CN104342706A - Washing, pre-filming and water treatment integration equipment - Google Patents

Washing, pre-filming and water treatment integration equipment Download PDF

Info

Publication number
CN104342706A
CN104342706A CN201410606366.3A CN201410606366A CN104342706A CN 104342706 A CN104342706 A CN 104342706A CN 201410606366 A CN201410606366 A CN 201410606366A CN 104342706 A CN104342706 A CN 104342706A
Authority
CN
China
Prior art keywords
valve
water
enters pipeline
batch tank
mixed solution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410606366.3A
Other languages
Chinese (zh)
Other versions
CN104342706B (en
Inventor
徐莹莹
徐林林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN ZHONGHUA GN TECHNOLOGY Co Ltd
Original Assignee
TIANJIN ZHONGHUA GN TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN ZHONGHUA GN TECHNOLOGY Co Ltd filed Critical TIANJIN ZHONGHUA GN TECHNOLOGY Co Ltd
Priority to CN201410606366.3A priority Critical patent/CN104342706B/en
Publication of CN104342706A publication Critical patent/CN104342706A/en
Application granted granted Critical
Publication of CN104342706B publication Critical patent/CN104342706B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cleaning In General (AREA)

Abstract

The invention discloses washing, pre-filming and water treatment integration equipment. The equipment comprises a water storage tank, a washing agent storage tank, a corrosion inhibitor storage tank, a water treating agent storage tank, a first preparation tank, a second preparation tank and a pump station. Compared with the prior art, equipment to be subjected to washing, pre-filming and water treatment is detached and washing work can be finished, so that the manpower investment is reduced, the operation is simple and the operation can be finished without professional training; meanwhile, washing, water treatment and pre-filming multifunctional structures are integrated so that raw materials are saved and the working efficiency is improved; the use requirements of users are met and the equipment is convenient to industrially popularize.

