CN104360218A - Breaker secondary circuit wiring detecting device and breaker replacing method - Google Patents

Breaker secondary circuit wiring detecting device and breaker replacing method Download PDF

Info

Publication number
CN104360218A
CN104360218A CN201410667452.5A CN201410667452A CN104360218A CN 104360218 A CN104360218 A CN 104360218A CN 201410667452 A CN201410667452 A CN 201410667452A CN 104360218 A CN104360218 A CN 104360218A
Authority
CN
China
Prior art keywords
pilot lamp
breaker
switch
binding post
combined floodgate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410667452.5A
Other languages
Chinese (zh)
Inventor
陈根生
张文梦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fucheng Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
Fucheng Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fucheng Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical Fucheng Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority to CN201410667452.5A priority Critical patent/CN104360218A/en
Publication of CN104360218A publication Critical patent/CN104360218A/en
Pending legal-status Critical Current

Links

Landscapes

  • Breakers (AREA)

Abstract

The invention belongs to the technical field of detection, and discloses a breaker secondary circuit wiring detecting device and a breaker replacing method. The breaker secondary circuit wiring detecting device is mainly technically characterized in that a shell is included, a power switch, a wiring terminal, a double-contact switch, a tripping indicating lamp and a switch-on indicating lamp are arranged on the shell, the tripping indicating lamp and the switch-on indicating lamp are connected in parallel, the double-contact switch is connected with the tripping indicating lamp and the switch-on indicating lamp in parallel, the tripping indicating lamp is electrically connected with a first binding post of the wiring terminal, the switch-on indicating lamp is electrically connected with a third binding post of the wiring terminal, a second binding post and a fourth binding post of the wiring terminal are connected with a null line, a fifth binding post and a sixth binding post of the wiring terminal are connected with the null line and a live wire respectively, and testing wires are connected with output binding posts, corresponding to the binding posts, of the wiring terminal. The wiring condition of a breaker secondary circuit can be detected below a tower through the device, debugging time on the tower is reduced, and power failure time is greatly reduced.

