CN104362674A - 一种基于安全运行电压的双馈风电机组高电压穿越方法 - Google Patents

一种基于安全运行电压的双馈风电机组高电压穿越方法 Download PDF

Info

Publication number
CN104362674A
CN104362674A CN201410602240.9A CN201410602240A CN104362674A CN 104362674 A CN104362674 A CN 104362674A CN 201410602240 A CN201410602240 A CN 201410602240A CN 104362674 A CN104362674 A CN 104362674A
Authority
CN
China
Prior art keywords
double
represent
max
voltage
fan motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410602240.9A
Other languages
English (en)
Other versions
CN104362674B (zh
Inventor
徐琳
唐永红
蒲维
龚锦霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410602240.9A priority Critical patent/CN104362674B/zh
Publication of CN104362674A publication Critical patent/CN104362674A/zh
Application granted granted Critical
Publication of CN104362674B publication Critical patent/CN104362674B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J3/386
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/18Arrangements for adjusting, eliminating or compensating reactive power in networks
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Control Of Eletrric Generators (AREA)

Abstract

本发明公开了一种基于安全运行电压的双馈风电机组高电压穿越方法,包括以下步骤:步骤A:根据双馈风力发电机的参数对安全电压范围进行确定;如能够确定安全电压范围,则双馈风电机组能够成功实现高压穿越,并进行步骤B;如不能够确定安全电压范围,则双馈风电机组不能够成功实现高压穿越,不执行后续步骤;步骤B:根据双馈风电机组接口电压和步骤A确定的安全电压范围,确定双馈风力发电机组的发电机定子和网侧变流器需输出的无功和有功电流分量。本发明可对双馈风力发电机组的高电压穿越能力进行判断。