Description

Cleaning, pre-film and water treatment integration apparatus
Technical field
The invention belongs to water circulation system and pipeline cleaning technical field, particularly relate to a kind of cleaning, pre-film and water treatment integration apparatus.
Background technology
Current storage tank, the cleaning of air-conditioning duct, general is manually hand-manipulated, needs equipment and transport pipe to disassemble, and again loads onto after cleaning and sterilizing.This cleaning and sterilizing technique Problems existing is: 1) greatly, expend man-hour, equipment is fragile, reduces the service efficiency of equipment for dismounting and erecting equipment labour intensity; 2) in the process of ressembling, there is the risk of secondary pollution.
Summary of the invention
The object of this invention is to provide a kind of cleaning, pre-film and water treatment integration apparatus, to solve the above-mentioned technical problem existed in prior art.
In order to realize object of the present invention, the invention provides a kind of cleaning, pre-film and water treatment integration apparatus, described equipment comprises water tank, clean-out system hold-up vessel, inhibiter hold-up vessel, water conditioner hold-up vessel, first batch tank, second batch tank and pumping plant, described water tank is for depositing cleaning water used, it is connected with the first batch tank with pumping plant with suction culvert respectively by flushing pipeline, described flushing pipeline is provided with the first valve, described suction culvert is provided with the second valve, described clean-out system hold-up vessel is used for depositing clean-out system stoste, it enters pipeline by clean-out system and is connected with batch tank, described clean-out system enters pipeline and is provided with the 3rd valve, described inhibiter hold-up vessel is used for depositing inhibiter stoste, it enters pipeline by inhibiter and is connected with batch tank, described inhibiter enters pipeline and is provided with the 4th valve, described first batch tank is for being configured for the mixed solution of cleaning, its inside is provided with the first agitator, described first batch tank enters pipeline by the first mixed solution and is connected with described pumping plant, described first mixed solution enters pipeline and is provided with the 5th valve, described pumping plant enters pipeline by the second mixed solution and is connected with pending equipment, described second mixed solution enters pipeline and is provided with the 6th valve, described pending equipment is provided with sewage draining exit, described water conditioner hold-up vessel is used for depositing water conditioner stoste, it enters pipeline by water conditioner and is connected with the second batch tank, described water conditioner enters pipeline and is provided with the 9th valve, described second batch tank is for being configured for the mixed solution of water treatment, its inside is provided with the second agitator, described water tank is connected with the second batch tank by secondary suction culvert, described secondary suction culvert is provided with the 8th valve, described second batch tank enters pipeline by the 3rd mixed solution and is connected with described pumping plant, described 3rd mixed solution enters pipeline and is provided with the tenth valve, described prefilming agent hold-up vessel is used for depositing prefilming agent stoste, and it enters pipeline by prefilming agent and is connected with batch tank, and described prefilming agent enters pipeline and is provided with the 11 valve.
The present invention, compared with prior art, without the need to by be cleaned and treat pre-film, treat that the equipment of water treatment is dismantled, can complete cleaning, decrease human input, and simple to operate, gets final product complete operation without the need to professional training; Meanwhile, be integrated with cleaning and water treatment, in advance film multi-functional structure, save starting material, improve working efficiency, meet the user demand of user, be convenient to industrially promote.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
In figure, 1-water tank, 2-clean-out system hold-up vessel, 3-inhibiter hold-up vessel, 4-first valve, 5-second valve, 6-the 3rd valve, 7-the 4th valve, 8-first batch tank, 9-first agitator, 10-the 5th valve, 11-pumping plant, 12-the 6th valve, the pending equipment of 13-, 14-sewage draining exit, 15-the 7th valve, 16-water quality sampling mechanism, 17-water conditioner hold-up vessel, 18-the 8th valve, 19-the 9th valve, 20-second preparing tank, 21-second agitator, 22-the tenth valve, 23-prefilming agent hold-up vessel, 24-the 11 valve.
Embodiment
In order to make object of the present invention, technical scheme and beneficial effect clearly understand, below in conjunction with embodiment, the present invention is further elaborated.Should be understood to specific embodiment described herein only in order to explain the present invention, be not limited to protection scope of the present invention.
As shown in Figure 1, the invention provides a kind of cleaning, pre-film and water treatment integration apparatus, described equipment comprises water tank, clean-out system hold-up vessel, inhibiter hold-up vessel, water conditioner hold-up vessel, first batch tank, second batch tank and pumping plant, described water tank is for depositing cleaning water used, it is connected with the first batch tank with pumping plant with suction culvert respectively by flushing pipeline, described flushing pipeline is provided with the first valve, described suction culvert is provided with the second valve, described clean-out system hold-up vessel is used for depositing clean-out system stoste, it enters pipeline by clean-out system and is connected with batch tank, described clean-out system enters pipeline and is provided with the 3rd valve, described inhibiter hold-up vessel is used for depositing inhibiter stoste, it enters pipeline by inhibiter and is connected with batch tank, described inhibiter enters pipeline and is provided with the 4th valve, described first batch tank is for being configured for the mixed solution of cleaning, its inside is provided with the first agitator, described first batch tank enters pipeline by the first mixed solution and is connected with described pumping plant, described first mixed solution enters pipeline and is provided with the 5th valve, described pumping plant enters pipeline by the second mixed solution and is connected with pending equipment, described second mixed solution enters pipeline and is provided with the 6th valve, described pending equipment is provided with sewage draining exit, described water conditioner hold-up vessel is used for depositing water conditioner stoste, it enters pipeline by water conditioner and is connected with the second batch tank, described water conditioner enters pipeline and is provided with the 9th valve, described second batch tank is for being configured for the mixed solution of water treatment, its inside is provided with the second agitator, described water tank is connected with the second batch tank by secondary suction culvert, described secondary suction culvert is provided with the 8th valve, described second batch tank enters pipeline by the 3rd mixed solution and is connected with described pumping plant, described 3rd mixed solution enters pipeline and is provided with the tenth valve, described prefilming agent hold-up vessel is used for depositing prefilming agent stoste, and it enters pipeline by prefilming agent and is connected with batch tank, and described prefilming agent enters pipeline and is provided with the 11 valve.