Description

The method that secondary loop of breaker wiring testing device and isolating switch are changed
Technical field
The invention belongs to proving installation technical field, relate to the method for secondary loop of breaker wiring testing device and isolating switch replacing specifically.
Background technology
Along with the ERP system in electric power system is reached the standard grade successively, electrical production device therefor goods and materials need to circulate in ERP system, and particularly 35kV project of transmitting and converting electricity goods and materials must centralized and unified bid.But technician is when filling in information on bidding, can fill in the device parameter provided considerably less, so just causing the unit type of middle target unit type and replacing different, first and second mode of connection when equipment is installed will be different.Isolating switch is the line device that power circuit often uses, because model is different or inspection carelessness when dispatching from the factory, cause part secondary loop of breaker wiring faults, after being with out of order isolating switch line attachment, during test, closing coil is abnormal with breaking coil work on the line, can not realize closing a floodgate and tripping operation, mounted isolating switch is needed to take off, again change, cause power off time long, affect production and the life of the people.
Summary of the invention
First technical matters that the present invention solves just be to provide a kind of can under shaft tower just can test both opens device secondary circuit, shorten debug time on shaft tower, minimizing fault power-off time, the secondary loop of breaker wiring testing device of increasing work efficiency.
For solving the problems of the technologies described above, the technical scheme that the present invention proposes is: comprise housing, be provided with power switch on the housing, connection terminal, two switch contacts, tripping operation pilot lamp and combined floodgate pilot lamp, described tripping operation pilot lamp and the parallel connection of combined floodgate pilot lamp, described pair of switch contacts is in parallel with described tripping operation pilot lamp and combined floodgate pilot lamp, described tripping operation pilot lamp is electrically connected with the first binding post of connection terminal, described combined floodgate pilot lamp is electrically connected with the 3rd binding post of connection terminal, second binding post of described connection terminal is connected with zero line with the 4th binding post, 5th binding post of described connection terminal is connected with zero line and live wire respectively with the 6th binding post, output wiring terminal corresponding with each binding post on connection terminal is connected with test lead.
Second technical matters that the present invention solves just is to provide a kind of method that isolating switch is changed.
For solving the problems of the technologies described above, the technical scheme that the present invention proposes is:
The method comprises the following steps:
The first step, is connected secondary loop of breaker wiring testing device with circuit breaker electric
Under tower bar by each test lead respectively terminals each with isolating switch be connected;
Second step, detects the combined floodgate situation of secondary loop of breaker
Turn on the power switch, two switch contacts is allocated to combined floodgate on position, if combined floodgate pilot lamp lights, prove that breaker closing coil working is normal, if combined floodgate pilot lamp does not work, reselect isolating switch;
3rd step, detects the trip condition of secondary loop of breaker
To the qualified isolating switch of combined floodgate situation be detected, more two switch contacts is allocated to tripping operation on position, if tripping operation pilot lamp lights, prove that circuit breaker trip coil working is normal, if tripping operation pilot lamp does not work, exchange new isolating switch for, re-execute the first step;
4th step, changes isolating switch
Make isolating switch be in off position, then the disconnecting link of isolating switch front end is disconnected, the primary circuit of isolating switch is connected;
5th step, test
Protector is utilized to test isolating switch, test passes.
The method that secondary loop of breaker wiring testing device provided by the invention and isolating switch are changed, compared with the existing technology comparatively have the following advantages: comprise housing, be provided with power switch on the housing, connection terminal, two switch contacts, tripping operation pilot lamp and combined floodgate pilot lamp, described tripping operation pilot lamp and the parallel connection of combined floodgate pilot lamp, described pair of switch contacts is in parallel with described tripping operation pilot lamp and combined floodgate pilot lamp, described tripping operation pilot lamp is electrically connected with the first binding post of connection terminal, described combined floodgate pilot lamp is electrically connected with the 3rd binding post of connection terminal, second binding post of described connection terminal is connected with zero line with the 4th binding post, 5th binding post of described connection terminal is connected with zero line and live wire respectively with the 6th binding post, output wiring terminal corresponding with each binding post on connection terminal is connected with test lead, secondary loop of breaker wiring testing device is connected with circuit breaker electric, under tower bar by each test lead respectively terminals each with isolating switch be connected, the combined floodgate situation detecting secondary loop of breaker first whether is lighted according to combined floodgate pilot lamp, and then whether light according to tripping operation pilot lamp the trip condition detecting secondary loop of breaker, just secondary loop of breaker wiring condition can be detected by this device below shaft tower, decrease the debug time on shaft tower, power off time is reduced greatly.
Accompanying drawing explanation
Fig. 1 is the structural representation of secondary loop of breaker wiring testing device provided by the invention;
Fig. 2 is the circuit diagram of secondary loop of breaker wiring testing device principle of work.
Embodiment
Below in conjunction with accompanying drawing, secondary loop of breaker wiring testing device proposed by the invention is described further.
As depicted in figs. 1 and 2, the structural representation of secondary loop of breaker wiring testing device.This secondary loop of breaker wiring testing device comprises housing 1, housing 1 is provided with power switch 2, connection terminal 3, two switch contacts 4, tripping operation pilot lamp 5 and combined floodgate pilot lamp 6, tripping operation pilot lamp 5 and combined floodgate pilot lamp 6 parallel connection, two switch contacts 4 is in parallel with tripping operation pilot lamp 5 and combined floodgate pilot lamp 6, tripping operation pilot lamp 5 is electrically connected with the first binding post 31 of connection terminal 3, combined floodgate pilot lamp 6 is electrically connected with the 3rd binding post 33 of connection terminal 3, second binding post 32 of connection terminal 3 is connected with zero line with the 4th binding post 34, 5th binding post 35 of connection terminal 3 is connected with zero line and live wire respectively with the 6th binding post 36, output wiring terminal corresponding with each binding post on connection terminal is connected with test lead 7.Secondary loop of breaker wiring testing device is connected with circuit breaker electric, under tower bar by each test lead respectively terminals each with isolating switch be connected, the combined floodgate situation detecting secondary loop of breaker first whether is lighted according to combined floodgate pilot lamp, and then whether light according to tripping operation pilot lamp the trip condition detecting secondary loop of breaker, just secondary loop of breaker wiring condition can be detected by this device below shaft tower, decrease the debug time on shaft tower, power off time is reduced greatly.
As shown in Figure 2, when two switch contacts 4 is allocated to tripping operation on position, i.e. the first switch 41 conducting, the breaking coil 91 of isolating switch 9 works, the trip switch 81 that the breaking coil 91 of isolating switch is connected disconnects, closing switch 82 conducting, and tripping operation pilot lamp 5 and closing coil 92 form the closed-loop path of serial connection, tripping operation pilot lamp 5 lights, and proves that circuit breaker trip coil 91 is working properly; When two switch contacts 4 is allocated to combined floodgate on position, i.e. second switch 42 conducting, the closing coil 92 of isolating switch works, the closing switch 82 that the closing coil 92 of isolating switch is connected disconnects, trip switch 81 conducting, combined floodgate pilot lamp 6 and breaking coil 91 form the closed-loop path of serial connection, and combined floodgate pilot lamp 6 lights, and proves that circuit breaker trip coil working is normal.
The method that isolating switch is changed, the method comprises the following steps:
The first step, is connected secondary loop of breaker wiring testing device with circuit breaker electric
Under tower bar by each test lead respectively terminals each with isolating switch be connected;
Second step, detects the combined floodgate situation of secondary loop of breaker
Turn on the power switch 2, two switch contacts 4 is allocated to combined floodgate on position, if combined floodgate pilot lamp 6 lights, prove that breaker closing coil 92 is working properly, if combined floodgate pilot lamp does not work, reselect isolating switch;
3rd step, detects the trip condition of secondary loop of breaker
To the qualified isolating switch of combined floodgate situation be detected, more two switch contacts 4 is allocated to tripping operation on position, if tripping operation pilot lamp 5 lights, prove that circuit breaker trip coil working is normal, if tripping operation pilot lamp does not work, exchange new isolating switch for, re-execute the first step;
4th step, changes isolating switch
Make isolating switch be in off position, then the disconnecting link of isolating switch front end is disconnected, the primary circuit of isolating switch is connected;
5th step, test
Protector is utilized to test isolating switch, test passes.
Protection scope of the present invention is not only confined to above-described embodiment, as long as structure is identical with secondary loop of breaker wiring testing device structure of the present invention, just drops on the scope of protection of the invention.

Claims (2)

1. secondary loop of breaker wiring testing device, it is characterized in that: comprise housing, be provided with power switch on the housing, connection terminal, two switch contacts, tripping operation pilot lamp and combined floodgate pilot lamp, described tripping operation pilot lamp and the parallel connection of combined floodgate pilot lamp, described pair of switch contacts is in parallel with described tripping operation pilot lamp and combined floodgate pilot lamp, described tripping operation pilot lamp is electrically connected with the first binding post of connection terminal, described combined floodgate pilot lamp is electrically connected with the 3rd binding post of connection terminal, second binding post of described connection terminal is connected with zero line with the 4th binding post, 5th binding post of described connection terminal is connected with zero line and live wire respectively with the 6th binding post, output wiring terminal corresponding with each binding post on connection terminal is connected with test lead.
2. use the secondary loop of breaker wiring testing device described in claim 1 to carry out the replacing options of isolating switch, it is characterized in that: the method comprises the following steps:
The first step, is connected secondary loop of breaker wiring testing device with circuit breaker electric
Under tower bar by each test lead respectively terminals each with isolating switch be connected;
Second step, detects the combined floodgate situation of secondary loop of breaker
Turn on the power switch, two switch contacts is allocated to combined floodgate on position, if combined floodgate pilot lamp lights, prove that breaker closing coil working is normal, if combined floodgate pilot lamp does not work, reselect isolating switch;
3rd step, detects the trip condition of secondary loop of breaker
To the qualified isolating switch of combined floodgate situation be detected, more two switch contacts is allocated to tripping operation on position, if tripping operation pilot lamp lights, prove that circuit breaker trip coil working is normal, if tripping operation pilot lamp does not work, exchange new isolating switch for, re-execute the first step;
4th step, changes isolating switch
Make isolating switch be in off position, then the disconnecting link of isolating switch front end is disconnected, the primary circuit of isolating switch is connected;
5th step, test
Protector is utilized to test isolating switch, test passes.
CN201410667452.5A 2014-11-20 2014-11-20 Breaker secondary circuit wiring detecting device and breaker replacing method Pending CN104360218A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410667452.5A CN104360218A (en) 2014-11-20 2014-11-20 Breaker secondary circuit wiring detecting device and breaker replacing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410667452.5A CN104360218A (en) 2014-11-20 2014-11-20 Breaker secondary circuit wiring detecting device and breaker replacing method

Publications (1)

Publication Number Publication Date
CN104360218A true CN104360218A (en) 2015-02-18

Family

ID=52527499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410667452.5A Pending CN104360218A (en) 2014-11-20 2014-11-20 Breaker secondary circuit wiring detecting device and breaker replacing method

Country Status (1)

Country Link
CN (1) CN104360218A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109884521A (en) * 2019-03-28 2019-06-14 山东钢铁股份有限公司 A kind of circuit-breaker switching on-off control loop template monitoring, alarming circuit
CN112710968A (en) * 2020-11-19 2021-04-27 中广核核电运营有限公司 Secondary circuit rapid detection on-off device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1127927A (en) * 1994-07-06 1996-07-31 施耐德电器公司 An auxiliary unit notably for indicating the state of circuit breakers
CN2909504Y (en) * 2006-05-27 2007-06-06 中国石化集团胜利石油管理局电力管理总公司 Simple high-tension circuit breaker analog device
JP2010276344A (en) * 2009-05-26 2010-12-09 Nec Computertechno Ltd Electric test system and electric test method
CN201757762U (en) * 2010-06-29 2011-03-09 山西省电力公司晋城供电分公司 Circuit breaker tripping and closing voltage tester
CN203310970U (en) * 2013-06-28 2013-11-27 国家电网公司 10-35KV circuit breaker opening and closing operation box
CN204166079U (en) * 2014-11-20 2015-02-18 国网河北阜城县供电公司 Secondary loop of breaker wiring testing device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1127927A (en) * 1994-07-06 1996-07-31 施耐德电器公司 An auxiliary unit notably for indicating the state of circuit breakers
CN2909504Y (en) * 2006-05-27 2007-06-06 中国石化集团胜利石油管理局电力管理总公司 Simple high-tension circuit breaker analog device
JP2010276344A (en) * 2009-05-26 2010-12-09 Nec Computertechno Ltd Electric test system and electric test method
CN201757762U (en) * 2010-06-29 2011-03-09 山西省电力公司晋城供电分公司 Circuit breaker tripping and closing voltage tester
CN203310970U (en) * 2013-06-28 2013-11-27 国家电网公司 10-35KV circuit breaker opening and closing operation box
CN204166079U (en) * 2014-11-20 2015-02-18 国网河北阜城县供电公司 Secondary loop of breaker wiring testing device

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
叶树锦: "断路器二次回路完整性监视系统的设计与实现", 《广东科技》 *
秦卫东 等: "变电站断路器更换方法的优化", 《能源技术经济》 *
顾伟 等: "变电站短路器分合闸故障的分析与处理", 《浙江电力》 *
黄永清 等: "相量检测技术在主变35kV断路器更换中的应用", 《国外电子元器件》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109884521A (en) * 2019-03-28 2019-06-14 山东钢铁股份有限公司 A kind of circuit-breaker switching on-off control loop template monitoring, alarming circuit
CN109884521B (en) * 2019-03-28 2024-03-12 山东钢铁股份有限公司 Circuit breaker divide-shut brake control circuit broken wire monitoring alarm circuit
CN112710968A (en) * 2020-11-19 2021-04-27 中广核核电运营有限公司 Secondary circuit rapid detection on-off device

Similar Documents

Publication Publication Date Title
US9088152B2 (en) Leakage detection protection circuit
CN204666788U (en) A kind of relay checking seat
CN201945649U (en) Comprehensive test table for relay protector
US20120170159A1 (en) Leakage detection protective circuit
CN105116322A (en) System and method for testing circuit breaker auxiliary switch
CN204166079U (en) Secondary loop of breaker wiring testing device
CN103163419B (en) Indicator and method for cable core correction and transformer tripping outlet correction
CN104332948A (en) Arc fault protection device
CN104360218A (en) Breaker secondary circuit wiring detecting device and breaker replacing method
CN203350305U (en) Analog circuit breaker
CN103311889A (en) Manual switching protection circuit for dual power supplies
CN102004174A (en) Analog circuit breaker
CN102868215A (en) Double-T inner bridge power substation spare power automatic switching device corresponding operation mode self-adaption device
CN202798126U (en) Automatic switching system for uninterrupted power supply of PLC (programmable logic controller)
CN104076209A (en) Motor detection device
CN104092281B (en) A kind of exchange dual power supply switching method
CN109216100B (en) Monitoring indication circuit of power switch vacuum circuit breaker
CN203825144U (en) Circuit for identifying broken line area of switch control circuit
CN202600032U (en) All-loop electroscope
CN106841862B (en) Pacify river frequency converter UV method for diagnosing faults and its automatic detection device
CN104505823A (en) Method for power maintenance through transient power stop and transient stop selective reclosing circuit
CN106655489B (en) Three-remote control device for medium-voltage load switch cabinet
CN204695489U (en) Multiloop fire detecting arrangement
CN205355911U (en) From three -phase kilowatt -hour meter case of taking uninterrupted power source
CN103364702A (en) Test system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150218