CN104372791B - Filling pile structure - Google Patents

Filling pile structure Download PDF

Info

Publication number
CN104372791B
CN104372791B CN201410533075.6A CN201410533075A CN104372791B CN 104372791 B CN104372791 B CN 104372791B CN 201410533075 A CN201410533075 A CN 201410533075A CN 104372791 B CN104372791 B CN 104372791B
Authority
CN
China
Prior art keywords
anchor plate
pile
pouch
annular slab
main muscle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410533075.6A
Other languages
Chinese (zh)
Other versions
CN104372791A (en
Inventor
潘泰妙
林恩义
卓乐斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang wilderness Construction Co., Ltd.
Original Assignee
YONGJIA YUANYE GARDEN ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YONGJIA YUANYE GARDEN ENGINEERING Co Ltd filed Critical YONGJIA YUANYE GARDEN ENGINEERING Co Ltd
Priority to CN201410533075.6A priority Critical patent/CN104372791B/en
Publication of CN104372791A publication Critical patent/CN104372791A/en
Application granted granted Critical
Publication of CN104372791B publication Critical patent/CN104372791B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0046Production methods using prestressing techniques
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of filling pile structure, comprise anchor plate, anchor plate both sides are provided with annular slab, annular slab adopts two boards body to be spliced, pinned connection is passed through between annular slab and anchor plate, annular slab is provided with bored pile, bored pile is two, and bored pile is vertically arranged on anchor plate, bored pile top extends in outside anchor plate upper surface, extend in outside prestress anchorage cable soffit through a prestress anchorage cable bottom it, main muscle is provided with between two bored piles, main muscle two ends are fixed on bored pile, also comprise pouch, pouch top is positioned at anchor plate soffit, be positioned on annular slab inner bottom surface bottom it, pouch and main muscle junction are provided with stiffener.This filling pile structure single pile bearing capacity is strong, and pulling test strength is high, and castinplace pile can be made to remain on stake holes center when burying underground as far as possible, and can not cause moving bar data excessive, construction is simple, and piling is convenient, sturdy and durable, effectively can reach consolidation effect.

Description

Filling pile structure
Technical field
The present invention relates to a kind of building facilities, particularly a kind of filling pile structure.
Background technology
China is vast in territory, and complex geologic conditions is various, and numerous Area distribution karst area.Carry out pile foundation construction in karst area very difficult, accident is many, and progress is slow, and cost is high, particularly on the stratum running into solution cavity, easily occurs the problems such as spillage, broken pile, solution cavity collapse.In recent years, along with the extensive use of Model analysis and self-rebound force balance loading case, when a large amount of Model analysis has been constructed, all can there is the tapering caused by engineering machinery drill bit in bottom, but load box and reinforcing bar castinplace pile are in put procedure, reinforcing bar castinplace pile inserts in tapered hole bottom, cause the reinforcing bar of whole pile body and load box to tilt, thus likely cause unnecessary accident to occur, and affect construction speed.
Summary of the invention
The technical problem to be solved in the present invention is: overcome the problems referred to above, and provide a kind of single pile bearing capacity strong, pulling test strength is high, and castinplace pile can be made to remain on stake holes center when burying underground as far as possible, can not cause moving the excessive filling pile structure of bar data.
To achieve these goals, the technical solution used in the present invention is such: filling pile structure of the present invention, comprise anchor plate, anchor plate both sides are provided with annular slab, annular slab adopts two boards body to be spliced, pinned connection is passed through between annular slab and anchor plate, annular slab is provided with bored pile, bored pile is two, and bored pile is vertically arranged on anchor plate, bored pile top extends in outside anchor plate upper surface, extend in outside prestress anchorage cable soffit through a prestress anchorage cable bottom it, main muscle is provided with between two bored piles, main muscle two ends are fixed on bored pile, also comprise pouch, pouch top is positioned at anchor plate soffit, be positioned on annular slab inner bottom surface bottom it, pouch and main muscle junction are provided with stiffener, stiffener structure triangular in shape, stiffener is fixed between pouch and main muscle.
Further, as a kind of concrete form of structure, prestress anchorage cable of the present invention has the through hole mated with bored pile.
Further, as a kind of concrete form of structure, prestress anchorage cable of the present invention adopts ductile steel material to make.
Further, as a kind of concrete form of structure, pouch circular in cross-section structure of the present invention.
Further, as a kind of concrete form of structure, between main muscle of the present invention and stiffener, be connected with guiding rib.
Further, as a kind of concrete form of structure, pouch of the present invention has inflation inlet.
Compared with prior art, the invention has the advantages that: this filling pile structure single pile bearing capacity is strong, and pulling test strength is high, castinplace pile can being made as far as possible to remain on stake holes center when burying underground, can not cause moving bar data excessive, construction is simple, piling is convenient, sturdy and durable, effectively can reach consolidation effect.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is further described.
Fig. 1 is structural representation of the present invention;
In figure: 1. anchor plate; 2. bored pile; 3. pouch; 4. annular slab; 5. main muscle; 6. stiffener; 7. prestress anchorage cable.
Detailed description of the invention
In conjunction with the accompanying drawings, the present invention is further detailed explanation.These accompanying drawings are the schematic diagram of simplification, only basic structure of the present invention are described in a schematic way, and therefore it only shows the formation relevant with the present invention.
The preferred embodiment of filling pile structure of the present invention as shown in Figure 1, comprise anchor plate 1, anchor plate 1 both sides are provided with annular slab 4, annular slab 4 adopts two boards body to be spliced, pinned connection is passed through between annular slab 4 and anchor plate 1, annular slab 4 is provided with bored pile 2, bored pile 2 is two, and bored pile 2 is vertically arranged on anchor plate 1, bored pile 2 top extends in outside anchor plate 1 upper surface, extend in outside prestress anchorage cable 7 soffit through a prestress anchorage cable 7 bottom it, main muscle 5 is provided with between two bored piles 2, main muscle 5 two ends are fixed on bored pile 2, also comprise pouch 3, pouch 3 top is positioned at anchor plate 1 soffit, be positioned on annular slab 4 inner bottom surface bottom it, pouch 3 and main muscle 5 junction are provided with stiffener 6, stiffener 6 structure triangular in shape, stiffener 6 is fixed between pouch 3 and main muscle 5, described prestress anchorage cable 7 has the through hole mated with bored pile 2, described prestress anchorage cable 7 adopts ductile steel material to make, described pouch 3 circular in cross-section structure, guiding rib is connected with between described main muscle 5 and stiffener 6, described pouch 3 has inflation inlet.
Filling pile structure single pile bearing capacity of the present invention is strong, and pulling test strength is high, and castinplace pile can be made to remain on stake holes center when burying underground as far as possible, and can not cause moving bar data excessive, construction is simple, and piling is convenient, sturdy and durable, effectively can reach consolidation effect.Described prestress anchorage cable 7 has the through hole mated with bored pile 2, be convenient to the connection between prestress anchorage cable 7 and bored pile 2; Described prestress anchorage cable 7 adopts ductile steel material to make, and has good flexility; Described pouch 3 circular in cross-section structure, reasonable in design; Be connected with guiding rib between described main muscle 5 and stiffener 6, can guide effect be played; Described pouch 3 has inflation inlet, is convenient to inflate pouch 3.
With above-mentioned according to desirable embodiment of the present invention for enlightenment, by above-mentioned description, relevant staff in the scope not departing from this invention technological thought, can carry out various change and amendment completely.The technical scope of this invention is not limited to the content on manual, must determine its technical scope according to right.

Claims (3)

1. a filling pile structure, comprise anchor plate, it is characterized in that: anchor plate both sides are provided with annular slab, annular slab adopts two boards body to be spliced, pinned connection is passed through between annular slab and anchor plate, annular slab is provided with bored pile, bored pile is two, and bored pile is vertically arranged on anchor plate, bored pile top extends in outside anchor plate upper surface, extend in outside prestress anchorage cable soffit through a prestress anchorage cable bottom it, main muscle is provided with between two bored piles, main muscle two ends are fixed on bored pile, also comprise pouch, pouch top is positioned at anchor plate soffit, be positioned on annular slab inner bottom surface bottom it, pouch and main muscle junction are provided with stiffener, stiffener structure triangular in shape, stiffener is fixed between pouch and main muscle, described prestress anchorage cable has the through hole mated with bored pile, described prestress anchorage cable adopts ductile steel material to make, guiding rib is connected with between described main muscle and stiffener.
2. filling pile structure according to claim 1, is characterized in that: described pouch circular in cross-section structure.
3. filling pile structure according to claim 1, is characterized in that: described pouch has inflation inlet.
CN201410533075.6A 2014-10-11 2014-10-11 Filling pile structure Active CN104372791B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410533075.6A CN104372791B (en) 2014-10-11 2014-10-11 Filling pile structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410533075.6A CN104372791B (en) 2014-10-11 2014-10-11 Filling pile structure

Publications (2)

Publication Number Publication Date
CN104372791A CN104372791A (en) 2015-02-25
CN104372791B true CN104372791B (en) 2016-03-16

Family

ID=52551961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410533075.6A Active CN104372791B (en) 2014-10-11 2014-10-11 Filling pile structure

Country Status (1)

