and dangerous.
Accompanying drawing explanation
Fig. 1 is front view of the present invention.
Fig. 2 is lateral view of the present invention.
Fig. 3 is top view of the present invention.
In figure, 1-keeps out the wind unit board, the perforate of 2-verge board, 3-draw-in groove, 4-column, 5-verge board set bolt, the 6-beam body edge of a wing.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the present invention will be described in detail.
A kind of high-speed railway bridge wind shielding structure verge board involved in the present invention, being fixed on bridge windward side spaced column 4(spacing is 1.6-2.5m) between, the wind shielding structure of composition bridge.Verge board is spliced by some unit boards 1 that keeps out the wind parallel up and down and forms, and is transverse wave steel plate, every plate hight 0.5m, long 1.5-2m, thick 3-4mm, wave height 70mm, waveform hypotenuse rake angle 50 degree.Keep out the wind on unit board 1 and be provided with verge board perforate 2, being nose circle perforate, is highly 14mm, comprises oval stomidium (length 45mm) and short nose circle hole (length 22mm), and interval is arranged, and hole center distance 51mm, percent opening is 10% or 20%.During 20% percent opening, every module unit Lamb wave shape hypotenuse offers 3 rows of openings, flat section offers 1 round.During 10% percent opening, every module unit Lamb wave shape hypotenuse offers 1 rows of openings.Adopt 10% percent opening within the scope of the above 1.0-2.0m of bridge floor, within the scope of all the other, adopt 20% percent opening, different percent opening combinations also can be set between different columns 4.
Unit board about 1 two ends of keeping out the wind are provided with draw-in groove 3 for fixing with column, and are reserved with bolt hole for arranging verge board set bolt 5.
Content of the present invention is not limited to cited by embodiment, and the conversion of those of ordinary skill in the art by reading manual of the present invention to any equivalence that technical solution of the present invention is taked, is claim of the present invention and contains.
Claims (4)
1. high-speed railway bridge wind shielding structure verge board, is characterized in that:
Described verge board is spliced by some unit boards that keeps out the wind (1) parallel up and down and forms, and is transverse wave steel plate, every plate hight 0.5m, long 1.5-2m, thick 3-4mm, wave height 70mm;
The described unit board that keeps out the wind (1) is provided with verge board perforate, is nose circle perforate, comprise oval stomidium and short nose circle hole, and interval is arranged.
2. high-speed railway bridge wind shielding structure verge board according to claim 1, is characterized in that:
The described unit board that keeps out the wind (1) two ends, left and right are provided with the draw-in groove (3) for fixing with column, and are reserved with bolt hole for arranging verge board set bolt (5).
3. high-speed railway bridge wind shielding structure verge board according to claim 2, is characterized in that:
The percent opening of the described unit board that keeps out the wind (1) is 10% or 20%;
During 20% percent opening, every block keeps out the wind on unit board (1) waveform hypotenuse and offers 3 rows of openings, flat section offers 1 round;
During 10% percent opening, every block keeps out the wind on unit board (1) waveform hypotenuse and offers 1 rows of openings.
4. high-speed railway bridge wind shielding structure verge board according to claim 3, is characterized in that:
Described oval stomidium and short nose circle hole height are 14mm, and length is respectively 45mm and 22mm, hole center distance 51mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410706131.1A CN104404894A (en) | 2014-11-28 | 2014-11-28 | High-speed rail bridge wind shielding structure wind shielding plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410706131.1A CN104404894A (en) | 2014-11-28 | 2014-11-28 | High-speed rail bridge wind shielding structure wind shielding plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104404894A true CN104404894A (en) | 2015-03-11 |
Family
ID=52642555
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410706131.1A Pending CN104404894A (en) | 2014-11-28 | 2014-11-28 | High-speed rail bridge wind shielding structure wind shielding plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104404894A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107307679A (en) * | 2017-07-03 | 2017-11-03 | 栗春侠 | Infanette |
CN108952315A (en) * | 2018-09-17 | 2018-12-07 | 山西尚风科技股份有限公司 | A kind of checking device |
CN110130516A (en) * | 2019-04-29 | 2019-08-16 | 同济大学 | Corrugated steel board wall assembled height is adjustable connecting node and its installation method |