It should be noted that, the working process of the present invention's cleaning is: tap water, clean-out system, inhibiter are quantitatively added the first batch tank, after first agitator automatic control startup stirs default minute, (can be 1 minute) is squeezed into the second mixed solution by pumping plant and is entered pipeline, 5th valve closes, second valve opening, enters pipeline to the second mixed solution and carries out clear water flushing, and washing fluid enters pending equipment by the 6th valve, participate in cleaning, until terminate.The working process of water treatment integration is: selective system equipment material.Water yield X ton is possessed, quantity of circulating water Y ton, the rate of water make-up Z ton of every day by water tank input.Second agitator automatic control is squeezed into the second mixed solution by pumping plant after starting stirring Preset Time (1 minute) and is entered pipeline, 8th valve closes, first valve opening, enter pipeline to the second mixed solution and carry out clear water flushing, washing fluid is useless to be entered water by the 6th valve and follows system and participate in water treatment.The treating processes of pre-film is: by tap water, prefilming agent quantitatively adds batch tank, after first agitator automatic control startup stirs default minute, (can be 1 minute) is squeezed into the second mixed solution by pumping plant and is entered pipeline, 5th valve closes, second valve opening, pipeline is entered to the second mixed solution and carries out clear water flushing, washing fluid is entered by the 6th valve and treats pre-film device, mixed solution is treating that pre-film device place carries out water cycle, participate in pre-film, until terminate, manual observation pre-film effect is reminded at interval of Preset Time (30 minutes) in pre-membrane process, by observation test piece pre-film effect, test piece is arranged on the optional position of water circle device, as long as be convenient to observe.
In a preferred embodiment, the present invention under the control of PLC, can Auto-matching clean-out system stoste, inhibiter stoste, tap water adding proportion, add time, order of addition, reduce further artificial participation, improve precision and the speed of cleaning, increase work efficiency.The present invention under the control of PLC, can Auto-matching water conditioner stoste, tap water adding proportion, add time, order of addition, reduce further artificial participation, improve precision and the speed of water treatment, increase work efficiency.The present invention under the control of PLC, can Auto-matching prefilming agent stoste, tap water adding proportion, add time, order of addition, reduce further artificial participation, improve precision and the speed of pre-film, increase work efficiency.
Described first valve, the second valve, the 3rd valve, the 4th valve and the 5th valve, the 6th valve, the 7th valve, the 8th valve, the 9th valve, the tenth valve, the 11 valve are magnetic valve and are all connected with PLC, described agitator, pumping plant are connected with PLC, described first valve, the second valve, the 3rd valve and the 4th valve, the 8th valve, the 9th valve, the 11 valve top are provided with under meter, and described under meter is connected with PLC.
In a preferred embodiment, in order to control the quality of cleaning and water treatment further, in time cleaning, described equipment to be cleaned is connected with water quality sampling mechanism by water quality sampling pipeline, and described water quality sampling structure is connected with PLC.The 7th valve in cleaning process in every Preset Time on (can be 15 minutes) water quality sampling pipeline has opened automatically taking water sample automatically, and water sample enters Water Test Kits detection relevant item-water quality standard and completes contrast.Comparison is successful or unsuccessful, and arithmetic center all can provide associated solutions and be presented on liquid crystal display, in order to control cleaning process, and automatic pollution discharge.When water treatment time, described in treat that water treating equipment are connected with water quality sampling mechanism by water quality sampling pipeline, described water quality sampling structure is connected with PLC.Selective system equipment material.Water yield X ton is possessed in input, quantity of circulating water Y ton, the rate of water make-up Z ton of every day. automatically open the 7th valve and carry out water sampling, control center provides solution after analysing and comparing according to water sampling and is presented on liquid crystal display, approval scheme, after pressing OK button, the adding proportion of control center's Auto-matching water treatment agent monomeric species, tap water, interpolation time, order of addition.Agitator automatic control is squeezed into the second mixed solution by pumping plant after starting stirring Preset Time (1 minute) and is entered pipeline, 5th valve closes, first valve opening, pipeline is entered to the second mixed solution and carries out clear water flushing, washing fluid is useless to be entered water by the 6th valve and follows system and participate in water treatment, can from main separation water quality test sampling and detection time again in engineering of water treatment, until after seasonal engineering of water treatment terminates.
Described pending equipment for treating pre-film device or treating water treating equipment or equipment to be cleaned, when for described in treat pre-film device time, described in treat that pre-film device is provided with test piece, described test piece is for observing the effect of pre-film.
It should be noted that, because the present invention is cleaning, pre-film and water treatment integration apparatus, therefore, described pending equipment is equipment to be cleaned or treats water treating equipment or treat pre-film device.
The above is only the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (4)

