CN104389437B - A kind of reinforced column connects the constructional method that steel column connects structure - Google Patents

A kind of reinforced column connects the constructional method that steel column connects structure Download PDF

Info

Publication number
CN104389437B
CN104389437B CN201410652123.3A CN201410652123A CN104389437B CN 104389437 B CN104389437 B CN 104389437B CN 201410652123 A CN201410652123 A CN 201410652123A CN 104389437 B CN104389437 B CN 104389437B
Authority
CN
China
Prior art keywords
steel column
column
former
steel plate
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410652123.3A
Other languages
Chinese (zh)
Other versions
CN104389437A (en
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN GOLDEN CENTURY ENGINEERING INDUSTRY CO LTD
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201410652123.3A priority Critical patent/CN104389437B/en
Publication of CN104389437A publication Critical patent/CN104389437A/en
Application granted granted Critical
Publication of CN104389437B publication Critical patent/CN104389437B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to the constructional method connecing steel column on a kind of reinforced column and connecting structure, it is applicable to floor and increases and reconstruction project, separate type is set in former column end and tightly binds round casing, and the 3 tight garter springs in road are set on casing, tight with bolt anchor; Steel column bottom is arranged on separate type and tightly binds round casing medium position; Junction steel plate is set bottom steel column, and is symmetrical arranged 2 strengthening rib welded with junction steel plate at steel column web; Being drilled with some holes on junction steel plate in advance, the vertical muscle of the former post exposed after can making to cut certain altitude concrete passes, and vertical for former post muscle and junction steel plate is welded by welded nut. The present invention relates to that structure construction speed is fast, strength of joint height, there is good technical economic benefit.

Description

A kind of reinforced column connects the constructional method that steel column connects structure
Technical field
The present invention relates to the constructional method connecing steel column on a kind of reinforced column and connecting structure, it is applicable to floor and increases and reconstruction project, belong to building engineering technical field.
Background technology
Steel column is coagulation earth pillar embedded set shaped steel combination component, and steel column is as the main body load-bearing component of buildings. Steel column compares general reinforced column, although steel using amount is a little big a little, but resistance to deformation and anti-seismic performance are good. And in construction process, shaped steel has bigger bearing capacity, can be used as scaffolding and use. Conventional relevant to steel column of present stage China is profile steel concrete column, and profile steel concrete column is at shaped steel periphery casting concrete.
Increase for floor and reconstruction project, first to be solved be exactly pillar increase problem. Present stage, the floor of China increased two kinds of methods of generally selecting with reconstruction project pillar: 1, have the electroslag pressure welding that just adopts of reserving rib to connect; 2, chemically-planted steel bar is just adopted to connect without reserving rib. Above two kinds of method reality are all adopt to connect reinforcing bar, and the mode of casting concrete connects post. This two kinds of methods construction is long in time limit, and the big and common concrete member of cost is more and more difficult to meet the building improved constantly and service requirements.
Along with the economic development of China, all kinds of rooms problem constantly occurs. At present, China has extensively carried out the way that newly-built and old room add-story reconstruction combines, and solves the problem of all kinds of rooms deficiency. According to statistics, in all kinds of houses that the whole nation is built, the house of 1/3��1/4 is had to have add-story reconstruction condition.After adopting add-story reconstruction scheme, than " tearing open old newly-built " scheme, there is more advantage. But for add-story reconstruction, but do not have practical method to carry out. For the phenomenon of domestic house land used resource anxiety, country is urgent needs effective method to address this problem.
Therefore, need badly at present and seek a kind of strength of joint height, speed of application, do not increase cost and the connection structure that can extend reinforced column height seems very important again.
Summary of the invention
It is an object of the invention to overcome deficiency of the prior art, a kind of strength of joint that can effectively improve former coagulation earth pillar and steel column is provided, accelerate speed of application, reduce the constructional method connecing steel tube concrete earth pillar on the reinforced column of environmental pollution and connecting structure.
For realizing above-mentioned technical purpose, present invention employs following technical scheme:
This kind of reinforced column connects the constructional method that steel column connects structure, mainly comprises the following steps:
1) cut end concrete: former coagulation earth pillar is designed the above concrete in position and is cut, expose the vertical muscle of former post, excision stirrup, and vertical muscle is cleaned;
2) steel column 1 and junction steel plate is made: steel column and junction steel plate are added man-hour, is welded with steel column by junction steel plate in advance, and welded with web and the junction steel plate of steel column by pre-processed strengthening rib;
3) steel column is fixed on former concrete column end: the steel column combined is hung on the capital of former coagulation earth pillar, it is corresponding that junction steel plate is reserved with hole muscle position vertical with former post, make the hole that vertical muscle is reserved through junction steel plate, the vertical muscle of former post is entangled, and muscle vertical with former post and junction steel plate weld with welded nut;
4) steel pile casting is set: the separate type processed tightly is bound round casing and is enclosed within former coagulation earth pillar, then tight garter spring hoop is tightly bound round on casing in separate type, tightened by bolt, fix;
5) end is built: tightly bind round casing as permanent template using separate type, and at former concrete column end young concrete, overall maintenance is shaping.
As preferably: step 4) in, tight garter spring is according to spaced 3 roads such as the size of separate type tight hoop iron casing is even.
As preferably: step 5) in, answer symmetrical construction during casting concrete, note when vibrating guaranteeing not disturbance steel column and former coagulation earth pillar.
As preferably: step 2) in, described strengthening rib is between steel column web symmetrically arranged two.
The invention has the beneficial effects as follows:
1, the setting that separate type tightly binds round casing serves the effect of template, strengthens steel column and the strength of joint of former coagulation earth pillar as permanent part, and separate type casing is easy for installation simultaneously.
2, tight garter spring strengthens separate type and tightly binds round casing and the friction resistance of former coagulation earth pillar, further increases the bearing capacity of pillar.
3, strengthening rib to be arranged so that steel column is connected with junction steel plate more tight, also improve the resistance to capsizing of steel column.
4, the combination being arranged so that junction steel plate and the vertical muscle of former post of nut more closely, makes the connection of steel column and former coagulation earth pillar more firm.
5, former column end onsite concrete makes steel column embedded in coagulation earth pillar, substantially increases the concatenation ability of the two.
Accompanying drawing explanation
Fig. 1 connects steel column to connect structural upright schematic diagram on reinforced column;
Fig. 2 connects steel column to connect face schematic diagram on reinforced column;
Fig. 3 connects steel column to connect section of structure on reinforced column.
Description of reference numerals: steel column 1;Strengthening rib 2; Tight garter spring 3; Bolt 4; Muscle 5 indulged by former post; Concrete 6; Junction steel plate 7; Welded nut 8; Separate type tightly binds round casing 9; Former coagulation earth pillar 10.
Embodiment
Below in conjunction with drawings and Examples, the present invention is described further. Although the present invention will be described in conjunction with better embodiment, but should know, do not represent and limit the invention in described embodiment. On the contrary, the present invention by contain can be included in attached claim book limit the present invention scope in alternative, modified version and etc. jljl.
As shown in Figures 1 to 3, the present invention comprises former coagulation earth pillar and steel column, and former coagulation earth pillar 10 concrete grade is C30, and diameter is 600mm, vertical muscle diameter 18mm, protective layer thickness 25mm. Steel column 1 is the H profile steel of Q235, high 200mm, wide 200mm, web thickness 8mm, wing plate thickness 12mm.
By top, former coagulation earth pillar 10 end concrete chisel removal, cut height 500mm, expose the vertical muscle 5 of former post, excision stirrup, and cleaned.
The Q235A steel plate adopting 10mm thick makes the circular junction steel plate 7 of diameter 580mm and the isosceles right-angle triangle strengthening rib 2 of square edge 200mm. Junction steel plate 7 is welded on steel column 1 bottom, and on the web that two strengthening rib 2 are symmetrically welded at steel column 1 and junction steel plate 7. The wherein circular hole being circumferentially evenly drilled with 8 20mm diameters of diameter 550mm on circular junction steel plate 7, so that the vertical muscle 5 of former post passes through.
Separate type is tightly bound round the Q235A steel plate that casing 9 adopts 10mm thick and has been rolled, and two lobe casings can be closely integrated into internal diameter 600mm, the hollow original post of external diameter 620mm, high 1000mm. Tight garter spring 3 adopts the Q235A steel plate that 10mm is thick to roll equally, is set to 40mm width, internal diameter 620mm, can tightly bind round casing 9 with separate type and fit tightly, and select M30 bolt 4 in order to fastening.
Again the steel column 1 of the band strengthening rib 2 made, junction steel plate 7 is winched to former coagulation earth pillar 10 to push up, the circular hole making the vertical muscle 5 of former post default on junction steel plate 7, steel column 1 is set to and cuts end, entangle the vertical muscle 5 of former post with welded nut 8 subsequently, and vertical to welded nut 8 and former post muscle 5 and junction steel plate 7 are welded to each other.
Subsequently the two lobe separate types made tightly being bound round casing 9 is enclosed within former coagulation earth pillar 10, and the junction steel plate 7 bottom steel column 1 is positioned at the medium position of casing, is then loaded onto by tight garter spring 3, tightens with bolt 4.
Finally tightly binding round casting concrete in the space that casing 9 and steel column 1 surround in separate type, tightly bind round casing 9 with separate type and do template, overall maintenance is shaping.
Above-mentioned embodiment does not limit the technical scheme of the present invention in any form, and the technical scheme that every employing is equal to replacement or the mode of equivalent transformation obtains all drops on protection scope of the present invention.

Claims (4)

1. reinforced column connects the constructional method that steel column connects structure, mainly comprises the following steps:
1) cut end concrete: former coagulation earth pillar (10) is designed the above concrete in position and is cut, expose the vertical muscle (5) of former post, excision stirrup, and vertical muscle is cleaned;
2) steel column (1) and junction steel plate (7) is made: steel column (1) and junction steel plate (7) are added man-hour, in advance junction steel plate (7) is welded with steel column (1), and pre-processed strengthening rib (2) is welded with web and the junction steel plate (7) of steel column (1);
3) steel column (1) is fixed on former coagulation earth pillar (10) end: the steel column (1) combined is hung on the capital of former coagulation earth pillar (10), it is corresponding that junction steel plate (7) is reserved with hole muscle (5) position vertical with former post, make the hole that vertical muscle is reserved through junction steel plate (7), the vertical muscle (5) of former post is entangled, and muscle (5) vertical with former post and junction steel plate (7) weld with welded nut (8);
4) steel pile casting is set: the separate type processed tightly is bound round casing (9) and is enclosed within former coagulation earth pillar (10), then tight garter spring (3) hoop is tightly bound round on casing (9) in separate type, bolt (4) is tightened, fixes;
5) end is built: tightly bind round casing (9) as permanent template using separate type, and former coagulation earth pillar (10) end young concrete (6), overall maintenance is shaping.
2. reinforced column according to claim 1 connects the constructional method that steel column connects structure, it is characterized in that: step 4) in, tight garter spring (3) is according to spaced 3 roads such as the size of separate type tight hoop iron casing (9) is even.
3. reinforced column according to claim 1 connects the constructional method that steel column connects structure, it is characterized in that: step 5) in, answer symmetrical construction time casting concrete (6), note when vibrating guaranteeing not disturbance steel column (1) and former coagulation earth pillar (10).
4. reinforced column according to claim 1 connects the constructional method that steel column connects structure, it is characterised in that: step 2) in, described strengthening rib (2) is between steel column (1) web symmetrically arranged two.
CN201410652123.3A 2014-11-17 2014-11-17 A kind of reinforced column connects the constructional method that steel column connects structure Expired - Fee Related CN104389437B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410652123.3A CN104389437B (en) 2014-11-17 2014-11-17 A kind of reinforced column connects the constructional method that steel column connects structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410652123.3A CN104389437B (en) 2014-11-17 2014-11-17 A kind of reinforced column connects the constructional method that steel column connects structure

Publications (2)

Publication Number Publication Date
CN104389437A CN104389437A (en) 2015-03-04
CN104389437B true CN104389437B (en) 2016-06-08

Family

ID=52607389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410652123.3A Expired - Fee Related CN104389437B (en) 2014-11-17 2014-11-17 A kind of reinforced column connects the constructional method that steel column connects structure

Country Status (1)

Country Link
CN (1) CN104389437B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804428B (en) * 2016-03-25 2017-10-20 浙江省建筑设计研究院 Increase structural column vertical deformation control structure preparation method afterwards
CN105863297B (en) * 2016-06-15 2017-12-15 福建江夏学院 A kind of reinforced concrete frame column add-story reconstruction structure and construction method
CN109424072B (en) * 2017-08-23 2022-05-03 香港华艺设计顾问(深圳)有限公司 Connecting joint for supporting reinforced concrete columns on steel beams and construction method
TWI656263B (en) * 2017-09-14 2019-04-11 潤弘精密工程事業股份有限公司 Structure of load-bearing columns and factory using the same
CN109505379B (en) * 2017-09-14 2021-08-24 润弘精密工程事业股份有限公司 Bearing column structure and plant using same
CN113338615A (en) * 2021-07-05 2021-09-03 中建科工集团有限公司 A mould for pouring strength nature post
CN113982305A (en) * 2021-10-27 2022-01-28 上海建工二建集团有限公司 Force transmission node of reconstruction and reconstruction structure and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1851202A (en) * 2006-05-26 2006-10-25 上海大学 Steel reinforced concrete rectangular column reinforcing method
JP2007002432A (en) * 2005-06-21 2007-01-11 Kurabo Ind Ltd Method of reinforcing cement-based structure, and cement-based structure reinforced by the method
JP2008088637A (en) * 2006-09-29 2008-04-17 Tokyu Construction Co Ltd Reinforcing member and joint structure of column and beam
CN101397854A (en) * 2008-01-23 2009-04-01 贵州大学 Enveloping prestressing force fastening type steel tube concrete column and reinforcement method
US8281545B2 (en) * 2007-10-09 2012-10-09 Kwang-Won Ind Co., Ltd. Method for retrofitting reinforced concrete column using multi-layered steel plates, and retrofitting structure of reinforced concrete column using the same
CN202899637U (en) * 2012-10-12 2013-04-24 浙江鸿安建设有限公司 Enlarged section reinforced structure for circular reinforced concrete column

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007002432A (en) * 2005-06-21 2007-01-11 Kurabo Ind Ltd Method of reinforcing cement-based structure, and cement-based structure reinforced by the method
CN1851202A (en) * 2006-05-26 2006-10-25 上海大学 Steel reinforced concrete rectangular column reinforcing method
JP2008088637A (en) * 2006-09-29 2008-04-17 Tokyu Construction Co Ltd Reinforcing member and joint structure of column and beam
US8281545B2 (en) * 2007-10-09 2012-10-09 Kwang-Won Ind Co., Ltd. Method for retrofitting reinforced concrete column using multi-layered steel plates, and retrofitting structure of reinforced concrete column using the same
CN101397854A (en) * 2008-01-23 2009-04-01 贵州大学 Enveloping prestressing force fastening type steel tube concrete column and reinforcement method
CN202899637U (en) * 2012-10-12 2013-04-24 浙江鸿安建设有限公司 Enlarged section reinforced structure for circular reinforced concrete column

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
型钢混凝土组合结构安装施工技术;董继勇;《福建建设科技》;20060430;全文 *
浅谈混凝土结构加固技术;李春熙;《科技信息》;20120730(第19期);全文 *
浅谈钢骨混凝土结构构造及施工;高磊;《城市建筑》;20130731;全文 *

Also Published As

Publication number Publication date
CN104389437A (en) 2015-03-04

Similar Documents

Publication Publication Date Title
CN104389437B (en) A kind of reinforced column connects the constructional method that steel column connects structure
CN105649202B (en) Prestressing force assembling frame node structure and its construction method
CN105714933B (en) A kind of beam-column connection in frame structure
CN204326255U (en) A kind of Reinforced Concrete Composite Beams and steel pipe column connected node
CN105256917A (en) Prestressed shear wall and vertical joint combining-connecting structure and construction method thereof
CN202323683U (en) Steel plate light steel fiber concrete pier provided with hooping and stiffening ribs with holes
CN204266193U (en) Pile foundation steel bar cage locator
CN103938730A (en) Combination node for connecting concrete beam with round steel tube concrete column through unbonded prestressed ribs and ordinary steel bars
CN107237453B (en) Steel pipe concrete composite column
CN205046464U (en) Prefabricated assembled concrete bridge mound
CN102535640B (en) Multidirectional rotation structure node for reinforced concrete column and construction method for multidirectional rotation structure node
CN204326250U (en) Direct type steel column syndeton on a kind of reinforced concrete post
CN204825945U (en) A fixture for fixing buried bolt in advance
CN203222817U (en) Connecting structure of basement stand column
CN108277817B (en) Construction method of high-pile bearing platform tower crane foundation reinforcing structure
CN203613796U (en) Recoverable eave tile bolt formwork system of steel-reinforced concrete column
CN103924682A (en) Circular concrete-filled steel tubular column node of unbonded pre-stressing connecting concrete beam
CN106121055B (en) A kind of steel box column and beams of concrete connecting node and its construction method
CN111795212B (en) Suspension method and suspension structure for pipeline crossing foundation pit
CN210767941U (en) Box steel column underpins node
CN103498573B (en) Set up the existing frame strengthening method of band frame bracing members
CN103437498B (en) With hanging muscle reinforcement holes in soffit profiled sheet compound beam continuously and preparing mounting method
CN203960813U (en) Anchorage part for earth work membrane
CN207228103U (en) A kind of precast pile with pile foundation
CN206188271U (en) Tower crane chassis supports ballast structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wu Zerui

Inventor before: Wang Xinquan

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170620

Address after: Luohu District Baoan road Shenzhen city Guangdong province 518000 No. 3083 Caiwuwei development building 2101

Patentee after: SHENZHEN GOLDEN CENTURY ENGINEERING INDUSTRY Co.,Ltd.

Address before: Hangzhou City, Zhejiang province 310003 City Ring Road No. 63 in the center of wealth (Office) Room 405

Patentee before: HANGZHOU JIANGRUN TECHNOLOGY Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160608

Termination date: 20211117