CN111441268A (en) * | 2020-04-11 | 2020-07-24 | 新疆交通建设集团股份有限公司 | Windproof snow shed tunnel construction method |
CN111676850A (en) * | 2020-04-22 | 2020-09-18 | 青海路拓工程设施制造集团有限公司 | Corrugated steel wind-resistant snow-retaining wall structure and manufacturing and mounting process thereof |
JP7005474B2 (en) | 2018-11-28 | 2022-01-21 | 株式会社栗本鐵工所 | Repair of the outer surface of the balustrade |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11140825A (en) * | 1997-11-13 | 1999-05-25 | Nippon Kankyo Shisetsu Kk | Guardfence |
JP2006169770A (en) * | 2004-12-14 | 2006-06-29 | Nippon Steel Metal Prod Co Ltd | Flat plate-like perforated metal plate and fence using it, and construction method |
CN202730660U (en) * | 2012-08-15 | 2013-02-13 | 北京交通大学 | Socket type wind shielding device of combined structure |
CN202809503U (en) * | 2012-08-31 | 2013-03-20 | 成都市新筑路桥机械股份有限公司 | Connecting structure of novel wind protection screen |
CN202809504U (en) * | 2012-08-31 | 2013-03-20 | 成都市新筑路桥机械股份有限公司 | Waveform wind shutter |
CN204282236U (en) * | 2014-11-28 | 2015-04-22 | 中铁第一勘察设计院集团有限公司 | A kind of high-speed railway bridge wind shielding structure verge board |
-
2014
- 2014-11-28 CN CN201410706131.1A patent/CN104404894A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11140825A (en) * | 1997-11-13 | 1999-05-25 | Nippon Kankyo Shisetsu Kk | Guardfence |
JP2006169770A (en) * | 2004-12-14 | 2006-06-29 | Nippon Steel Metal Prod Co Ltd | Flat plate-like perforated metal plate and fence using it, and construction method |
CN202730660U (en) * | 2012-08-15 | 2013-02-13 | 北京交通大学 | Socket type wind shielding device of combined structure |
CN202809503U (en) * | 2012-08-31 | 2013-03-20 | 成都市新筑路桥机械股份有限公司 | Connecting structure of novel wind protection screen |
CN202809504U (en) * | 2012-08-31 | 2013-03-20 | 成都市新筑路桥机械股份有限公司 | Waveform wind shutter |
CN204282236U (en) * | 2014-11-28 | 2015-04-22 | 中铁第一勘察设计院集团有限公司 | A kind of high-speed railway bridge wind shielding structure verge board |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107307679A (en) * | 2017-07-03 | 2017-11-03 | 栗春侠 | Infanette |
CN108952315A (en) * | 2018-09-17 | 2018-12-07 | 山西尚风科技股份有限公司 | A kind of checking device |
JP7005474B2 (en) | 2018-11-28 | 2022-01-21 | 株式会社栗本鐵工所 | Repair of the outer surface of the balustrade |
CN110130516A (en) * | 2019-04-29 | 2019-08-16 | 同济大学 | Corrugated steel board wall assembled height is adjustable connecting node and its installation method |
CN111441268A (en) * | 2020-04-11 | 2020-07-24 | 新疆交通建设集团股份有限公司 | Windproof snow shed tunnel construction method |
CN111676850A (en) * | 2020-04-22 | 2020-09-18 | 青海路拓工程设施制造集团有限公司 | Corrugated steel wind-resistant snow-retaining wall structure and manufacturing and mounting process thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104404894A (en) | High-speed rail bridge wind shielding structure wind shielding plate | |
CN104032684B (en) | For the built-up type wind barrier of high-speed railway bridge | |
CN102031749B (en) | Grid structure for controlling girder induced vibration of split steel box girder bridge | |
CN203923929U (en) | Road traffic paravent | |
CN208430446U (en) | A kind of Wind-resistance of Bridges device | |
CN101967801A (en) | Wind-break wall of high speed railway | |
CN202913368U (en) | Sound barrier top noise reduction device | |
CN204959587U (en) | Bridge with ceiling structure | |
CN103628405A (en) | Railroad bridge air-guide handrail | |
CN204282236U (en) | A kind of high-speed railway bridge wind shielding structure verge board | |
CN102776845A (en) | Socket type wind shielding device of composite structure | |
CN104389263B (en) | High-speed railway bridge wind shielding structure | |
CN202730660U (en) | Socket type wind shielding device of combined structure | |
CN207091843U (en) | Lattice overhead monorail traffic track beam | |
CN206873289U (en) | A kind of bridge guard rail | |
CN204803773U (en) | Highway wind protective screen stand fixing device | |
CN201738252U (en) | Semi-enclosed hurricane resistant corridor | |
CN208544271U (en) | A kind of suspension type rail to electric installation and its protective device | |
CN209555790U (en) | A kind of bridge abat-vent | |
CN203904858U (en) | Shutter type wind barrier for high-speed railway bridge | |
CN208309460U (en) | A kind of highway barrier obstruction block | |
CN203904889U (en) | Movable guardrail for separation zone opening of highway | |
CN205171394U (en) | Bridge screen that keeps out wind | |
CN203684086U (en) | Wind guiding railing for railroad bridge | |
CN205617277U (en) | Construction sign tablet is prevent wind to high stability |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150311 |
|
RJ01 | Rejection of invention patent application after publication |