CN104354018A - Fixture for drilling steel rails - Google Patents
Fixture for drilling steel rails Download PDFInfo
- Publication number
- CN104354018A CN104354018A CN201410633560.0A CN201410633560A CN104354018A CN 104354018 A CN104354018 A CN 104354018A CN 201410633560 A CN201410633560 A CN 201410633560A CN 104354018 A CN104354018 A CN 104354018A
- Authority
- CN
- China
- Prior art keywords
- rail
- plate
- location
- gripper shoe
- top board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23Q—DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
- B23Q3/00—Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine
- B23Q3/02—Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine for mounting on a work-table, tool-slide, or analogous part
- B23Q3/06—Work-clamping means
- B23Q3/062—Work-clamping means adapted for holding workpieces having a special form or being made from a special material
- B23Q3/064—Work-clamping means adapted for holding workpieces having a special form or being made from a special material for holding elongated workpieces, e.g. pipes, bars or profiles
Abstract
The invention discloses a fixture for drilling steel rails. The fixture comprises a travelling mechanism with a supporting flat plate; the travelling mechanism is driven to move by a driving motor; the upper end face of the supporting flat plate is fixedly provided with a steel rail pressing mechanism and positioning mechanisms which are symmetrically arranged on two sides of the steel rail pressing mechanism and are used for positioning and placing the steel rails. According to the fixture, the steel rails are arranged on a travelling trolley provided with the positioning mechanisms and the pressing mechanism, the positioning and pressing efficiency is high, the heavy-weight steel rails can be conveniently moved, and the production efficiency is greatly improved by drilling the steel rails during movement of the travelling trolley; as two groups of steel rails can be drilled when the travelling trolley moves each time, and the production efficiency is improved by more than 50 percent.
Description
Technical field
The present invention relates to a kind of drilling of the rail equipment, the frock of a kind of drilling of the rail specifically.
Background technology
According to the decision and deployment of Executive Meeting of the State Council, Chinese Railway parent company, on the basis considering the conditions such as socio-economic development demand, railway transportation needs, railway construction fund supportability, adjusts the target having increased railway construction in this year.One be newly operated project by 44, be increased to 48; Two be china railway investment in fixed assets by 7,000 hundred million yuan, be increased to 7,200 hundred million yuan; Three is that new line operation mileage is by 6600 kilometers, be increased to more than 7000 kilometers, therefore, along with the expansion gradually of railway construction scale, the demand of rail also grows with each passing day, and manufacturing and processing enterprise supporting is therewith also gradually using how improving the working (machining) efficiency of rail as main research direction;
At present, all need after Rail Production to punch thereon, owing to not having special frock, conventional method is, being sling by the rail of tens tons of weight by loop wheel machine is placed on a processing platform, after fixing, by manually adopting rig to hole one by one, because each rail is all longer, master worker has bored a rail needs the longer time just can complete, so, production efficiency reduces greatly, and labor strength is higher.
Summary of the invention
For solving the problems of the technologies described above, object of the present invention provides a kind of frock of the drilling of the rail, this device is by being arranged on the walking dolly with detent mechanism and hold-down mechanism by rail, location and to compress efficiency high, and is convenient to the larger rail of mobile weight, carries out the drilling of the rail in being moved by walking dolly, production efficiency improves greatly, because walking dolly often moves once, can hole to two groups of rail, enhance productivity more than 50%; Secondly owing to being provided with T-shaped supporting pad in detent mechanism between location-plate and gripper shoe, the lower end of T-shaped supporting pad is placed in described chute and also can moves back and forth along the direction of chute; Therefore can change different supporting pads to realize processing the rail of different model, improve the practicality of this device.
The technical solution adopted in the present invention is: a kind of frock of the drilling of the rail, comprise the walking mechanism of a band support plate, walking mechanism moves under the drive of drive motors, is fixed with rail hold-down mechanism and the detent mechanism for locating placement rail being symmetricly set on rail hold-down mechanism both sides in the upper surface of support plate;
Described detent mechanism is made up of the location-plate of inner side, the gripper shoe in outside and the T-shaped supporting pad be arranged between location-plate and gripper shoe, described location-plate has a step surface, the height of this step surface is mutually concordant with the height of gripper shoe, be provided with chute between location-plate and gripper shoe, the lower end of T-shaped supporting pad is placed in described chute and also can moves back and forth along the direction of chute;
Described rail hold-down mechanism is made up of the support rim be fixedly connected in described support plate, the U-shaped sliding sleeve being threaded bar and top board, U-shaped sliding sleeve is set on support rim and also can moves back and forth along the direction of support rim, threaded rod is fixedly connected with in the upper end of U-shaped sliding sleeve, the middle part of top board is provided with screwed hole and is connected on threaded rod by the screwed hole on it, under the state of borehole drill construction work, the end, two ends of top board is pressed on the rail that is positioned on two side positioning mechanisms, and has nut to be fixed by top board.
Further optimization, the end, two ends of described top board is provided with unworn liner.
Further optimization, the shape of the cross section of described support rim is T-shaped.
Further optimization, has gap between described location-plate and gripper shoe, and the vertical section of this T-shaped supporting pad is arranged in the gap of location-plate and gripper shoe, and the horizontal segment of T-shaped supporting pad is placed on the upper surface of location-plate and gripper shoe.
The invention has the beneficial effects as follows:
One, this device are by being arranged in the walking mechanism with detent mechanism and hold-down mechanism by rail, be on walking dolly, and be convenient to the larger rail of mobile weight, location and compress efficiency high, carry out the drilling of the rail in being moved by walking mechanism, production efficiency improves greatly.
Two, this device is provided with the walking mechanism of a band support plate, rail hold-down mechanism and the detent mechanism for locating placement rail being symmetricly set on rail hold-down mechanism both sides is fixed with in the upper surface of support plate, because walking dolly often moves once, can hole to two groups of rail, enhance productivity more than 50%.
Three, owing to being provided with T-shaped supporting pad in detent mechanism between location-plate and gripper shoe, the lower end of T-shaped supporting pad is placed in described chute also can take out; This structure has two benefits: one: can change different supporting pads to realize processing the rail of different model, improve the practicality of this device; Two, because the minor face of rail during boring impacts larger to whole supporting mechanism, therefore to support platform serious wear, and after arranging T-shaped supporting pad, vibratory impulse is transferred in location-plate and gripper shoe by this supporting pad, improve the service life of this device greatly.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Fig. 2 is the structural representation of detent mechanism in the present invention.
Fig. 3 is the structural representation of rail hold-down mechanism in the present invention.
Mark in figure: 1, walking mechanism, 101, support plate, 2, rail hold-down mechanism, 201, support rim, 202, U-shaped sliding sleeve, 203, threaded rod, 204, top board, 3, detent mechanism, 301, location-plate, 302, gripper shoe, 303, T-shaped supporting pad, 304, chute, 4, rail to be processed.
Detailed description of the invention
Elaborate to embodiments of the invention below in conjunction with accompanying drawing, the present embodiment, premised on technical solution of the present invention, give detailed embodiment and concrete operating process, but protection scope of the present invention is not limited to following embodiment.
As shown in the figure, a kind of frock of the drilling of the rail, comprise the walking mechanism 1 of a band support plate 101, walking mechanism moves under the drive of drive motors, can the road wheel of walking mechanism 1 be arranged on guide rail in actual condition, make to move along guide rail direction in walking mechanism moving process, directionality is better, the position skew of boring can not being had influence on, being fixed with rail hold-down mechanism 2 and the detent mechanism 3 for locating placement rail being symmetricly set on rail hold-down mechanism both sides in the upper surface of support plate 101;
Described detent mechanism 3 is made up of the location-plate 301 of inner side, the gripper shoe 302 in outside and the T-shaped supporting pad 303 be arranged between location-plate and gripper shoe, above-mentioned inner side is the side near rail hold-down mechanism 2, described location-plate 301 has a step surface, the height of this step surface is mutually concordant with the height of gripper shoe 302, be provided with chute 304 between location-plate 301 and gripper shoe 302, the lower end of T-shaped supporting pad 303 is placed in described chute 304 and also can moves back and forth along the direction of chute 304;
Described rail hold-down mechanism 2 is by the support rim 201 be fixedly connected in described support plate 101, the U-shaped sliding sleeve 202 and the top board 204 that are threaded bar 203 form, U-shaped sliding sleeve 202 is set on support rim 201 and also can moves back and forth along the direction of support rim, threaded rod 203 is fixedly connected with in the upper end of U-shaped sliding sleeve 202, the middle part of top board 204 is provided with screwed hole and is connected on threaded rod 203 by the screwed hole on it, under the state of borehole drill construction work, the end, two ends of top board 204 is pressed on the rail to be processed 4 that is positioned on two side positioning mechanisms, and have nut to be fixed by top board 204.
Workflow is: first unclamped by top board, top board is adjusted to a side position, it is made not have influence on the placement of rail, by Handling device, rail is placed on two side positioning mechanisms afterwards, rail has a minor face and a long limit, minor face is near the side of location-plate, and supported by the supporting pad of bottom, the long limit of rail is supported by the gripper shoe of detent mechanism, when processing the rail of different model, only need to change different supporting pads, after rail is placed, two ends of adjustment top board are pressed on rail, and have nut to be fixed by top board, after fixedly completing, boring is implemented by operator.
In order to realize optimum efficiency, the end, two ends of the top board described in this programme is provided with unworn liner.
In order to realize optimum efficiency, the shape of the cross section of the support rim described in this programme is T-shaped.
In order to realize optimum efficiency, between location-plate described in this programme and gripper shoe, there is gap, the vertical section of this T-shaped supporting pad is arranged in the gap of location-plate and gripper shoe, the horizontal segment of T-shaped supporting pad is placed on the upper surface of location-plate and gripper shoe, because during boring, the minor face of rail impacts larger to whole supporting mechanism, therefore to support platform serious wear, and after T-shaped supporting pad is set, the vertical section of this T-shaped supporting pad is arranged in the gap of location-plate and gripper shoe, the horizontal segment of T-shaped supporting pad is placed on the upper surface of location-plate and gripper shoe, vibratory impulse is transferred in location-plate and gripper shoe by this supporting pad, improve the service life of this device greatly.
It is prior art that this programme does not describe technology in detail.
Claims (4)
1. the frock of a drilling of the rail, comprise the walking mechanism of a band support plate, walking mechanism moves under the drive of drive motors, it is characterized in that: be fixed with rail hold-down mechanism and the detent mechanism for locating placement rail being symmetricly set on rail hold-down mechanism both sides in the upper surface of support plate;
Described detent mechanism is made up of the location-plate of inner side, the gripper shoe in outside and the T-shaped supporting pad be arranged between location-plate and gripper shoe, described location-plate has a step surface, the height of this step surface is mutually concordant with the height of gripper shoe, be provided with chute between location-plate and gripper shoe, the lower end of T-shaped supporting pad is placed in described chute and also can moves back and forth along the direction of chute;
Described rail hold-down mechanism is made up of the support rim be fixedly connected in described support plate, the U-shaped sliding sleeve being threaded bar and top board, U-shaped sliding sleeve is set on support rim and also can moves back and forth along the direction of support rim, threaded rod is fixedly connected with in the upper end of U-shaped sliding sleeve, the middle part of top board is provided with screwed hole and is connected on threaded rod by the screwed hole on it, under the state of borehole drill construction work, the end, two ends of top board is pressed on the rail that is positioned on two side positioning mechanisms, and has nut to be fixed by top board.
2. the frock of a kind of drilling of the rail according to claim 1, is characterized in that: the end, two ends of described top board is provided with unworn liner.
3. the frock of a kind of drilling of the rail according to claim 1, is characterized in that: the shape of the cross section of described support rim is T-shaped.
4. the frock of a kind of drilling of the rail according to claim 1, it is characterized in that: between described location-plate and gripper shoe, there is gap, the vertical section of this T-shaped supporting pad is arranged in the gap of location-plate and gripper shoe, and the horizontal segment of T-shaped supporting pad is placed on the upper surface of location-plate and gripper shoe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410633560.0A CN104354018B (en) | 2014-11-12 | 2014-11-12 | Fixture for drilling steel rails |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410633560.0A CN104354018B (en) | 2014-11-12 | 2014-11-12 | Fixture for drilling steel rails |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104354018A true CN104354018A (en) | 2015-02-18 |
CN104354018B CN104354018B (en) | 2017-01-18 |
Family
ID=52521376
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410633560.0A Expired - Fee Related CN104354018B (en) | 2014-11-12 | 2014-11-12 | Fixture for drilling steel rails |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104354018B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104875056A (en) * | 2015-05-27 | 2015-09-02 | 佛山市普拉迪数控科技有限公司 | Z-direction positioning clamp controlled in groups and capable of rotating left and right for fine tuning |
CN104875057A (en) * | 2015-05-27 | 2015-09-02 | 佛山市普拉迪数控科技有限公司 | Multi-row Z-direction positioning fixture supporting leftward-rightward rotational fine adjustment |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2072458U (en) * | 1990-04-28 | 1991-03-06 | 李建升 | Rotational lock type fast mounting clip device |
CN2175655Y (en) * | 1993-06-28 | 1994-08-31 | 沈阳铁路局科学技术研究所 | Steel rail drilling clamp |
JPH1178623A (en) * | 1997-09-02 | 1999-03-23 | Furukawa Electric Co Ltd:The | Manufacture of composite rigid body electric traction and boring machine |
CN102430929A (en) * | 2010-09-29 | 2012-05-02 | 溧阳市盛杰机械有限公司 | Large workpiece machining working platform |
CN202592063U (en) * | 2012-03-29 | 2012-12-12 | 永煤集团股份有限公司新桥煤矿 | Clamp used for locating steel rail during drilling |
CN203019262U (en) * | 2013-01-30 | 2013-06-26 | 成都大漠石油机械有限公司 | Pressing plate structure capable of increasing contact area |
CN203426751U (en) * | 2013-08-19 | 2014-02-12 | 杨吉明 | Bottom die for milling machine engine base |
CN203471425U (en) * | 2013-08-08 | 2014-03-12 | 天津东义镁制品股份有限公司 | Clamp air cylinder positioning device |
CN203875653U (en) * | 2014-06-03 | 2014-10-15 | 芜湖中铁科吉富轨道有限公司 | Clamp used for steel rail milling machine |
CN204295307U (en) * | 2014-11-12 | 2015-04-29 | 汝州郑铁三佳道岔有限公司 | A kind of frock of the drilling of the rail |
-
2014
- 2014-11-12 CN CN201410633560.0A patent/CN104354018B/en not_active Expired - Fee Related
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2072458U (en) * | 1990-04-28 | 1991-03-06 | 李建升 | Rotational lock type fast mounting clip device |
CN2175655Y (en) * | 1993-06-28 | 1994-08-31 | 沈阳铁路局科学技术研究所 | Steel rail drilling clamp |
JPH1178623A (en) * | 1997-09-02 | 1999-03-23 | Furukawa Electric Co Ltd:The | Manufacture of composite rigid body electric traction and boring machine |
CN102430929A (en) * | 2010-09-29 | 2012-05-02 | 溧阳市盛杰机械有限公司 | Large workpiece machining working platform |
CN202592063U (en) * | 2012-03-29 | 2012-12-12 | 永煤集团股份有限公司新桥煤矿 | Clamp used for locating steel rail during drilling |
CN203019262U (en) * | 2013-01-30 | 2013-06-26 | 成都大漠石油机械有限公司 | Pressing plate structure capable of increasing contact area |
CN203471425U (en) * | 2013-08-08 | 2014-03-12 | 天津东义镁制品股份有限公司 | Clamp air cylinder positioning device |
CN203426751U (en) * | 2013-08-19 | 2014-02-12 | 杨吉明 | Bottom die for milling machine engine base |
CN203875653U (en) * | 2014-06-03 | 2014-10-15 | 芜湖中铁科吉富轨道有限公司 | Clamp used for steel rail milling machine |
CN204295307U (en) * | 2014-11-12 | 2015-04-29 | 汝州郑铁三佳道岔有限公司 | A kind of frock of the drilling of the rail |
Non-Patent Citations (1)
Title |
---|
朱耀祥 等: "《现代夹具设计手册》", 31 October 2009, article "夹紧装置典型结构" * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104875056A (en) * | 2015-05-27 | 2015-09-02 | 佛山市普拉迪数控科技有限公司 | Z-direction positioning clamp controlled in groups and capable of rotating left and right for fine tuning |
CN104875057A (en) * | 2015-05-27 | 2015-09-02 | 佛山市普拉迪数控科技有限公司 | Multi-row Z-direction positioning fixture supporting leftward-rightward rotational fine adjustment |
Also Published As
Publication number | Publication date |
---|---|
CN104354018B (en) | 2017-01-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204295308U (en) | The fixture of the drilling of the rail | |
CN204295336U (en) | A kind of fixture of the drilling of the rail | |
CN105312798A (en) | Steel structure numerical control assembly center | |
CN201320615Y (en) | Countershaft boring machine special for hydraulic bracket component | |
CN202539934U (en) | Process line of channel steel of portal of hoisting system | |
CN104354018A (en) | Fixture for drilling steel rails | |
CN104308219B (en) | A kind of drilling equipment of rail | |
CN204295307U (en) | A kind of frock of the drilling of the rail | |
CN204294984U (en) | A kind of drilling equipment of rail | |
CN204294983U (en) | A kind of rail drilling equipment | |
CN104369000B (en) | Drilling fixture for steel rails | |
CN102305035B (en) | Device for adjusting centration of complete vehicle-mounted service machine to wellhead | |
CN202670656U (en) | Multifunctional bogie walking vehicle | |
CN205764045U (en) | A kind of five metals drilling machine for machining equipment | |
CN204295306U (en) | The frock of the drilling of the rail | |
CN201314234Y (en) | Drill tool quick handling device for coal augers | |
CN104353860B (en) | A kind of rail drilling equipment | |
CN103758542A (en) | Trolley for laying tunnel waterproof plate | |
CN102500791A (en) | Method for drilling large-sized workpiece | |
CN102441789A (en) | Method and device for press-mounting and centering of variable-gauge railway wheel set bearings | |
CN105458760A (en) | Moving support of boring machine for frame-type strander | |
CN106493856B (en) | Suitable for the automatic installation locking robot of high speed railway fragments-free track slab steel reinforcement cage tension rod | |
CN103272882A (en) | Slideway assembly used for spool wire-winding machine | |
CN204381313U (en) | A kind of metal die installing mechanism in place | |
CN210755294U (en) | Novel high-precision drilling equipment for extra-high-pressure steel plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170118 Termination date: 20171112 |