CN104404398A - Preparation method of high-strength and high-toughness packing steel strip - Google Patents

Preparation method of high-strength and high-toughness packing steel strip Download PDF

Info

Publication number
CN104404398A
CN104404398A CN201410779927.XA CN201410779927A CN104404398A CN 104404398 A CN104404398 A CN 104404398A CN 201410779927 A CN201410779927 A CN 201410779927A CN 104404398 A CN104404398 A CN 104404398A
Authority
CN
China
Prior art keywords
strength
preparation
steel
temperature
steel strip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410779927.XA
Other languages
Chinese (zh)
Other versions
CN104404398B (en
Inventor
范建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changshu Huaye Steel Strip Co Ltd
Original Assignee
JIANGSU CHANGSHU HUANTONG INDUSTRIAL CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU CHANGSHU HUANTONG INDUSTRIAL CO LTD filed Critical JIANGSU CHANGSHU HUANTONG INDUSTRIAL CO LTD
Priority to CN201410779927.XA priority Critical patent/CN104404398B/en
Publication of CN104404398A publication Critical patent/CN104404398A/en
Application granted granted Critical
Publication of CN104404398B publication Critical patent/CN104404398B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/38Ferrous alloys, e.g. steel alloys containing chromium with more than 1.5% by weight of manganese
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • C21D8/02Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips
    • C21D8/0221Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips characterised by the working steps
    • C21D8/0226Hot rolling
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/02Ferrous alloys, e.g. steel alloys containing silicon
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/04Ferrous alloys, e.g. steel alloys containing manganese
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/60Ferrous alloys, e.g. steel alloys containing lead, selenium, tellurium, or antimony, or more than 0.04% by weight of sulfur

Abstract

The invention discloses a preparation method of high-strength and high-toughness packing steel strip. The preparation method of the high-strength and high-toughness packing steel strip comprises the following steps: (1) selecting and preparing steel material components, wherein the selected steel material comprises the following components in percentage by weight: 0.3-0.37% of carbon, 0.05-0.08% of chromium, 0.45-0.75% of silicon, 1.53-1.75% of manganese, less than or equal to 0.19% of phosphorus, less than or equal to 0.065% of sulfur and the balance of iron; (2) smelting; (3) continuous casting; (4) descaling; (5) rolling; (6) coiling, cooling and storing the steel strip in a storehouse. The preparation method of the high-strength and high-toughness packing steel strip is simple in process and low in cost; the temperature and time for heating a steel slab are reasonably controlled and adjusted; the strength and toughness of the steel strip are effectively improved; the yield and quality of the steel strip are improved; the resource waste is effectively avoided; the prepared steel strip is stable in quality, good in property and wide in market prospect.