Country Link
CN (1) CN104372791B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587358A (en) * 2012-03-27 2012-07-18 河海大学 Technology of high polymer material post-grouting squeezed cast-in-place pile
CN103526770A (en) * 2013-10-16 2014-01-22 鸿鑫建设集团有限公司 High-impermeable anti-floating pile raft structure and construction method
CN103835284A (en) * 2014-02-21 2014-06-04 安徽省公路桥梁工程有限公司 Karst area drilling cast-in-place pile structure and construction method
CN203741820U (en) * 2014-02-21 2014-07-30 安徽省公路桥梁工程有限公司 Cast-in-situ bored pile structure for karst area
CN204238210U (en) * 2014-10-11 2015-04-01 隆嘉建设集团有限公司 Filling pile structure

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5502538B2 (en) * 2010-03-17 2014-05-28 旭化成建材株式会社 Pile construction method and pile construction device
KR101227680B1 (en) * 2010-12-17 2013-01-29 이승수 Connection method for cast-in-place concrete pile and drilled pile

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587358A (en) * 2012-03-27 2012-07-18 河海大学 Technology of high polymer material post-grouting squeezed cast-in-place pile
CN103526770A (en) * 2013-10-16 2014-01-22 鸿鑫建设集团有限公司 High-impermeable anti-floating pile raft structure and construction method
CN103835284A (en) * 2014-02-21 2014-06-04 安徽省公路桥梁工程有限公司 Karst area drilling cast-in-place pile structure and construction method
CN203741820U (en) * 2014-02-21 2014-07-30 安徽省公路桥梁工程有限公司 Cast-in-situ bored pile structure for karst area
CN204238210U (en) * 2014-10-11 2015-04-01 隆嘉建设集团有限公司 Filling pile structure

Also Published As

Publication number Publication date
CN104372791A (en) 2015-02-25

Similar Documents

Publication Publication Date Title
CN103046543B (en) Antiskid pile with hollow outer isosceles trapezoid cross section and in unequal interval arrangement
CN203782684U (en) Anti-skid pile provided with crossbeam
CN102653945A (en) Foundation reinforcing and replacing structure and construction method thereof
CN109208615A (en) A kind of groove notch supporting construction, construction method and groove pouring procedure
CN104018490A (en) Z-shaped rectangular-section anti-skidding pile and construction method thereof
CN102926388B (en) Earth moving method for deep foundation pit excavation
CN110409525A (en) Weak soil and unfavorable geology composite foundation reinforcing method
CN204151798U (en) A kind of steel reinforced concrete anti-slide pile structure
CN204238210U (en) Filling pile structure
CN107063213B (en) It is a kind of suitable for the earth's surface monitoring point in loess geology tunnel and installation aiding device and method
CN104372791B (en) Filling pile structure
CN106087996B (en) Manual digging pile construction method based on self leveling backpressure device
CN207878441U (en) A kind of ruggedized construction of soft soil foundation
CN207121926U (en) Pattern foundation pit supporting structure retaining wall
CN105696701A (en) Along-slope shear wall building development platform and construction method thereof
CN205296177U (en) Dado bearing structure suitable for hole friction pile stake hole is dug in manual work
CN210031852U (en) A a fender structure for high abrupt slope embankment section
CN102561378A (en) Concrete pile cap structure and construction method thereof
CN208792943U (en) A kind of excavating device of Quick-moving type electric pole foundation pit
CN106759391A (en) The antiskid pile group and its construction method of a kind of townhouse hollow section combining structure
CN104452667B (en) A kind of river course reinforced earth retaining wall structure and construction method thereof
CN206646517U (en) A kind of foundation ditch supporting construction
CN106640118A (en) Underground cavity arch crown structure, underground cavity and underground cavity construction method
CN203834485U (en) Upheaval resisting earth pressure balance device for foundation pit
CN207362864U (en) A kind of basis for electric power pylon

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Pan Taimiao

Inventor after: Lin Enyi

Inventor after: Zhuo Lebin

Inventor before: Wen Guodong

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160218

Address after: 325100 Zhejiang Oubei town of Yongjia County, Rome City, building 13, room 307

Applicant after: Yongjia Yuanye Garden Engineering Co., Ltd.

Address before: Jinjiang District Jinhua Road Chengdu City, Sichuan province 610000 section of No. 8 Building 1 11 unit 23 floor No. 2301

Applicant before: CHENGDU JUZHI INDUSTRIAL DESIGN CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 325000 Zhejiang province Wenzhou Yongjia County Sanjiang Street 104 National Road south side field farm

Patentee after: Zhejiang wilderness Construction Co., Ltd.

Address before: 325100 Room 307, 13 Rome Town, Oubei Town, Yongjia County, Zhejiang Province

Patentee before: Yongjia Yuanye Garden Engineering Co., Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Cast in place pile structure

Effective date of registration: 20220119

Granted publication date: 20160316

Pledgee: Wenzhou Financing Guarantee Co.,Ltd.

Pledgor: Zhejiang Yuanye Construction Co.,Ltd.

Registration number: Y2022990000033