1. a cleaning, pre-film and water treatment integration apparatus, it is characterized in that, described equipment comprises water tank, clean-out system hold-up vessel, inhibiter hold-up vessel, water conditioner hold-up vessel, first batch tank, second batch tank and pumping plant, described water tank is for depositing cleaning water used, it is connected with the first batch tank with pumping plant with suction culvert respectively by flushing pipeline, described flushing pipeline is provided with the first valve, described suction culvert is provided with the second valve, described clean-out system hold-up vessel is used for depositing clean-out system stoste, it enters pipeline by clean-out system and is connected with batch tank, described clean-out system enters pipeline and is provided with the 3rd valve, described inhibiter hold-up vessel is used for depositing inhibiter stoste, it enters pipeline by inhibiter and is connected with batch tank, described inhibiter enters pipeline and is provided with the 4th valve, described first batch tank is for being configured for the mixed solution of cleaning, its inside is provided with the first agitator, described first batch tank enters pipeline by the first mixed solution and is connected with described pumping plant, described first mixed solution enters pipeline and is provided with the 5th valve, described pumping plant enters pipeline by the second mixed solution and is connected with pending equipment, described second mixed solution enters pipeline and is provided with the 6th valve, described pending equipment is provided with sewage draining exit, described water conditioner hold-up vessel is used for depositing water conditioner stoste, it enters pipeline by water conditioner and is connected with the second batch tank, described water conditioner enters pipeline and is provided with the 9th valve, described second batch tank is for being configured for the mixed solution of water treatment, its inside is provided with the second agitator, described water tank is connected with the second batch tank by secondary suction culvert, described secondary suction culvert is provided with the 8th valve, described second batch tank enters pipeline by the 3rd mixed solution and is connected with described pumping plant, described 3rd mixed solution enters pipeline and is provided with the tenth valve, described prefilming agent hold-up vessel is used for depositing prefilming agent stoste, and it enters pipeline by prefilming agent and is connected with batch tank, and described prefilming agent enters pipeline and is provided with the 11 valve.
2. cleaning according to claim 1, pre-film and water treatment integration apparatus, it is characterized in that, described first valve, second valve, 3rd valve, 4th valve and the 5th valve, 6th valve, 7th valve, 8th valve, 9th valve, tenth valve, 11 valve is magnetic valve and is all connected with PLC, described agitator, pumping plant is connected with PLC, described first valve, second valve, 3rd valve and the 4th valve, 8th valve, 9th valve, 11 valve top is provided with under meter, described under meter is connected with PLC.
3. cleaning according to claim 1, pre-film and water treatment integration apparatus, it is characterized in that, described pending equipment is connected with water quality sampling mechanism by water quality sampling pipeline, and described water quality sampling structure is connected with PLC.
4. cleaning according to claim 1, pre-film and water treatment integration apparatus, it is characterized in that, described pending equipment is for treating pre-film device or treating water treating equipment or equipment to be cleaned, when for described in treat pre-film device time, describedly treat that pre-film device is provided with test piece, described test piece is for observing the effect of pre-film.
CN201410606366.3A 2014-10-31 2014-10-31 Cleaning, pre-film and water process integration apparatus Expired - Fee Related CN104342706B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410606366.3A CN104342706B (en) 2014-10-31 2014-10-31 Cleaning, pre-film and water process integration apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410606366.3A CN104342706B (en) 2014-10-31 2014-10-31 Cleaning, pre-film and water process integration apparatus