Description

A kind of preparation method of high-strength and high ductility steel belt for packages
Technical field
The present invention relates to steel band preparing technical field, particularly relate to a kind of preparation method of high-strength and high ductility steel belt for packages.
Background technology
Along with the fast development of social all trades and professions, the consumption of package steel strip is increasing, and specification of quality is also more and more higher, and high strength, high tenacity have become the inexorable trend of package steel strip development.In prior art, package steel strip often adopts hot rolling, cold rolling associating rolling technology, this complex process, cost is high, and due to the control of billet heating temperature and time unreasonable, cause the intensity of product and toughness all not to reach the service requirements of package steel strip, scrap rate is high, serious waste of resources.
Summary of the invention
The technical problem that the present invention mainly solves is to provide a kind of preparation method of high-strength and high ductility steel belt for packages, can solve the problems referred to above existed in existing package steel strip preparation method.
For solving the problems of the technologies described above, the technical scheme that the present invention adopts is: the preparation method providing a kind of high-strength and high ductility steel belt for packages, comprises the steps:
(1) steel material composition apolegamy: steel material composition and the weight percentage content thereof of selection are: carbon 0.3 ~ 0.37%, chromium 0.05 ~ 0.08%, silicon 0.45 ~ 0.75%, manganese 1.53 ~ 1.75%, phosphorus≤0.19%, sulphur≤0.065%, and surplus is iron;
(2) smelting: inserted in smelting furnace by the raw material in step (1) and be heated into molten iron, then carry out blowing argon gas process with removal of impurities, finally adds reductor and metal niobium carries out deoxidation alloying process;
(3) continuous casting: adopt the method continuous casting of full guard casting to become base the raw material after smelting in step (2);
(4) de-scaling: the blank 10 ~ 30min taking pressure as continuous casting forming in the high pressure water spraying step (2) of 18 ~ 20MPa;
(5) rolling: the blank after de-scaling in step (4) is inserted in Segmented heating stove after heating, then adopt one-pass roller technique carry out roughing, in roll and finish rolling, obtain steel band;
(6) cooling warehouse-in is batched: the cold warehouse-in of freezing air speed will be used after the steel strip coiling of roll forming in step (5).
In a preferred embodiment of the present invention, in described step (2), the temperature of described molten iron is 1300 DEG C, and the injection rate of described argon gas is 15 ~ 20m 3/ min, the winding-up time is 10 ~ 20min; Described reductor is metallic aluminium, and consumption is 5 ~ 10kg/t; The add-on of described metal niobium is 0.06 ~ 0.08% of step (1) Raw weight part.
In a preferred embodiment of the present invention, in the molten steel after described smelting, phosphorus≤0.14%, sulphur≤0.04%, temperature is 1300 ~ 1350 DEG C.
In a preferred embodiment of the present invention, in described step (3), the processing condition of described continuous casting are: middle bag liquid level 500 ~ 530mm, superheating temperature are 18%, pulling rate 1.6m/min.
In a preferred embodiment of the present invention, in described step (5), described process furnace is five-part form process furnace, and comprise preheating section, one section, two sections, three sections and soaking zone, the length of each section is identical, is 5.5m; The steel billet time be placed in stove is 2.5 ~ 3h.
In a preferred embodiment of the present invention, each section of temperature of described five-part form process furnace is: preheating section 810 ~ 840 DEG C, one section 950 ~ 1000 DEG C, two sections 1050 ~ 1150 DEG C, three sections 1210 ~ 1247 DEG C, soaking zone 1250 ~ 1260 DEG C.
In a preferred embodiment of the present invention, in described step (5), the start rolling temperature of described roughing is 1150 ~ 1200 DEG C, and the sotck thinkness after roughing is 30mm; The start rolling temperature rolled in described is 1000 ~ 1050 DEG C, and the sotck thinkness after roughing is 15mm; The start rolling temperature of described finish rolling is 950 ~ 980 DEG C, and the thickness of strips after finish rolling is 2.5 ~ 5.3mm.
In a preferred embodiment of the present invention, in described step (6), the winding rate of described steel band is 3 ~ 5m/min, and temperature when batching is 650 ~ 670 DEG C, and described fast cooling rate rate is 10 ~ 30 DEG C/s.
In a preferred embodiment of the present invention, the tensile strength of described steel band is 790 ~ 850MPa, and elongation is 28 ~ 33%.
The invention has the beneficial effects as follows: the preparation method of a kind of high-strength and high ductility steel belt for packages of the present invention, technological process is simple, cost is low, by conservative control and the Heating temperature and the time that adjust steel billet, effectively improve intensity and the toughness of product, improve yield rate and the quality of steel band, effectively prevent the wasting of resources, prepared steel band steady quality, performance is good, wide market.