Description

一种基于安全运行电压的双馈风电机组高电压穿越方法
技术领域
本发明属于风力发电系统控制技术领域,尤其涉及一种基于安全运行电压的双馈风电机组高电压穿越方法。
背景技术
随着风能利用的迅速发展,一些国家相继提出了风电接入电网的导则、测试要求以及适应性规范,对风电机组故障穿越能力的要求越来越高。目前国内外对低压故障穿越能力(lowvoltage ride-through:LVRT)的研究已趋成熟。国内各家风电企业的技术路线虽有差别,近两年基本都实现了低电压穿越功能。而通常由短路引起低电压造成的风电脱网现象,实际运行中低电压的时间通常非常短,仅几十毫秒,最终导致风场所有风机停机的原因往往是无功过补偿引起的电压偏高,因此高电压穿越(High Voltage Ride-Through:HVRT)问题更应引起重视。国际上对风电机组HVRT已有初步规范的是澳大利亚、美国、德国、西班牙、丹麦等国电网规程,如澳大利亚电网规程要求风电机组能够在并网点电压骤升至1.3倍标称值时不脱网运行60ms。国内风电行业目前还没有高电压穿越的相关要求和检测标准。
现有解决风电机组高电压穿越问题的基本思路是在风机原有硬件设备基础上,充分利用LVRT设备,调整相应的控制策略,使用同一套设备来实现LVRT和HVRT。双馈风电机组对电压的变化敏感,电压偏高会引起直流母线电容过压,导致变流器不能正常工作,风电机组由于自我保护自动脱离电网。而目前现有技术没有从接口电压控制方面进行研究。本发明方法充分考虑双馈风力发电机组(Double Fed Induction Generator:DFIG)接口电压对直流母线电压的影响,给出一种基于安全电压的协调控制策略,协调控制变流器和发电机定子输出的无功功率和有功功率,保证变流器的安全运行,最终实现双馈风力发电机组的高电压穿越。
发明内容
本发明的目的即在于克服现有技术的不足,提供一种基于安全运行电压的双馈风电机组高电压穿越方法,本方法可在电网高电压故障期间将双馈风力发电机组的接口电压控制在安全运行范围内。
本发明的目的通过以下技术方案实现:
一种基于安全运行电压的双馈风电机组高电压穿越方法,包括以下步骤:
步骤A:根据双馈风力发电机的参数对安全电压范围进行确定;
如能够确定安全电压范围,则双馈风电机组能够成功实现高压穿越,并进行步骤B;
如不能够确定安全电压范围,则双馈风电机组不能够成功实现高压穿越,不执行后续步骤;
步骤B:根据双馈风电机组接口电压和步骤A确定的安全电压范围,确定双馈风力发电机组的发电机定子和网侧变流器需输出的无功和有功电流分量。
进一步的,所述安全电压的范围的确定方法如下:
U wt - I w , max X t ≤ U g , R ≤ V dc , R 2 3 - ( ω r L g I gd ) 2 - ω r L g I gq
其中,Ug,R表示安全电压,Uwt表示双馈风电机组接口电压;Iw,max表示DFIG最大能够输出的无功电流;Xt表示接口变压器的电抗;ωr表示转子旋转角速度;Lg表示网侧变流器进线电感;Igd表示网侧变流器输出的有功电流分量;Igq表示网侧变流器输出的无功电流分量;Vdc,R表示网侧变流器直流侧母线的给定电压运行值;
Vdc,R满足:
3 ( U wt + &omega; r L g I gq , max ) &le; V dc , R < k v V dc max
其中,kv为安全系数;为直流侧电容的最大能够连续工作电压,Igq,max表示网侧变流器能输出的最大无功电流分量;
如上述两个公式有解,则双馈风电机组能够成功实现高压穿越;
如上述两个公式无解,则双馈风电机组不能够成功实现高压穿越。
进一步的,双馈风电机组能够成功实现高压穿越,则Ug,R和Vdc,R均取其运行范围内的最小值。
进一步的,所述步骤B中,发电机定子输出的无功电流分量的确定方法如下:
Uwt≥U″g I sq = 1 X t ( U g , R - U wt )
Uwt<U″g时Isq=-2(Uwt-1)
其中,Isq表示发电机定子输出的无功电流分量,
进一步的,Isq满足如下约束:
U g L s &omega; s - ( L m L s I r , max ) 2 - I sd 2 &le; I sq &le; U g L s &omega; s + ( L m L s I r , max ) 2 - I sd 2