Publications (2)

Publication Number Publication Date
CN104342706A true CN104342706A (en) 2015-02-11
CN104342706B CN104342706B (en) 2016-11-09

Family

ID=52499141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410606366.3A Expired - Fee Related CN104342706B (en) 2014-10-31 2014-10-31 Cleaning, pre-film and water process integration apparatus

Country Status (1)

Country Link
CN (1) CN104342706B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1067230A (en) * 1991-05-25 1992-12-23 益阳地区氮肥厂 Nitrogen fertilizer plant's ammonia-containing water and contain ammonia circulating water treatment technology
CN201334403Y (en) * 2008-12-19 2009-10-28 上海依科绿色工程有限公司 Test cooling water treatment equipment
CN201952289U (en) * 2011-02-25 2011-08-31 天津钢管集团股份有限公司 Partial cleaning prefilming device of circulating water cooling water system
CN204224706U (en) * 2014-10-31 2015-03-25 天津中化洁安科技有限公司 Cleaning, pre-film and water treatment integration apparatus

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1067230A (en) * 1991-05-25 1992-12-23 益阳地区氮肥厂 Nitrogen fertilizer plant's ammonia-containing water and contain ammonia circulating water treatment technology
CN201334403Y (en) * 2008-12-19 2009-10-28 上海依科绿色工程有限公司 Test cooling water treatment equipment
CN201952289U (en) * 2011-02-25 2011-08-31 天津钢管集团股份有限公司 Partial cleaning prefilming device of circulating water cooling water system
CN204224706U (en) * 2014-10-31 2015-03-25 天津中化洁安科技有限公司 Cleaning, pre-film and water treatment integration apparatus

Also Published As

Publication number Publication date
CN104342706B (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN103868782A (en) Dilution system and dilution method of automatic online monitoring system for fishery water quality
CN204311137U (en) Cleaning and pre-film integration apparatus
CN204224706U (en) Cleaning, pre-film and water treatment integration apparatus
CN208648879U (en) Integrated MBR sewage-treatment plant
CN207811436U (en) A kind of aluminium section bar plant sewage purifying and treating device
CN204220574U (en) Automated cleaning equipment
CN204311138U (en) Pre-film and water treatment integration apparatus
CN204220572U (en) Cleaning and water treatment integration apparatus
CN202983675U (en) Novel paint coating reaction still
CN104307815A (en) Washing and water treating integrated equipment
CN104342706A (en) Washing, pre-filming and water treatment integration equipment
CN104328436A (en) Pre-filming and water treatment integrated equipment
CN204224281U (en) Automated water treatment facility
CN205933560U (en) Carwash sewage does not have cyclic utilization of emission device
CN208839385U (en) A kind of built-in MBR film gravity on-line cleaning device
CN210729259U (en) Sewage treatment plant dosing system
CN205518845U (en) Automatic cleaning equipment of solar energy
CN104528916A (en) Integrated pipe valve system for MBR (membrane bio-reactor) demonstration device and application method thereof
CN204324969U (en) A kind of integrated pipe valve system for MBR apparatus for demonstrating
CN207619084U (en) A kind of continuous Automatic Dosing dephosphorization apparatus of sewage disposal postposition
CN206666267U (en) A kind of improved organic silicon wastewater processing unit
CN206570074U (en) A kind of liquid waste processing discharger of blood analyser
CN209619131U (en) A kind of sewage post-processing module practices device
CN205368066U (en) Buried sewage treatment system
CN207532573U (en) Water-saving mask continuous rehydration system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161109

Termination date: 20191031

CF01 Termination of patent right due to non-payment of annual fee