CN104333634A - System and method for testing multi-terminal large telephone traffic pressure based on smart phones - Google Patents
System and method for testing multi-terminal large telephone traffic pressure based on smart phones Download PDFInfo
- Publication number
- CN104333634A CN104333634A CN201410577383.9A CN201410577383A CN104333634A CN 104333634 A CN104333634 A CN 104333634A CN 201410577383 A CN201410577383 A CN 201410577383A CN 104333634 A CN104333634 A CN 104333634A
- Authority
- CN
- China
- Prior art keywords
- mobile phone
- smart mobile
- control unit
- test
- main control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Mobile Radio Communication Systems (AREA)
- Telephone Function (AREA)
Abstract
The invention discloses a system and method for testing multi-terminal large telephone traffic pressure based on smart phones. The system is based on a database unit, a user interface unit, a main control unit and smart phone control units; a user configures the whole testing environment, and calls and executes a test case in the database unit, automatically forms a corresponding large traffic pressure testing instruction and uploads the instruction to the main control unit by use of the user interface unit; the main control unit distributes the received instruction to a plurality of smart phones connected to the main control unit by use of data wires; the running smart phone control unit in each the smart phone performs independent analysis and execution on the testing instruction; each smart phone control unit regularly reports the testing progress and the result to the main control unit; the main control unit stores the received information into the database unit and provides the information for the user interface unit. The system and the method for testing the multi-terminal large traffic pressure are implemented based on the smart phones, and the whole scheme is simple, easy to implement, suitable for all Android smart phones and good in universality.
Description
Technical field
The present invention relates to wireless communication field, particularly based on the large traffic pressure test in the multiple terminals technology of smart mobile phone.
Background technology
In traditional cordless communication network, mobile phone is passive, simple terminal, and along with the rise of smart mobile phone, mobile phone is one of core network element becoming cordless communication network.Smart mobile phone has also possessed more powerful computing capability, and traditional radio communication large traffic pressure test technology is still overly dependent upon the special test mobile phone that customized especially by chip producer and does not have systematic multiple terminals method for testing pressure.
Such testing scheme, its poor universality, the carrying out be merely able to for special product is tested; If desired testing different product, is exactly different test macros, testing cost height very.And owing to not having systematic method of testing, make existing test macro when testing, test process is complicated, not only affects testing efficiency, also impact test effect.
For above-mentioned situation, be necessary design one completely based on large traffic pressure testing system and the method for commercial smart mobile phone.
Summary of the invention
For the problem existing for existing wireless communications large traffic pressure test technology, the object of the present invention is to provide the large traffic pressure testing system in a kind of multiple terminals based on smart mobile phone; And based on this test macro, also provide corresponding method of testing.Solve the problem existing for prior art thus.
In order to achieve the above object, the present invention adopts following technical scheme:
The large traffic pressure testing system in multiple terminals based on smart mobile phone, described test macro comprises:
Database Unit, the data needed for described Database Unit runs for memory test system and test test case;
User interface elements, described user interface elements control connection main control unit and Database Unit, be configured whole test macro, and compile and call implementation of test cases, forms corresponding test instruction, and be sent to main control unit;
Main control unit, said main control unit connects with Database Unit data, and connected with at least one smart mobile phone by data wire, the test instruction that user interface elements sends is handed down to the smart mobile phone control unit in smart mobile phone, the data of the control unit feedback in smart mobile phone is stored into Database Unit simultaneously;
Smart mobile phone control unit, described smart mobile phone control unit runs in smart mobile phone, receive the test instruction below main control unit, and automatically control smart mobile phone according to test instruction and carry out corresponding test operation, and test to be in progress and result reports main control unit.
In the preferred version of this test macro, described test macro also comprises at least one shielding box, and this shielding box is for placing smart mobile phone.
Further, described smart mobile phone can be the mobile phone of the arbitrary standard of GSM/CDMA/WCDMA/FDD LTE/TDD LTE.
Based on above-mentioned test macro, the large traffic method for testing pressure in corresponding multiple terminals, it comprises the steps:
(1) user configures whole test environment by user interface elements, calls and the test case in performing database unit, automatically forms corresponding large traffic pressure test instruction, and reaches main control unit;
(2) instruction received is issued in the some smart mobile phones connected with it by main control unit by data wire;
(3) the smart mobile phone control unit of the operation in smart mobile phone carries out independent parsing automatically to the test instruction that main control unit issues, and carries out corresponding test operation according to the output control smart mobile phone of resolving;
(4) testing progress and result are regularly reported main control unit by smart mobile phone control unit;
(5) testing progress of reception and object information are stored into Database Unit by main control unit, are supplied to user interface elements.