当Isq越限时,取其上、下极限值;
其中,Ug表示定子侧接入点电压,Ls表示定子漏感,ωs表示定子旋转角速度,Lm表示激磁电感,Ir,max表示发电机转子侧最大允许电流,Isd表示发电机定子输出的有功电流分量。
进一步的,所述步骤B中,网侧变流器输出的无功电流分量的确定方法如下:
I gq = 1 &omega; r L g ( V dc , R 2 3 - ( &omega; r L g I gd ) 2 - U wt )
其中,Igq表示网侧变流器输出的无功电流分量,Igd表示网侧变流器输出的有功电流分量。
进一步的,Igq满足如下约束:
-Ig,max+Igd≤Igq≤Ig,max-Igd
当Igq越限时,取其上、下极限值;
Ig,max表示定子侧最大允许电流。
进一步的,所述步骤B中,双馈风力发电机组的发电机定子和网侧变流器输出的有功电流分量由双馈风力发电机组的最大功率跟踪方法获得。
进一步的,所述步骤B中,双馈风力发电机组的发电机定子和网侧变流器输出的有功电流分量的最大值为:
I sd , max = ( I s , max ) 2 - ( I sq ) 2 I gd , max = ( I g , max ) 2 - ( I gq ) 2
其中Isd,max表示考虑双馈风力发电机组定子输出的无功电流时,发电机定子最大可输出的有功电流分量,Igd,max表示考虑网侧变流器输出的无功电流时其最大可输出的有功电流分量,Is,max表示发电机定子侧最大允许电流,Ig,max表示网侧变流器最大允许电流,Isq表示发电机定子输出的无功电流分量,Igq表示网侧变流器输出的无功电流分量。
综上所述,本发明的优点和有益效果在于:
1.可对双馈风力发电机组的高电压穿越能力进行判断;
2.网侧变流器直流侧电压的给定值可以根据接口电压升高情况而设定,从而保证了控制系统的稳定;
3.控制过程中双馈风力发电机组接口电压可有效控制在机组安全运行的范围之内;
4.减少直流卸荷电路保护的动作。
附图说明
为了更清楚地说明本发明的实施例,下面将对描述本发明实施例中所需要用到的附图作简单的说明。显而易见的,下面描述中的附图仅仅是本发明中记载的一些实施例,对于本领域的技术人员而言,在不付出创造性劳动的情况下,还可以根据下面的附图,得到其它附图。
图1为本发明适用的双馈风力发电机组系统结构图;
图2为电网电压骤升至1.3倍标称值时实施例中双馈风力发电机的无功功率输出仿真图;
图3电网电压骤升至1.3倍标称值时实施例中双馈风力发电机的网侧变流器直流侧母线电压仿真图;
图4为电网电压骤升至1.3倍标称值时双馈风电机组接口电压。
具体实施方式
为了使本领域的技术人员更好地理解本发明,下面将结合本发明实施例中的附图对本发明实施例中的技术方案进行清楚、完整的描述。显而易见的,下面所述的实施例仅仅是本发明实施例中的一部分,而不是全部。基于本发明记载的实施例,本领域技术人员在不付出创造性劳动的情况下得到的其它所有实施例,均在本发明保护的范围内。
实施例1:
图1为本发明适用的双馈风力发电机组系统结构图,主要包括异步发电机(G)、网侧变流器(Grid-side Convertor,GSC)、卸荷Chopper电路、转子侧变换器(Rotor-side Convertor,RSC)、接口变压器T1、电缆以及风电场与电网连接的变压器T2,故障点电压为Uwt。正常运行下转子侧变换器和网侧变换器采用有功和无功功率解耦控制,通过控制RSC输出的励磁电流来调节DFIG定子输出的有功和无功功率,GSC的控制目标为直流侧电压的稳定。直流母线上并联的卸荷Chopper电路,在直流电容电压高于其最大能够连续操作电压时触发导通,以抑制电压骤变瞬间可能出现的母线电压泵升。网侧PWM变换器采用直流电压外环、交流侧电流内环的双闭环串级结构控制器。电压外环控制输出直流电压,电流内环控制交流侧电流,使之快速的跟踪电流指令。通过电流指令限幅实现对变换器装置的过流保护。图中Ug为GSC接入点电压,Uwt为风机接口变压器的网侧电压,Pg为GSC输出的有功功率,Ps为DFIG定子侧输出的有功功率,Qg为GSC输出的无功功率,Qs为DFIG定子侧输出的无功功率,Pw为DFIG输出的总有功功率,Qw为DFIG输出的总无功功率。
图1中相关参数如下:
DFIG叶片半径为40m,额定风速为12m/s,切入风速为6m/s,切除风速为15m/s;发电机参数:额定功率为2MW,定子转子比为0.333;定子额定电压690V;定子电阻0.00489p.u.;转子电阻0.0055p.u.;激磁电感3.954p.u.;定子漏感0.0924p.u.;转子漏感0.0996p.u.。变流器参数:GSC额定容量600kVA,RSC额定容量800kVA,直流母线电压额定值为1100V;最大能够连续操作直流电压1250V;PWM开关频率为2kHz;网侧进线电感为0.5mH,直流储能电容为10mF;变压器参数T1:额定容量2.5MVA,电抗0.1p.u.,k=0.95。其中p.u.(又名标么值)表示电力系统分析和工程计算中常用的数值标记方法,将实际值对统一的基准值进行归算表示各物理量及额定参数的相对值,无量纲。目的是简化计算和便于对计算结果进行分析和评价。本实施例中交流系统取基准功率2MW,基准线电压690V。
根据电网规程要求风电机组能够在并网点电压骤升至1.3倍标称值时至少不脱网运行60ms。当图1中双馈风力发电机组发生高电压故障,故障点电压Uwt升高到1.3倍标么值。
故障前风力发电机风速为11m/s,稳定输出0.83p.u.有功功率。在t=4s时刻电网电压骤升至1.3倍标么值,故障持续600ms。
Vdc,R表示网侧变流器直流侧母线的给定电压运行值;
Vdc,R的最大值为 k v V dc max = 0.95 * 1250 = 1187.5 V
为使下式有解:
3 ( U g , R + &omega; r L g I gq , max ) &le; V dc , R &le; k v V dc max
先需满足: 3 ( U g , R + &omega; r L g I gq , max ) &le; k v V dc max
即考虑其最大无功输出能力时相电压幅值Ug,R的最大值为:
k v V dc max / 3 - &omega; r L g I gq , max = 1187.5 / 1.732 + ( 0.11 * 2 * 50 * 3.14159 ) * 0.0005 * ( 600000 / 3 / 690 * 1 . 732 * 1.414 ) = 697.889 V , 换算为相电压的比例为:
697.889/(690*1.414/1.732)=1.24
由下式
U wt - I w , max X t &le; U g , R &le; V dc , R 2 3 - ( &omega; r L g I gd ) 2 - &omega; r L g I gq
Ug,R的最小值为Uwt-Iw,maxXt=1.3-1*0.1*(2.5/2)=1.175
Vdc,R的最小值与Ug,R的大小有关:
在Ug,R=1时,即接口电压为额定值时,为
3 ( U g , R + &omega; r L g I gq , max ) = 1.732 * ( 1 * ( 690 * 1.414 / 1.732 ) - ( 0.11 * 2 * 50 * 3.14159 ) * 0.0005 * ( 60 0000 / 3 / 690 * 1.732 * 1.414 ) ) = 954.4 V
在考虑接口电压升高的背景下,为更稳定的PWM控制效果,可将其适当抬高,一般取其额定值1100V。
在Ug,R=1.2时为
3 ( U g , R + &omega; r L g I gq , max ) = 1.732 * ( 1.2 * ( 690 * 1.414 / 1.732 ) - ( 0.11 * 2 * 50 * 3.14159 ) * 0.0005 * ( 6 00000 / 3 / 690 * 1.732 * 1.414 ) ) = 1149 . 5 V
由以上计算可知,安全电压范围Ug,R∈[1.175,1.24],Vdc,R∈[1149.5,1187.5],即有解。因此在发电机接口电压升高到1.3倍时,双馈风力发电机组可通过自身的无功调节能力实现高电压故障穿越。
取Ug,R=1.2,Vdc,R=1150,故障期间GSC快速向故障电网注入感性无功功率Igq,RSC控制DFIG优先向电网输出无功功率Isq,支持故障电网的快速恢复。
计算下式:
U g &prime; &prime; = 2 X t - U g , R 2 X t - 1 = ( 2 * 0.1 * ( 2.5 / 2 ) - 1.2 ) / ( 2 * 0.1 * ( 2.5 / 2 ) - 1 ) = 1.2667
满足Uwt≥U″g,故
I sq = 1 X t ( U g , R - U wt ) = ( 1.2 - 1.3 ) / ( 0.1 * ( 2.5 / 2 ) ) = - 0.8 p . u .
有名值为:-0.8*(2000000/1.732/690*1.414)=-1.8931e+003A
计算其约束范围:
U g L s &omega; s - ( L m L s I r , max ) 2 - I sd 2 &le; I sq &le; U g L s &omega; s + ( L m L s I r , max ) 2 - I sd 2
无功优先,先取Isd=0;按最严重情况取Ug=1.3
U g L s &omega; s - ( L m L s I r , max ) 2 - I sd 2 = 1.3 * ( 690 * 1.414 * 1.732 ) / ( 0.0924 * 0.69 ^ 2 / 2 * 2 * 50 * 3.14159 ) - ( 3 . 954 / 0.0924 * 1.2 * 800000 / 1.732 / 690 ) = - 3.4269 e + 004
按正常情况取Ug=1.2
U g L s &omega; s - ( L m L s I r , max ) 2 - I sd 2 = 1.2 * ( 690 * 1.414 / 1.732 ) / ( 0.0924 * 0.69 ^ 2 / 2 * 2 * 50 * 3.14159 ) + ( 3 . 954 / 0.0924 * 1.2 * 800000 / 1.732 / 690 ) = 3.4473 e + 004
-1.8931e+003A满足约束条件
无功优先,即先取Igd=0;考虑无功输出时接口电压Uwt即为实际Ug,以下采用Ug,R代入计算。
I gq = 1 &omega; r L g ( V dc , R 2 3 - ( &omega; r L g I gd ) 2 - U wt ) = 1 / ( 0.11 * 2 * 50 * 3.14159 * 0.0005 ) * ( 1150 / 1.732 - 1.2 * ( 6 90 * 1.414 / 1.732 ) ) = - 694.7622 A
Igq满足如下约束:
-Ig,max+Igd≤Igq≤Ig,max-Igd
Ig,max=(600000/1.732/690)*1.414=502.0584*1.414=709.9106A
-694.7622>-709.9,取其Igq=-694.7622;
双馈风力发电机组的发电机定子和网侧变流器输出的有功电流分量的最大值为:
I sd , max = ( I s , max ) 2 - ( I sq ) 2 = 2366.2 2 - 1893 2 = 1419.7 A I gd , max = ( I g , max ) 2 - ( I gq ) 2 = 709.9106 2 - - 694.7622 2 = 145 . 8 A
双馈风力发电机组的发电机定子和网侧变流器输出的有功电流分量由双馈风力发电机组的最大功率跟踪方法获得,当给定值超过上述最大可输出的有功电流分量时按照上式中最大值确定。
双馈风力发电机组的最大功率跟踪方法为现有技术,在双馈风力发电机组出厂时即由厂家对其进行设定。
双馈机组输出的风力发电机定子和GSC输出的无功功率如图2所示。图3为实施例下的直流侧母线电压,在1.3倍额定电压下,本发明方法中HVRT期间直流侧电压升高到1150kV,直流侧电压稳定,Chopper电路无触发。通过协调定子侧和GSC输出的无功功率均可有效实现风电机组在1.3倍系统电压下的安全运行。图4为电网电压骤升至1.3倍标称值时DFIG接口电压,在高电压故障期间,双馈风力发电机组的接口电压保持在1.2倍标称值,在风机正常运行可承受范围内,从而实现机组的高电压穿越。

Claims (9)

1.一种基于安全运行电压的双馈风电机组高电压穿越方法,其特征在于,包括以下步骤:
步骤A:根据双馈风力发电机的参数对安全电压范围进行确定;
如能够确定安全电压范围,则双馈风电机组能够成功实现高压穿越,并进行步骤B;
如不能够确定安全电压范围,则双馈风电机组不能够成功实现高压穿越,不执行后续步骤;
步骤B:根据双馈风电机组接口电压和步骤A确定的安全电压范围,确定双馈风力发电机组的发电机定子和网侧变流器需输出的无功和有功电流分量。
2.根据权利要求1所述的一种基于安全运行电压的双馈风电机组高电压穿越方法,其特征在于:
所述安全电压的范围的确定方法如下:
U wt - I w , max X t &le; U g , R &le; V dc , R 2 3 - ( &omega; r L g I gd ) 2 - &omega; r L g I gq
其中,Ug,R表示安全电压,Uwt表示双馈风电机组接口电压;Iw,max表示DFIG最大能够输出的无功电流;Xt表示接口变压器的电抗;ωr表示转子旋转角速度;Lg表示网侧变流器进线电感;Igd表示网侧变流器输出的有功电流分量;Igq表示网侧变流器输出的无功电流分量;Vdc,R表示网侧变流器直流侧母线的给定电压运行值;
Vdc,R满足:
3 ( U wt + &omega; r L g I gq , max ) &le; V dc , R < k v V dc max
其中,kv为安全系数;为直流侧电容的最大能够连续工作电压,Igq,max表示网侧变流器能输出的最大无功电流分量;
如上述两个公式有解,则双馈风电机组能够成功实现高压穿越;
如上述两个公式无解,则双馈风电机组不能够成功实现高压穿越。
3.根据权利要求2所述的一种基于安全运行电压的双馈风电机组高电压穿越方法,其特征在于:
双馈风电机组能够成功实现高压穿越,则Ug,R和Vdc,R均取其运行范围内的最小值。
4.根据权利要求2所述的一种基于安全运行电压的双馈风电机组高电压穿越方法,其特征在于:
所述步骤B中,发电机定子输出的无功电流分量的确定方法如下:
Uwt≥U″g I sq = 1 X t ( U g , R - U wt )
Uwt<U″g时Isq=-2(Uwt-1)
其中,Isq表示发电机定子输出的无功电流分量,
5.根据权利要求4所述的一种基于安全运行电压的双馈风电机组高电压穿越方法,其特征在于:
Isq满足如下约束:
U g L s &omega; s - ( L m L s I r , max ) 2 - I sd 2 &le; I sq &le; U g L s &omega; s + ( L m L s I r , max ) 2 - I sd 2
当Isq越限时,取其上、下极限值;
其中,Ug表示定子侧接入点电压,Ls表示定子漏感,ωs表示定子旋转角速度,Lm表示激磁电感,Ir,max表示发电机转子侧最大允许电流,Isd表示发电机定子输出的有功电流分量。
6.根据权利要求2所述的一种基于安全运行电压的双馈风电机组高电压穿越方法,其特征在于:
所述步骤B中,网侧变流器输出的无功电流分量的确定方法如下:
I gq = 1 &omega; r L g ( V dc , R 2 3 - ( &omega; r L g I gd ) 2 - U wt )
其中,Igq表示网侧变流器输出的无功电流分量,Igd表示网侧变流器输出的有功电流分量。
7.根据权利要求6所述的一种基于安全运行电压的双馈风电机组高电压穿越方法,其特征在于:
Igq满足如下约束:
-Ig,max+Igd≤Igq≤Ig,max-Igd
当Igq越限时,取其上、下极限值;
Ig,max表示定子侧最大允许电流。
8.根据权利要求1~7中任意一项所述的一种基于安全运行电压的双馈风电机组高电压穿越方法,其特征在于:
所述步骤B中,双馈风力发电机组的发电机定子和网侧变流器输出的有功电流分量由双馈风力发电机组的最大功率跟踪方法获得。
9.根据权利要求8所述的一种基于安全运行电压的双馈风电机组高电压穿越方法,其特征在于:
所述步骤B中,双馈风力发电机组的发电机定子和网侧变流器输出的有功电流分量的最大值为:
I sd , max = ( I s , max ) 2 - ( I sq ) 2 I gd , max = ( I g , max ) 2 - ( I gq ) 2
其中Isd,max表示考虑双馈风力发电机组定子输出的无功电流时,发电机定子最大可输出的有功电流分量,Igd,max表示考虑网侧变流器输出的无功电流时其最大可输出的有功电流分量,Is,max表示发电机定子侧最大允许电流,Ig,max表示网侧变流器最大允许电流,Isq表示发电机定子输出的无功电流分量,Igq表示网侧变流器输出的无功电流分量。
CN201410602240.9A 2014-10-31 2014-10-31 一种基于安全运行电压的双馈风电机组高电压穿越方法 Active CN104362674B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410602240.9A CN104362674B (zh) 2014-10-31 2014-10-31 一种基于安全运行电压的双馈风电机组高电压穿越方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410602240.9A CN104362674B (zh) 2014-10-31 2014-10-31 一种基于安全运行电压的双馈风电机组高电压穿越方法

Publications (2)

Publication Number Publication Date
CN104362674A true CN104362674A (zh) 2015-02-18
CN104362674B CN104362674B (zh) 2016-08-24

Family

ID=52529912

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410602240.9A Active CN104362674B (zh) 2014-10-31 2014-10-31 一种基于安全运行电压的双馈风电机组高电压穿越方法

Country Status (1)

Country Link
CN (1) CN104362674B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106611960A (zh) * 2015-10-27 2017-05-03 中国电力科学研究院 一种双馈风电机组高电压穿越方法
CN108471120A (zh) * 2018-03-06 2018-08-31 浙江运达风电股份有限公司 一种风电机组高电压穿越主动支撑优化控制方法
WO2019076028A1 (zh) * 2017-10-16 2019-04-25 新疆金风科技股份有限公司 变流器、变流器的高电压穿越控制方法和装置

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011026250A1 (de) * 2009-09-03 2011-03-10 Ids Holding Ag Generatorsystem mit direkt netzgekoppeltem generator und verfahren zum durchfahren von netzstörungen
WO2014008647A1 (en) * 2012-07-12 2014-01-16 General Electric Company Dynamic braking system for an electric power system and method of operating the same
CN103560680A (zh) * 2012-03-26 2014-02-05 洛克威尔自动控制技术股份有限公司 双馈感应发电机变流器以及用于改进电网故障穿越的方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011026250A1 (de) * 2009-09-03 2011-03-10 Ids Holding Ag Generatorsystem mit direkt netzgekoppeltem generator und verfahren zum durchfahren von netzstörungen
CN103560680A (zh) * 2012-03-26 2014-02-05 洛克威尔自动控制技术股份有限公司 双馈感应发电机变流器以及用于改进电网故障穿越的方法
WO2014008647A1 (en) * 2012-07-12 2014-01-16 General Electric Company Dynamic braking system for an electric power system and method of operating the same

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
S.K.SALMAN, ET AL: "Modelling wind turbine-generators for fault ride-through studies", 《2004. UPEC 2004. 39TH INTERNATIONAL UNIVERSITIES POWER ENGINEERING CONFERENCE》 *
XIE ZHEN, ET AL: "High voltage ride through control strategy of doubly fed induction wind generators based on active resistance", 《2012 7TH INTERNATIONAL POWER ELECTRONICS AND MOTION CONTROL CONFERENCE (IPEMC)》 *
徐海亮,等: "考虑动态无功支持的双馈风电机组高电压穿越控制策略", 《中国电机工程学报》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106611960A (zh) * 2015-10-27 2017-05-03 中国电力科学研究院 一种双馈风电机组高电压穿越方法
WO2019076028A1 (zh) * 2017-10-16 2019-04-25 新疆金风科技股份有限公司 变流器、变流器的高电压穿越控制方法和装置
CN108471120A (zh) * 2018-03-06 2018-08-31 浙江运达风电股份有限公司 一种风电机组高电压穿越主动支撑优化控制方法

Also Published As

Publication number Publication date
CN104362674B (zh) 2016-08-24

Similar Documents

Publication Publication Date Title
Qiao et al. Grid connection requirements and solutions for DFIG wind turbines
CN104113077B (zh) 一种双馈异步风力发电机高电压穿越的协调控制方法
CN108599256A (zh) 一种基于转速调节的直驱式风电机组低电压穿越控制方法
Mali et al. Improving low voltage ride-through capabilities for grid connected wind turbine generator
CN103178543A (zh) 一种可实现无功支持的双馈型风电机组高电压穿越方法
Qiu et al. Modeling and control of diode rectifier fed PMSG based wind turbine
Singh et al. Performance of wind energy conversion system using a doubly fed induction generator for maximum power point tracking
CN107895968A (zh) 一种直驱型风力发电机组高电压穿越控制方法
CN110380449A (zh) 单极闭锁故障下风电直流送出系统协调控制方法
Yang et al. Low voltage ride-through of directly driven wind turbine with permanent magnet synchronous generator
Deng et al. A new structure based on cascaded multilevel converter for variable speed wind turbine
Rashid et al. Bridge-type fault current limiter for asymmetric fault ride-through capacity enhancement of doubly fed induction machine based wind generator
CN104362674B (zh) 一种基于安全运行电压的双馈风电机组高电压穿越方法
Rosyadi et al. Low voltage ride-through capability improvement of wind farms using variable speed permanent magnet wind generator
CN107706937A (zh) 一种储能型双馈风电机组的协调控制方法
Kumar et al. A Review on the operation of grid integrated doubly fed induction generator
Arindya A Variable Speed Wind Generation System Based on Doubly Fed Induction Generator
Ling et al. Improvement of the low-voltage ride-through capability of doubly fed induction generator wind turbines
Heng et al. Improved control strategy of an active crowbar for directly-driven PM wind generation system under grid voltage dips
Dongling et al. Coordination control for offshore wind power sending through hybrid HVDC
Shukla et al. Dynamic Performance of DFIG based WECS under different Voltage Sag
Muyeen et al. Multi-converter operation of variable speed wind turbine driving permanent magnet synchronous generator during network fault
Liu et al. The Influence of the Grid Overvoltage on Fully Rated Converter Wind Turbine and an HVRT Control Strategy Based on Reactive Current
Soliman et al. A fault ride through strategy for wind energy conversion system based on permanent magnet synchronous generator
Yuan et al. FRT improvement strategy for offshore wind farm considering operation state

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant