CN104331334B - Computer implemented method and computing system - Google Patents
Computer implemented method and computing system Download PDFInfo
- Publication number
- CN104331334B CN104331334B CN201410648530.7A CN201410648530A CN104331334B CN 104331334 B CN104331334 B CN 104331334B CN 201410648530 A CN201410648530 A CN 201410648530A CN 104331334 B CN104331334 B CN 104331334B
- Authority
- CN
- China
- Prior art keywords
- calculate node
- group
- program
- modification
- user
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5005—Allocation of resources, e.g. of the central processing unit [CPU] to service a request
- G06F9/5027—Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
- G06F9/5044—Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals considering hardware capabilities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5061—Partitioning or combining of resources
- G06F9/5072—Grid computing
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2209/00—Indexing scheme relating to G06F9/00
- G06F2209/50—Indexing scheme relating to G06F9/50
- G06F2209/508—Monitor
Landscapes
- Engineering & Computer Science (AREA)
- Software Systems (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Mathematical Physics (AREA)
- Debugging And Monitoring (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Stored Programmes (AREA)
Abstract
The present invention describes the technology for management program executive capability, such as providing one group of calculate node for being used for that one or more programs to be performed for user.In some cases, the program executive capability dynamic modification of the calculate node group in use can periodically be carried out or perhaps carried out in an iterative fashion, such as to be aggregated in the multiple modification to be made through asking or otherwise determining in a period of time.The technology can combine charge program execution service in some cases and use, and the charge program execution service represents multiple service users to perform multiple programs.
Description
Technical field
The present invention relates to causal law is attributed into the modification of program executive capability and dynamic modification program executive capability field, more
Specifically the present invention relates to a kind of calculating of the causal law for the dynamic modification for being used to determine to be supplied to the program executive capability of user
Machine implementation method, a kind of computing system of the causal law of the dynamic of program executive capability for being configured to determine user modification, one
Kind is used to dynamically change the computer implemented method of the program executive capability of user, a kind of journey for being configured to dynamic and changing user
The computing system of sequence executive capability.
Background technology
More companies and other mechanisms are grasped to many computing systems are interconnected with the computer network for supporting it to operate
Make, wherein for example described computing system co-located (for example, part as localized network) or conversely be positioned at it is multiple not
Same geographical position (for example, being connected via one or more special or public go-betweens).Calculated for example, accommodating a large amount of interconnection
The data center of system has become customary, such as operated by single mechanism and represent the private data center of single mechanism with
And from the physical operation as enterprise with to customer provide computing resource shared data center.The behaviour at some shared data centers
Hardware offer network access, authority and the secure installation facilities that work person is possessed to each customer, and other public data centers
Operator " complete service (full the service) " facility for also including the available hardware resource of its customer is then provided.However,
With typical data center scale and scope increase, there is provided, dominate and management physical computing resources task become increasingly
It is complicated.
Going out for the virtualization technology of commercial hardware is provided on managing greatly to multiple users with different demands
Some benefits of scale computing resource, so that various computing resources can efficiently and safely be shared by multiple users.For example,
Those virtualizations such as provided by VMWare, XEN, Linux ' s KVM (" kernel level virtual machine ") or User-Mode Linux
Technology (can be provided) single physical meter by providing one or more virtual machines to each user by single physical computer
Calculation machine is shared between a plurality of users, wherein every this virtual machine is the software simulation as Different Logic computing system,
The illusion that the logic computing system provides a user is that they are the sole operation person and keeper for giving hardware computing resource, together
When also between each virtual machine provide application program isolation and safety.
The content of the invention
According to an aspect of the present invention, it is proposed that a kind of computer implemented method, including:By being configured as
One time provided one or more computing systems of program execution service, was received from user with being performed using one group of calculate node
The relevant instruction of one or more software programs, the user also specify one or more ability modification triggers limited, used
The program executive capability that modification is provided by one group of calculate node when specified requirements is then occurring;Using described one group
When calculate node performs one or more of software programs, at the second time after the very first time, pass through and configure
One or more of computing systems determine that one group of calculate node current first program available to the user performs
Ability, and change trigger for the ability of at least one restriction being satisfied of one group of calculate node;And
When performing one or more of software programs using one group of calculate node, pass through the one or more of meters configured
Calculation system changes one group of calculate node, and to provide the second program executive capability from the group of modification, second program performs
Ability is different with the first program executive capability and is at least partially based at least one ability being satisfied and repaiies
Change trigger, and when performing one or more of software programs using one group of calculate node, at described first
Between after and before one group of calculate node is changed, receive at least one ability specified by user dynamic and change
Instruction, and repaiied based at least one ability that at least one ability modification trigger being satisfied and dynamic are specified
Change instruction, to determine the second program executive capability.
According to another aspect of the present invention, it is proposed that a kind of computing system of configuration, including:One or more processing
Device;And one or more modules, when at least one computing device in by one or more of processors, by described in
At least one processor is configured to:Received in the very first time from user with performing one or more softwares using one group of calculate node
The relevant instruction of program, one group of calculate node have the one or more phases for being used for changing provided program executive capability
Pass ability modification trigger;It is determined that the second time after the first time can be by the first of one group of calculate node offer
Program executive capability;It is determined that meet at least one GL modification trigger of one group of calculate node;And modification institute
One group of calculate node is stated to provide the second program executive capability of modification from the group of modification, the second program executive capability is at least
At least one ability modification trigger being satisfied is based partially on, wherein when by least one computing device,
One or more of modules include following software instruction, and the software instruction further configures at least one processor
For using one group of calculate node perform one or more of software programs when after the very first time receive by
At least one ability modification instruction that user's dynamic is specified, and based at least one ability modification trigger being satisfied
At least one ability modification dynamically specified is instructed to determine the second program executive capability.
Brief description
Figure 1A and Figure 1B is to show to be managed the available program executive capability of multiple users of program execution service
The network of interactive exemplary.
Fig. 2A and Fig. 2 B show to be managed the program executive capability of one group of multiple calculate node of user, for example, with
Each time and the in a variety of ways example of dynamic modification available programs executive capability.
Fig. 3 is the exemplary embodiment party for showing the computing system for managing the program executive capability provided to multiple users
The block diagram of case.
Fig. 4 shows the flow chart of the exemplary of program execution service system manager programs.
Fig. 5 shows the flow chart of the exemplary of recursive facility coordinator.
Fig. 6 shows the flow chart of the exemplary of ability modification attribution program.
Fig. 7 shows the flow chart of the exemplary of program execution service ability maintenance manager program.
Embodiment
Describe the technology being managed to the program executive capability of the program for performing one or more users.Extremely
In some few embodiments, the program executive capability managed includes one group one that supplies user to be used to perform one or more programs
Individual or multiple calculate nodes.In addition, this group calculate node related to user can be dynamically changed during use, can to manage user
The amount of the program executive capability obtained from this group of calculate node.The modification of pair this group calculate node related to user is each
Can have in embodiment various forms (for example, to change the quantity of calculate node in the group, for example, by dynamic addition and/
Or delete calculate node), and can trigger in a variety of ways in each embodiment (for example, dynamic based on being specified by user
State instruction, the automatically determining of situation met, based on the service for providing this group of calculate node based on the predefined trigger of user
Automation mechanized operation etc.).What the dynamic of the program executive capability included below on that can be obtained from one group of calculate node was changed
Other details.In addition, at least some embodiments, these technologies can combine the multiple customers for representing the service or other use
Family is used to perform the program execution service of multiple programs (" PES "), such as network access program execution service, and it is provided
It is used to performing multiple calculate nodes of the program of long-distance user (for example, providing on one or more physical computing systems
Multiple physical computing systems and/or virtual machine).Some or all of these technologies can also pass through program execution service system pipe
The embodiment of reason device module and/or program execution service ability maintenance manager module is implemented automatically, and following article is in more detail
Description.
As it was previously stated, in each embodiment, to one group of calculating section of one or more programs for performing user
The dynamic modification that point is carried out can have various forms and can trigger in a variety of ways.As an example, this group of calculate node
Program executive capability can measure at least partially through the quantity of the calculate node for a group part, and can pass through change
The calculate node quantity of the group (for example, to improve program executive capability by increasing calculate node quantity, and passes through to change
Calculate node quantity is reduced to reduce program executive capability).The modification of such calculate node quantity can be used for (such as) in the group
Some or all of calculate nodes provide or can obtain same or like quantity computing resource (for example, amount of ram, hard drive space,
CPU performs cycle, network bandwidth etc.) in the case of so that the given percentage change of calculate node quantity is corresponding to the group
The same or similar percentage change of total computing resource and program executive capability.In other embodiments, the group calculates section
Some or all of point can one or more important ways different (example in terms of the amount of its obtainable computing resource
Such as, if configured using two or more different types of calculate nodes, if each calculate node is independently from other meters
Operator node configuration etc.) or be otherwise in its offer program executive capability type in terms of it is different (for example, according to special
With hardware, the type etc. of software program), but the program executive capability dynamic modification of the group can really be based at least partially on modification should
The quantity of group calculate node, or other manner can be conversely based on (for example, being another by a type of calculate node configuration change
Type), such as other places discuss in more detail.
In addition, at least some embodiments and situation, the program executive capability of one group of one or more calculate node
The mode that can be differently configured from the quantity of calculate node is measured and changed, such as the one or more types provided based on the group
Computing resource total amount (for example, amount of ram, hard drive space, CPU perform cycle, network bandwidth etc.).In addition, at least some
In embodiment, it is contemplated that other factorses in the program executive capability for measuring and specifying one group of calculate node, more such as or
Between the geographical position of all calculate nodes, some or all of calculate nodes correlation (for example, by it is at most maximum geographical away from
From or at least minimal geographical separating distance, by most maximum network be delayed or at least minimal network delay separate, be separated into two
Or more independent data center or the other calculate node set that will not simultaneously disable etc.), specialized hardware ability and/or soft
Availability of part ability etc..Other details included below on measuring with designated program executive capability.
The PES or other systems being managed to one group of calculate node of one or more programs for performing user can
Automatically determine how and when enter the dynamic modification of line program executive capability to the calculate node group in a variety of ways.For example, extremely
In few some embodiments and situation, PES or other systems can carry out certain form of program executive capability in direct mode and repair
Change, and the modification of other types of program executive capability can periodically carry out carrying out (for example, to prolong in an iterative fashion in other words
Late and be aggregated in a period of time (such as from carry out it is one or many polymerization modification before) it is to be made through ask or with
The multiple modification that other manner determines.If polymerizeing multiple program executive capability modification determination values within a period of time, on
The information of polymerization modification determination value can be used in a variety of ways to improve the implementation of program executive capability modification.If for example, two
The program executive capability modification of secondary determination corresponds to the modification of opposite types (for example, to increase and reduce calculate node quantity, increase
Add and reduce and can use total internal memory etc.), then modification can be polymerize in a variety of ways twice, such as by chosen come partly or completely
Cancel out each other entirely, or conversely by selecting the higher priority in pending modification twice come instead of another modification.In addition,
If the program executive capability modification determined two or more times corresponds to similar or complementary types modification (for example, so that meter
Operator node quantity increases specified amount, makes to can use total internal memory to increase specified amount etc. comprehensively comprehensively), then the modification of those determinations can be each
Kind mode similarly polymerize (for example, to select the modification that the single for meeting some specified values determines, such as maximum is changed, most
Small modifications, the modification with limit priority, the modification determined first, modification for finally determining etc.;To accumulate various determinations
Change and use the modification amount of accumulation;Deng).It is included below regarding determining how with when make each class method executive capability and change
Other details.
In addition, when PES or other systems perform the one of one or more programs group of calculate node dynamic to representing user
When entering the modification of line program executive capability, PES or other systems can further carry out various operations so that specific program is performed into energy
The causal law information of power modification or other attribution of responsibilities.Attribution of responsibility may include (such as) identification occurred in relevant time period
Particular event, wherein each event can cause program executive capability dynamic to be changed, and by one in these events or
More than one piece is attributed to some or all of program executive capability dynamic modification carried out during or after the period.For example,
In at least some embodiments and situation, the modification of some program executive capability dynamic each can trigger (example by single particular event
Such as, if this group of calculate node failure becomes unavailable in other words, automatic start provides replacement meter to system to the group immediately
Operator node, at the same calculate node unavailability turn into directly cause system auto-action with provide substitute calculate node single thing
Part).In at least some embodiments and situation, other program executive capability dynamic modifications are each attributable to multiple events
Combination, each in these events each contribute to or potentially contribute to ability modification (if for example, multiple independent events each
The calculate node quantity increase of the group is needed or indicated within a period of time, and these events are aggregated to terminate in the period
The quantity of the single calculate nodes of Shi Zengjia, at the same each independent event turn into cause the follow-up auto-action of system to increase indirectly jointly
Multiple events of calculate node quantity).
The attribution of responsibility for the specific program executive capability dynamic modification that pair calculate node group related to user is carried out with
Can have special benefit in the case of lower, for example, for the modification of at least some program executive capability and to user charge when (for example,
If PES or other systems be due to provide each calculate node of the group, each other measurements of program executive capability and/or
The charging system charged based on other foundations to consumption user).In such cases, user can not only receive and check
On changing the information of corresponding expense with specific program executive capability dynamic, and the responsibility related to checking can be received
Attribution information, so that user is able to confirm that the reason for those program executive capability dynamic is changed and appropriateness.It is at least some this
In class embodiment, attribution of responsibility information can be produced to be shown to user with people's readable format, allow the user to understand respectively
Individual auto-action why by PES or other systems included in people's readable information come the explanation taken.In other embodiments
In, can also various other modes (including the PES or other systems for passing through the other operations of automatic start) use such responsibility
Attribution information.In addition, at least some embodiments, all kinds of inquiries that may be in response to receive at user or other sources come
Produce and/or use attribution of responsibility information, these inquiry such as on identify which (multiple) event for cause one group one or
The request of the reason for modification of specific program executive capability that multiple calculate node availabilities indicate or other changes and/or pass
Which referred in (multiple) change in availability of (multiple) program executive capability modification or other calculate node groups by one or more
Asked caused by the event shown.Attribution of responsibility information included below on determining and using the dynamic modification of program executive capability
Other details.
In all cases, the technology for the dynamic modification of automatic management program executive capability can provide various benefits
Place.For example, by polymerize it is multiple through asking or determining program executive capability dynamic modification to be considered, PES or its
Perhaps, how its system carries out polymerization modification if can optimizing, and the change repeatedly of calculate node is minimized, and this can make progress
The some or all of calculate nodes additionally changed are temporarily unavailable within a period of time.In addition, user can be predefined based on one group
All kinds of triggers of the performance characteristics of calculate node, while when certain triggers are satisfied, optionally improve or reduce automatically
Program executive capability is (for example, improve the program executive capability of one group of calculate node with passive (reactively), so as to meet to count
The temporary increase of the calculated load of operator node group;Actively (proactively) improves or reduced the program of one group of calculate node
Executive capability, so as to meet the anticipated demand that will appear from of other program executive capability and/or meet that existing program performs energy
The anticipated demand that will appear from of power lacks, such as according to the weight on particular performance characteristics and/or instruction program executive capability
The trend changed over time of the historical data of multiple use pattern;Deng).Or user can be wished the journey of one group of calculate node
Sequence executive capability is maintained at specified level or its nearby (for example, calculate node specifies required constant), and can be to the group meter
Operator node carries out various modifications so that available programs executive capability is maintained at into the specified level (for example, referring to that will deviate automatically
Fixed the desired amount of actual calculate node quantity is recovered to specify aequum to this).Such as when each execution in this group of calculate node
The different duplicates (for example, alternative form for use as total calculated load in the group) of identical program, and change calculate node
Quantity to manage the workload handled by each calculate node when, such technology can be used, or perhaps these technologies are used
Each calculate node in one group is not performed each in the case of the different duplicates of identical program (if for example, the group meter
The different subsets of operator node each perform the duplicate of distinct program, such as so that some calculate nodes perform application server programs
And other calculate nodes are made to perform related database server program;If some or all of these calculate nodes are such as
Implement the different piece of single program in a distributed way;Deng).In addition, when to group addition additional calculations node when, PES or its
Its system also optionally takes other actions at least some of situation, such as is prepared with providing added calculate node
One or more programs are performed, or further trigger the execution of one or more programs automatically in the calculate node added.
As it was previously stated, related all kinds of tactile of user can predefine to dynamic changes multigroup calculate node program executive capability
Device is sent out, and those triggers are subsequently used in the corresponding program executive capability automation dynamic for triggering the calculate node group of user
Modification.As an example, definable specify calculate node specific aequum or one or more computing resources it is required total
The trigger of amount, such as it can be used for corresponding calculate node group being automatically held in required calculate node quantity or required calculate provides
Source total amount, or the opposite calculate node quantity or computing resource total amount (if meeting specified value) for being used for change and specifying.At it
In its situation, definable specifies the calculate node quantity of one or more computing resources or the specific of total amount definitely or relatively to change
Trigger, for example, if the performance characteristics of one or more instructions of calculate node group reach specified threshold or perhaps met
Specified value, then its can be triggered (for example, being maintained in the specified range of set period;Particular tendency is represented, when such as specifying
Specified variable quantity in section, or such as specific " acceleration (acceleration) " or rate of change;Conform or correspond to one kind
Or a variety of designated modes (such as historical data of the reuse pattern from representation program executive capability);Meet multiple performance
Other combinations of the specified logic or value of characteristic, such as logical operator (AND, NOT, OR etc.) and/or with other can be used
Mode is combined;Deng).In other embodiments and situation, predefined trigger can be according to being not belonging to calculate node group
The information of performance characteristics be otherwise satisfied (for example, based on meeting one or more specified times (for certain trigger
Part or all of the standard of device) current time;Based in the current calculating measured in a manner of different from performance characteristics
The status information of the one or more programs performed in node group, such as by (such as) the arranged or perhaps known or phase
The current calculated load for hoping the workload completed by one or more programs represent;Based on what is do not performed by current calculate node group
The performance characteristics of one or more of the other configuration processor or other status informations, for example, if current calculate node group is held with other
Line program interaction supports these programs in other words, so as to when the calculated load in other configuration processors increases or decreases, example
Such as improve the program executive capability of current calculate node group;Deng).Such performance characteristics can be based on one in this group of calculate node
Or multiple any measurable attributes or the other yardsticks corresponding with the operation of these nodes, including following nonexcludability is clear
Individual event:The absolute or relative usage amount of one or more computing resources of single calculate node is (for example, used free memory
Percentage amounts or cpu cycle utilization rate, the absolute magnitude of used network bandwidth etc.);One kind of all this group of calculate nodes or
The absolute or relatively total usage amount of a variety of computing resources;In response to absolute in the communication from outside computing system or relative prolong
When (latency) or it is other delay (delay) amount;Calculate node is absolute or relative in one or more required actions are completed
Failure amount;Deng.In addition, at least some embodiments and situation, trigger meets that situation not makes the trigger direct
Specify and change the specific program executive capability occurred when being satisfied, but can be notified appointing system or module, and
And the system or module can ask to carry out specific program executive capability modification (for example, unchanged predefined ability modification;
Such as the ability modification being dynamically determined based on condition at that time in notice;Deng).In addition, in some embodiments, PES or
Other systems can carry out various operations to monitor one group of calculate node, to determine some or institute of the trigger related to the group
There are a performance characteristics, or otherwise can obtain the performance characteristics of such monitoring (for example, from monitoring the meter from another source
The third party software of operator node, from calculate node perform with monitor the calculate node and optionally report monitoring information it is soft
Part etc.).In addition, in some embodiments, PES or other systems can have draws when meeting the instruction trigger criteria of trigger
The system of hair program executive capability dynamic modification defines trigger, or can otherwise be automatically determined with right under particular cases
Calculate node group makes certain form of change.
When the trigger of definition specify one or more computing resources calculate node quantity or total amount it is specific definitely or
Relative change, and automatically determined based on the present case of corresponding calculate node group to meet one or more of the trigger of definition
During individual specified value, PES or other systems may automatically determine whether and the program executive capability how to be specified to trigger
Modification.For example, certain form of designated program executive capability modification can be carried out immediately (for example, terminating using one or more meters
The request of operator node, request of the trigger for implementing immediately etc. is specified based on user), and can be specified other types of
At the end of the modification of program executive capability is deferred to the polymerization period, to be regarded as what is asked or perhaps determine during the period
A part for more secondary program executive capability modification of polymerization.Similarly, for example, based on program executive capability dynamic modification type,
Based on from user immediately or the explicit request etc. implemented of delay, it may be determined that repaiied by the program executive capability of user's dynamic requests
Change (for example, via GUI, or the graphic user interface of PES or other systems;By via the API or PES of definition or its
The user program of its systematic difference Program Interfaces;Deng) to carry out immediately and/or temporary delay and poly- in a similar way
Close.In addition, when determining how the combination for more secondary program executive capability modification that management determines, it is in some cases, different
Priority can modification correlations different from determination.It is if so, for example different from the trigger being satisfied preferential for assigning
User's request that the dynamic of level (for example, higher or lower priority) is specified or other user instructions, assign different priorities
(for example, for assigning higher priority compared with improving the request of program executive capability for the different types of modification through determination
Reduction program executive capability request for) etc., such priority can be assessed in a variety of ways.It is included below on use
User-defined trigger and the other details for determining performance characteristics.
In addition, at least some embodiments, multiple attributes based on following the trail of and using corresponding calculate node group, or
Say it is based on controllable parameter each related to one or more calculate nodes in the group, PES or other systems can manage fixed
Phase polymerize multiple through determining the modification of program executive capability repeatedly in other words.As an example, by the meter of calculate node group
Operator node quantity is used as the yardstick corresponding with the program executive capability of the calculate node group, and PES or other systems can be directed to should
Calculate node group and keep and using at least three kinds measurements that are mutually related, as described below:The required calculating section of calculate node group
Point quantity, such as when starting the calculate node group, associated user can initially be set to it, and the quantity can be according to tactile
Hair device meets that the user that situation and/or dynamic are specified is asked to change;The actual calculating of currently available calculate node in the group
Number of nodes (for example, being determined by the continuously or repeatedly monitoring to this group of calculate node);With currently available calculating in the group
The calculate node quantity of the offical record of node (for example, as triggering one or many program executive capability to move for the last time
State is determined when changing, and is optionally updated frequently by continuously or repeatedly monitoring).The calculate node group it is such more
Individual attribute can be used in a variety of ways (such as) continuously or repeatedly measure actual quantity and thus update offical record quantity
(for example, based on be monitored to this group of calculate node), and for periodically attempt by the quantity of nearest offical record update with
Meet current desired quantity (for example, when considering how and whether will be to repeatedly polymerizeing through determining that modification is combined).
As it was previously stated, PES or other systems can further carry out specific program executive capability of the various operations could be made that
The causal law information of dynamic modification or other attribution of responsibilities.For example, as it was previously stated, traceable perform with the program of calculate node group
The corresponding event of request of ability dynamic modification, including the dynamic instruction specified of the user received and automatically determined expired
The predefined trigger of foot, and the action taken automatically by PES or other systems in some embodiments is (for example, base
In the monitoring of progress, for example, if determine that calculate node is frozen or perhaps is not useable for carrying out required activity, it is automatic to close
The part that calculate node is used as to its current calculate node group is terminated in other words).Similarly, can similarly tracing computation section
The actual change of the program executive capability of point group, such as change (example corresponding with the event of generation and/or other capacity variations
Such as, the example that calculate node failure becomes unavailable in other words).As an example, various information concerning events can be stored up
In the presence of in the first database table, and can will be on the various information storages of capacity variation or other change in availability in the second number
According in the table of storehouse.If the relation between identification particular event and specific change in availability is (for example, particular event causes specific can use
Property change immediately occur), then can by by identical close knot relevant identifier with its of the event and the change in availability
Its information preserves to follow the trail of the knot of the corresponding pass between the event and change in availability together.Can be alone or in combination in multiple events
Ground causes specific change in availability but causal law is not attributed in other situations of individual event, single close can be tied into correlated identities
Stored together with according with each other information on the change in availability and those events, and can also with one
Or the other information of a number of other change in availability preserves (if they can similarly be attributed to those alone or in combination together
The multiple events of identical).Thus, for example if multiple events of given calculate node group occur during the single polymerization period simultaneously
And one or more program executive capability changes occur to occur (for example, making during the identical polymerize the period or immediately after
For a part for the Coordinating Activity carried out at the end of the polymerization period), and if those events are not directly attributed to
Any one of one or more of capacity variations, then the combination of all these multiple events be all attributable to it is one or
It is each in multiple capacity variations.Further detail below (including reference picture 2B) included below on this causal law attribution.
In addition, in a similar way, it is multiple it is such needed for, actual and formal attributes can be tracked and be used for and calculate node
The corresponding one or more of the other controllable parameter of program executive capability of group, all formula weights as required first group, actual and positive
Cpu cycle overall average utilization rate, required second group, network bandwidth overall average utilization rate of actual and positive formula weight etc..In addition,
When following the trail of and using the multiple parameters corresponding with the program executive capability of calculate node group simultaneously, PES or other systems can
Attempt to manage all parameters, such as to change calculate node group, so as to the cpu cycle overall average utilization rate needed for obtain simultaneously and
Required network bandwidth overall average utilization rate.As another example, the multiple parameters of calculate node group may include in the group respectively
The calculate node quantity and specified geographic location of individual calculate node are (for example, this group of calculate node between the first data center
Between 15% and 20%, remaining this group of calculate node is located at one or more of the other data center), while PES or other systems
System is attempted to manage calculate node quantity and the calculate node geographical position of the group simultaneously.It is included below on using multiple attributes come
Follow the trail of and manage other details of one or more program executive capability parameters.
In addition, in each embodiment, family can be used to access calculate node in a variety of ways for PES or other systems.Example
Such as, in some embodiments, at least some distribution in the calculate node that be able to will can be obtained at the PES for configuration processor
To one or more users, so that those users can preferentially use so that each in those users can relative to other users
Preferentially use those calculate nodes.In this embodiment, the preferential access of these users can be based on can be proprietary or exclusive
Use each user of those calculate nodes (such as in a manner of similar to rental) of set period.In addition, in some implementations
In scheme, for example, when calculate node is unassigned have the users of these calculate nodes using when and/or when being assigned calculate node
User clearly make allocated calculate node can by other users in use, distribute to one or more users with proprietary or
At least some in the calculate node preferentially used can be used as excessive program executive capability and used for other users sometimes.So,
At least some program executive capability for distributing to first group of user represent it available for (such as on the basis of non-guaranteed) sometimes
His user carrys out temporary transient configuration processor (for example, coming for other purposes if necessary to the program executive capability, such as one or more
The preferential or reservation of other users uses, then the right to use of excessive program executive capability can be cancelled).In addition, at some
In embodiment, PES may include on-demand computing node, it is received available for the dynamic for meeting user's configuration processor asks (for example,
When those users ask, the future time in instruction, a period of time in the period in future in instruction etc. perform) so that can
One or more programs indicated by the request are performed, with the proviso that the calculate node for being sufficient for the execution of request is being asked
Time when (near or) can use (but not ensureing that the request can be met) when.In addition, in some embodiments, immediately (or
It is predetermined) on-demand request that performs is satisfied and represents each user come after successfully triggering the execution of one or more programs,
On-demand computing node can be ensured to be continuing with until some time in future, some time selected by such as each user, appointed
Some somewhat prohibitive time of selection of land, (such as, it shall be guaranteed that PES will not the purposes of preemption for other purposes, but do not protect
The calculate node of card configuration processor can fail).In some embodiments, based on variable program executive capability on demand is provided
Operator node may differ from calculate node for providing proprietary program(me) executive capability and/or for providing excessive program executive capability
Calculate node, so if being not used for providing some on demand in the calculate node of variable program executive capability, then exist
In some embodiments, these nodes can be used for providing excessive program executive capability, and energy is performed until receiving variable program on demand
Power is asked, and in other embodiments, these nodes may not be used to provide excessive program executive capability.In other implementations
In scheme, the program executive capability of single type can be only provided, and/or other types of program executive capability can be provided.
Figure 1A is to show to performing the progress of the calculate node of the program of multiple users available for program executive capability is provided
The network of the example of the program execution service of management.For the purpose of illustrating property, some examples and reality are the following described
Scheme is applied, wherein providing and managing certain types of program executive capability in a specific way.In addition, in following examples and implementation
In some in scheme, the program executive capability provided by one group of calculate node can be in a specific way (for example, be based on calculate node
Quantity) measure, can in a specific way (for example, by needed for following the trail of, actual and formal attribute is relative to one or more journeys
The purposes of sequence executive capability yardstick) manage, can by associated user in a variety of ways (for example, based on predefined trigger and/
Or the purposes of dynamic designated order) be controlled, it can modify in a specific way (for example, by being aggregated in a period of time
It is determined that and delay the modification of at least some program executive capability, then carried out at the end of the period one or many corresponding poly-
Modification is closed, such as to change the quantity of calculate node in one group) etc..The purpose that these examples are used for illustrating property is provided and is
Simplified for purpose of brevity, and it should be understood that the technology of the present invention can be used in various other situations, and below only
Describe some in these situations.
In Figure 1A example, each client computing system 130 is being used to pass through network by each user's (not shown)
100 PES with being provided by program execution service offer entity 105 is interacted, while PES some functions are performed by program
The illustrated embodiment of service system manager (" PESSM ") module 110 is provided in the example, and other functions pass through program
The illustrated embodiment for performing service ability maintenance manager (" PESCMM ") module 115 is provided in the example.PESSM modules
110 can for example help specific user is ready to use in the multigroup calculate node for performing the program of these users to configure, including is these
Group is specified initial required calculate node quantity and specified and touched for then making dynamic modification automatically to calculate node quantity
Send out device.In this example, PES makes each calculate node 120 can be used for the program for performing user, but in other embodiments,
Can otherwise provide at least some in the calculate node at least some groups (for example, can by user and/or
Such as outside computing system 140 of third party is managed to provide by PES).In addition, the company of can help to of PESCMM modules 115
Continue or monitor calculate node group in use repeatedly, and optionally attempt times for replacing failure to become unavailable in other words
What calculate node, so as to which program executive capability is maintained at into previously determined level.
Network 100 may be, for example, the publicly accessible network of linked network, and it may be by different each side (such as because of spy
Net) operated.In other embodiments, network 100 can be private network, and such as non-privileged users completely or partially can not
The enterprise network or campus network of access.In other embodiments, network 100 may include the Internet accessible and/or can pass through because
One or more private networks that spy's net accesses.In the illustrated embodiment, PESSM modules 110 and PESCMM modules 115 each may be used
It is included in the software instruction performed on one or more computing system (not shown).In addition, module 110 and 115 and each meter
Operator node 120 can be in a variety of ways (such as at individual data center) or perhaps to use the computing system of one group of co-located
Mode, or conversely provided with distributed way using the various computing systems at each diverse geographic location.
In some embodiments, it is illustrated that calculate node 120 may include above to carry in one or more physical computing systems
The multiple physical computing systems and/or multiple virtual machines supplied (such as reference picture 1B is more fully described).Each calculate node 120 is equal
It can be used for performing the computing resources of one or more programs with a certain amount of, (such as) to provide the program of specified quantitative perform energy
Power, for example, described program executive capability can for example by one or more disposal abilities (for example, the quantity of processing unit and/or
Size), the combination of memory capacity, storage volume, network bandwidth capacity etc. measures.In some embodiments, PES suppliers
105 can provide pre-configured calculate node, wherein each pre-configured calculate node be respectively provided with it is equal or perhaps similar quantity
Available for the resource for representing user and coming configuration processor, and in other embodiments, PES suppliers 105 can provide various differences
The selection of calculate node, user be may select from carrying out configuration processor to represent the user, such as wherein each selection is respectively provided with not
The computing resource of same amount and/or type is (for example, the size of processing unit, speed and/or type;The quantity of processing unit;Internal memory
Amount and/or amount of storage;Platform configuration, such as 32 or 64;Deng).
In the illustrated embodiment, program execution service is provided for manage in multiple users each multigroup one
Or the function of multiple calculate nodes 120.Such as other places discuss in more detail, and each user can enter with PESSM modules 110
Row interaction, begin to use multigroup calculate node to specify to represent the request of user's configuration processor., can in each embodiment
When representing user and performing the request of one or more programs in one group of calculate node and/or in one or more of the other time
(such as when user's first registers and/or subscribe using PES service when) specify such resource.In some embodiments,
PESSM modules 110 can provide reservation and/or registration service to one or more users so that user may specify and represent user
Come the related information of the one or more programs performed (for example, the program of one or more programs, source code, addressable point
Deng), account (for example, user name, charge information etc.), Terms of Use etc..In some embodiments, user with
PESSM modules 110 interact after obtaining service, can be issued related to the user with subscribing and/or registering to the user
And the one or more identifiers (for example, key, token, user name etc.) for representing the configuration processor of user to use will be combined.
In other embodiments, it is possible to provide the module different from the (not shown) of PESSM modules 110, with carry out with PES reservation and/
Or the various operations that registration service is related.
After user receives the request using one or more calculate nodes, PESSM1 modules 110 can be determined whether to deposit
In sufficient amount of calculate node 120 (it, which has, meets the available resources of the request), and if so, PESSM1 modules
110 can represent user starts to perform one or more programs of the request in appropriate calculate node.It is scheduled in user
In the case of performing the request of one or more programs in one group of one or more calculate node, PESSM modules 110 can taste
Examination retains appropriate calculate node to perform one or more programs in one or more future times immediately, and/or can postpone by
The calculate node is used for until later time (for example, such as when one or more of future times occur) just performs
Decision.In the illustrated embodiment, it is described if PESSM modules 110 can not be asked for user to distribute calculate node
Request may fail so that program can not perform.In such cases, user can submit failed request again, with later
Perform.As it was previously stated, in some embodiments, for example, used in the quantity of calculate node, the type of calculate node used,
Specific operation (for example, data transmission and/or storage) carried out using the duration of calculate node, calculate node etc., can be to
User collects the various expenses related to using PES.
It is used to representing user come after performing one or more programs providing one group of one or more calculate node, can be with
Various modes manage the calculate node group.For example, as it was previously stated, PESCMM modules 115 can monitor this group of calculate node, example
Such as to determine the performance characteristics of some or all of calculate nodes, including actual calculate node quantity or provided by this group of calculate node
Practical programs executive capability other measurements.If (such as) failure of one or more calculate nodes becomes in other words can not
With can then change the practical programs executive capability of the group, and at least some embodiments, module 115 can carry out various
Operate to keep the program executive capability of the calculate node group in these cases (for example, substituting meter by being added to the group
Operator node is to substitute disabled calculate node).In addition, what module 115 can be used on the calculate node group through determination
The information of actual calculate node quantity, with such as when detecting actual calculate node quantity and changing, regularly update institute
State the calculate node quantity of the offical record of calculate node group.
In addition, PESSM modules 110 can also contribute in a variety of ways to manage the calculate node group.For example, such as preceding institute
State, the user related to the group there can be the one or more quantity modification trigger previously specified, and it is specified and will done to the group
The type (if meeting each specified value) of the calculate node number change gone out.In addition, at least some embodiments, with
The related user of the group can be in the specified operation change to its associated computing nodes group of dynamic of each time, including the group is calculated
The number change of node.As the part for managing the calculate node group, the institute of the traceable calculate node group of module 110
Calculate node quantity is needed, and periodically by the calculate node quantity of the offical record of the calculate node group and the calculate node
The required calculate node quantity of group is coordinated.Such as the predefined trigger specified according to one or more users meets feelings
The user instruction that condition and/or one or more dynamics are specified, during this periodically coordination may include to follow the trail of and be aggregated in the polymerization period
The modification through request of the calculate node quantity of generation.At the end of the period, then module 110 can be determined whether and how enter
The calculate node quantity modification of row polymerization, and can be changed according to the calculate node quantity of polymerization come calculate node number needed for updating
Amount.Then, module 110 can be changed by starting the calculate node quantity of polymerization, and the calculate node number of renewal offical record
Amount with match will be new caused by the calculate node quantity modification that polymerize required calculate node quantity come to required and formal note
The calculate node quantity of record is coordinated.In addition, it is different from just at the end of the period in current actual calculate node quantity
, can also be according to actual calculate node quantity to required and offical record calculating section in the case of the calculate node quantity of formula record
Point quantity is coordinated so that start the calculate node quantity modification of polymerization, by current actual calculate node quantity
It is updated to current desired calculate node quantity.Module 110 can also repeatedly, when such as pass through set period every time, it is each
Such regular Coordinating Activity is carried out during calculate node number change through requesting minimum etc..
In addition, PESSM modules 110 can carry out other activities, with follow the trail of the event that occurs for specific calculation node group and
Specific program executive capability changes.At least some program executive capability change informations can be with being triggered using as regular by module 110
Or the program executive capability dynamic of a part for Coordinating Activity is changed corresponding repeatedly, and optionally may be used also in some cases
Including in the monitoring that is carried out by PESCMM modules 115 program executive capability change information (for example, with corresponding to failure in other words
It is the calculate node become unavailable, or the other types of of the program executive capability of calculate node group detects change).Module
110 can also be carried out for example according to the regular or other Coordinating Activity repeatedly of progress in each time (or opposite at other times) from
Dynamic to determine, the causal law that certain capabilities are changed or other attribution of responsibilities are in particular event.
Although the PES for providing types of functionality to each user describes Figure 1A above-mentioned example embodiment,
It is to be understood that there may be various other embodiments.For example, at least some embodiments, single calculate node 120
Unused portion (for example, untapped processing unit clock cycle, unused portion etc. of internal memory) be available for one or more
User uses so that one or more programs of the first user can be single with those procedure sharings of one or more other users
The resource of calculate node.In addition, though some embodiments are described for program execution service and program executive capability, but should
When understand the technology can be used for manage each other groups of calculate nodes or it is other types of calculate related resource the right to use.
It can may include through the nonexcludability inventory item for the example for managing the other types of calculating related resource used for multiple users
Following content:Persistent data storage capacity (for example, non-volatile memory device, such as on hard disk drive);Nonce
According to storage capacity (for example, volatile memory, such as on RAM);Message queueing and/or transmission capacity;It is other types of logical
Letter ability (for example, network socket, virtual communication circuit etc.);Data base administration ability;Proprietary bandwidth or the related money of other networks
Source;Input unit ability;Output device ability;Cpu cycle or other instruction execution capabilities;Deng.
Figure 1B is shown in which that journey can be provided using the one or more data centers for including multiple physical computing systems
The embodiment that sequence performs service.Specifically, Figure 1B is the He of PESSM modules 180 for showing wherein program execution service
PESCMM modules 160 using each computing system at one or more of data centers come one of Management Representative user or
The network of the exemplary of the execution of multiple programs.Illustrated example includes the data center 170 that PES is used, data
Center 170 is connected to the internet 196 outside data center 170.In this example, internet 196, which provides, accesses various outsides
The right of computing system, such as computing system 190 via private network 194 and the computing system 192 that can directly access.It is special
Net 194 can be for example from the enterprise network of the completely or partially inaccessible of the non-privileged computing system outside private network 194.Calculate
System 192 may include for example to be connected directly to internet (for example, via phone or cable modem, digital subscriber line
(" DSL ") etc.) family expenses computing system.In addition it is shown that it is connected to via internet 196 one or more of data center 170
Individual other data centers 198, such as data center 198 can further be used at least some embodiments by PES.
Exemplary data center 170 includes many physical host computing systems 175, physical computing systems 182, PES
The PESCMM modules 160 of PESSM modules 180 and PES.In this example, host computing system 175 each provides multiple virtual
Machine, and virtual machine (" VM ") manager component with those virtual machines of management is (for example, management program or other virtual machines prison
Visual organ), such as shown by the host computing system 175a with multiple virtual machine 177a and VM manager components 179a.Its
Its host computing system 175b can similarly include this class component, for simplicity, those other components be not shown herein, and
And some or all of computing systems 182 are optionally same with one or more such virtual machines and/or VM manager components
(not shown).Each in the virtual machine provided by host computing system can be used as different calculate nodes in PES, example
Such as so that the first virtual machine calculate node on host computing system turns into a part for the first calculate node group of the first user,
And the second virtual machine calculate node in the same host computing system is set to turn into the second calculate node group of second user
A part.Or in other embodiments, some or all of physical host computing system at the data center
Any virtual machine may not be provided, such as conversely perform one or more journeys directly as the final consumption user for representing PES
The calculate node of sequence.In addition, in some embodiments, each computing system 175 and 182 can have different abilities, can
With it is different it is used in connection with take, different types of user program can be supported (for example, the software image of various sizes of virtual machine
Example, or there is different types of resource criterion and/or computing resource utilization rate, the I/O and memory of such as different mode are deposited
Take and the program of network usage) etc..If so, then can according to one or more such factors to specific user and/or
Its program is grouped (such as automatically), and these factors also act as selection computing system to perform the constraint bar of specific program
Part and/or preference.Exemplary data center 170 also includes may include multiple interconnection device (not shown) (such as converters, side
Edge router and core router) internal network 172, and be connected to internal network 172 computing system 175 and 182,
PESCMM modules 160 and PESSM modules 180.Each host computing system 175 and other computing systems 182 can be with various sides
Formula is set, including by being grouped in the frame of shared shared bottom plate or other connected mediums.It is also possible to use one
Or multiple computing system (not shown) come it is each in execution module 160 and 180.
The PESSM modules 180 and PESCMM modules 160 of diagram implement it is at least some in the technology, to manage
It is more fully described using computing system 175 and 182 come configuration processor in multigroup calculate node for providing, such as other places.When
When selecting specific calculation node to perform one or more programs of user, in some embodiments, PESSM modules can pass through
Interacted to out with other manager components of the execution of the program of VM manager components or the control selected calculate node
Begin perform those programs, or can in selected calculate node direct configuration processor.Various calculating systems can be used in PES user
System, such as computing system 190 or 192, or the computing system at place of one of other data centers 198 with PESSM modules 180 to carry out
Interaction.
It is to be understood that Figure 1B data center is merely provided for illustrative purpose, and in other embodiments
Program execution service can be otherwise provided and other softwares perform service.For example, data center 170 can be used on the contrary
Outside one or more of the other computing system, the computing system at such as computing system 190,192 or data center 198 are come
PESSM modules 180 and/or PESCMM modules 160 are provided.
Fig. 2A shows one group of example calculation section to providing the one or more programs for being used to perform example user
The example for the technology that point is managed, the skill that can be such as implemented automatically by the embodiment of PESSM modules and/or PESCMM modules
Art.Specifically, in this example, specific user (hereinafter referred to as user UUU and be not shown in fig. 2) has started to use one
The multiple calculate nodes of group are come to represent the duplicate that the user each performs indicated program, such as use as calculate node is substituted
The service received request provided by the configuration processor is handled (for example, to balance the service in the multiple of the whole group
Calculated load in calculate node).As shown in timeline coordinate diagram 210, user has requested that offer calculates section in time T1
Point group, and specify initial required calculate node quantity 215a for 8 calculate nodes of the group.Information 250 is to each user
The trigger instruction of definition, user specify in such as initial request to calculate node group.In addition, timeline coordinate diagram 205
Show on will be tracked for calculate node group and by the two of the performance characteristics whether being satisfied for determining trigger 250
The information of kind example types, the described information CPU overall average utilization rate 205a including calculate node group and calculating in this example
The network bandwidth overall average utilization rate 205b of node group.
Event E1 during in response to the corresponding time T1 of the user received the request with starting offer calculate node group,
Exemplary PES (not shown) starts the meter for initially including eight calculate nodes according to initial required calculate node quantity to user
Operator node group.In addition, the calculate node quantity 225 of the offical record of calculate node group is similarly set to eight calculate nodes.
However, as shown in timeline coordinate diagram 210, eight calculate nodes are not actually immediately available, since it is desired that one section
Time provides these calculate nodes and it is can be used as a part for calculate node group, including makes journey by PES or user
Sequence duplicate performs on each in these calculate nodes.Specifically, after the initial time after elapsed time T1, calculate
The program executive capability of node group changes C1 255, and the change terminates in time T1 in whenabouts T2, and
It is and corresponding with first four in available eight calculate nodes.Therefore, the actual calculate node for calculate node group is followed the trail of
Quantity 220 increases to 4 in the time from 0.In addition, simultaneously or shortly after that, timeline coordinate diagram 205 shows, according to the group
In can be started to follow the trail of CPU overall average utilization rate 205a and network bandwidth overall average utilization rate 205b with the operation of calculate node
Performance characteristics.
In this example, PES (or other third party systems) is supervised in a manner of substantially continuous to this group of calculate node
Survey so that carry out the information of retention property characteristic 205a and 205b and actual calculate node quantity 220 in a manner of newest.So
And in this example, the dynamic modification of at least some of type periodically only is carried out to the calculate node quantity of calculate node group, such as
To polymerize the modification through request of at least some of type during polymerization period 260, and with respectively required, actual and just
Coordinating Activity is carried out at the end of the polymerization period between the calculate node quantity 215,220 and 225 of formula record.Therefore, first
During polymerizeing period 260a, change 255 outside the calculate node quantity amount of calculate node group.For example, four calculating before making
After the available change C1 of node, the follow-up change C2 that terminates in whenabouts T3 and the part that can be used as calculate node group
Three additional calculations nodes it is corresponding.
However, in this example, such as hardware problem existing for the calculate node due to initially selecting (or conversely other
In situation, because in time T1, only 7 calculate nodes can be used in calculate node group, wherein once the 8th calculate node with
After can use, just its dynamic is added), the 8th calculate node of initial request can not can use in time.Therefore, event E2 is shown
265 occur after change C2 soon (during in whenabouts T4), wherein PES terminate the 8th calculate node originally (if
Need) (if for example, it is frozen in an intermediate state), and start to provide the 8th replacement calculate node.Such as reference picture
2B is discussed in more detail, in this example, when PES has caused with adding the 8th initial calculate node corresponding time T1
Change C10a, but change C10a fails by having added and available reality the 8th calculate node is completed, therefore becomes
Change C10a not embody in the actual calculate node quantity 220 of timeline coordinate diagram 210, also show in fig. 2 not otherwise
Go out.On the contrary, in this example, event E2 is divided into simultaneously or nearly that simultaneous two different event E2a and E2b are not (
It is separately shown).Specifically, in this example, PES records and failed the 8th of correct initialization (such as in fixed time limit)
Event E2a during the corresponding time T4 of individual calculate node, and change C10b (not shown) when PES triggers time T4 automatically
To terminate the 8th initial calculate node for failing correctly to initialize.In addition, in this example, initial the 8th calculates section
The actual termination that point occurs due to event E2a is considered as individual case E2b during time T4 in itself, and individual case E2b is automatic
Trigger and the 8th replacement calculate node is provided immediately.So that result caused by the change of the first event can be considered as causing separately in itself
Such the link event and respective change result of a kind of second event of change are between track of events and respective change result
Various benefits can be provided in correlation, such as other places discuss in more detail.Then, opened according to event E2b in time T4
Begin, and the change C3 255 terminated in time T5 makes actual calculate node quantity be changed into eight from seven, because the 8th
Substitute the part that calculate node can be used as calculate node group.
In eight calculate nodes by way of expectations after an operating polymerization period 260a part of calculate node group,
Another change C4 255 occurs for whenabouts T7, actual calculate node quantity 220, and the change is become not in other words by failure
One in available calculate node promotes.Corresponding event E3 265 at about occurs with change C4, and wherein PES is terminated can not
With calculate node (if desired), and optionally automatically begin to provide to substitute calculate node.Specifically, with similar to before this
The mode discussed for event E2, event E3 are divided into simultaneously or nearly simultaneous two different things in this example
Part E3a and E3b (not separately shown).Therefore, PES records the calculate node phase with having become unavailable after testing in this example
Event E3a during corresponding time T7, and PES triggers activity during time T7 to terminate unavailable calculate node, example automatically
Such as change C4 directly to cause.In addition, in this example, the termination that unavailable calculate node occurs due to event E3a is in itself
It is considered as automatic in whenabouts T7 to trigger to provide the individual case E3b of replacement calculate node immediately, but in other implementations
In scheme and situation, substituting any this offer of calculate node will be merely deferred until at the end of period 260a is polymerize on the contrary
The Coordinating Activity H1 of progress.Then, in this example, change C5 255 terminates in whenabouts T9, and the change is by actual meter
Operator node quantity is recovered to eight, and this is directly caused by event E3b, because the replacement calculate node can be used as calculate node group
A part.In this example, the calculate node quantity 225 of offical record is not updated temporarily with corresponding to change C4 and C5,
Do not update with corresponding to previous change C1-C3, but in other embodiments, the calculate node quantity of offical record may be updated
225 to reflect some or all of such changes, such as continuously or repeatedly to keep the calculate node quantity 225 of offical record
In the consistent state of the actual calculate node quantity 220 with being updated.In this example, when polymerizeing remaining of period 260a
In the change of other calculate node capability availabilities or event do not occur, including all triggers 250 specified are not satisfied, and
And the user instruction that dynamic is specified is not received.Therefore, in the time T11 at the end of the period 260a, it is contemplated that first group
Coordinating Activity H1, but without any activity, because current desired, reality and the calculate node quantity 215 of offical record, 220 and
225 match at eight calculate nodes respectively.If do not carry out replacing unavailable calculate node during period 260a is polymerize
Change C5 (as shown in the example), then after the polymerization period, the change on the contrary can be as the one of Coordinating Activity H1
Part is caused, to replace the unavailable calculate node at the time (for example, being asked during being incorporated in polymerization period 260a
Or caused any other dynamic availability change).
However, during the second polymerization period 260b, there occurs other events.Specifically, event E5 265 is sent out first
It is raw in whenabouts T16, so as to corresponding with automatically determining of making of PES, i.e., by improving CPU overall average utilization rates
205a is satisfied trigger TR-1 250a, as in timeline coordinate diagram 205 by CPU overall average utilization rate 205a lines
First black ellipse illustrated in.For 12 through calculate node quantity 215c needed for the whole of request (or nothing
By current desired calculate node quantity how, the required calculate node quantity that can ask to be updated is arranged to 12), touch
Hair device TR-1's meets that situation has triggered the request that required calculate node quantity 215 is increased to 4 calculate nodes.Similarly, exist
After other extra time, next event E6 265 occurs in whenabouts T18, so as to determining by carrying
High network bandwidth overall average utilization rate 205b is corresponding be satisfied trigger TR-N 250c, in timeline coordinate diagram 205
By illustrated in the black ellipse on network bandwidth overall average utilization rate 205b lines.For ten all required calculating through request
For number of nodes 215d (or regardless of current desired calculate node quantity, the required calculating that will be updated can be asked
Number of nodes is arranged to ten), trigger TR-N's meets that situation has triggered required calculate node quantity 215 is increased into 2 meters
The request of operator node.After by shorter extra time, event E4 265 occurs in whenabouts T19, wherein for
11 through for calculate node quantity 215b needed for the whole of request (or no matter current desired calculate node quantity such as
What, the required calculate node quantity that can ask to be updated is arranged to 11), the user related to calculate node group provides
The dynamic that required calculate node quantity 215 is increased to 3 calculate nodes specifies request.For example basis it can notice CPU overall averages
Utilization rate 205a is the user that is increasing etc. of total calculated load in higher, calculate node group to make the request.
Finally, shortly before polymerization period 260b terminates, the extra C6 that changes occurs in whenabouts T20, the change
One in this group of calculate node become unavailable in other words by failure promotes.Corresponding event E9 and change C6 is at about
Occur, wherein PES terminates unavailable calculate node (if desired).In this example, but PES is not to immediately begin to offer to replace
For calculate node, but decide to wait for starting (for example, root when the second group of Coordinating Activity H2 that will be carried out is in time T21
There is provided according to a small amount of time remaining before time T21, according to the such delay for substituting calculate node etc., the delay is to make
The default-action for any calculate node that used time becomes unavailable) because will likely be reduced according to those Coordinating Activities
The quantity of calculate node in calculate node group, and without the replacement calculate node.In other embodiments, PES is opposite
Ground, which can immediately begin to provide, substitutes calculate node (for example, based on the replacement for not postponing unavailable calculate node under any circumstance;
Based on not postponing the replacement of unavailable calculate node in this case (because required calculate node quantity is as Coordinating Activity H2's
A part and may increase rather than reduce);Based on do not postpone in this case unavailable calculate node replacement (due to it is other because
Element, such as user are paid to eight calculate nodes before later time T3);Deng).Specifically, with similar to
The mode discussed previously for event E2 and E3, event E9 are divided into simultaneously or nearly simultaneous two different events
E9a and E9b (not separately shown).Therefore, PES records relative with the calculate node become unavailable after testing in this example
Event E9a during the time T20 answered, and PES triggers activity during time T20 to terminate unavailable calculate node, example automatically
Such as change C6 directly to cause.In addition, in this example, the termination that unavailable calculate node occurs due to event E9a is in itself
It is considered as individual case E9b during whenabouts T20, the event, which triggers to be used as substituting by the additional calculations node of the group, calculates section
The request of point, such as so that required calculate node quantity 215 to be maintained to the requirement 215a of eight calculate nodes.In the example
In, event E9b request is handled in a manner of similar to event E4-E6, the request is merely deferred until when when pre-polymerization
The Coordinating Activity H2 carried out at the end of section 260b, but in other embodiments and situation, can immediately begin to substitute meter on the contrary
This offer of operator node.In addition, in this example, do not updated in a manner of similar to being described previously for change C4 and C5
The calculate node quantity 225 of offical record is corresponding to change C6, but in other embodiments, to may be updated the meter of offical record
Operator node quantity 225 is to reflect such change.
Therefore, at the end of the second polymerization period 260b, start Coordinating Activity H2, and can cause in this case to meter
The dynamic modification of operator node group.Specifically, PES in this example will be various through request with event E4, E5, E6 and E9b
The corresponding modification polymerization through request of required calculate node quantity 215b, 215c, 215d and 215a, and determine to eight elder generations
Calculate node quantity 215a needed for preceding makes the dynamic quantity modification of polymerization, while the dynamic quantity modification polymerizeing is in this example
Four additional calculations nodes (for example, based on using maximum in the quantity modification through request) are added, so as to corresponding to ten
Two current desired calculate node quantity 215e updated.In other embodiments, otherwise can determine to polymerize
Dynamic quantity modification, such as changed with the dynamic quantity of selective polymerization to keep previously necessary calculating according to event E9b
Number of nodes 215a (for example, so as to cause to increase a calculate node from current actual calculate node quantity), with using thing
Minimum value in the part E4-E6 modification of the quantity through request is (for example, so as to cause from current desired calculate node quantity increase
Two calculate nodes), the average value changed with the quantity through request using event E4-E6 is (for example, so as to cause from current institute
The calculate node quantity needed increases by three calculate nodes), the polymerizing value changed with the quantity through request using event E4-E6
(for example, so as to cause to increase by nine calculate nodes from current desired calculate node quantity), to be asked using event E4-E6 warp
The limit priority for the quantity modification asked is (for example, so as to cause to increase by three calculating sections from current desired calculate node quantity
Point, with the proviso that the trigger for example compared to event E5 and E6 meets situation, E4 user instruction is considered as with higher prior
Level), with the modification or the modification of last time request asked for the first time in the modification of the quantity through request using event E4-E6
(for example, so as to cause to increase by four or three calculate nodes respectively from current desired calculate node quantity) etc..Use wherein
Family command event compared to trigger meet event have in some embodiments and situation of higher priority (if for example, with
Family instruction can cover any dynamic modification through request for meeting event from trigger all the time), PES can also prevent other triggerings
Device meets that event occurred during the polymerization period after receiving user instruction event, such as (or exhausted to ignore in this example
It is uncertain) occur meeting event for event E4 to receive any trigger after user instruction.In addition, in the example
In, in Coordinating Activity H2, the currently practical and calculate node quantity of offical record 220 and 225 calculates section at seven and eight
It is respectively different at point.Therefore, the part as Coordinating Activity H2, PES start to provide five additional calculations to calculate node group
Node, seven current actual calculate node quantity are increased into 12 required calculate node quantity newly updated, and
The calculate node quantity 225 of offical record is further updated to meet 12 required calculate node quantity newly updated.Therefore,
In this example, the capability availability change of 5 calculate nodes is caused by the following manner indirectly:Replaced according to event E9b
A calculate node becoming unavailable due to change C7, and increase with from gathering determined by event E4, E5 and E6
Close quantity and change 4 corresponding additional calculations nodes.
During third polymerization period 260c, other event and calculate node capability availability changes further occur.Tool
Say, change C7 terminates in whenabouts T22, wherein currently available calculate node quantity adds five to altogether ten body
Two calculate nodes, to reflect five additional calculations nodes that its availability starts in time T21, and actual calculate node
Thus quantity 220 is updated.As shown in timeline coordinate diagram 205, CPU overall average utilization rate 205a and network bandwidth overall average profit
Reduced with rate 205b changing after C7, wherein CPU overall averages utilization rate 205a declines rapidly.Specifically, in the example
In, CPU overall average utilization rates 205a is finally brought down below 20% threshold value corresponding with trigger 250b specified value, from
And cause event E8 that (including determine trigger TR-3250b be satisfied) occurs, as total by CPU in timeline coordinate diagram 205
Illustrated in second black ellipse on average utilization 205a lines.For ten through calculate node quantity needed for the whole of request
For 215f (or regardless of current desired calculate node quantity, the required calculate node quantity that will be updated can be asked
It is arranged to ten), trigger meets that situation has triggered the request that required calculate node quantity 215 is reduced to 2 calculate nodes.
Finally, before polymerization period 260c terminates, the extra C8 that changes occurs in whenabouts T28, and the change is by losing
One in this group of calculate node that effect becomes unavailable in other words promotes.Corresponding event E10 is at about sent out with change C8
Raw, wherein PES terminates unavailable calculate node (if desired).In a manner of similar to for change C6, PES is in this example
Selection is waited when the 3rd group of Coordinating Activity H3 is in time T31, rather than immediately begins to substitute unavailable calculate node (example
Such as, because event E8 allows to or it is likely that in calculate node group hereafter the requirement of calculate node can be reduced),
But in other embodiments, PES, which can immediately begin to provide on the contrary, substitutes calculate node, specifically, with similar to before this
For the mode described in event E2, E3 and E9, event E10 is divided into simultaneously or nearly that simultaneous two not in this example
Same event E10a and E10b (not separately shown).Therefore, in this example, PES is recorded and after testing become unavailable
Event E10a during the corresponding time T28 of calculate node, and PES triggers activity during time T28 can not to terminate automatically
With calculate node, such as directly to cause change C8.In addition, in this example, unavailable calculate node due to event E10a and
The termination of generation is considered as individual case E10b during whenabouts T28 in itself, and the event triggers the additional calculations section of the group
Point is used as the request for substituting calculate node, such as so that required calculate node quantity 215 to be maintained to the institute of 12 calculate nodes
Need quantity 215e.In this example, event E10b request is handled in a manner of similar to event E9b, the request is delayed by
Until by the Coordinating Activity H3 carried out at the end of pre-polymerization period 260c, but in other embodiments and situation, conversely
Ground can immediately begin to substitute this offer of calculate node.In addition, in this example, not with similar to previously for change C4-
Mode described in C6 updates the calculate node quantity 225 of offical record with corresponding to change C8, but in other embodiments,
The calculate node quantity 225 of renewable offical record is to reflect such change.
Therefore, at the end of third polymerization period 260c, start Coordinating Activity H3, and calculate node group can be caused to occur
Change.Specifically, PES is in this example by with having occurred and that the event during period 260b (is only thing in this example
Part E8 and E10b) it is corresponding through request modification polymerization, and determine to 12 previously necessary calculate node quantity 215e
The dynamic quantity modification of polymerization is made, the modification reduces two calculate nodes in this example, so as to corresponding to ten institutes
The current desired calculate node quantity 215g of renewal.In addition, in Coordinating Activity H3, the currently practical and calculating section of offical record
Point quantity 220 and 225 is respectively different at 11 and 12 calculate nodes.Therefore, the part as Coordinating Activity H3,
PES triggers 12 current formal calculate node quantity according to the currently practical calculate node ability of 11 calculate nodes
Change, to reach ten current desired actual calculate node quantity, so as to which one of existing calculate node is saved from calculating
Removed in point group (for example, optionally to terminate in the calculating section removed after some or all of actions for completing to have started to
Configuration processor on point, and so that the calculate node is available for other users to use in the future).Therefore, in this example, in the time
The capability availability change for removing one of existing calculate node during T31 is caused by the following manner indirectly:Terminate on event
E10b one group of calculate node, and request reduce 2 calculate nodes corresponding with event E8.Further renewal is formal by PES
The calculate node quantity 225 of record is to meet ten required calculate node quantity newly updated.After time T31 soon, most
Change C9 terminates in whenabouts T32 eventually, wherein currently available calculate node quantity reduces one to ten altogether meter
Operator node, to be reflected in the calculate node for starting to remove from calculate node group during time T31, and actual calculate node quantity
Thus 220 are updated, in other embodiments, when deciding to do the change, change C9 substantially can occur immediately
Time T31, such as with the proviso that immediately by calculate node to be removed from calculate node group it is other activity in exit, or even
The calculate node removed temporarily performs and available for when being worked on.
In addition, though shown in this example Coordinating Activity H1, H2 and H3 occurred at single time point, but it should reason
Solving some or all of Coordinating Activities can actually occur in a period of time, and can also be other with continuing for some time
Effect.For example, at least some embodiments, by the PES program executive capability to calculate node group triggered some or
All changes can produce the temporary locking phase that may not allow at least some other types of events or change.This locking can be caused
PES- instruction program executive capability change may include for example as Coordinating Activity a part come caused by program perform energy
Power increases and/or reduces (for example, add new calculate node, remove existing calculate node etc.), and/or determines (example in response to PES
Such as, calculate node failure, receive the trigger that user instruction, user specify meet situation etc.) and the program that triggers immediately is held
Row capacity variation.Such locking can have various types of duration (for example, until the result specified or generation, such as directly
It has been made available by the calculate node added;The duration specified, the calculate node such as added are made available by flat
Equal or expeced time;Deng), and in some embodiments can be different according to the type of the PES changes triggered.Herein
During class locks, event or the change of at least some of type may not be allowed, such as not in during the Lockout Duration
The trigger that user specifies is satisfied (or meeting situation by ignoring any such trigger), and/or not in the locking
Receive user instruction (or by ignoring any such user instruction) during duration.In addition, in some embodiments, with
The related user of calculate node group can similarly specify the cooling phase to be operated with locking cooling phase similar mode, such as immediately
Locking or the cooling phase that specified time amount at other times occurs on the contrary.Such as locking, during cooling, may not allow
The event of at least some of type or change, such as the trigger to be specified not in cooling period user are satisfied and (or passed through
Ignore any such trigger and meet situation).It is to be understood that in other embodiments, user and/or PES can be with other
Mode controls the modification to calculate node group.
Therefore, so, PES operations are supplied to the program executive capability of user by one group of calculate node to manage, including with
Various dynamic modifications are made to the calculate node group according to various situations.It is to be understood that the event shown in Fig. 2A and change
It is merely provided for carrying out schematical purpose, and the PES actual event, change and other operations are in other embodiments
It is possible different with situation.
Fig. 2 B are shown for causality information to be attributed into the calculate node number that reference picture 2A before this discussed automatically
The example of the technology of amount dynamic modification, the technology that can be such as carried out automatically by the embodiment of PESSM modules.Specifically, scheme
2B shows two instance database list data structure of the storage with some corresponding information in information shown in Fig. 2A, wherein
The exemplary meter that Fig. 2 B storage of example table 280 and Fig. 2A exemplary computing node group (being referred to as " the 1st group " in Fig. 2 B) occur
Operator node capability availability changes relevant various information, and Fig. 2 B storage of example table 290 and Fig. 2A example calculation
The relevant various information of (the 1st group) exemplary event occurred of node group.
Example table 280 include respectively correspond to one of the exemplary variations C1-C10 that reference picture 2A is discussed each row or
Item 285a-285k, it illustrated therein is each column or row 280a-280x of each row.Specifically, in this example, each row is included only
One identifier (" ID ") 280a, ID 280b that is applicable calculate node group corresponding with change, the class of program executive capability change
The instruction 280d for the expected results that type 280c, program executive capability change, the various details 280e on change, the beginning of change
(it is in this example base to end time 280f and 280g, the polymerization period 280h related to change in other words that changes
The polymerization period mentioned by Coordinating Activity carried out at the end of the period is being polymerize), change-event close knot ID 280x and optionally
Various other information.As an illustrative examples, row 285a corresponds to the 1st group of change C1, and change C1 corresponds to the 1st group
Calculate node quantity change, the change be related to increase by 4 calculate nodes and during period H1 is polymerize in time T02 when
Terminate.Other rows include similar information.
Example table 290 includes respectively correspond toing one of the exemplary event E1-E10 described in reference picture 2A each row or item
295a-295m, it illustrated therein is each column or row 290a-290x of each row.Specifically, in this example, each row includes unique
Identifier (" ID ") 290a, ID 290b that is applicable calculate node corresponding with event, the type 290c of event, on event
The information 290d in source, the time 290e of event, generation event or perhaps the polymerization period 290f related to event are (in the reality
Example middle finger is based on the Coordinating Activity carried out at the end of the period polymerize), change-event close knot ID 290x and optionally various its
Its information (for example, specific user related to the user instruction received).As an illustrative examples, row 295h corresponds to
1st group of event E4, event E4 correspond to the user instruction received during the time T19 during period H2 is polymerize, and this refers to
Order asks the 1st group of required calculate node quantity to increase by 3 calculate nodes.Other rows include similar information.
In Fig. 2 B example, change-event of table 280 and 290 is closed knot id information 280x and 290x and reflected by attribution
The causality information of relation between reflection change and event.Specifically, in this example, if in table 280 and 290
The hand-manipulating of needle knot id information 280x and 290x is closed to change-event and shared common value, then that reflects corresponding event and change
Between the causality by attribution.As an example, as reference picture 2A is discussed before this, event E3b, which corresponds to, provides change
For the replacement calculate node of disabled calculate node, the calculate node can be directly attributed to correspond to thus by calculate node
Added to the change C5 of the group.Therefore, row 295e (corresponding to event E3b) and row 285g (corresponding to change C5) share jointly
Close knot identifier.
On the contrary, the change C7 corresponding with five calculate nodes of addition started during Coordinating Activity H2 is without can
It is directly attributed to the individual event of the change.Specifically, event E4, E5 and E6 each asks to enter the 1st group Mobile state modification,
These are dynamically changed aggregated and are provided commonly for promoting to add four in five calculate nodes for change C7.Thus, OK
The shared common pass knot identifiers of 295f-295h (corresponding to event E4-E6) and row 285i (corresponding to change C7).In addition,
In Fig. 2A example, it is added as changing one of C7 five calculate nodes of a part as because change C6 becomes not
The substitute node of available calculate node, start simultaneously at the replacement calculate node corresponding to event E9b.Therefore, row 295j is (corresponding
In event E9b) and row 285i (correspond to change C7) also share identical and close knot identifier jointly.In other embodiments,
If individually start to provide replacement in event E9b by providing four additional calculations nodes corresponding to event E4-E6
Calculate node, such as to replace unavailable calculate node immediately, then the respective change for substituting calculate node will be in the period
The 260b and Coordinating Activity H2 thus carried out occurs before terminating, and by table 280 from event E9b and sharing different phases
The extra change that knot identifier should be closed individually is shown.In addition, though five calculate nodes added for change C7
Shown in a manner of polymerization in the single file of table 280, but in other embodiments, each calculate node added can be
Represented in the single row 285 of table 280, and if so, it, which each shares identical, closes knot identifier N7, pass knot mark
Symbol N7 changes C7 unique row 285i currently for polymerization and shown.
In addition, in this example, change has been followed the trail of in table 280, these changes correspond not only to refer to based on dynamic subscriber
The dynamic modification of the calculate node quantity for the user's trigger for making and/or being satisfied, the unexpected change also based on calculate node quantity
Change (for example, being become unavailable in other words because calculate node fails).Such change is detected based on monitoring activity, and by
It is shown as triggering the event (such as provide and substitute calculate node) additionally changed, but in other embodiments, can be otherwise
It is handled, such as does not follow the trail of such change and/or the replacement activity that system starts is not considered as event.Although in addition,
Change in table 280 and 290-event, which closes knot information, pair can not be directly attributed to one or more corresponding events (for example, drawing immediately
Send out those change events) change and one or more corresponding events can be attributed to indirectly (for example, for example in the Coordinating Activity phase
Between the event that condenses together and cause those to change jointly) change make a distinction, but in other embodiments, one can be entered
Step tracking this type of information.
As it was previously stated, the attribution of responsibility changed the specific program executive capability dynamic of calculate node group can provide various benefits
Place, including to related to calculate node group user's offer why the explanation that can be changed.May also be responsive in from user or its
All kinds of inquiries received at its source produce and/or using such attribution of responsibility information, these inquiries such as on identification which
(multiple) event is that the specific program executive capability for causing the availability of one group of one or more calculate node to indicate is repaiied a bit
Which change or request the reason for other changes and/or on (multiple) program executive capability modification or other calculate node groups
The request as caused by the event of one or more instruction of (multiple) change in availability.Reference picture 2B is discussed, in table 280 and 290
The pass knot information shown provides a kind of mechanism for being used to following the trail of and providing attribution of responsibility information.For example, in Fig. 2A with change
For changing corresponding 5 calculate nodes of addition of C7, user may wonder with the addition of 5 calculate nodes why (for example, especially
It is the user instruction according to the event E4 of 3 calculate nodes of addition).Tie information by using the pass that is shown in Fig. 2 B, PES or its
Its system can be easy to automatically generate the readable explanation of people.For example, in response to the addition four corresponding on the change C1 with Fig. 2A
User's request of the reason for individual calculate node, PES or other systems can for example indicate herein below:" when change C01 is by time T1
Event E01 directly cause.Event E01 be from user UUU with start provide one group of 8 calculate node request ".The information
Can so it produce:Correspond to event in table 290 by using the pass knot information 280x for corresponding to change C1 in row 285a to identify
E1 row 295a, and extracted in a desired manner from row 285a and 295a with formatted message (for example, to be asked based on user
Or previous User Preferences form, with form based on PES default values etc.).Similarly, in response to referring on performing user
Make E1 and asked with starting to provide the user of eight calculate nodes of the group, PES or other systems can for example indicate herein below:" when
Between T1 when event E01 directly cause change C01, C02 and C03.Change C01 as 4 calculate nodes of addition, it is in time T1
Start and terminate in time T2.Change C02 as 3 calculate nodes of addition, it starts in time T1 and in time T3
When terminate.Change C03 as 1 calculate node of addition, it does not terminate in time T1 ".As another example, ring
User's request of the reason for Ying Yu five calculate nodes of addition corresponding on the change C7 with Fig. 2A, PES or other systems
Herein below can for example be indicated:" change C07 is by occurring in period T11 between event E05, E06, E04 and E09b during T21
Connect and cause.Event E05 is the request of 4 additional calculations nodes for meeting situation based on trigger TR-1.Event E06 be based on
The request of trigger TR-N 2 additional calculations nodes for meeting situation.Event E04 is to be carried based on the user from user UUU
For the request of 3 additional calculations nodes of dynamic instruction.Event E09b is the automatic end based on unavailable calculate node in the group
The request of 1 replacement calculate node only ".As the supplement or replacement to such text string, attribution of responsibility information can also be each
Kind of other forms autoreport (for example, with form, chart etc.) and produced with regular or other predetermined ways.Should
It is understood that in other embodiments, such attribution of responsibility information can be produced and used in a manner of various other.
It is to be understood that the information of the event and change on being shown in Fig. 2 B is merely provided for carrying out schematical mesh
, and for stored information, the storage of this type of information can be come in a manner of various other in other embodiments
Carry out.In addition, in other embodiments, PES can store the information of the various other types on user and calculate node group,
Such as to provide storage on user-defined trigger, the performance measure information on monitoring, the letter on user account etc.
The add list of breath.
In addition, Fig. 2A and 2B previous examples are provided for carrying out schematical purpose, and other embodiments can be with
Various modes are different from these examples.Although for example, in these examples, program executive capability according to the quantity of calculate node come
Measurement and modification, such as with the proviso that various available calculate nodes are considered as equivalent (for example, with equivalent computing resource), but
Other embodiments can be provided, wherein various available calculate nodes can be (such as different disposal abilities, interior with different qualities
Storage, platform specification etc.) different type, and/or wherein come in a manner of different from calculate node quantity tracing program execution
Ability.In some such embodiments, various requests may include the instruction of one or more certain types of calculate nodes, institute
State calculate node to be used to be selected in multigroup calculate node of the execution program related to the request, and those requests are only
It can be realized in the calculate node of corresponding specified type.
In addition, at least some embodiments, PES or other systems can be also carried out as the multigroup calculate node of management
The other types of activity of a part.For example, as it was previously stated, PES or other systems can be determined in each time from calculate node
Calculate node is added or removed in group, and each time includes as follows:(rung during the Coordinating Activity carried out at the end of polymerizeing the period
One or more triggers that Ying Yu is satisfied during the period and/or the user instruction received during the period);
In response to designated or determining there is the user instruction of immediate effect or trigger to meet any time of situation;Responding
In the automatic movable of PES or other systems for example to replace the calculate node of failure and/or termination and to remove current operation banned
Any time of calculate node only;Deng.In at least some embodiments, PES or other systems can also be it is determined that at least one
Consider other factorses during the exact time of a little such calculate node group modifications.For example, it will be responsible for making for the given period in user
It is such in the case of with the calculate node of given quantity (for example, having collected expense of the X calculate node at next hour)
Information can be used for the time for determining the modification of at least some of type on calculate node group.If PES or other systems determine
The quantity of calculate node in the group is reduced below X, then PES or other systems can be determined calculate node quantity actually
It is reduced below before X, waits at the end of close to given period or given period (for example, being collected the charges to user
Hour at the end of).Similarly, if one group of calculate node fails (for example, close when close to progress new Coordinating Activity
At the end of by a period of time during the calculate node quantity modification polymerization through request), then PES or other systems can be determined to reality
The number of nodes of border number of nodes and optional offical record is updated, and to reflect the failure, but need not immediately begin to add
Add replacement calculate node-so, if it is determined that calculate node quantity modification of the polymerization through request can will during Coordinating Activity
The calculate node quantity of the group reduces one or more calculate nodes, then the calculate node to fail can be used as the such of reduction
Node, and the execution calculate node of the nonterminal group.
In some embodiments, PES or other systems can manage the multiple inhomogeneity carried out to calculate node group simultaneously
The modification of type.As an example, the calculate node of single opening position can be used calculate node group management current desired
Calculate node quantity, but user can be determined as calculate node group specify Second Type yardstick so that calculate node in the group
The required subset specified be located at the different second places.If so, PES or other systems are operable by by a manner of various
To meet the desired value of the second yardstick, various modes are included by the way that any new calculate node is progressively added into the second place
Desired value of any existing calculate node until realizing the second yardstick is progressively removed in group and from the group at first position, or
Person terminates the existing calculate node in the group at first position so that replacement calculate node can be made to be added to the second place immediately
Group in.It is such progressively add and/or remove can in a manner of other places discuss in more detail in any mode trigger,
Including the trigger for replacing unavailable calculate node, being specified in response to the user instruction dynamically specified and/or the user being satisfied
To change calculate node quantity etc..In addition, though calculate node quantity and position are in this example to be simultaneously balanced, but can be with class
As mode come carry out the change of various other types (for example, for example according to have different correlated measures computing resource not
Same type by existing calculate node from the first type change be second of type).Although in addition, by changing calculate node number
Amount has carried out the modification of program executive capability in some instances, but in other embodiments, such ability modification can be by changing
Become the program executive capability of one or more calculate nodes in the group to carry out (for example, by using with more or less one kind
Or the second calculate node of polytype correlation computations resource replaces the first calculate node, by as one of the group
The amount of the available one or more computing resources of a node in the calculate node divided is modified).
As it was previously stated, PES can be provided and using types of functionality in each embodiment, and these functions can be with various
Mode provides.For example, in some embodiments, multiple calculate nodes, institute can be may include from the program executive capability that PES is obtained
State calculate node and be used to representing user and carry out configuration processor, such as by via one or more networks or can be between the computers
Transmit multiple physical computers of other data exchange mediums interconnection of data.At least some in these computers can be at some
Each include performing the enough calculating related resource of multiple programs in embodiment simultaneously (for example, enough writeable internal memories, non-
Volatile storage, cpu cycle or other CPU usages measurement, network bandwidth, swapace etc.), and in these computers
At least some that multiple virtual machine calculate nodes can be each provided in some such embodiments, the virtual machine calculate node is each
One or more programs are performed from different users can be represented.In addition, in each embodiment, PES can represent multiple use
Family performs each class method.For example, this class method for representing user to perform may include one or more operating systems, application
(for example, server and/or other software applications), utility program, program library etc..In addition, at least some embodiments, this
Class method may include executable software image, such as virtual machine image, and it can in one or more virtual machine calculate nodes
Start loadable, and each may include operating system software, the software for one or more application programs in other words,
And/or configuration information etc..
In at least some embodiments, one or more is performed in one group of one or more calculate node by PES
The current execution that program may be in response to be immediately performed those programs is asked to trigger.Or the initiation can be based on receiving before this
Program execution requests, the request predetermined to the program of those in current time can retain in other words to be performed in the future.Program is held
Row request can receive in a variety of ways, such as be received directly at user (for example, being held via interactive console or by program
Other GUI that row service provides), or from the use voluntarily performed for triggering one or more of the other program or other examples automatically
Received at the configuration processor of family (for example, API provided via program execution service, such as using the API of network service).Program is held
Row request may include the various information of the execution for triggering one or more programs, such as executable program or pending
Other duplicates of program, the instruction that the program for execution is provided in other words through registering before this, and treat many performed simultaneously
Program example (for example, being expressed as the example of single requirement, the required example etc. of minimum and maximum quantity), and for holding
The preference of the various other types of the one or more programs of row and/or requirement are (for example, resource allocation, the geography for execution
And/or logical place, other programs and/or calculate node close on execution, time correlation standard etc.).
It is used for receiving after the time of instruction performs the request of one or more program examples, PES can be determined one
Individual or multiple calculate nodes are used in one group of configuration processor example.In some embodiments, (used using calculate node
In future perform) decision in the request when carry out.In other embodiments, calculate node is used to perform one in the future
Or the decision of multiple program examples can be based on available information at that time and be delayed to later time, during the execution in such as future
Between.In some embodiments, which calculate node is being held for representing user to perform the decision of one or more programs
Row is made before asking, such as subscribes and/or register with using the request of PES time and/or execution user program in user
Another time before.For example, in some such embodiments, one or more calculate nodes can be with a period of time
User is related so that can the period any time (such as receive performed in the period user software please
Any time asked) represent user configuration processor in the calculate node of correlation.In addition, in some embodiments, by which
A little calculate nodes be used to representing user come configuration processor decision can one or more calculate nodes and/or it is one or more based on
The computing resource of operator node can be used for making when performing the program of the user, for example, to be not used by calculate node and/or
When can be otherwise used for configuration processor, the journey of one or more pending requests is performed in one or more calculate nodes
Sequence.
The decision which calculate node is used to perform to each program duplicate or example can be made in a variety of ways, including based on
Any preference that is specifying in the request or perhaps being specified for program and/or associated user and/or requirement are (for example, noting
Volume time etc.).For example, if it is determined that the preferred and/or required resource for configuration processor example is (for example, internal memory and/or deposit
Storage;Cpu type, cycle or other performance measurement;Network capacity;Platform Type etc.) standard, then appropriate calculate node is used
In the decision of configuration processor example can be based at least partially on calculate node whether have can be used for meet those resource criterions
Enough resources.It is included in March 31 in 2006 with configurator with the other details performed on program execution service on performing
Entitled " the Managing Execution of Programs by Multiple Computing Systems " that day submits
Pending U.S. Patent application No.11/395, in 463, the full patent texts are incorporated herein in a manner of introducing accordingly.
In some embodiments, expense can use related to PES so that PES can represent user come configuration processor with
Exchange payment of the user to one or more expenses.For example, in some embodiments, according to distribution be used to representing user come
The amount and/or type of the program executive capability of one or more programs are performed, such as according to journey of the distribution for performing the user
One or more of many processing units of sequence, amount of ram, amount of storage, amount of network resources etc., can be to user's collection charge
With.In some embodiments, expense can be based on other factorses, such as configuration processor computing resource various characteristics,
Such as based on CPU abilities or performance, Platform Type (for example, 32,64 etc.) etc..In some embodiments, expense can root
Collected according to various service factors, such as every time using service price, using calculate service each chronomere price,
The price of amount of storage, price of the data each transmitted to and or from etc. used in each.In at least some embodiments, such as
It is discussed in greater detail below, expense can be based on various other factors, and such as the various properties on configuration processor are (for example, perform
Continuity, fault tolerance etc.).In at least some embodiments, PES suppliers can provide for representing multiple users to perform
One or more in the services or functionalities of the various grades of program, type and/or level, and in some such embodiments
In, various expenses can be related to the service of various grades, type and/or level.In addition, for example, grade can be used for being provided by PES
Certain types of function, such as with the program executive capability function for the first quantity collect the first estate expense (for example,
The first threshold specified of calculate node up to used), for the program executive capability function of the second quantity collect the second grade
Expense (for example, lower price grade) (for example, higher than calculate node used the first threshold specified and up to used calculate
The Second Threshold specified of node) etc..Other details on the various expenses related to program execution service are included in 2007
On December 21, in submits entitled " Providing Configurable Pricing for Execution of
Software Images " pending U.S. Patent application No.11/963, in 331, the full patent texts are accordingly with the side of introducing
Formula is incorporated herein.
In addition, PES can be provided in each embodiment and the function using various other types, such as other places are more detailed
Carefully discuss.
Fig. 3 is the example for showing to be applied to the system that the technology of multigroup calculate node to managing multiple users is implemented
The block diagram of property embodiment.Specifically, Fig. 3 shows the service of at least some functions suitable for providing program execution service
Device computing system 300, and each client computing system 350 that can use of user of program execution service, program perform clothes
The calculate node 360 and other computing systems 380 that business can use.In the illustrated embodiment, server computing systems 300
With with lower component, it includes CPU 305, various I/O parts 310, storage device 320 and memory 330.The I/O portions of diagram
Part includes display 311, network connection 312, computer-readable medium drive 313 and other I/O equipment 315 (for example, key
Disk, mouse, loudspeaker etc.).In addition, it is illustrated that user's computing system 350 have with the part of server computing systems 300 it is similar
As part, it includes CPU 351, I/O parts 352, storage device 354 and memory 357.Other computing systems 380 and meter
Operator node 360 each may also comprise similar with some or all of the part with reference to shown by server computing systems 300
Part, but for simplicity, this base part is not shown in this example.
The embodiment of program execution service system manager module 340 just performs in memory 330, and passes through net
Network 390 (for example, via internet and/or WWW, via private cellular network etc.) and computing system 350 and 380 and meter
Operator node 360 interacts.In this exemplary embodiment, PESSM 340 is included on management (such as with reference to by PESSM
The program execution service of 340 management) multiple calculate is saved with each user's (not shown) that user's computing system 350 interacts
The function of using of point 360.Other computing systems 350 and 380 and calculate node 360 can using various softwares as with PESSM
An interactive part perform.For example, user's computing system 350 can be performed in memory 357 software with PESSM
340 interact (for example, as Web-browser or part of private client application program), for example, with configuration and/
Or request represents the users of those systems and carrys out configuration processor in a variety of ways in one or more calculate nodes 360, and with
Implement the action of various other types, such as other places discuss in more detail.Can be by each of the function of PESSM modules 340
Kind of information storage in storage device 320, such as on carry out the configuration of configuration processor for representing multiple users, perform and/or
The information 324 that the information 322 of registration, the program executive capability on calculate node group are changed on user (for example, specify pre-
Define the information of trigger;The information for the ability modification instruction specified on the dynamic from user;On computing node performance
The other information whether information of measurement and the trigger on determining to specify are satisfied;Required, the actual and formal note of each group
The currency of the calculate node quantity of record;Deng), and on specific calculation node group specific program executive capability change because
The information 326 of fruit relation attribution is (for example, at least some event and each group calculate nodes occurred by listing is at least some
Change, and particular event and specific change are connected, such as the side to be discussed similar to Fig. 2 B and other places
Formula).
Received in PESSM modules 340 and asking for one or more programs is performed in one group of one or more calculate node 360
After asking (or other instructions), PESSM modules 340 select one or more calculate nodes of the group, and trigger those programs
Execution in those calculate nodes 360.In addition, PESSM modules 340 can be interacted further with calculate node 360, with
Terminate the execution of triggered program in the calculate node afterwards, by one or more of described program be moved to one or
A number of other calculate nodes 360 or computing system 380 etc..Calculate node 360 can have various forms in each embodiment,
Such as many virtual machines to be performed including many physical computing systems and/or on one or more physical computing systems.
In some embodiments, server computing systems 300 and calculate node 360 can be data center or other groups of co-located meter
A part for calculation system, or can be otherwise the calculate node of private network.In addition, in some embodiments, PESSM
Module 340 can interact with one or more of the other computing system 380, to start or terminate one or more programs at those
Execution in computing system, such as with the proviso that used by offer calculate node for other users one of computing system 380
Or multiple third party participants provide.In some embodiments, PESSM modules 340 can manage one kind further or on the contrary
It is polytype calculating related resource or service (in addition to program execution service) (for example, persistence or ephemeral data storage
Service, messenger service, database service etc.) the right to use.
In addition, the embodiment of program execution service ability maintenance manager module 345 just performs in memory 330,
And interacted in this embodiment by network 390 and calculate node 360.Specifically, in the exemplary embodiment party
In case, PESCMM modules 345 include on one or more of monitoring calculation node 360 in other words interact with
Follow the trail of the function of using of those calculate nodes, for example, with determine the currently practical program executive capability of calculate node group and/or
It is determined that the current performance characteristics corresponding with some or all of calculate nodes of calculate node group.As it was previously stated, this type of information can
It is stored on storage device 320 and/or other positions, and can be used in a variety of ways by module 340 and 345.For example, one
In a little embodiments, if module 345 find calculate node failed or perhaps become unavailable (for example, as providing or
Person say be initialize calculate node for use as calculate node group a part during a part, be used as in calculate node
After a part for calculate node group etc.), then module 345 can take action automatically so that unavailable calculate node to be saved with new calculate
Put to replace.In other embodiments, module 345 may can not carry out some or all of monitorings to calculate node on the contrary,
Such as with the proviso that module 345 obtains at another source on the contrary performs energy on the currently practical program of calculate node group
The information of power and/or the current performance characteristics corresponding with some or all of calculate nodes of calculate node group, then optionally
The information is used for the program executive capability for maintaining calculate node group.
It is to be understood that computing system 300,350 and 380 and calculate node 360 are exemplary only, and not purport
Limiting the scope of the present invention.The computing system and/or node can each include multiple interactive computing systems on the contrary or set
It is standby, and the computing system/node may include by one or more networks (such as internet), via WWW or via
Private network (such as mobile communications network etc.) is connected to unshowned miscellaneous equipment.In more general terms, calculate node or other meters
Calculation system may include to interact and perform the hardware of the function of the type or any combinations of software, include but is not limited to
Desktop computer or other computers, database server, network storage equipment and other network equipments, PDA, mobile phone, radio
Words, pager, electronic organizer, internet equipment, television system are (for example, using set top box and/or individual/digitally recorded video
Camera), and the various other consumer goods comprising appropriate communication capacity.In addition, provided by the module 340 and/or 345 illustrated
Function can be allocated in other modules in some embodiments.Similarly, in some embodiments, mould can not may be provided
Some functions of block 340 and/or 345 and/or other additional functions are probably available.
Although it should also be understood that each project be illustrated as when in use storage in memory or on storage device,
These projects or part thereof can be in order to transmit between the memory of storage management and data integrity and other storage devices.Or
Person, in other embodiments, some or all of described software module and/or system can be in the storages in another equipment
Performed in device, and communicate between computer and communicated with the computing system illustrated.In addition, in some embodiments
In, some or all of described system and/or module otherwise can be implemented or provide, these modes such as at least portion
Dividing ground, including but not limited to one or more application specific integrated circuits (ASIC), standard integrate in a manner of firmware and/or hardware
Circuit, controller (for example, by performing appropriate instruction, and including microcontroller and/or embedded controller), scene can
Program gate array (FPGA), CPLD (CPLD) etc..Also can be by the module, system and data structure
Some or all (for example, as software instruction or structural datas) store on a computer-readable medium, such as hard disk, storage
Device, network, or pass through appropriate driver or the portable medium object read via appropriate connector.The system,
Module and data structure can also be used as caused data-signal (for example, as carrier wave or other analog or digital transmitting signals
A part) transmitted on various computer-readable transmission mediums (including wireless and wired/cable dielectric), and can take each
Kind form (for example, as single or multichannel analog signals a parts, or as multiple discrete digital bags or frame).Other
In embodiment, such computer program product can also take other forms.Therefore, the present invention can pass through other computer systems
Configure to implement.
Fig. 4 is the flow chart of the exemplary of program execution service system manager programs 400.Described program can
There is provided in the following manner, such as perform Figure 1A and Figure 1B respective PESSM modules 110 and 180, and/or Fig. 3 PESSM
Module 340, such as to help to manage use of the user to multigroup calculate node, and other types are carried out in some cases
Management operation.In the illustrated embodiment, the management program of program 400 performs each use of service, and the program is held
Row service, which provides, represents the program executive capability that multiple users carry out configuration processor.
In the illustrated embodiment, described program is since at receive information or the picture frame of request 405.Described program continues
To picture frame 410, to determine whether received request or information (such as request from user) are on triggering one or more
Execution of the individual program in one group of calculate node.If it is, described program proceeds to picture frame 415, to obtain on through request
The information that program performs, the initial aequum of the program executive capability of such as calculate node group is (for example, required calculate node number
Amount), the ability modification trigger specified of optionally one or more pending programs and optionally one or more users.
As it is other place institute discuss, in some embodiments, user can be selected from one or more of all kinds of calculate nodes with/
Or can otherwise specify various amounts and/or type required computing resource (for example, processing unit type/amount, amount of ram,
Platform specification etc.).In picture frame 420, described program and then calculate node is selected in the group, and in picture frame 425,
Start to make those selected calculate nodes for users to use, such as one can be triggered by calculate node selected by offer and optionally
Or the execution of multiple pending programs.Described program also refers to the required program executive capability of the selected calculate node in the group
It is set to the initial program executive capability of the offical record of the group.When represent user can be used calculate node when, can be in a variety of ways
The user is known its availability, or in other embodiments, calculate node can be operated in an automatic fashion, without with
The further interaction at family.Described program then continues to picture frame 430, to store the information on calculate node group, including the group
The trigger specified of any user.
It is described if determining not receive the request for the execution for triggering one group of calculate node on the contrary at picture frame 410
Program proceeds to picture frame 440 on the contrary, to determine whether to receive the program executive capability on changing existing calculate node group
Request.If it is, described program proceeds to picture frame 445, to receive and store on changing indicated existing calculate node
The user instruction that the dynamic of the program executive capability of group is specified.In the illustrated embodiment, user instruction can be with occurring current
Other possible program executive capability modification requests during the polymerization period condense together, and carry out Coordinating Activity in next time
(referring for example to picture frame 465-477) is further processed in period, but in other embodiments, can be immediately performed on the contrary to
The modification request that some few such users specify.
If determine not receive asking for the program executive capability of one group of calculate node of modification on the contrary at picture frame 440
Ask, then described program proceeds to picture frame 460 on the contrary, to determine whether currently to be directed to the journey of one or more calculate node groups
Sequence executive capability carries out Coordinating Activity periodically in other words repeatedly, such as is changed in the program executive capability of this calculate node group
At the end of the polymerization period of request.If it is, described program proceeds to picture frame 465, to determine the one of current progress Coordinating Activity
Individual or multiple calculate node groups are (for example, the calculate node group that has terminated of polymerization period and one or more program executive capability are moved
The calculate node group that has been polymerize of state modification), and in picture frame 467, next calculate node group through determination is selected, from the
One beginning.Described program then continues to picture frame 470, to perform the program for carrying out repeatedly Capacity Coordination activity, wherein this journey
Reference picture 5 is more fully described one example of sequence.Described program next continues to picture frame 475, with perform carry out on
The program of the activity (being carried out in picture frame 470) of the causality attribution of program executive capability modification, wherein the one of this program
Reference picture 6 is more fully described example.After picture frame 475, described program proceeds to picture frame 477, to determine whether to locate
The more calculate node group through determination of reason, and if it is, described program is back to picture frame 467, it is next through determining to select
This calculate node group.
If the current program executive capability for not being directed to one or more calculate node groups is determined at picture frame 460 on the contrary
Coordinating Activity periodically in other words repeatedly is carried out, then described program proceeds to picture frame 480 on the contrary, optionally to carry out one
Or the operation of a number of other instructions.This generic operation may include for example one or more of following:It is other types of on carrying out
User's request (if the program execution service provided provides such other programs and performs type) that program performs, such as with
Single program is performed in single calculate node;The program executive capability that the user not being immediately performed specifies, which is changed, asks (for example,
The user instruction for performing indicated specific calculation node is terminated, for example, if the calculate node is not normally functioning);Specify attached
Add trigger or perhaps change user's request of the configuration information of indicated calculate node group;For indicated calculating section
Point group carries out user's request of Coordinating Activity immediately, and such as the supplement or replacement as Coordinating Activity repeatedly are (if for example, only
Coordinating Activity is just carried out when user asks);Obtain the various shapes on the one or more calculate node groups related to user
User's request of state information;The request of correlated activation (such as reservation, registration or payment operation) is managed to user;Deng.
After picture frame 430,445 or 480, or if the additional calculations through determination are determined in picture frame 477 on the contrary
Node group is unavailable, then described program proceeds to picture frame 485, with according to the information or request received in picture frame 405 or with
The information or request that other manner (such as regularly) triggers, any user's charging (or reimbursemen) activity is optionally carried out, such as
To collect and/or collect expense at one or more users according to the program perform function of these users is supplied to.It is described
Program also optionally can optionally carry out regular house-keeping.
After picture frame 485, described program proceeds to picture frame 495, to determine whether to continue, such as until terminating execution
When being explicitly indicated of described program.If it is determined that to continue, then described program is back to picture frame 405, otherwise, proceeds to picture frame
499 and terminate.It is to be understood that other types of activity can be carried out in some embodiments and situation, such as to determine
Whether user is authorized for the specific operation through request, to be obtained immediately at user for the certain form of operation through request
It must pay the bill.In addition, though user's request and other operations are indicated as by specifically in terms of specific in the illustrated embodiment
Operator node group and the mode of specific associated user are carried out, but in other embodiments, this some or all of generic operation are opposite
Ground can be calculated more generally useful for example applied to multiple calculate node groups related to unique user and/or from one or more
Applied at the related multiple users of node group.
Fig. 5 is the flow chart of the exemplary of recursive facility coordinator 500.Described program can be by with lower section
Formula provides, such as performs Figure 1A and Figure 1B respective PESSM modules 110 and 180, and/or Fig. 3 PESSM modules 340, example
Such as the program can be since at the picture frame 470 of the program 400 in Fig. 4.
In the illustrated embodiment, described program starts from picture frame 505, is lived wherein which giving pending Capacity Coordination
The instruction of dynamic currently selected calculate node group.In picture frame 515, described program and then retrieval are on selected calculate node group
The information of the program executive capability of offical record, such as the basis Coordinating Activity that previously the calculate node group for selected by had been carried out (or
If the activity is the first time Coordinating Activity that is carried out, the initial program for the offical record of selected calculate node group performs
Ability), and/or subsequently repaiied according to what the program executive capability that can be recorded by PES ability maintenance manager module registrations formula was carried out
Change (for example, as reference picture 7 is more fully described).Described program then continues to picture frame 520 and 525, selected by determining respectively
The currently practical and current desired program executive capability of calculate node group.Determine that currently practical program executive capability may include for example
Retrieval before this by PES ability maintenance manager modules as calculate node group selected by monitoring a part come the information that stores, but
In other embodiments, described program 500 can be dynamically determined currently practical ability (for example, being tieed up by dynamic requests PES abilities
Shield manager module or other monitoring sources provide the information).
Determine that current desired program executive capability may include for example to retrieve following information in picture frame 525, on association
The corresponding dynamic received for selected calculate node group at associated user during the pre-polymerization period of tune activity is specified
The modification instruction of any ability information (for example, the picture frame 445 such as reference picture 4 before this discusses), and on previously existing
The information for the trigger that any user for the selected calculate node group for being confirmed as being satisfied during the pre-polymerization period specifies.Or
Person, in some embodiments, described program can retrieve the identified performance characteristics information of selected calculate node group on the contrary
(for example, before this by PES ability maintenance manager modules as calculate node group selected by monitoring a part come the information that stores,
Or by asking PES ability maintenance manager modules or other monitoring sources to provide information of the information dynamically to obtain), so as to
The trigger that the current any user for determining whether selected calculate node group specifies is satisfied and/or is working as pre-polymerization before this at present
It has been satisfied during period.After various information are retrieved, current desired program executive capability can be one or more by polymerizeing
Program executive capability through request is changed to determine (such as other places discuss in more detail), to make this any Type of Collective
Ability modification after, it is determined that the required program executive capability of gained.
After picture frame 525, described program proceeds to picture frame 530, to determine the reality that will be made to selected calculate node group
Border changes, to coordinate currently practical, required and offical record the program executive capability of selected calculate node group, such as to incite somebody to action
Current formal capacity adjusting is current desired ability.Described program then continues to picture frame 535, by will by it is modified it is selected in terms of
The current desired program executive capability that operator node group provides is appointed as the current offical record updated of selected calculate node group
Program executive capability, and further trigger picture frame 530 in determine program executive capability modification.After picture frame 535, institute
Program is stated to proceed to picture frame 599 and return.
Fig. 6 is the flow chart for the exemplary that ability changes attribution program 600.Described program can be by with lower section
Formula provides, such as performs Figure 1A and Figure 1B respective PESSM modules 110 and 180, and/or Fig. 3 PESSM modules 340, example
Such as the program can be since at the picture frame 475 of the program 400 in Fig. 4.
In the illustrated embodiment, described program starts from picture frame 605, returns wherein which giving pending ability modification
Because of the instruction of the currently selected calculate node group of activity.In picture frame 625, described program and then identify on from the previous time
The program executive capability change in availability occurred since (Coordinating Activity such as previously carried out for selected calculate node group)
Information.Identify that the change information may include for example to retrieve before this by PES ability maintenance managers module as the selected meter of monitoring
A part for operator node group is come the information that stores, but in other embodiments, described program 600 can be dynamically determined the information
(for example, providing the information by dynamic requests PES ability maintenance manager modules or other monitoring sources).
After picture frame 625, described program proceeds to picture frame 630, can use with determining whether to have occurred any such ability
Property change, otherwise, proceed to picture frame 699.Otherwise, described program proceeds to picture frame 635, with identification on from the previous time
The program executive capability modification request event occurred since (Coordinating Activity such as previously carried out for selected calculate node group)
Information.Identify that the event information may include for example to retrieve to be used as to selected calculate from PES system manager modules before this to save
The part that point group provides function is discussed in more detail referring for example to Fig. 4 and Fig. 5 come the information stored.In picture frame 640, example
As according to event type (such as instead of unavailable calculate node automated system operation, specify make an immediate response accordingly
User instruction received etc.), during described program is it is then determined that directly cause institute's identification events of corresponding change in availability
Any event.
After picture frame 640, described program proceeds to picture frame 645, next available to select to be identified in picture frame 625
Property change, since first.In picture frame 650, described program is it is then determined that whether the change can be directly attributed to picture frame 640
One of individual case of middle determination, if it is, the reason for being selected capability availability change by the logout.Otherwise, it is described
The reason for program changes selected capability availability in picture frame 650 is attributed to undetermined other identified things in picture frame 640
The combination of part.In picture frame 660, described program with the presence or absence of more capability availabilities it is then determined that change, if it is, being back to
Picture frame 645 is to select next this capability availability to change.Otherwise, described program proceeds to picture frame 699 and returned.
Fig. 7 is the flow chart of the exemplary of program execution service ability maintenance manager program 700.The journey
Sequence can provide in the following manner, such as perform the respective PESCMM modules 115 and 160 of Figure 1A and Figure 1B, and/or Fig. 3
PESCMM modules 345, such as to contribute to multigroup calculate node of monitoring user, including determine what can be obtained from calculate node group
Practical programs executive capability.In the illustrated embodiment, described program 700 represents multiple users with reference to offer and carrys out configuration processor
The program execution service of program executive capability operated, but in other embodiments, can otherwise provide program
700 some or all of functions.
In the illustrated embodiment, described program starts from picture frame 705, wherein have been received by start collect on one or
The instruction (such as continuously or perhaps in a repetitive fashion) of the information of the calculate node of multiple calculate node groups, although herein
Be not shown, but in some embodiments, other modules and/or program can dynamic requestor 700 it is specific to produce and provide
Relevant information (such as information on specific associated computing nodes group).In picture frame 705, described program collect one or
The performance characteristics information of multiple such calculate nodes, include the instruction of the calculate node group belonging to those calculate nodes, to be provided with
It is used for the aggregation information for producing the calculate node group afterwards.Described information can produce in a variety of ways, including specific by asking
Calculate node or correlation module (for example, related VM manager components of virtual machine calculate node) provide the information and take this letter to drag
Breath, the information is pushed into program 700 (such as regularly by such calculate node and/or associated components;Certain form of
During event, calculate node can be such as set to close the detected error state become unavailable in other words;Deng), by specific
Calculate node comes monitoring network flow and/or single resource utilization;Deng.
Described program then continues to picture frame 710, to determine that the polymerization of calculate node group selected by one or more is special
Property information and store the identified information for later use, such as all calculate node groups, have collected list just
The calculate node group of only calculate node information, have requested that or recently uncreated polymerization characteristic information calculate node
Calculate node group of each calculate node that group, wherein single calculate node information can be used in calculate node group etc..Should
It is understood that polymerization characteristic information can produce in a variety of ways, including only partial information it ought can be used for the calculate node of the group
When, such as infer and estimate disabled individually performance characteristics information in other words.In addition, the specificity collected and/or polymerize
Energy characteristic information can be different in a variety of ways, such as to collect all calculate node groups all the time in certain embodiments
Certain form of information, it is certain form of to collect with the specified value of institute's determination trigger according to specific calculation node group
Information etc..In addition, although picture frame 705-785 is illustrated as in a continuous manner to implement in this example, it should be understood, however, that
In some embodiments, each picture frame can otherwise be implemented on the contrary.For example, in some embodiments, picture frame 705
Information activity can be carried out on a continuous basis or on the basis of approaching continuously, but in picture frame 710 and/or other picture frames
Aggregation information produce only can periodically carry out.
After picture frame 710, described program proceeds to picture frame 715, to determine and store one or more calculate node groups
In each currently practical program executive capability information, such as to reflect the current quantity of one group of currently available calculate node
And/or one or more other measurements of the program executive capability of calculate node group, and information determined by storing is to be provided with
After use.Although be not shown herein, in some embodiments and situation, described program can also update calculate node group immediately
Corresponding offical record program executive capability, to reflect that currently practical program determined by calculate node group performs energy
Power, and in other embodiments, the program can wait just updates offical record when corresponding next group of Coordinating Activity
Program executive capability.
In picture frame 720, what then described program optionally determined to be satisfied for any calculate node group appoints
Any ability modification trigger of what calculate node group in collected in picture frame 705 and/or picture frame 710 (for example, according to polymerizeing
Performance characteristics information, and/or according to the practical programs executive capability information determined in picture frame 715), but in other embodiments
In, this trigger meets that situation determines to carry out (such as begging in more detail with reference to reference picture 5 on the contrary at the end of the period is polymerize
The corresponding Coordinating Activity of opinion).If any trigger is satisfied through determining, and then storage is on such trigger being satisfied
Information for later use.In some embodiments and situation, certain triggers, which are satisfied, can also trigger correlometer immediately
The program executive capability modification of operator node group, and if so, can then trigger this program executive capability modification activity, and institute
The also recordable causality information for associating the trigger that this is satisfied with described program executive capability modification activity of program is stated,
Such as using (with reference to the program 600 of figure 6) later.
In a similar way, described program determines whether to have triggered any meter of any calculate node group in picture frame 725
Operator node is with available for calculate node group, but the initialization has been failed in other words not within set period (such as 10 minutes)
Complete, if it is, the illustrated embodiment of described program starts to provide the replacement calculate node of any such calculate node immediately,
And described program it is also recordable using the initialization calculate node unavailability as the reason for the replacement activity triggered because
Fruit relation information.In other embodiments, such replacement activity may not be carried out (for example, opposite in direct mode on the contrary
Ground can polymerize together with other requests of modification program executive capability) and/or can be carried out on the contrary by Fig. 4 program 400.Separately
Outside, the part as the replacement activity for triggering such unavailable calculate node, described program can also take action to terminate not
Calculate node (if for example, the node is still in operation but without response) can be used.
In a similar way, described program optionally starts to provide immediately in calculate node group to use before this in picture frame 730
Any calculate node for making a part for calculate node group but being confirmed as having failed at present or perhaps becoming unavailable is replaced
For calculate node, and if so, described program is also recordable using the calculate node unavailability as the replacement triggered
The causality information of the reason for movable.In other embodiments, such replacement activity on the contrary may not be in direct mode
Carrying out (for example, can polymerize on the contrary together with other requests of modification program executive capability) and/or can be by Fig. 4 program
400 are carried out, and/or can carry out automatically triggering the other types changed immediately of the program executive capability of specific calculation node group
Automatically determine.In addition, the part as the replacement activity for triggering unavailable calculate node, described program can also take action
To terminate the unavailable calculate node (if for example, the node is still in operation but without response).In addition, such as other places in more detail
Ground discussion, when determining whether to carry out replacement activity immediately with reference to picture frame 725 and/or 730, described program can be in some implementations
Consider other factorses in scheme, such as by or collected the charges to associated user period, until plan progress can influence to replace
Plenty of time before the advisability Coordinating Activity next time of generation activity progress etc..
After picture frame 730, described program proceeds to picture frame 785, optionally to carry out any house-keeping, including regarding feelings
Condition updates storage information.After picture frame 785, described program proceeds to picture frame 795, to determine whether to continue, such as until
Receive when being explicitly indicated of termination.If it is determined that to continue, then described program is back to picture frame 705, otherwise, proceeds to picture frame
799 and terminate.Although the various activities with reference to described in program 700 be illustrated as in this embodiment by with configuration processor
The different module of 400 module is carried out, but in other embodiments, some or all of functions of the two programs can be by single
Module is performed or otherwise combined.
It is to be understood that in some embodiments, the function that is provided by said procedure can be provided with alternative, all
As distributed between more multiprogram or being incorporated in less program.Similarly, in some embodiments, such as when other figures
The program shown lacks or during including such function respectively on the contrary, or when changing provided function quantity, it is illustrated that journey
Sequence can be provided with the function phase than more or less functions.In addition, though various operations can be illustrated as with specific side
Formula (such as serial or parallel) and/or carry out in a particular order, but those skilled in the art will realize in other implementations
In scheme, these operations in other sequences and can be carried out otherwise.Those skilled in the art will additionally appreciate, above-mentioned number
According to structure can structuring in a different manner, such as by making individual data structure be divided into multiple data structures or more by making
Individual data structure merges into individual data structure.Such as the data structure when other diagrams similarly, in some embodiments,
Lack respectively on the contrary or during including this type of information, or when changing stored information content or type, it is illustrated that data
Structure can store more or less information compared with described information.
1st article:It is supplied to the program of user to perform with determination in a kind of configuration computing system for program execution service
The method of the causal law of the dynamic modification of ability, methods described include:
Under the control that the configuration computing system of service is performed in described program, described program performs service offer can quilt
The multiple calculate nodes for configuring to perform the program of multiple long-distance users to exchange to user's fee charged for, and be directed to
It is each in multiple users,
From receive information at following user, the user specifies the calculate node of the instruction program for performing the user
Initial requirement and specify the automatic modification for then triggering the quantity of calculate node to being used for the user
Multiple quantity modification trigger, each in quantity modification trigger include being used to determine the quantity modification triggering
The one or more standards whether device is satisfied, and if quantity modification trigger is satisfied, then include waiting to ask
The calculate node number change specified asked;
One group of the multiple calculates that the instruction program for performing the user is automatically determined to the user is saved
Multiple in point, the multiple calculate node has initial required calculate node quantity, and described more in very first time offer
Individual calculate node uses for the user;
In response to the instruction from the user, trigger the duplicate of the instruction program every in described group of calculate node
Execution on individual;And
During a period of time from the very first time to the second subsequent time, manage automatically in the following manner
Described group of calculate node:
During the period, described group of calculate node is monitored automatically with the operation by those calculate nodes come certainty
It can measure, and trigger is changed to automatically determine the quantity specified by the user according to the performance metric of the determination
In at least one be satisfied;
During the period, the dynamic for the number change for each indicating described group of calculate node is received at the user
Specify one or more number changes instruction of request;
Actual calculate node quantity is automatically determined in second time, the quantity reflects real in second time
It can be used to perform the quantity of described group of calculate node of the program of the user on border, based in part on during the period
Described group of calculate node multiple change in availability, second time determine actual calculate node quantity be different from institute
State the initial requirement of the calculate node at the very first time, at least some in the multiple change in availability have to described
One or more correlative charges that user collects;
For the multiple change in availability it is at least one in it is each for, by the single original of the change in availability
Because of automatic attribution, the single reason changes one of trigger or from institute at least one quantity through determining to be satisfied
State one of one or more of number changes instruction of user;
For each at least in another in the multiple change in availability of the not automatic attribution of single reason,
Described at least another change in availability is different from least one change in availability, and the combination of a variety of possible causes is automatic
Be attributed to the change in availability, a variety of possible causes are independent of one another, and including through determine be satisfied described at least
One quantity is changed one or more of trigger and referred to including one or more of number changes from the user
It is at least one in order;And
There is provided the single reason of each institute's attribution at least one change in availability instruction and it is described at least
Each institute's attribution in another change in availability multiple reasons combination instruction, so as to by it is described it is at least some can
The correlative charges changed with property is attributed to the user.
2nd article:According to the method described in the 1st article, wherein for one of the multiple user, based in part on described
The increase through request of the quantity of the described group of calculate node of one user, in the actual calculate node that second time determines
Quantity is more than the initial required calculate node quantity at the very first time, and the increase through request is according to through determining to be satisfied
At least one quantity modification trigger one or more in it is each and from the one of one user
Or it is at least one in multiple number change instructions, wherein automatically determining the reality at second time of one user
Calculate node quantity include by polymerize one or more of quantity for being satisfied change triggers increase through request and
The increase through request of at least one number change instruction from one user determines to wait to make to increase
The single polymerization modification of described group of the calculate node quantity of a user is stated, wherein increase described group of one user
The single polymerization of the determination of calculate node quantity is revised as described group of one user described, and at least another can
One in being changed with property, wherein one or more of quantity being satisfied change trigger and from one user's
At least one number change instruction is not attributed to described group of at least one availability of one user
Any one single reason in change, and described at least another availability of described group of wherein one user becomes
The combination of each a variety of possible causes in change includes being directed to the calculating section of one user during the period
The institute of single reason that is that the change in availability of point group determines and not being attributed to one of at least one change in availability
It is possible to reason.
3rd article:According to the method described in the 2nd article, it is that network access service causes described that wherein described program, which performs service,
The instruction from client computing device each is provided by one or more networks in long-distance user, wherein with described
At least some change in availability of described group of one user of correlative charges include the described of one user
Group calculate node quantity one or many increases, and wherein one user be the very first time offer by institute
State the multiple calculate node that a user uses and pay the first expense and for described group as one user
One or many increased parts of quantity paid each additional calculations node for providing it is one or many different
Second expense.
4th article:A kind of computer of the causal law for the dynamic modification for being used to determine to be supplied to the program executive capability of user
Implementation method, methods described include:
In the control for the one or more computing systems for being configured to provide the program execution service used by multiple users
Under, described program performs multiple meters of program of the service with the user that can be configured to carry out described program execution service
Operator node,
Receive and perform the first user serviced for representing described program to perform the initial of one or more software programs
The instruction of required program executive capability;
It is determined that multiple energy of the automatic modification for then triggering the program executive capability to being supplied to first user
Power changes trigger, each in ability modification trigger include being used for determining the ability modification trigger whether by
One or more standards of satisfaction, and if ability modification trigger is satisfied, then include to be asked specify
The program executive capability modification of type;
Automatically determine more described in first group of the initial required program executive capability for providing first user
It is multiple in individual calculate node, and make described first group of calculate node can be used to each perform described first in the very first time
One or more software programs of user;
During a period of time of automatic identification generation between the very first time and the second subsequent time and each
Multiple independent events of the modification of the described program executive capability of multiple calculate nodes offer to described first group can be provided,
The multiple event includes at least one in the ability modification trigger specified through determining to be satisfied;
The reality that first user can obtain from first group of calculate node is automatically determined in second time
Program executive capability, based in part on the institute during the period occurred between the very first time and second time
One or more change in availability of first group of one or more calculate nodes are stated, the practical programs at second time are held
Row ability is different from the required program executive capability that first user is supplied in the very first time;
, will for each in the change in availability of described first group of one or more of calculate nodes
The reason for one or more of institute's identification events are attributed to the change in availability automatically, in the change in availability at least
One has reason, and the reason is repaiied for independent of one another and at least one ability specified including being satisfied through determination
Change the combination of multiple events of one or more of trigger;And
The instruction for the reason for each attribution in one or more change in availability is provided, so as to enter
The further action of the row one or more corresponding with the reason for the attribution.
5th article:According to the method described in the 4th article, wherein the multiple event also includes dynamically being referred to by first user
It is fixed to be instructed with asking at least one ability to the specified modification of the described program executive capability of first group of offer to be changed, and
And the combination of the multiple events for the reason for being wherein attributed to one of described at least one change in availability includes described at least one
One or more of individual ability modification instruction specified.
6th article:According to the method described in the 4th article, wherein in the change in availability at least another have be described
The reason for institute's attribution of individual event in multiple events, described at least another change in availability are different from described at least one
Change in availability.
7th article:According to the method described in the 6th article, in addition to:Automatically determine the individual event for it is described at least another
The certain type of reason of institute of change in availability, the certain type of reason of the institute is immediate cause or remote cause, and is carried
For instruction of the individual event at least certain type of reason of another change in availability.
8th article:According to the method described in the 4th article, wherein automatically determining the practical programs executive capability includes determining
The multiple change in availability occurred, and wherein one or more of events are attributed in the change in availability automatically
The reason for each, is respectively the one or more the multiple of the single reason of one of the multiple change in availability including identification
Event, and by be not one of the multiple change in availability single reason all the multiple event aggregations be without
A part for the multiple change in availability combination with one another of single reason.
9th article:According to the method described in the 4th article, wherein for one of described at least one change in availability, by institute
Stating includes the combination for determining the multiple event the reason for the combinations of multiple events is attributed to one change in availability automatically
It is for immediate cause or indirectly former for the certain type of reason of one change in availability, the certain type of reason of institute
Cause, and instruction the reason for wherein provide each attribution in one or more of change in availability includes
The instruction of described the certain type of reason for being combined as one change in availability of the multiple event is provided.
10th article:According to the method described in the 4th article, wherein the multiple independent event each asks to carry described first group
The modification of the described program executive capability of confession, and wherein methods described also includes:Please by the warp for polymerizeing the multiple event
The single polymerization modification changed and trigger the determination to described first group before second time asked comes automatically
It is determined that the single that the program executive capability to described first group is made polymerize modification.
Sub_clause 11:According to the method described in the 10th article, wherein the multiple event is also included by first user dynamic
Specify to ask at least one ability to the specified modification of the described program executive capability of first group of offer to change instruction,
Multiple abilities modification trigger of wherein described determination is specified by first user before the very first time, and wherein
The combination of the multiple events for the reason for being attributed to one of described at least one change in availability includes described at least one specified
Ability modification instruction one or more of.
12nd article:Method according to Sub_clause 11, wherein the single polymerization of the determination is revised as one can use
Property change, abilities modification instruction that its is one or more of to specify, which is included in, to be attributed in the combination of the reason.
13rd article:According to the method described in the 10th article, wherein described first group of program executive capability is according to for described
The quantity of the calculate node of the part of one group measures so that it is described it is initial needed for program executive capability for calculate node just
Beginning requirement, and the practical programs executive capability for determine in second time is that can be used as in second time
The actual quantity of the calculate node of the part of described first group, wherein described first group of one or more of calculate nodes
One or more of change in availability each include being that the one or more of unavailable part in described first group calculate section
It is at least one and wherein right in the new calculate node of at least one and added to described first group one or more in point
The single polymerization of described first group of the determination is revised as the identified change of the quantity of first group of calculate node.
14th article:According to the method described in the 13rd article, wherein the single polymerization modification of the determination will pass through specified quantity
One or more calculate nodes increase the quantity of first group of calculate node, wherein the single polymerization modification of the determination
One in one or more of change in availability of the instruction of the reason for be provided with the attribution, and wherein institute
Stating method also includes carrying out one or more further based in part on the identified single polymerization modification of the initiation
Action, the action include starting to collect one or more expenses to first user.
15th article:According to the method described in the 4th article, wherein described the one of the instruction for the reason for being provided with the attribution
One in individual or multiple change in availability was included described at least one of the reason for as one change in availability
At least first in multiple events, and wherein cause one availability to become in response at least one in the event
Change and become with least one request caused by first event in the change in availability to provide one availability
The instruction of the reason for attribution changed.
16th article:According to the method described in the 15th, wherein receiving the request at user, and described one is wherein provided
The instruction of the reason for attribution of individual change in availability includes the attribution for producing one change in availability
The people of reason is readable to explain and provides the readable explanation of the caused people to be shown to the user.
17th article:According to the method described in the 4th article, in addition to:For occur one after second time or
For each in multiple additional times, the additional institute's identification events of one or more are attributed to generation in the additional hours automatically
The reason for change in availability during section, and wherein, for as occur in one or more of additional times one
It is described for additional institute's identification events of the reason for one in the change in availability during individual period change
One additional institute's identification events is that can be used described in during the period between the very first time and second time occurs
Property change in one change result.
18th article:According to the method described in the 4th article, wherein enabling first group of calculate node to be used in the very first time
Include automatically providing first group of calculate node each to perform one or more of software programs of first user
In it is each and each in first group of calculate node in one or more of software programs including triggering automatically
It is each on execution.
19th article:According to the method described in the 4th article, it is the receipts away from first user that wherein described program, which performs service,
Expense property network access service, wherein described program perform at least one of both below service offer:For remote computation system
The one or more interacted in system with programmatically performing service with described program by one or more networks is applied
Program Interfaces (API) and long-distance user by one or more of networks come the graphic user interface that uses, and its
Described in the first user based in part on one or more change in availability the attribution the reason for pay one
Item or multinomial expense.
20th article:According to the method described in the 4th article, wherein described program execution service is caused described using virtualization technology
Multiple calculate nodes include being provided by the physical computing systems respective for each in multiple physical computing systems
Multiple virtual machines of at least one program are able to carry out, wherein first group of calculate node is loading virtual machine, and wherein
One or more of programs of first user are a part for virtual machine image.
21st article:A kind of computer-readable medium, its content configure computing system to determine by implementing a kind of method
The causal law for being supplied to the dynamic of the program executive capability of user to change, methods described include:
Under the control of the configuration computing system, the first group multiple meters related to the first user are received in the very first time
The instruction of operator node, it is used to represent first user to perform the execution of the initial program of one or more software programs to provide
Ability;
Automatic identification occurs between the very first time and the second subsequent time and each with described first group
Program executive capability correlation needed for modification multiple independent events;
The reality that first user can obtain from first group of calculate node is automatically determined in second time
Program executive capability, become based in part on one or more availabilities of described first group of one or more calculate nodes
Change, the initial program that the practical programs executive capability at second time is different from providing in the very first time performs energy
Power;
One or more reasons are attributed to automatically each in the change in availability of described first group of the determination, returned
Because at least one one or more of reasons in the change in availability are by multiple independent events identified
Combination;And
One or more reasons of institute's attribution one or more at least one change in availability are provided
Instruction.
22nd article:According to the computer-readable medium described in the 21st article, wherein the configuration computing system is multiple to provide
A part for the program execution service of calculate node, the multiple calculate node can be configured to carry out described program and perform service
User program, wherein described first group of multiple calculate nodes be the multiple calculate node subset, wherein receiving institute
State before first group of instruction is included in the very first time reception initial program executive capability from first user at
Request, and in the very first time by first group of calculate node and the first user auto-associating for by institute
State initial program executive capability and be supplied to first user, wherein first user also indicates before the very first time
One or more ability modifications are triggered for then triggering the automatic modification to described first group of program executive capability, and
Wherein the multiple independent event include through determine be satisfied the ability modification trigger in it is at least one and including by
At least one ability modification instruction that the first user dynamic is specified.
23rd article:According to the computer-readable medium described in the 22nd article, wherein each the multiple independent event is described
Program executive capability it is described needed for be revised as the modification through request, wherein methods described also includes by polymerizeing at least one quilt
The modification through request and at least one ability modification from first user of the ability modification trigger of satisfaction refer to
The modification through request of order polymerize modification to automatically determine to wait to make to improve the single of described first group of program executive capability,
And the single of the determination is triggered to polymerize modification before second time, wherein the single polymerization of the determination is revised as
One of described at least one change in availability, and be wherein attributed to the determination single polymerization modification it is one or
The combination of the multiple independent event of multiple reasons includes at least one ability modification trigger being satisfied and come from
At least one ability modification instruction of first user.
24th article:According to the computer-readable medium described in the 21st article, wherein the computer-readable medium is following two
At least one of person:Store the memory of the computing system of the content and including the caused storage comprising the content
The data transmission media of data-signal, and wherein described content is that the computing system can be made to implement methods described upon execution
Instruction.
25th article:A kind of calculating system of the causal law of the dynamic modification of the program executive capability for being configured to determine user
System, including:
One or more processors;With
System manager module, at least one execution in by one or more of processors, for described more
Each in individual user, it is configured to manage the program of multiple users of network access service in the following manner and performs energy
Power:
Determine it is to be supplied be used for represent the user to perform the initial program executive capability of one or more software programs,
And determine the one or more of the automatic modification for then triggering the described program executive capability to being provided to the user
Ability changes trigger;
In the very first time by one group of multiple available calculate node and user's auto-associating, for by the initial institute
Program executive capability is needed to be supplied to the user;And
After the very first time, automatic identification occur between the very first time and the second subsequent time and
Multiple independent events each with modification needed for the correlation of described group of described program executive capability, the multiple event include
It is at least one in ability modification trigger through determining to be satisfied;
One or more change in availability of described group of one or more calculate nodes are automatically determined, the availability becomes
Changing influences by the described group of described program provided executive capability;
One or more reasons are attributed to automatically each in the change in availability of described group of the determination, be attributed to
The group of at least one one or more of reasons in the change in availability by multiple independent events identified
Close, and be attributed at least another one or more of reasons in the change in availability by it is described identify it is only
Individual event in vertical event;And provide the institute of one or more of described group of the change in availability of the determination
The instruction of one or more reasons of attribution.
26th article:According to the computing system described in the 25th article, wherein the multiple independent thing of one of the multiple user
Part also includes changing instruction by least one ability that one user dynamic is specified, wherein the system manager module is also
It is configured to change the required modification of trigger and by one user by polymerizeing at least one ability being satisfied
The required modification at least one ability modification instruction specified is waited to make to improve one user's to automatically determine
The single polymerization modification of described group of described program executive capability, and trigger before second time to one use
The single polymerization modification of described group of the determination at family, wherein the single polymerization of the determination is revised as one user's
One of described at least one change in availability, and be wherein attributed to the determination single polymerization modification it is one or
The combination of the multiple independent event of multiple reasons includes at least one ability modification trigger being satisfied and by institute
State at least one ability modification instruction that a user specifies.
27th article:According to the computing system described in the 26th article, wherein the ability modification of the determination of one user
Trigger is specified by one user, wherein the network access service performs clothes to provide the program of multiple calculate nodes
Business, the multiple calculate node can be configured to carry out the program that described program performs the long-distance user of service, and wherein institute
State the son that at least one described group each of the multiple calculate node in multiple users is the multiple calculate node
Collection.
28th article:According to the computing system described in the 25th article, wherein the system administration manager component is included by the calculating
The software instruction that system performs.
29th article:According to the computing system described in the 25th article, wherein for each in the multiple user, the system
Manager component is by managing the program executive capability of multiple users of the network access service in the following manner
Device forms:
Determine it is to be supplied be used for represent the user to perform the initial program executive capability of one or more software programs,
And determine the one or more of the automatic modification for then triggering the described program executive capability to being provided to the user
Ability changes trigger;
In the very first time by one group of multiple available calculate node and user's auto-associating, for by the initial institute
Program executive capability is needed to be supplied to the user;And
After the very first time, automatic identification occur between the very first time and the second subsequent time and
Multiple independent events each with modification needed for the correlation of described group of described program executive capability, the multiple event include
It is at least one in ability modification trigger through determining to be satisfied;
One or more change in availability of described group of one or more calculate nodes are automatically determined, the availability becomes
Changing influences by the described group of described program provided executive capability;
One or more reasons are attributed to automatically each in the change in availability of described group of the determination, be attributed to
The group of at least one one or more of reasons in the change in availability by multiple independent events identified
Close, and be attributed at least another one or more of reasons in the change in availability by it is described identify it is only
Individual event in vertical event;And provide the institute of one or more of described group of the change in availability of the determination
The instruction of one or more reasons of attribution.
30th article:In a kind of configuration computing system for program execution service energy is performed dynamically to change the program of user
The method of power, methods described include:
Under the control that the configuration computing system of service is performed in described program, described program performs service offer can quilt
Configure to perform multiple calculate nodes of the program of multiple long-distance users, and for each in multiple users,
From receive information at following user, the user specifies the calculate node of the instruction program for performing the user
Initial requirement and specify one or more for then triggering automatic modification to the required calculate node quantity
Individual quantity changes trigger, and the quantity is changed each including being used to determine that the quantity modification trigger is in trigger
The no one or more standards being satisfied, and if quantity modification trigger is satisfied, then include the meter specified
Operator node number change;
Automatically determine it is multiple in one group of the multiple calculate node of the instruction program for performing the user,
Described group of the multiple calculate node has the initial required calculate node quantity, and described more in very first time offer
Individual calculate node uses for the user;
Instructed in response to the one or more from the user, trigger the duplicate of the instruction program in described group of calculating
Execution on each in node, and by it is described it is initial needed for calculate node quantity be appointed as being registered as the user in institute
State formal calculate node quantity workable for the very first time;And
During a period of time from the very first time to the second subsequent time, manage automatically in the following manner
Described group of calculate node:
During the period, described group of calculate node is monitored automatically with the operation by the calculate node come certainty
Energy characteristic, and change trigger according to the performance characteristics of the determination to automatically determine the quantity specified by the user
In at least one be satisfied;
During the period, the user's instruction for the described group of calculate node that instruction is specified by user dynamic is received
At least one instruction of calculate node number change;
Modified required calculate node quantity is automatically determined in second time, based in part on from described
What the calculate node number change specified of at least one quantity modification trigger being satisfied and the user indicated
Calculate node number change, the modified required calculate node quantity are included from the very first time to the required calculating
The change of number of nodes;
Actual calculate node quantity is automatically determined in second time, the quantity reflects real in second time
It can be used to perform the quantity of described group of calculate node of the program of the user on border;
In second time, by the formal calculate node quantity of the user and the modified required meter
Operator node quantity automatic synchronization, it is described to coordinate to include being used as described in the part of described group by taking action to automatic modification
The quantity of calculate node, the actual calculate node quantity of the determination is changed into the modified required calculate node number
Amount;And
The modified quantity of described group of calculate node is provided so that the user uses, and will be described modified
Required calculate node quantity be appointed as user calculate node quantity formal workable for second time.
31st article:According to the method described in the 30th article, wherein for one of the multiple user, based in part on
From the very first time to the described group of calculating of the one user become unavailable during the period of second time
One or more of node, it is less than in the actual calculate node quantity that second time determines at the very first time just
The calculate node quantity of formula, wherein monitoring the described group of calculate node of one user automatically during the period is included instead
The current actual calculate node quantity of one user is determined again, and updates the formal meter of one user
Operator node quantity is so that the formal calculate node quantity and the current actual calculate node quantity of the determination of the renewal
Unanimously, wherein at least one quantity modification trigger being satisfied of one user is following trigger, it is specified
Increase the described group of calculate node of one user with the quantity according to one or more of unavailable calculate nodes, with
Just the formal calculate node quantity at second time is maintained at the calculate node specified by one user just
Beginning requirement, wherein the number change that the user specified by one user dynamic indicates includes at least one calculating
The decrement of the instruction of the initial requirement of calculate node of node, wherein automatically determining one use in second time
The modified required calculate node quantity at family is included with one or more of unavailable calculate nodes come at least partly
Offset the decrement of the instruction, and the calculating section that wherein one user is formal workable for second time in ground
Point quantity is to be subtracted as the initial requirement of the calculate node that one user specifies as described in specifying one user
The decrement of instruction.
32nd article:According to the method described in the 31st article, it is charge network access service that wherein described program, which performs service,
So that the multiple user is respectively the multiple calculate node payment for providing in the very first time and being used by the user
First expense, and it is respectively the modified of the described group of calculate node used in second time offer by the user
Quantity pays the second different expenses, and first and second expense is each based at least partially on the described group of meter of the user
The current quantity of operator node.
33rd article:A kind of computer implemented method for being used to dynamically change the program executive capability of user, methods described bag
Include:
In the control for the one or more computing systems for being configured to provide the program execution service used by multiple users
Under, described program performs multiple meters of program of the service with the user that can be configured to carry out described program execution service
Operator node,
Receive to specify and perform the first user serviced for representing described program to perform one or more software programs
Program executive capability needed for initial and specify one for then triggering the automatic modification to the required program executive capability
The information of individual or multiple ability modification triggers, the ability are changed each including being used to determine the ability in trigger
The one or more standards whether modification trigger is satisfied, and if ability modification trigger is satisfied, then
Include the modification of the specified type to be asked to required program executive capability;
Automatically determine more described in first group of the initial required program executive capability for providing first user
It is multiple in individual calculate node, make first group of calculate node can be used to each perform first user's in the very first time
One or more software programs, and by it is described it is initial needed for program executive capability be appointed as being registered as first user existing
Formal proceedings executive capability workable for the very first time.
After the very first time, it is one or more of on performing to determine to monitor first group of calculate node
The currency of the performance characteristics of one or more types of those calculate nodes of software program, the monitoring are included in described the
The second subsequent time after one time determines the reality that first user can obtain from first group of calculate node
Program executive capability;
Automatically determine with according to more during a period of time occurred between the very first time and second time
Individual event come change first user it is described needed for program executive capability, the multiple event is based in part on described
The currency of the determination of one or more performance characteristics types, which includes the ability specified through determining to be satisfied, to be changed
It is at least one in trigger, and at least one ability including being specified by first user dynamic changes instruction, it is described
Each instruction at least one ability modification trigger specified and at least one ability modification instruction is to described required
The specified modification of program executive capability;And
Determined by the formal proceedings executive capability of the available record of first user and in second time
Practical programs executive capability and the modified required program executive capability automatic synchronization, coordinate the formal proceedings of the record
Executive capability include according to the practical programs executive capability of the determination and it is described it is modified needed for program executive capability come from
Calculate node of the dynamic modification as the part of described first group so that the modified calculate node can be used for described in offer
Program executive capability needed for modified, and cause the formal proceedings executive capability of the record to be updated to reflect that described carry
The modified required program executive capability supplied.
34th article:According to the method described in the 33rd article, wherein described first group of program executive capability is according to as described
The quantity of the calculate node of the part of first group measures so that it is described it is initial needed for program executive capability be calculate node
Initial requirement, it is that can be used as in second time described the in the practical programs executive capability that second time determines
The actual quantity of the calculate node of the part of one group, change automatically determining including by described in for the required program executive capability
Program executive capability needed for modified is defined as the modified requirement of first group of calculate node, and repaiies automatically
Transform into includes as the reality of the calculate node of the part of described first group for the calculate node of the part of described first group
Border quantity changes into the modified requirement.
35th article:According to the method described in the 34th article, wherein at least one ability for specifying is changed trigger and
In at least one ability modification instruction it is each it is described needed for the specified modification of program executive capability reflect described the
The number change of the instruction of the requirement of one group of calculate node, and wherein determine described first group of the modified institute
Program executive capability is needed to include polymerizeing at least one ability modification trigger specified and at least one ability modification
The number change of the instruction of instruction, and according to the polymerization number change come change calculate node it is initial needed for it is several
Amount.
36th article:According to the method described in the 34th article, first group of meter that wherein currency is determined by the monitoring
The performance characteristics of one or more types of operator node include the calculate node that can be used as the part of described first group
Actual quantity, wherein the monitoring is including each in multiple times during the period between first and second time
Time determines the currently practical quantity of calculate node, and the formal proceedings executive capability for wherein coordinating the record also includes inciting somebody to action
The modified requirement of first group of calculate node is appointed as first user can make in second time
Current formal proceedings executive capability.
37th article:According to the method described in the 33rd article, wherein described first group of program executive capability is according to can be from conduct
Each in the polytype computing resource obtained in the calculate node of the part of described first group measures, and its
In automatic modification include as the calculate node of the part of described first group in change polytype computing resource extremely
A kind of few total amount, the computing resource can be from one as described first group after the automatic modification of the calculate node
Obtained in the calculate node divided.
38th article:According to the method described in the 33rd article, wherein at least one ability modification trigger specified
Each one or more of one or more standards based at least one of one or more performance characteristics types gives
Value, and wherein methods described is also included based in part on every at least one ability modification trigger specified
Match condition between the currency of the determination of individual one or more set-points and one or more performance characteristics types
It is satisfied to automatically determine at least one ability modification trigger specified.
39th article:According to the method described in the 38th article, wherein at least one performance characteristics type corresponds to described the
Calculated load in one group of calculate node, wherein the determination that at least one ability modification trigger specified is satisfied is based on
Calculated load in the state that is temporarily increased in first group of calculate node, wherein automatic change one as described first group
Partial calculate node include being temporarily increased the practical programs executive capability that can be obtained from first group of calculate node so as to
The calculated load of state is temporarily increased described in receiving, and wherein methods described is additionally included in the practical programs executive capability
The 3rd subsequent time after being temporarily increased is automatically determined to reduce the reality being temporarily increased of first group of calculate node
Program executive capability, so as to reflect the end for being temporarily increased state of the calculated load.
40th article:According to the method described in the 38th article, wherein at least one performance characteristics type includes can be used as institute
The actual quantity of the calculate node of the part of first group is stated, wherein at least one ability modification trigger specified is expired
Actual quantity of the determination based on first group of calculate node of foot, it is required that the actual quantity has deviateed specifying for calculate node
Amount, and wherein automatic modification has included first group of calculate node as the calculate node of the part of described first group
The actual quantity of deviation is back to the specified aequum of calculate node.
41st article:According to the method described in the 38th article, wherein one of described at least one ability modification trigger specified
One or more standards be based on it is one or more of following:The threshold value of the currency of the determination of instruction performance attribute type,
Indicate the current of the measurement that changes over time of currency of the determination of performance attribute type and the determination of multiple performance attribute type
The logical combination of value.
42nd article:According to the method described in the 33rd article, wherein the multiple event also includes wherein one or more standards
One of the ability specified modification trigger being triggered based on one or more specified times, and wherein methods described is also wrapped
Include based in part on the current time for meeting one or more of specified times to automatically determine one specify
Ability modification trigger is satisfied.
43rd article:According to the method described in the 33rd article, wherein the multiple event also includes wherein one or more standards
One of the ability specified modification trigger being triggered based on the one or more patterns determined by historical data, and wherein
Methods described also include based in part on at least one corresponding one kind or more in one or more patterns
The currency of the determination of kind performance characteristics type is satisfied to automatically determine one ability modification trigger specified.
44th article:According to the method described in the 33rd article, wherein the multiple event also includes wherein one or more standards
One based on the workload that will be completed by the one or more of software programs performed in first group of calculate node
Or one of the ability specified modification trigger being triggered of multiple instructions, and wherein methods described is also included at least in part
According to being obtained on the information of real work amount that will be completed by one or more of software programs to automatically determine
The ability specified a modification trigger is stated to be satisfied.
45th article:According to the method described in the 33rd article, wherein determining described first group of the modified required program
Executive capability includes the modification of instruction of the polymerization to the required program executive capability, and the modification is by described at least one specified
Ability modification trigger and at least one ability modification instruction in it is each specify, and according to the required program
The instruction of the polymerization of executive capability is changed to specify the modified required program executive capability of the determination.
46th article:According to the method described in the 45th article, wherein polymerizeing the instruction modification to the required program executive capability
Including at least one of the following:Accumulate the instruction modification, offset with least another modification in the instruction modification
It is described instruction modification in it is at least one, according to one or more selection standards selection it is described instruction modification in one and adopt
One or more of modification related one or more priority are indicated with to described.
47th article:According to the method described in the 33rd article, wherein being specified by first user dynamic and being included in described
The single ability that at least one ability modification instruction in multiple events includes being specified by first user changes instruction, wherein
The ability modification instruction specified by first user changes trigger prior to the ability specified through determining to be satisfied, and
Wherein determine that described first group of the modified required program executive capability includes selection and referred to by the single ability modification
The instruction modification to the required program executive capability specified is made for replacing at least one ability specified to change
The instruction modification of trigger.
48th article:Multiple diverse geographic locations are received according to the method described in the 33rd article, in addition to first user
Illustrate, according to one or more of described first group of calculate node positioned at the geographical position, the geographical position is each
The instruction subset of the program executive capability of first group of calculate node need to be included, and wherein automatic modification is used as described first
The calculate node of a part for group is carried out always according to the explanation of the reception so that the modified calculate node is changed
To include instruction of the program executive capability of first group of calculate node of each opening position in the multiple geographical position
Collection.
49th article:According to the method described in the 33rd article, wherein calculating of the automatic modification as the part of described first group
Node is included with one or more of the other calculate node come one or more of instead of described first group of calculate node, and described one
Individual or a number of other calculate nodes each have the available programs of the amount different from the calculate node of one or more of replacements
Executive capability.
50th article:According to the method described in the 33rd article, wherein making first group of calculate node can in the very first time
Include automatically providing first group of calculating section each to perform one or more of software programs of first user
It is each in point and each in first group of calculate node in one or more of software programs including triggering automatically
In it is each on execution.
51st article:According to the method described in the 33rd article, it is away from first user that wherein described program, which performs service,
Charge network access service, wherein described program perform at least one of both below service offer:For remote computation
The one or more interacted in system with programmatically performing service with described program by one or more networks should
With Program Interfaces (API) and long-distance user by one or more of networks come the graphic user interface that uses, and
A part wherein as the automatic synchronization, first user are meter of the automatic modification as the part of described first group
Operator node pays one or more expenses.
52nd article:According to the method described in the 33rd article, wherein described program performs to service causes institute using virtualization technology
State multiple calculate nodes include being provided by the physical computing systems for each in multiple physical computing systems it is each
From the multiple virtual machines for being able to carry out at least one program, wherein first group of calculate node is loading virtual machine, and its
Described in the first user one or more of programs be virtual machine image a part.
53rd article:A kind of computer-readable medium, its content configure computing system with dynamic by implementing a kind of method
The program executive capability of user is changed, methods described includes:
Under the control of the configuration computing system, the first group multiple meters related to the first user are received in the very first time
The instruction of operator node, it is used to represent first user to perform the execution of the required program of one or more software programs to provide
Ability;
The second subsequent time after the very first time automatically determines first user can be from described first group
The practical programs executive capability obtained in calculate node, based in part on one in described first group of multiple calculate nodes
Individual or multiple one or more change in availability, practical programs executive capability at second time are different from described the
One time was supplied to the required program executive capability of first user;
According to it is respective occur after the very first time and each specify it is described needed for program executive capability instruction
Multiple independent events of modification, the modified required program for being supplied to first user is automatically determined in second time
Executive capability, program executive capability needed for modified at second time to the multiple independent event based on specifying
Instruction modification polymerize and different from the very first time provide instruction required program executive capability;And
In second time calculate node of the modification as the part of described first group automatically, so as to by described second
Modified required program executive capability and the practical programs executive capability of the determination at second time at time are coordinated,
The modified calculate node is used to the modified required program executive capability being supplied to first user.
54th article:According to the computer-readable medium described in the 53rd article, wherein the configuration computing system is multiple to provide
A part for the program execution service of calculate node, the multiple calculate node can be configured to carry out described program and perform service
User program, wherein described first group of multiple calculate nodes be the multiple calculate node subset, and in response to
The request of the required program executive capability received before the very first time at first user, passes through the journey
Sequence execution service is automatically related in the very first time and first user, wherein first user also indicates to be used for then
Trigger one or more abilities modification trigger of the automatic modification to the required program executive capability, and it is wherein described true
Fixed modified required program executive capability includes the ability through determining to be satisfied based on its multiple independent events and repaiied
At least one and at least one ability including being specified by first user dynamic changed in trigger changes instruction.
55th article:According to the computer-readable medium described in the 54th article, wherein one or more of software programs are in institute
State and performed in first group of multiple calculate nodes, to support at least one computing system in the not part of described first group
At least another software program of upper execution, and wherein at least one ability modification trigger through determining to be satisfied
One or more each with the status information based on the execution at least another software program obtained
One or more standards.
56th article:According to the computer-readable medium described in the 54th article, wherein described program perform service will be described the
One time was supplied to the required program executive capability of the instruction of first user to be recorded as first user can be described
The initial formal proceedings executive capability that one time used, wherein methods described also include:From the very first time to described second
First group of calculate node is monitored during a period of time of time described first group of one or more calculate is saved with identifying
One or more change in availability of point, and update the available described program of first user and performing the record of service just
Formula program executive capability is to reflect one or more of change in availability, wherein the available described program of the first user
The formal proceedings executive capability for performing the record of service is not described modified required by being automatically determined in second time
Program executive capability is updated, and is wherein also modified in second time as the part of described first group
Calculate node so as to by the formal proceedings executive capability of the record at second time with it is modified at second time
Required program executive capability coordinate, coordinating the formal proceedings executive capability of the record is included the warp at second time
The required program executive capability of modification is defined as the further renewal of the available described program execution service of first user
The formal proceedings executive capability of record.
57th article:According to the computer-readable medium described in the 53rd article, wherein the computer-readable medium is following two
At least one of person:Store the memory of the computing system of the content and including the caused storage comprising the content
The data transmission media of data-signal, and wherein described content is that the computing system can be made to implement methods described upon execution
Instruction.
58th article:A kind of computing system for the program executive capability for being configured to dynamic modification user, including:
One or more processors;With
System manager module, at least one execution in by one or more of processors, for described more
Each in individual user, it is configured to manage the program of multiple users of network access service in the following manner and performs energy
Power:
It is determined that the required program executive capability of one or more software programs is performed for representing the user, and really
It is fixed to be used to then trigger one or more abilities of the automatic modification to the required program executive capability of the user to change
Trigger;
In the very first time by one group of multiple available calculate node and user's auto-associating, for by the determination
Required program executive capability is supplied to the user;And
After the very first time, the second subsequent time after the very first time automatically determines the user
The practical programs executive capability that can be obtained from described group of calculate node, the practical programs executive capability at second time is not
It is same as being supplied to the required program executive capability of the user in the very first time;
According to it is respective occur after the very first time and each have it is described needed for program executive capability correlation
Multiple independent events of modification, automatically determined in second time and be supplied to the modified required program of the user to perform
Ability, the multiple independent event include through determine be satisfied the ability modification trigger in it is at least one and including
At least one ability specified by user dynamic changes instruction, and the modified required program at second time performs
Polymerization of the ability based on the related amendments to the multiple independent event;And
In second time calculate node of the modification as the part of described group automatically, so as to by second time
The modified required program executive capability and the practical programs executive capability of the determination at second time at place are coordinated, described
Modified calculate node is used to the modified required program executive capability being supplied to the user.
59th article:According to the computing system described in the 58th article, wherein the required program of the determination of one of the multiple user
It is that one user can make in the very first time that executive capability, which is indicated by one user and is confirmed as recorded,
Initial formal proceedings executive capability, wherein automatically determining one user actual journey workable for second time
Sequence executive capability is based at least partially on during from the very first time to a period of time of second time described in monitoring
The described group of calculate node of one user is carried out to identify one or more changes, and monitoring the calculate node includes renewal
The formal proceedings executive capability of one available record of user is to reflect one or more of changes, wherein one
The formal proceedings executive capability of the available record of user is not by automatically determining the modified required journey at second time
Sequence executive capability is updated, and wherein also a part of second time modification as described group calculate node with
Just by the modified required program at the formal proceedings executive capability of the record at second time and second time
Executive capability is coordinated, coordinate the formal proceedings executive capability of the record include will be second time at it is modified required
Program executive capability is defined as the formal proceedings executive capability of the available record further updated of first user.
60th article:According to the computing system described in the 59th article, wherein the ability modification of the determination of one user
Trigger is specified by one user, wherein the network access service performs clothes to provide the program of multiple calculate nodes
Business, the multiple calculate node can be configured to carry out the program that described program performs the long-distance user of service, and wherein institute
State the son that at least one described group each of the multiple calculate node in multiple users is the multiple calculate node
Collection.
61st article:According to the computing system described in the 58th article, wherein the system manager module is included by the calculating
The software instruction that system performs.
62nd article:According to the computing system described in the 58th article, wherein for each in the multiple user, the system
Manager module in the following manner by managing the device of the program executive capability of multiple users of network access service
Composition:
It is determined that the required program executive capability of one or more software programs is performed for representing the user, and really
It is fixed to be used to then trigger one or more abilities of the automatic modification to the required program executive capability of the user to change
Trigger;
In the very first time by one group of multiple available calculate node and user's auto-associating, for by the determination
Required program executive capability is supplied to the user;And
After the very first time, the second subsequent time after the very first time automatically determines the user
The practical programs executive capability that can be obtained from described group of calculate node, the practical programs executive capability at second time is not
It is same as being supplied to the required program executive capability of the user in the very first time;
According to it is respective occur after the very first time and each have it is described needed for program executive capability correlation
Multiple independent events of modification, automatically determined in second time and be supplied to the modified required program of the user to perform
Ability, the multiple independent event include through determine be satisfied the ability modification trigger in it is at least one and including
At least one ability specified by user dynamic changes instruction, and the modified required program at second time performs
Polymerization of the ability based on the related amendments to the multiple independent event;And
In second time calculate node of the modification as the part of described group automatically, so as to by second time
The modified required program executive capability and the practical programs executive capability of the determination at second time at place are coordinated, described
Modified calculate node is used to the modified required program executive capability being supplied to the user.
From the forgoing, it should it is understood that specific embodiment is described herein although for illustration purposes, but
Various modifications can be made without departing from the spirit and scope of the present invention.Therefore, the present invention is only by appended claims
And mentioned desired limitation herein.In addition, though certain aspects of the invention are shown in the form of some claims below
Go out, but inventor considers various aspects of the invention in the form of any available claim.It is although for example, only of the invention
Some aspects can be mentioned as being embodied in computer-readable medium at present, other side can be similarly obtained embodiment.
Claims (18)
1. a kind of computer implemented method, including:
By being configured as providing one or more computing systems of program execution service in the very first time, received from user with making
The relevant instruction of one or more software programs is performed with one group of calculate node, the user also specifies one or more limit
Ability modification trigger, for then occur specified requirements when modification by one group of calculate node provide program perform
Ability;
When performing one or more of software programs using one group of calculate node, the after the very first time
At two times, determine that one group of calculate node is available to the user by the one or more of computing systems configured
Current first program executive capability, and the ability of at least one restriction being satisfied for one group of calculate node
Change trigger;And
It is one or more by what is configured when performing one or more of software programs using one group of calculate node
Individual computing system changes one group of calculate node, to provide the second program executive capability, second program from the group of modification
Executive capability is different with the first program executive capability and is at least partially based at least one energy being satisfied
Power changes trigger, and when performing one or more of software programs using one group of calculate node, described the
After one time and before one group of calculate node is changed, at least one ability specified by user dynamic is received
Modification instruction, and at least one energy specified based at least one ability modification trigger being satisfied and dynamic
Power modification instruction, to determine the second program executive capability.
2. according to the method for claim 1, wherein described program performs service offer application programming interface API and supplies institute
The client for stating program execution service uses, and at least one ability modification instruction wherein dynamically specified be via
API receives from configuration processor user controlled.
3. according to the method for claim 1, wherein based at least one ability modification trigger being satisfied and moving
At least one ability modification instruction that state is specified, to determine that the second program executive capability includes accumulating one group of meter
Multiple specified changes of the quantity of calculate node in operator node.
4. according to the method for claim 1, wherein at least one ability modification trigger being satisfied is specified described
First quantity of the program executive capability of one group of calculate node changes, wherein at least one ability modification dynamically specified refers to
Order specifies the second quantity of the program executive capability of one group of calculate node to change, and wherein based on described in being satisfied extremely
At least one ability modification instruction that few ability modification trigger and dynamic are specified, to determine that second program is held
Row ability includes offsetting first quantity change specified and the second quantity changes.
5. according to the method for claim 1, wherein at least one ability modification trigger being satisfied is specified described
First quantity of the program executive capability of one group of calculate node changes, wherein at least one ability modification dynamically specified refers to
Order specifies the second quantity of the program executive capability of one group of calculate node to change, and wherein based on described in being satisfied extremely
At least one ability modification instruction that few ability modification trigger and dynamic are specified, to determine that second program is held
Row ability includes one of first quantity that selection is specified changes and the second quantity changes.
6. according to the method for claim 1, wherein determining to meet that at least one ability modification trigger is also included really
Surely one group of calculate node is directed to, the multiple ability modification trigger is satisfied, and wherein described second program performs
Combination of the ability also based on the multiple ability modification trigger being satisfied.
7. according to the method for claim 6, wherein the multiple ability being satisfied changes each ability in trigger
Modification trigger has one or more relevant criterions, for determining whether the ability modification trigger is satisfied, and its
Middle determination is directed to one group of calculate node, and the multiple ability modification trigger is satisfied including determining quilt based on conditions present
The relevant criterion of each ability modification trigger in the multiple ability modification trigger met is satisfied.
8. according to the method for claim 6, wherein the multiple ability being satisfied changes each ability in trigger
The specified quantity that modification trigger has the calculate node in one group of calculate node changes, and wherein methods described is also wrapped
Include and the specified quantity of trigger is changed by total the multiple ability being satisfied change, come based on described in being satisfied
The combination of multiple ability modification triggers determines the second program executive capability.
9. according to the method for claim 1, wherein described program performs service offer application programming interface API and supplies institute
The client for stating program execution service uses, and at least one ability modification instruction wherein dynamically specified be via
API receives from configuration processor user controlled.
10. the method according to claim 11, in addition to:It is one or more being performed using one group of calculate node
It is each independent by the generation of the multiple independent events of one or more of computational system identifications configured during individual software program
Event specifies the specified modification of the program executive capability of one group of calculate node;And the finger based on the multiple independent event
The set that periodical repair changes, to determine the second program executive capability.
11. according to the method for claim 1, wherein performing one or more of softwares in one group of calculate node
Program is to support at least one other software program performed at least one computing system outside described one group, and its
In at least one ability modification trigger that is satisfied have based on the execution with least one other software program
One or more standards of relevant status information.
12. according to the method for claim 1, in addition to monitoring one group of calculate node is one to determine and perform
Or one or more values of the relevant at least a kind of performance characteristics of multiple software programs, and be wherein at least based partially on for institute
The value stated at least a kind of performance characteristics and determined is satisfied to determine that at least one ability changes trigger.
13. according to the method for claim 12, wherein at least a kind of performance characteristics are in one group of calculate node
The actual quantity of available calculate node, or born with the calculating in one or more of one group of calculate node calculate node
Carry the actual quantity of corresponding calculate node.
14. according to the method for claim 1, wherein based on changing one of trigger at least one ability
Or the current time of multiple specified time matchings is satisfied to determine that at least one ability changes trigger.
15. according to the method for claim 1, in addition to reception user specifies to multiple diverse geographic locations, and its
Each geographical location that middle modification one group of calculate node is included in the multiple geographical position provides the group of modification
The subset of program executive capability.
16. a kind of computing system of configuration, including:
One or more processors;And
One or more modules, when at least one computing device in by one or more of processors, by described in extremely
A few processor is configured to:
The instruction relevant with performing one or more software programs using one group of calculate node, institute are received from user in the very first time
Stating one group of calculate node has the one or more GLs modification trigger for being used to change provided program executive capability;
It is determined that the first program executive capability that the second time after the first time can be provided by one group of calculate node;
It is determined that meet at least one GL modification trigger of one group of calculate node;And
One group of calculate node is changed to provide the second program executive capability of modification from the group of modification, second program is held
Row ability is at least partially based at least one ability modification trigger being satisfied, wherein by least one processing
When device performs, one or more of modules include following software instruction, and the software instruction is by least one processor
It is further configured to when performing one or more of software programs using one group of calculate node in the very first time
At least one ability specified by user's dynamic is received afterwards changes instruction, and based at least one ability being satisfied
At least one ability modification that modification trigger and dynamic are specified is instructed to determine the second program executive capability.
17. computing system according to claim 16, wherein the computing system configured is carrying for program execution service
The part used for application programming interface API for the client of program execution service, and wherein dynamically specify
At least one ability modification instruction is what is received from configuration processor user controlled via API.
18. computing system according to claim 16, wherein the computing system configured is carrying for program execution service
The part that is used for application programming interface API for the client of program execution service, and wherein to being satisfied
The definition of at least one ability modification trigger is to be received from configuration processor user controlled via API in the very first time.
Applications Claiming Priority (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/569,723 | 2009-09-29 | ||
US12/569,744 | 2009-09-29 | ||
US12/569,744 US8689225B2 (en) | 2009-09-29 | 2009-09-29 | Attributing causality to program execution capacity modifications |
US12/569,723 US8352609B2 (en) | 2009-09-29 | 2009-09-29 | Dynamically modifying program execution capacity |
CN201080041786.1A CN102511041B (en) | 2009-09-29 | 2010-09-27 | Computer implementation and calculating system |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201080041786.1A Division CN102511041B (en) | 2009-09-29 | 2010-09-27 | Computer implementation and calculating system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104331334A CN104331334A (en) | 2015-02-04 |
CN104331334B true CN104331334B (en) | 2018-04-06 |
Family
ID=43826606
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410648530.7A Active CN104331334B (en) | 2009-09-29 | 2010-09-27 | Computer implemented method and computing system |
CN201080041786.1A Active CN102511041B (en) | 2009-09-29 | 2010-09-27 | Computer implementation and calculating system |
CN201410646174.5A Active CN104331333B (en) | 2009-09-29 | 2010-09-27 | Computer implemented method and computing system |
Family Applications After (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201080041786.1A Active CN102511041B (en) | 2009-09-29 | 2010-09-27 | Computer implementation and calculating system |
CN201410646174.5A Active CN104331333B (en) | 2009-09-29 | 2010-09-27 | Computer implemented method and computing system |
Country Status (6)
Country | Link |
---|---|
EP (1) | EP2483797A4 (en) |
JP (2) | JP5486687B2 (en) |
CN (3) | CN104331334B (en) |
CA (1) | CA2774297C (en) |
SG (2) | SG179098A1 (en) |
WO (1) | WO2011041253A1 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104102646B (en) * | 2013-04-07 | 2019-01-15 | 腾讯科技(深圳)有限公司 | The method, apparatus and system of data processing |
US11140045B2 (en) * | 2015-07-31 | 2021-10-05 | Microsoft Technology Licensing, Llc | Changelog transformation and correlation in a multi-tenant cloud service |
CN108632067B (en) | 2017-03-21 | 2020-12-08 | 华为技术有限公司 | Disaster recovery deployment method, device and system |
US10824413B2 (en) * | 2018-07-23 | 2020-11-03 | International Business Machines Corporation | Maintenance of computing nodes concurrently in a number updated dynamically |
CN110968590A (en) * | 2019-12-23 | 2020-04-07 | 北京奇艺世纪科技有限公司 | Task execution method and device, electronic equipment and computer readable storage medium |
CN111831944B (en) * | 2020-07-09 | 2021-09-28 | 腾讯科技(深圳)有限公司 | Multimedia processing method, device, client, server and storage medium |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101371238A (en) * | 2005-03-24 | 2009-02-18 | 阿卡迈技术有限公司 | Distributed on-demand computing system |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6779030B1 (en) * | 1997-10-06 | 2004-08-17 | Worldcom, Inc. | Intelligent network |
US6957343B2 (en) * | 2001-03-30 | 2005-10-18 | Intel Corporation | Validating keying material by using a validation area of read-only media to prevent playback of unauthorized copies of content stored on the media |
JP3772713B2 (en) * | 2001-09-12 | 2006-05-10 | 日本電気株式会社 | Priority dynamic control method, priority dynamic control method, and program for priority dynamic control |
JP2005196601A (en) * | 2004-01-09 | 2005-07-21 | Hitachi Ltd | Policy simulator for autonomous management system |
JP2005250818A (en) * | 2004-03-04 | 2005-09-15 | Hitachi Ltd | Program execution service provision method |
US7454427B2 (en) * | 2005-01-31 | 2008-11-18 | Cassatt Corporation | Autonomic control of a distributed computing system using rule-based sensor definitions |
US7680799B2 (en) * | 2005-01-31 | 2010-03-16 | Computer Associates Think, Inc. | Autonomic control of a distributed computing system in accordance with a hierarchical model |
US7543020B2 (en) * | 2005-02-10 | 2009-06-02 | Cisco Technology, Inc. | Distributed client services based on execution of service attributes and data attributes by multiple nodes in resource groups |
US8190682B2 (en) * | 2006-03-31 | 2012-05-29 | Amazon Technologies, Inc. | Managing execution of programs by multiple computing systems |
US7792944B2 (en) * | 2006-03-31 | 2010-09-07 | Amazon Technologies, Inc. | Executing programs based on user-specified constraints |
CN101127130A (en) * | 2006-08-14 | 2008-02-20 | 林伟龙 | Safe recording and control system for automobile |
US8767535B2 (en) * | 2007-07-11 | 2014-07-01 | Hewlett-Packard Development Company, L.P. | Dynamic feedback control of resources in computing environments |
US8396846B2 (en) * | 2007-12-13 | 2013-03-12 | International Business Machines Corporation | Database trigger modification system and method |
-
2010
- 2010-09-27 CN CN201410648530.7A patent/CN104331334B/en active Active
- 2010-09-27 CN CN201080041786.1A patent/CN102511041B/en active Active
- 2010-09-27 CA CA2774297A patent/CA2774297C/en active Active
- 2010-09-27 EP EP10821079.0A patent/EP2483797A4/en not_active Withdrawn
- 2010-09-27 WO PCT/US2010/050351 patent/WO2011041253A1/en active Application Filing
- 2010-09-27 SG SG2012017281A patent/SG179098A1/en unknown
- 2010-09-27 JP JP2012531096A patent/JP5486687B2/en active Active
- 2010-09-27 SG SG2013004551A patent/SG188079A1/en unknown
- 2010-09-27 CN CN201410646174.5A patent/CN104331333B/en active Active
-
2014
- 2014-02-21 JP JP2014031946A patent/JP5868442B2/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101371238A (en) * | 2005-03-24 | 2009-02-18 | 阿卡迈技术有限公司 | Distributed on-demand computing system |
Also Published As
Publication number | Publication date |
---|---|
SG188079A1 (en) | 2013-03-28 |
CN104331333B (en) | 2018-09-18 |
CA2774297C (en) | 2015-03-03 |
SG179098A1 (en) | 2012-05-30 |
EP2483797A4 (en) | 2013-08-07 |
CN102511041B (en) | 2014-12-10 |
CA2774297A1 (en) | 2011-04-07 |
CN104331333A (en) | 2015-02-04 |
CN102511041A (en) | 2012-06-20 |
JP2013505519A (en) | 2013-02-14 |
CN104331334A (en) | 2015-02-04 |
JP5868442B2 (en) | 2016-02-24 |
WO2011041253A1 (en) | 2011-04-07 |
JP5486687B2 (en) | 2014-05-07 |
EP2483797A1 (en) | 2012-08-08 |
JP2014089776A (en) | 2014-05-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11409556B2 (en) | Custom placement policies for virtual machines | |
CN104331334B (en) | Computer implemented method and computing system | |
US11709843B2 (en) | Distributed real-time partitioned MapReduce for a data fabric | |
US8266254B2 (en) | Allocating resources in a distributed computing environment | |
JP4597488B2 (en) | Program placement method, execution system thereof, and processing program thereof | |
CN108287756A (en) | A kind of method and device of processing task | |
AU2014209611B2 (en) | Instance host configuration | |
US8966025B2 (en) | Instance configuration on remote platforms | |
CN109313564A (en) | For supporting the server computer management system of the highly usable virtual desktop of multiple and different tenants | |
CN108399101A (en) | The methods, devices and systems of scheduling of resource | |
US9672545B2 (en) | Optimizing license use for software license attribution | |
CN107968810A (en) | A kind of resource regulating method of server cluster, device and system | |
CN110162407A (en) | A kind of method for managing resource and device | |
US9262505B2 (en) | Input-output prioritization for database workload | |
JP2008059599A (en) | Method for allocating virtualized resource and execution system thereof | |
CN110351104A (en) | A kind of VIM selection method and device | |
CN112612579A (en) | Virtual machine deployment method, storage medium, and computer device | |
CN110022376A (en) | Method for scheduling task, apparatus and system | |
US9412083B2 (en) | Aggregation and workflow engines for managing project information | |
JP2011258222A (en) | Business resources management method and implementation system thereof | |
Igreja de Freitas et al. | Public bicycle sharing systems control and performance evaluation:: A Petri net-based approach | |
JP4932877B2 (en) | Business resource management method and implementation system thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |