CN104362806B - Light-duty whole Transporting fuel engine power generation machine is in Installation in Plant method - Google Patents

Light-duty whole Transporting fuel engine power generation machine is in Installation in Plant method Download PDF

Info

Publication number
CN104362806B
CN104362806B CN201410718927.9A CN201410718927A CN104362806B CN 104362806 B CN104362806 B CN 104362806B CN 201410718927 A CN201410718927 A CN 201410718927A CN 104362806 B CN104362806 B CN 104362806B
Authority
CN
China
Prior art keywords
locking device
installation
end locking
power generation
electromotor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410718927.9A
Other languages
Chinese (zh)
Other versions
CN104362806A (en
Inventor
梁洪涛
刘庆河
金瑞
崔峰
邢文杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Electric Machinery Co Ltd
Original Assignee
Harbin Electric Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Electric Machinery Co Ltd filed Critical Harbin Electric Machinery Co Ltd
Priority to CN201410718927.9A priority Critical patent/CN104362806B/en
Publication of CN104362806A publication Critical patent/CN104362806A/en
Application granted granted Critical
Publication of CN104362806B publication Critical patent/CN104362806B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacture Of Motors, Generators (AREA)

Abstract

It is an object of the invention to provide a kind of light-duty whole Transporting fuel engine power generation machine in Installation in Plant method, this installation method for the structure of light-duty whole Transporting fuel engine power generation machine and is formulated with the assembly relation of power plant factory building foundation, construct according to the present invention, reach to ensure assembly relation correct between generator amature and generator unit stator, electromotor is made to reach performance indications requirement, ensure wheel and shafting alignment quality, it is ensured that the distribution of each bearing shell load is normal, it is ensured that shaft system of unit vibration index is outstanding;Ensure the secondary pouring quality between whole Transporting electromotor and basis, reach the purpose of Fast Installation, it is ensured that cause project to complete on schedule, it is to avoid cause directly and indirect economic loss.

Description

Light-duty whole Transporting fuel engine power generation machine is in Installation in Plant method
Technical field: the present invention relates to a kind of light-duty whole Transporting fuel engine power generation machine in Installation in Plant Method.
Background technology: gas-fired station and gas Combined circulation efficiency of plant is high, disposal of pollutants is low, Meeting national energy policy requirement, the project construction cycle is short, has market prospect widely;Pass Split transport, the electromotor installation period of Assembling version united are long, it is difficult to adapt to combustion The construction rhythm at pneumoelectric station, newly-built gas-fired station and gas Combined circulation power station are to supporting combustion Machine electromotor proposes whole Transporting to the on-the-spot and requirement of enforcement Fast Installation;Due to integral installation Fuel engine power generation machine needs to complete general assembly in factory, and this type integral installation fuel engine power generation machine uses seat Formula bearing block structure, for meeting the demand of whole Transporting, integral installation, uses independent underframe to tie Structure, forms pedestal bearing seat, big end cap, the mounting interface of small end cover, and Undercarriage structure possesses whole Body installs fuel engine power generation machine topology requirement in factory needed for general assembly, and rotor is propped up by product bearing shell Support, stator and rotor center cold conditions to be formed shifting amount the most in advance, make integral installation fuel engine power generation machine exist During normal power generation, hot stator and rotor center superposition, whole Transporting is to on-the-spot;Owing to simplifying Field installation steps, so integral installation combustion engine can be greatly shortened in-site installation construction week Phase;
This integral installation fuel engine power generation machine needs to arrange transport locking device, makes lifting, transport During rotor be relatively fixed reliably with stator, prevent rotor from causing bearing shell because of inertia force play Or the damage of other structure, and maintain relative position correct between rotor with stator;At the scene In installation process, phase para-position correct between transport locking device rotor to be maintained and stator Put, and constructive interference must not be produced with the structure such as combustion engine rotating shaft, and can be in combustion engine and overall peace Dress fuel engine power generation machine is removed easily to after wheel;Owing to this light-duty whole Transporting combustion engine is sent out The structure of motor and with the assembly relation of power plant's factory building foundation, installation adjusting method with conventional Electromotor is the most different, but also there is restriction and the impact of transport locking device, if installed Step process is improper, easily causes wheel deviation, makes shafting alignment bad, and each bearing shell load is divided Cloth substantial deviation normal range, affect bearing instability speed, cause vibration exceeding the standard even to cause machine Group cannot startup optimization;It is likely to cause the secondary between whole Transporting fuel engine power generation machine and basis Pouring quality problem, and then have influence on shafting vibration index, it is necessary to increase and decrease furnishing pad repeatedly Eliminate above-mentioned impact, add follow-up adjustment workload, also increase the follow-up adjustment time, reach Less than the purpose of Fast Installation, cause project to drag the phase, bring directly and indirect economic loss.
Summary of the invention: it is an object of the invention to provide a kind of light-duty whole Transporting fuel engine power generation machine In Installation in Plant method, this installation method is for this light-duty whole Transporting fuel engine power generation machine Structure and the assembly relation formulation with power plant's factory building foundation, construct according to the present invention, reach to protect Assembly relation correct between card generator amature and generator unit stator, makes electromotor reach performance Index request, it is ensured that to wheel and shafting alignment quality, it is ensured that the distribution of each bearing shell load is normal, protects Card shaft system of unit vibration index is outstanding;Ensure that the secondary between whole Transporting electromotor and basis waters Build quality, reach the purpose of Fast Installation, it is ensured that cause project to complete on schedule, it is to avoid cause straight Connect and indirect economic loss.
The technical scheme is that a kind of light-duty whole Transporting fuel engine power generation machine is in Installation in Plant Method, said method comprises the following steps:
Step one: unscrew dragging end locking device bolt and encourage end locking device bolt, again locking Strain at moved end locking device bolt and encourage end locking device bolt, removing axial bolt and axle To locating piece;
Step 2: preliminary leveling in place, is placed in parallels under seat board, is laid by adjustment pad Between electromotor and seat board;End bearing is dragged by adjusting the position change of parallels and electromotor Seat height journey and encourage end bearing block elevation, makes generator coupling and combustion engine shaft coupling by adjusting parallels Device centering, dehisces under adjusting between generator coupling and combustion engine shaft coupling;Remove and drag end Locking device bolt holds locking device bolt with encouraging, and removes dragging end locking device and locks with encouraging to hold Device, tight anchor nut;Pour basis back-grouting concrete;
Step 3: after the back-grouting concrete curing of basis, checks electromotor in the case of jiggering Shaft coupling and combustion engine shaft coupling centering and between generator coupling and combustion engine shaft coupling under dehisce Numerical value, installs connecting pin.
Technique effect: for protection axle journal and bearing shell, this light-duty whole Transporting fuel engine power generation machine is in fortune Using locking device to be held up by generator amature before defeated, the enforcement of step one makes rotor fall bearing shell On, after unscrewing dragging end locking device bolt and encouraging end locking device bolt, in rotor deadweight Under effect, rotor is fallen on bearing shell, and locking drags end locking device bolt and encourages end locking again Device bolt ensures that generator unit stator keeps not relative to position with rotor in subsequent tuning process Become, it is ensured that install accurately;Remove axial bolt and axial locating piece is avoided and combustion engine shaft coupling Device interferes, it is ensured that installation steps are implemented;Step 2 is preliminary leveling in place, by adjusting pad Sheet be placed between electromotor and seat board can facilitate follow-up easy to adjust;After tight anchor nut Pour basis back-grouting concrete, permissible when back-grouting expansion capacity of concrete generation deviation Play assist control effect, it is to avoid deviation is excessive;The method is sent out for light-duty whole Transporting combustion engine The construction features of motor, reasonable utilization locking device, significantly simplify electromotor installation steps, As conventional art wear rotor, bearing block adjust, air gap adjust, assembling end cap, sealing gland adjust, Oil sealing adjusts, assembles brush holder etc., and the method has only used conventional art part steps to combine new knot The reasonable combination distribution of the step that structure must be carried out, has saved field installation time, it is ensured that Installation quality.
Accompanying drawing illustrates:
Fig. 1 is step 1 schematic diagram of the present invention.
Fig. 2 is step 2 schematic diagram of the present invention.
Fig. 3 is step 3 schematic diagram of the present invention.
Detailed description of the invention:
A kind of light-duty whole Transporting fuel engine power generation machine, in Installation in Plant method, is characterized in that: above-mentioned Method comprises the following steps:
Step one is as shown in Figure 1: unscrews dragging end locking device bolt 1 and encourages end locking device Bolt 2, locking dragging end locking device bolt 1 is removed with encouraging end locking device bolt 2 again Axially bolt 3 and axial locating piece 4;
Step 2 is as shown in Figure 2: preliminary leveling in place, and parallels 5 is placed in seat board 6 times, Adjustment pad 7 is placed between electromotor and seat board 6;By adjusting parallels 5 and electromotor Position change drag end bearing block elevation 8 and encourage end bearing block elevation 9, by adjusting parallels 5 Make generator coupling 10 and combustion engine shaft coupling 11 centering, adjust generator coupling 10 and combustion 12 are dehisced under between machine shaft coupling 11;Remove and drag end locking device bolt 1 and encourage end lock Determine device bolt 2, remove and drag end locking device 13 and encourage end locking device 14, foot tightly Nut 15;Pour basis back-grouting concrete;
Step 3 is as shown in Figure 3: after the back-grouting concrete curing of basis, in the case of jiggering Check generator coupling 10 and combustion engine shaft coupling 11 centering and generator coupling 10 and combustion engine Dehisce under between shaft coupling 11 12 numerical value, tight anchor nut 15, connecting pin 16 be installed, Complete electromotor and all processes is installed.For protection axle journal and bearing shell, this light-duty whole Transporting combustion engine Electromotor uses locking device to be held up by generator amature before shipping, and the enforcement of step one makes to turn Son is fallen on bearing shell, after unscrewing dragging end locking device bolt and encouraging end locking device bolt, Under the effect of rotor deadweight, rotor is fallen on bearing shell, and locking drags end locking device bolt again Generator unit stator and rotor phase para-position in subsequent tuning process is ensured with encouraging end locking device bolt Put holding constant, it is ensured that install accurately;Remove axial bolt and axial locating piece avoid with Combustion engine shaft coupling interferes, it is ensured that installation steps are implemented;Step 2 is preliminary leveling in place, Adjustment pad is placed between electromotor and seat board can facilitate follow-up easy to adjust;Tightly Foot nut after-pouring basis back-grouting concrete, when back-grouting expansion capacity of concrete occurs partially Assist control effect can be played, it is to avoid deviation is excessive during difference;The method is for light-duty overall fortune The construction features of defeated fuel engine power generation machine, reasonable utilization locking device, significantly simplify electromotor Installation steps, as conventional art wear rotor, bearing block adjust, air gap adjust, assembling end cap, Sealing gland adjusts, oil sealing adjusts, assemble brush holder etc., and the method has only used conventional art part to walk Suddenly the reasonable combination distribution of the step that new construction must be carried out is combined, when having saved in-site installation Between, it is ensured that installation quality.

Claims (1)

1. light-duty whole Transporting fuel engine power generation machine is in an Installation in Plant method, it is characterized in that: Comprise the following steps:
Step one: unscrew dragging end locking device bolt (1) and encourage end locking device bolt (2), Locking drags end locking device bolt (1) and encourages end locking device bolt (2) again, removes axle To bolt (3) and axial locating piece (4);
Step 2: preliminary leveling in place, is placed in parallels (5) under seat board (6), will adjust Whole pad (7) is placed between electromotor and seat board (6);By adjusting parallels (5) and sending out The position change of motor drags end bearing block elevation (8) and encourages end bearing block elevation (9), passes through Adjust parallels (5) and make generator coupling (10) and combustion engine shaft coupling (11) centering, adjust (12) are dehisced under between generator coupling (10) and combustion engine shaft coupling (11);Dismounting is dragged Moved end locking device bolt (1) and encourage end locking device bolt (2), remove drag end locking dress Put (13) and encourage end locking device (14), tight anchor nut (15);Pour basis secondary Grouted-aggregate concrete;
Step 3: after the back-grouting concrete curing of basis, checks electromotor in the case of jiggering Shaft coupling (10) and (11) centering of combustion engine shaft coupling and generator coupling (10) and combustion engine Dehisce under between shaft coupling (11) (12) numerical value, connecting pin (16) is installed.
CN201410718927.9A 2014-12-02 2014-12-02 Light-duty whole Transporting fuel engine power generation machine is in Installation in Plant method Active CN104362806B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410718927.9A CN104362806B (en) 2014-12-02 2014-12-02 Light-duty whole Transporting fuel engine power generation machine is in Installation in Plant method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410718927.9A CN104362806B (en) 2014-12-02 2014-12-02 Light-duty whole Transporting fuel engine power generation machine is in Installation in Plant method

Publications (2)

Publication Number Publication Date
CN104362806A CN104362806A (en) 2015-02-18
CN104362806B true CN104362806B (en) 2016-11-30