In the preferred version of this method of testing, in described step (1), test environment configuration comprises the connection modulation of test macro and smart mobile phone and the compiling of test case.
Further, the connection of described test macro and the smart mobile phone process of modulating is as follows:
(11) whole test macro work, runs smart mobile phone control unit in each smart mobile phone, and connects with master control unit data in test macro;
(12) the smart mobile phone control unit detection of handset state in each smart mobile phone, and mobile phone state information is regularly reported main control unit by the data channel connected;
(13) state information of all mobile phones received is stored into Database Unit by main control unit, is supplied to user interface elements;
(14) state of the smart mobile phone of all connections is inquired about and managed to user interface elements, if there is smart mobile phone state incorrect, undertaken alternately, until mobile phone state is normal by main control unit and corresponding smart mobile phone.
Further, in described step (12), the state information of mobile phone comprises the essential information of smart mobile phone, the data connection information of smart mobile phone and wireless signal strength.
Further, when carrying out the compiling of test case in described step (1), corresponding test case is directly write by user interface elements, and will Database Unit be uploaded to, or from Database Unit, transfer original test case by user interface elements, it is modified, and is again uploaded to Database Unit.
Multiple terminals provided by the invention large traffic pressure test scheme realizes based on smart mobile phone, and whole scheme is simply easy to realize, and can be applicable to the smart mobile phone of any standard, highly versatile.
Moreover whole test process system is complete, and concrete test operation completes automatically, greatly improves testing efficiency, the precision of testing can be ensured simultaneously.
Accompanying drawing explanation
The present invention is further illustrated below in conjunction with the drawings and specific embodiments.
Fig. 1 is the theory diagram of test macro in the present invention;
Fig. 2 is the flow chart of method of testing in the present invention.
Embodiment
The technological means realized to make the present invention, creation characteristic, reaching object and effect is easy to understand, below in conjunction with concrete diagram, setting forth the present invention further.
See Fig. 1, it is depicted as the schematic diagram of the large traffic pressure testing system in the multiple terminals based on smart mobile phone provided by the invention.As seen from the figure, this test macro mainly comprises user interface elements 11, Database Unit 12, main control unit 13, these four parts of smart mobile phone control unit 14.
Wherein, user interface elements 11, this unit provides corresponding human-computer interaction interface for whole test macro, also be the operation center of whole test macro simultaneously, Database Unit 12 in its control connection system, main control unit 13, accepted the instruction of user by human-computer interaction interface, control data library unit 12, main control unit 13 manage the basic operation of whole test macro and test process and control.
The basic operational management of test macro and control, mainly comprise the configuration of system, the display of data, the management etc. of test terminal.
The management of test process and control, mainly comprise according to test case corresponding in the automatic called data library unit 12 of the operational order of user, compile it, the operation such as amendment; Automatically perform corresponding test case in Database Unit 12 according to instruction, form corresponding pressure test instruction according to the content of test case, and reach main control unit 13; The corresponding test result of also management feedback simultaneously, thus automatically complete the large traffic pressure test in multiple terminals.
Thus, the operating function of user interface elements 11 comprises: system configuration, and data show, and test case is called, compile, revise, deletion etc., automatically performing of test case, the management etc. of test terminal.
This user interface elements 11 is specially the user interface of sing on web, by computer, and the various ways access such as mobile phone.
Database Unit 12, it runs data that are required and that produce and the test case for the large traffic pressure test in multiple terminals for memory test system.
Concrete, comprise the operation result of the interface configuration information of user, the management information of test terminal, the management information of test case and test case needed for the test macro that Database Unit 12 stores runs with the data produced and perform details etc.
Main control unit 13, it connects with Database Unit 12 data, and sets up the communication connection based on USB with multiple smart mobile phone.This main control unit 13 receives the pressure test instruction that user interface elements 11 issues, and is handed down to each smart mobile phone; And receive the test progress and result that smart mobile phone control unit 14 reports, be stored into Database Unit 12, be supplied to user interface elements 11.
Smart mobile phone control unit 14, it runs in corresponding smart mobile phone, and the communication connection based on USB of being set up by main control unit 13 and smart mobile phone, carries out data communication with main control unit 13.During this cell operation, detect in real time the state information (as the essential information of mobile phone, link information and crucial radio communication index KPI etc.) of place smart mobile phone, be regularly sent to main control unit 13; This unit also receives the pressure test instruction issued with independent parsing main control unit 13 simultaneously, automatically controls place smart mobile phone carry out corresponding large traffic pressure test operation, as audio call or data service etc. according to the instruction after parsing.
Here involved smart mobile phone can be the mobile phone of the arbitrary standard of GSM/CDMA/WCDMA/FDD LTE/TDD LTE.c
Because native system is used for the large traffic pressure test in multiple terminals, in order to avoid influencing each other between each terminal, each smart mobile phone is placed in independent shielding box by this programme, can mutually isolated radiofrequency signal when multiple mobile phone is tested simultaneously, radio-frequency (RF) index is unaffected, ensures the precision of test.
For the test macro that such scheme is formed, when carrying out practically, user interface elements 11, Database Unit 12, main control unit 13 are packaged into the software systems that can run in a computer, wherein user interface elements 11 runs in WEB mode in a computer, this unit also encapsulates and forms corresponding APP simultaneously, can run in smart mobile phone, connected with the computer data being provided with test macro by smart mobile phone, Database Unit 12, main control unit 13 are controlled, realize being controlled by mobile phone, greatly improve portability.
And the smart mobile phone control unit 14 in system is packaged into corresponding APP, be convenient to like this carry out installation and operation in different smart mobile phones.
There is provided multiple terminals large traffic pressure testing system based on such scheme, it is as follows that it carries out multiple terminals large traffic pressure test sequence, concrete flow chart as shown in Figure 2:
The some smart mobile phones being provided with smart mobile phone control unit are connected to by USB in the computer being provided with the large traffic pressure testing system in this multiple terminals by step 21: install corresponding smart mobile phone control unit in each smart mobile phone.Start native system in a computer, make the user interface elements 11 in system, Database Unit 12 and main control unit 13 run in a computer, start smart mobile phone control unit 14 (as shown in Figure 1) in smart mobile phone simultaneously.
In this step, each smart mobile phone is after startup smart mobile phone control unit 14, smart mobile phone control unit in this smart mobile phone will detect the state of this smart mobile phone in real time, and mobile phone state information is regularly reported the main control unit 13 in computer by the data channel connected.
And the state information of all mobile phones received is stored into Database Unit 12 by main control unit 13, be supplied to user interface elements 11.
Step 22: user, by the smart mobile phone state information stored in user interface elements 11 called data library unit 12, can inquire the state of the smart mobile phone of all connections, carries out management and confirms.
Step 23: if there is the state of smart mobile phone incorrect, user can be managed by user interface elements 11 pairs of terminals.
Concrete, user interface elements 11 provides corresponding terminal management interface to carry out terminal to restart/connects reconnecting operation of etc.ing, by main control unit 13 and smart mobile phone control unit 14 alternately, until mobile phone state is normal.
Step 24: between all smart mobile phones of adjustment and computer connection status normal after, each smart mobile phone control unit 14 periodically reports the KPI information such as state, wireless signal strength of place smart mobile phone to main control unit 13, is stored into Database Unit 12.
Step 25: user inquires the KPI information of the smart mobile phone kept in Database Unit 12 by user interface elements 11.
Step 26: when if desired testing, user directly writes corresponding test case by user interface elements 11, and will be uploaded to Database Unit, or from Database Unit, transfers original test case by user interface elements, it is modified, and is again uploaded to database list.As required, deletion action can be carried out by user interface elements to the test case in Database Unit.
Step 27: after completing the writing or revise of test case, by the test case in user interface elements 11 called data library unit, and automatically perform test case, form corresponding audio call, the test instruction of data service equal pressure, and be handed down to all smart mobile phone control units 14 by main control unit 13, run by smart mobile phone control unit 14 independent parsing test instruction.
Step 28: the control unit 14 in each smart mobile phone is according to the instruction after parsing, control this smart mobile phone and carry out corresponding pressure test operation, and control unit 14 also detects progress and the result that the machine carries out test execution in real time, this smart mobile phone control unit 14 will periodically report test execution result to main control unit 13, be stored into Database Unit 12, until tested.
Step 29: in test process or after test terminates, user inquires the detailed test case of preserving in Database Unit 12 by user interface elements 11 and runs progress and result.
Above-mentioned whole test process, is all completed automatically by test macro, effectively ensures testing efficiency and effect; Test required use-case simultaneously, can compile at any time, be applicable to various situation, versatility is extremely strong.
More than show and describe general principle of the present invention, principal character and advantage of the present invention.The technical staff of the industry should understand; the present invention is not restricted to the described embodiments; what describe in above-described embodiment and specification just illustrates principle of the present invention; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements all fall in the claimed scope of the invention.Application claims protection range is defined by appending claims and equivalent thereof.
Claims (8)
1., based on the large traffic pressure testing system in multiple terminals of smart mobile phone, it is characterized in that, described test macro comprises:
Database Unit, the data needed for described Database Unit runs for memory test system and test test case;
User interface elements, described user interface elements control connection main control unit and Database Unit, be configured whole test macro, and compile and call implementation of test cases, forms corresponding test instruction, and be sent to main control unit;
Main control unit, said main control unit connects with Database Unit data, and connected with at least one smart mobile phone by data wire, the test instruction that user interface elements sends is handed down to the smart mobile phone control unit in smart mobile phone, the data of the control unit feedback in smart mobile phone is stored into Database Unit simultaneously;
Smart mobile phone control unit, described smart mobile phone control unit runs in smart mobile phone, receive the test instruction below main control unit, and automatically control smart mobile phone according to test instruction and carry out corresponding test operation, and test to be in progress and result reports main control unit.
2. the large traffic pressure testing system in a kind of multiple terminals based on smart mobile phone according to claim 1, it is characterized in that, described test macro also comprises at least one shielding box, and this shielding box is for placing smart mobile phone.
3. the large traffic pressure testing system in a kind of multiple terminals based on smart mobile phone according to claim 1, is characterized in that, described smart mobile phone can be the mobile phone of the arbitrary standard of GSM/CDMA/WCDMA/FDD LTE/TDD LTE.
4., based on the large traffic method for testing pressure in multiple terminals of smart mobile phone, it is characterized in that, described test comprises the steps:
(1) user configures whole test environment by user interface elements, calls and the test case in performing database unit, automatically forms corresponding large traffic pressure test instruction, and reaches main control unit;
(2) instruction received is issued in the some smart mobile phones connected with it by main control unit by data wire;
(3) the smart mobile phone control unit of the operation in smart mobile phone carries out independent parsing automatically to the test instruction that main control unit issues, and carries out corresponding test operation according to the output control smart mobile phone of resolving;
(4) testing progress and result are regularly reported main control unit by smart mobile phone control unit;
(5) testing progress of reception and object information are stored into Database Unit by main control unit, are supplied to user interface elements.
5. the large traffic method for testing pressure in a kind of multiple terminals based on smart mobile phone according to claim 4, it is characterized in that, in described step (1), test environment configuration comprises the connection modulation of test macro and smart mobile phone and the compiling of test case.
6. the large traffic method for testing pressure in a kind of multiple terminals based on smart mobile phone according to claim 5, is characterized in that, the process that the connection of described test macro and smart mobile phone is modulated is as follows:
(11) whole test macro work, runs smart mobile phone control unit in each smart mobile phone, and connects with master control unit data in test macro;
(12) the smart mobile phone control unit detection of handset state in each smart mobile phone, and mobile phone state information is regularly reported main control unit by the data channel connected;
(13) state information of all mobile phones received is stored into Database Unit by main control unit, is supplied to user interface elements;
(14) state of the smart mobile phone of all connections is inquired about and managed to user interface elements, if there is smart mobile phone state incorrect, undertaken alternately, until mobile phone state is normal by main control unit and corresponding smart mobile phone.
7. the large traffic method for testing pressure in a kind of multiple terminals based on smart mobile phone according to claim 6, it is characterized in that, in described step (12), the state information of mobile phone comprises the essential information of smart mobile phone, the data connection information of smart mobile phone and wireless signal strength.
8. the large traffic method for testing pressure in a kind of multiple terminals based on smart mobile phone according to claim 5, it is characterized in that, when carrying out the compiling of test case in described step (1), corresponding test case is directly write by user interface elements, and will Database Unit be uploaded to, or from Database Unit, transfer original test case by user interface elements, it is modified, and is again uploaded to Database Unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410577383.9A CN104333634A (en) | 2014-10-24 | 2014-10-24 | System and method for testing multi-terminal large telephone traffic pressure based on smart phones |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410577383.9A CN104333634A (en) | 2014-10-24 | 2014-10-24 | System and method for testing multi-terminal large telephone traffic pressure based on smart phones |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104333634A true CN104333634A (en) | 2015-02-04 |
Family
ID=52408282
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410577383.9A Pending CN104333634A (en) | 2014-10-24 | 2014-10-24 | System and method for testing multi-terminal large telephone traffic pressure based on smart phones |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104333634A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106201852A (en) * | 2015-04-29 | 2016-12-07 | 展讯通信(上海)有限公司 | A kind of distributed test method and test system |
CN108877806A (en) * | 2018-06-29 | 2018-11-23 | 中国航空无线电电子研究所 | System is verified in the test for testing instruction type speech control system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102098702A (en) * | 2011-01-30 | 2011-06-15 | 大唐移动通信设备有限公司 | Performance testing system, method and equipment |
CN102487345A (en) * | 2010-12-06 | 2012-06-06 | 普天信息技术研究院有限公司 | Apparatus for testing network performance parameter, system thereof, and method thereof |
CN102802172A (en) * | 2012-07-27 | 2012-11-28 | 大唐移动通信设备有限公司 | Wireless communication quality testing method and device based on intelligent terminal |
CN102938800A (en) * | 2012-11-07 | 2013-02-20 | 大唐移动通信设备有限公司 | System and method for automatically testing wireless communication quality |
US20130064108A1 (en) * | 2011-09-12 | 2013-03-14 | Jacques Combet | System and Method for Relating Internet Usage with Mobile Equipment |
-
2014
- 2014-10-24 CN CN201410577383.9A patent/CN104333634A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102487345A (en) * | 2010-12-06 | 2012-06-06 | 普天信息技术研究院有限公司 | Apparatus for testing network performance parameter, system thereof, and method thereof |
CN102098702A (en) * | 2011-01-30 | 2011-06-15 | 大唐移动通信设备有限公司 | Performance testing system, method and equipment |
US20130064108A1 (en) * | 2011-09-12 | 2013-03-14 | Jacques Combet | System and Method for Relating Internet Usage with Mobile Equipment |
CN102802172A (en) * | 2012-07-27 | 2012-11-28 | 大唐移动通信设备有限公司 | Wireless communication quality testing method and device based on intelligent terminal |
CN102938800A (en) * | 2012-11-07 | 2013-02-20 | 大唐移动通信设备有限公司 | System and method for automatically testing wireless communication quality |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106201852A (en) * | 2015-04-29 | 2016-12-07 | 展讯通信(上海)有限公司 | A kind of distributed test method and test system |
CN108877806A (en) * | 2018-06-29 | 2018-11-23 | 中国航空无线电电子研究所 | System is verified in the test for testing instruction type speech control system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102769937B (en) | A kind of multi-standby terminal of Android system and terminal realize the method treated more | |
CN104615414B (en) | A kind of channel packet method for customizing and device | |
CN103927256A (en) | Method for controlling multiple Android devices | |
CN105528229A (en) | Method and device for improving first starting speed of mobile terminal | |
CN105357737A (en) | Method and device for accessing WiFi device to wireless access point | |
CN110324808A (en) | Switching method, device and the mobile terminal of configuration file | |
CN104679532A (en) | Method and device for loading kernel module | |
CN104991806A (en) | Remote firmware upgrading system and method for single-chip microcomputer program | |
CN104333634A (en) | System and method for testing multi-terminal large telephone traffic pressure based on smart phones | |
CN106331284A (en) | Communication system based on WIFI Internet of things technology | |
CN100417095C (en) | Method and system for realizing network management and network element configuration operation | |
CN105279077A (en) | Method and device for automated testing | |
CN113452556A (en) | Product skill configuration method and device, storage medium and electronic device | |
CN105204891A (en) | Download method and download device during shutdown of mobile terminal and mobile terminal | |
CN104333856A (en) | Method for switching network of Java SIM card, SIM card, server and system | |
CN104125593A (en) | Information processing method and electronic equipment | |
CN109347578B (en) | Radio frequency performance test method and device, computer equipment and readable storage medium | |
CN109144850B (en) | Method and system for testing interactive communication of mobile terminal | |
CN105306704A (en) | Mobile terminal alarm clock control method and mobile terminal | |
CN104735641A (en) | Parameter-configuration conducting method and device based on DDR register | |
CN104578418A (en) | Configuration method and system of automatic power distribution equipment based on 101 protocols, and equipment | |
CN105681927A (en) | Application sorting method and system, mobile terminal and smart television | |
CN102223610A (en) | Method for realizing data exchange among mobile devices and mobile device | |
CN104461629A (en) | PC terminal and method for installing cellphone application program by PC terminal | |
CN102455034A (en) | Intelligent air conditioner system and intelligent air conditioner control method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150204 |