Embodiment
Below preferred embodiment of the present invention is described in detail, can be easier to make advantages and features of the invention be readily appreciated by one skilled in the art, thus more explicit defining is made to protection scope of the present invention.
The embodiment of the present invention comprises:
Select the raw material of following composition and weight percentage content thereof: carbon 0.3 ~ 0.37%, chromium 0.05 ~ 0.08%, silicon 0.45 ~ 0.75%, manganese 1.53 ~ 1.75%, phosphorus≤0.19%, sulphur≤0.065%, surplus is iron; Concrete preparation process is as follows:
Embodiment 1
Smelt: the raw material chosen is inserted in smelting furnace and is heated into the molten iron that temperature is 1300 DEG C, then use argon gas with 15m 3the speed winding-up 20min of/min, to remove the impurity component in molten steel, finally add in molten steel per ton and add 5kg metallic aluminium as reductor, add again account for parts by weight of raw materials 0.08% metal niobium carry out Alloying Treatment, by in the molten steel after above-mentioned smelting, phosphorus≤0.14%, sulphur≤0.04%, temperature is 1300 ~ 1350 DEG C;
Continuous casting: adopted by the raw material after above-mentioned smelting the method continuous casting of full guard casting to become base, the processing condition of continuous casting are: middle bag liquid level 500mm, superheating temperature are 18%, pulling rate 1.6m/min;
De-scaling: the blank 30min taking pressure as the above-mentioned continuous casting forming of high pressure water hydro-peening of 18MPa;
Rolling: after the blank after de-scaling being inserted in Segmented heating stove heating, then adopt one-pass roller technique carry out roughing, in roll and finish rolling, obtain steel band; Wherein, process furnace is five-part form process furnace, and its each section of temperature and length are: preheating section 810 DEG C, one section 950 DEG C, two sections 1050 DEG C, three sections 1210 DEG C, soaking zone 1250 DEG C, and the length of each section is identical, is 5.5m, and the steel billet time be placed in stove is 2.5h; The start rolling temperature of described roughing is 1150 DEG C, and the sotck thinkness after roughing is 30mm; The start rolling temperature rolled in described is 1000 DEG C, and the sotck thinkness after roughing is 15mm; The start rolling temperature of described finish rolling is 950 DEG C, and the thickness of strips after finish rolling is 2.5mm;
Batch cooling warehouse-in: steel band shaping for the rolling is batched rolling with 5m/min under the condition of 650 DEG C, and then with freezing air with the fast cold rear warehouse-in of the speed of 10 DEG C/s.
Embodiment 2
Smelt: the raw material chosen is inserted in smelting furnace and is heated into the molten iron that temperature is 1300 DEG C, then use argon gas with 20m 3the speed winding-up 10min of/min, to remove the impurity component in molten steel, finally add in molten steel per ton and add 10kg metallic aluminium as reductor, add again account for parts by weight of raw materials 0.08% metal niobium carry out Alloying Treatment, by in the molten steel after above-mentioned smelting, phosphorus≤0.14%, sulphur≤0.04%, temperature is 1300 ~ 1350 DEG C;
Continuous casting: adopted by the raw material after above-mentioned smelting the method continuous casting of full guard casting to become base, the processing condition of continuous casting are: middle bag liquid level 530mm, superheating temperature are 18%, pulling rate 1.6m/min;
De-scaling: the blank 10min taking pressure as the above-mentioned continuous casting forming of high pressure water hydro-peening of 20MPa;
Rolling: after the blank after de-scaling being inserted in Segmented heating stove heating, then adopt one-pass roller technique carry out roughing, in roll and finish rolling, obtain steel band; Wherein, process furnace is five-part form process furnace, and its each section of temperature and length are: preheating section 840 DEG C, one section 1000 DEG C, two sections 1150 DEG C, three sections 1247 DEG C, soaking zone 1260 DEG C, and the length of each section is identical, is 5.5m, and the steel billet time be placed in stove is 3h; The start rolling temperature of described roughing is 1200 DEG C, and the sotck thinkness after roughing is 30mm; The start rolling temperature rolled in described is 1050 DEG C, and the sotck thinkness after roughing is 15mm; The start rolling temperature of described finish rolling is 980 DEG C, and the thickness of strips after finish rolling is 5.3mm;
Batch cooling warehouse-in: steel band shaping for the rolling is batched rolling with 3m/min under the condition of 670 DEG C, and then with freezing air with the fast cold rear warehouse-in of the speed of 30 DEG C/s.
The tensile strength of steel belt for packages prepared by aforesaid method is 790 ~ 850MPa, and elongation is 28 ~ 33%.
The foregoing is only embodiments of the invention; not thereby the scope of the claims of the present invention is limited; every utilize description of the present invention to do equivalent structure or equivalent flow process conversion; or be directly or indirectly used in other relevant technical fields, be all in like manner included in scope of patent protection of the present invention.

Claims (9)

1. a preparation method for high-strength and high ductility steel belt for packages, is characterized in that, comprises the steps:
(1) steel material composition apolegamy: steel material composition and the weight percentage content thereof of selection are: carbon 0.3 ~ 0.37%, chromium 0.05 ~ 0.08%, silicon 0.45 ~ 0.75%, manganese 1.53 ~ 1.75%, phosphorus≤0.19%, sulphur≤0.065%, and surplus is iron;
(2) smelting: inserted in smelting furnace by the raw material in step (1) and be heated into molten iron, then carry out blowing argon gas process with removal of impurities, finally adds reductor and metal niobium carries out deoxidation alloying process;
(3) continuous casting: adopt the method continuous casting of full guard casting to become base the raw material after smelting in step (2);
(4) de-scaling: the blank 10 ~ 30min taking pressure as continuous casting forming in the high pressure water spraying step (2) of 18 ~ 20MPa;
(5) rolling: the blank after de-scaling in step (4) is inserted in Segmented heating stove after heating, then adopt one-pass roller technique carry out roughing, in roll and finish rolling, obtain steel band;
(6) cooling warehouse-in is batched: the cold warehouse-in of freezing air speed will be used after the steel strip coiling of roll forming in step (5).
2. the preparation method of high-strength and high ductility steel belt for packages according to claim 1, is characterized in that, in described step (2), the temperature of described molten iron is 1300 DEG C, and the injection rate of described argon gas is 15 ~ 20m 3/ min, the winding-up time is 10 ~ 20min; Described reductor is metallic aluminium, and consumption is 5 ~ 10kg/t; The add-on of described metal niobium is 0.06 ~ 0.08% of step (1) Raw weight part.
3. the preparation method of high-strength and high ductility steel belt for packages according to claim 2, is characterized in that, in the molten steel after described smelting, phosphorus≤0.14%, sulphur≤0.04%, temperature is 1300 ~ 1350 DEG C.
4. the preparation method of high-strength and high ductility steel belt for packages according to claim 1, is characterized in that, in described step (3), the processing condition of described continuous casting are: middle bag liquid level 500 ~ 530mm, superheating temperature are 18%, pulling rate 1.6m/min.
5. the preparation method of high-strength and high ductility steel belt for packages according to claim 1, is characterized in that, in described step (5), described process furnace is five-part form process furnace, comprise preheating section, one section, two sections, three sections and soaking zone, the length of each section is identical, is 5.5m; The steel billet time be placed in stove is 2.5 ~ 3h.
6. the preparation method of Bearing Steel Strip according to claim 5, it is characterized in that, each section of temperature of described five-part form process furnace is: preheating section 810 ~ 840 DEG C, one section 950 ~ 1000 DEG C, two sections 1050 ~ 1150 DEG C, three sections 1210 ~ 1247 DEG C, soaking zone 1250 ~ 1260 DEG C.
7. the preparation method of high-strength and high ductility steel belt for packages according to claim 1, is characterized in that, in described step (5), the start rolling temperature of described roughing is 1150 ~ 1200 DEG C, and the sotck thinkness after roughing is 30mm; The start rolling temperature rolled in described is 1000 ~ 1050 DEG C, and the sotck thinkness after roughing is 15mm; The start rolling temperature of described finish rolling is 950 ~ 980 DEG C, and the thickness of strips after finish rolling is 2.5 ~ 5.3mm.
8. the preparation method of high-strength and high ductility steel belt for packages according to claim 1, is characterized in that, in described step (6), the winding rate of described steel band is 3 ~ 5m/min, and temperature when batching is 650 ~ 670 DEG C, and described fast cooling rate rate is 10 ~ 30 DEG C/s.
9. according to the preparation method of the high-strength and high ductility steel belt for packages one of claim 1 to 8 Suo Shu, it is characterized in that, the tensile strength of described steel band is 790 ~ 850MPa, and elongation is 28 ~ 33%.
CN201410779927.XA 2014-12-17 2014-12-17 A kind of preparation method of high-strength and high ductility steel belt for packages Active CN104404398B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410779927.XA CN104404398B (en) 2014-12-17 2014-12-17 A kind of preparation method of high-strength and high ductility steel belt for packages

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410779927.XA CN104404398B (en) 2014-12-17 2014-12-17 A kind of preparation method of high-strength and high ductility steel belt for packages

Publications (2)

Publication Number Publication Date
CN104404398A true CN104404398A (en) 2015-03-11
CN104404398B CN104404398B (en) 2016-08-17

Family

ID=52642061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410779927.XA Active CN104404398B (en) 2014-12-17 2014-12-17 A kind of preparation method of high-strength and high ductility steel belt for packages

Country Status (1)

Country Link
CN (1) CN104404398B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107419178A (en) * 2017-08-08 2017-12-01 鞍山发蓝股份公司 A kind of high-intensity packing steel belt with solderability and preparation method thereof
CN111485180A (en) * 2020-04-16 2020-08-04 铜陵有色金神耐磨材料有限责任公司 Preparation method of tempered martensite wear-resistant steel ball with TiC particles precipitated in complex phase
CN111702010A (en) * 2020-06-23 2020-09-25 中冶赛迪工程技术股份有限公司 Production process of thin strip by continuous casting and rolling

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10130721A (en) * 1996-10-28 1998-05-19 Nippon Steel Corp Production of low yield ratio high tensile strength steel excellent in weldability and low temperature toughness
CN102851476A (en) * 2012-09-14 2013-01-02 武钢集团昆明钢铁股份有限公司 Construction-use HPB300 hot-rolled straight steel bar and preparation method thereof
CN103938087A (en) * 2014-04-10 2014-07-23 铜陵南江鑫钢实业有限公司 High strength high nickel steel material and preparation method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10130721A (en) * 1996-10-28 1998-05-19 Nippon Steel Corp Production of low yield ratio high tensile strength steel excellent in weldability and low temperature toughness
CN102851476A (en) * 2012-09-14 2013-01-02 武钢集团昆明钢铁股份有限公司 Construction-use HPB300 hot-rolled straight steel bar and preparation method thereof
CN103938087A (en) * 2014-04-10 2014-07-23 铜陵南江鑫钢实业有限公司 High strength high nickel steel material and preparation method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107419178A (en) * 2017-08-08 2017-12-01 鞍山发蓝股份公司 A kind of high-intensity packing steel belt with solderability and preparation method thereof
CN107419178B (en) * 2017-08-08 2019-06-04 鞍山发蓝股份公司 A kind of high-intensity packing steel belt and preparation method thereof with solderability
CN111485180A (en) * 2020-04-16 2020-08-04 铜陵有色金神耐磨材料有限责任公司 Preparation method of tempered martensite wear-resistant steel ball with TiC particles precipitated in complex phase
CN111485180B (en) * 2020-04-16 2021-08-31 铜陵有色金神耐磨材料有限责任公司 Preparation method of tempered martensite wear-resistant steel ball with TiC particles precipitated in complex phase
CN111702010A (en) * 2020-06-23 2020-09-25 中冶赛迪工程技术股份有限公司 Production process of thin strip by continuous casting and rolling
CN111702010B (en) * 2020-06-23 2022-03-11 中冶赛迪工程技术股份有限公司 Production process of thin strip by continuous casting and rolling

Also Published As

Publication number Publication date
CN104404398B (en) 2016-08-17

Similar Documents

Publication Publication Date Title
CN101914725B (en) Low-carbon ultra-deep punching cold-rolling steel sheet and production method thereof
CN102174683B (en) Method for producing cold-rolling low-carbon aluminum killed steel with uniform through plate mechanical property
CN105803299B (en) A kind of production method of special thick high cleanliness plastic steel plate for die
CN104233064B (en) Cold rolling IF high-strength steel and the production method thereof of phosphorating of a kind of 170MPa level
CN103451519B (en) A kind of thickness is greater than cold rolling hot dipping steel plating and the production method thereof of 1.5mm bending and forming
CN103589951B (en) The production method of big cross section H profile steel
CN104451386B (en) A kind of low yield strength ratio oil reserve is 610Mpa high-strength steel sheet and manufacture method thereof for tank body
CN105088071A (en) Ultrathin-specification broad hot strip with tensile strength as 600MPa and producing method thereof
CN102825236B (en) Method for removing transverse crack defects of continuous casting billet corner of boron steel
CN104831167A (en) Q550E high-strength steel hot rolled coil and production method thereof
CN104831207A (en) Thin gauge 600MPa grade hot galvanized plate production method
CN102304668B (en) Preparation method of high performance ultra-thick steel plate
CN104805363A (en) Phi 14 mm high-strength wire rod for manufacturing of 1*(7-21.6)/1770 MPa prestressed steel strand and production method of phi 10 mm high-strength wire rod
CN105483557A (en) Steel wire rod for 80 grade core thread external winding wire and manufacturing method of steel wire rod
CN106086348A (en) A kind of cold rolling bailing band of high-strength high-elongation ratio and manufacture method thereof
CN105349884A (en) Ti-contained hot-rolled and acid-pickled enameled steel strip and production method thereof
CN105296853A (en) 930-MPa high-strength finished deformed steel bars and preparation technology thereof
CN100560773C (en) A kind of high-strength anti-fatigue steel products and manufacture method thereof
CN103484766A (en) Hardened and tempered high-strength and low-weld crack sensitivity steel plate for 600MPa-level water-power engineering and preparing method thereof
CN104328338A (en) Small-scale finish-rolled twisted steel and production method thereof
CN104264051A (en) Low-alloy steel hot-rolling coil plate of which yield strength is more than 345Mpa, and preparation method of low-alloy steel hot-rolling coil plate
CN102345049A (en) Low alloy Q345C-Z35 thick plate and production method thereof
CN102952998A (en) 800MPa-grade hot-rolling transformation induced plasticity steel plate and its manufacturing method
CN105256225B (en) Elevator cold-rolled steel sheet and preparation method thereof
CN101831585A (en) High-strength steel for automotive wheels and manufacture method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201217

Address after: No.13 caodang Road, Changshu City, Suzhou City, Jiangsu Province

Patentee after: Changshu intellectual property operation center Co.,Ltd.

Address before: 215500 Xinzhuang Town, Changshou City, Suzhou, Jiangsu

Patentee before: JIANGSU CHANGSHU HUANTONG INDUSTRIAL Co.,Ltd.

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 215500 5th floor, building 4, 68 Lianfeng Road, Changfu street, Changshu City, Suzhou City, Jiangsu Province

Patentee after: Changshu intellectual property operation center Co.,Ltd.

Address before: No.13 caodang Road, Changshu City, Suzhou City, Jiangsu Province

Patentee before: Changshu intellectual property operation center Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220916

Address after: No. 8, Huaye Avenue, Dongbang Town, Changshu City, Suzhou City, Jiangsu Province 215500

Patentee after: Changshu Huaye Steel Strip Co.,Ltd.

Address before: 215500 5th floor, building 4, 68 Lianfeng Road, Changfu street, Changshu City, Suzhou City, Jiangsu Province

Patentee before: Changshu intellectual property operation center Co.,Ltd.