Family

ID=52530042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410718927.9A Active CN104362806B (en) 2014-12-02 2014-12-02 Light-duty whole Transporting fuel engine power generation machine is in Installation in Plant method

Country Status (1)

Country Link
CN (1) CN104362806B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110289737B (en) * 2019-08-13 2024-04-19 南京汽轮电机集团电站设备技术服务有限公司 Generator bearing bush protection device
CN110587285A (en) * 2019-09-18 2019-12-20 华电通用轻型燃机设备有限公司 Shafting centering method for aeroderivative gas turbine generator set
CN111219252B (en) * 2019-11-28 2023-04-18 中国电建集团河南工程有限公司 Heavy gas turbine installation construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101598621A (en) * 2009-06-30 2009-12-09 上海电气电站设备有限公司 A kind of method of improving shaft vibration of magnetizing exciter rotor
CN202395630U (en) * 2011-11-21 2012-08-22 哈尔滨电机厂有限责任公司 Locking structure of rotary shaft coupler of non-salient pole synchronous generator
CN202494569U (en) * 2012-01-19 2012-10-17 中科恒源科技股份有限公司 Test bench for testing wind power generator
CN103196432A (en) * 2012-01-06 2013-07-10 上海信慧电力科技有限公司 Alignment instrument measurement and adjustment method for generator coupled wheel shaft system
CN203404015U (en) * 2013-08-22 2014-01-22 霍华山 Non-dam hydroelectric power generating equipment

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0898476A (en) * 1994-09-27 1996-04-12 Toshiba Corp Moving unit for centering stator

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101598621A (en) * 2009-06-30 2009-12-09 上海电气电站设备有限公司 A kind of method of improving shaft vibration of magnetizing exciter rotor
CN202395630U (en) * 2011-11-21 2012-08-22 哈尔滨电机厂有限责任公司 Locking structure of rotary shaft coupler of non-salient pole synchronous generator
CN103196432A (en) * 2012-01-06 2013-07-10 上海信慧电力科技有限公司 Alignment instrument measurement and adjustment method for generator coupled wheel shaft system
CN202494569U (en) * 2012-01-19 2012-10-17 中科恒源科技股份有限公司 Test bench for testing wind power generator
CN203404015U (en) * 2013-08-22 2014-01-22 霍华山 Non-dam hydroelectric power generating equipment

Also Published As

Publication number Publication date
CN104362806A (en) 2015-02-18

Similar Documents

Publication Publication Date Title
CN104362806B (en) Light-duty whole Transporting fuel engine power generation machine is in Installation in Plant method
CN104169531B (en) The flame-out method operating turbogenerator afterwards
CN205753852U (en) A kind of car generator protector
CN104333180B (en) Heavy whole Transporting electromotor is in Installation in Plant method
US9757821B2 (en) System and method for in-situ resurfacing of a wind turbine main rotor shaft
CN204113509U (en) Railway Diesel machine oil-fired system integrated part
KR102343297B1 (en) Permanent Magnet Synchronous Motor
CN105277348A (en) Method for measuring inherent frequency of stator core/support system of water turbine generator prototype
CN202395630U (en) Locking structure of rotary shaft coupler of non-salient pole synchronous generator
CN108177727B (en) Technique in the Shafting Alignment of Vessels of axle generator is seized with magneto
CN104333181B (en) Light-duty whole Transporting fuel engine power generation machine general assembly method in factory
CN205986464U (en) An end fan seating ring and a flange body structure are encouraged to turbo generator rotor
CN204334214U (en) A kind of rotor of magnetic suspension high speed motor and protection bearing arrangement thereof
CN204802062U (en) Actuating system of ship
CN106208522A (en) A kind of automobile current generator
CN103051118A (en) Rotor assembly method of permanent magnet generator
CN203470848U (en) Portable mould closing clip
CN104410216B (en) Heavy whole Transporting electromotor general assembly method in factory
CN204003089U (en) A kind of split pedestal of generator set
CN203434801U (en) Vibration motor
CN104727866A (en) Control method for preventing trip accident caused by steam turbine steam-flow excited vibration
US20160356312A1 (en) Bug roller bearing outer race assembly
CN203850959U (en) AC generator improved structure for vehicles
CN106777671B (en) Low-rotational-inertia turbine design method
CN216742728U (en) Matching structure of torque arm and elastic pin shaft and wind power gear box

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant