CN104328930B - A kind of hot-working Workshop layout method - Google Patents

A kind of hot-working Workshop layout method Download PDF

Info

Publication number
CN104328930B
CN104328930B CN201410495330.2A CN201410495330A CN104328930B CN 104328930 B CN104328930 B CN 104328930B CN 201410495330 A CN201410495330 A CN 201410495330A CN 104328930 B CN104328930 B CN 104328930B
Authority
CN
China
Prior art keywords
supply line
hot
steelshop
electric flat
flat carriage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410495330.2A
Other languages
Chinese (zh)
Other versions
CN104328930A (en
Inventor
朱吉禄
郝立文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China IPPR International Engineering Co Ltd
Original Assignee
China IPPR International Engineering Co Ltd
Filing date
Publication date
Application filed by China IPPR International Engineering Co Ltd filed Critical China IPPR International Engineering Co Ltd
Priority to CN201410495330.2A priority Critical patent/CN104328930B/en
Publication of CN104328930A publication Critical patent/CN104328930A/en
Application granted granted Critical
Publication of CN104328930B publication Critical patent/CN104328930B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of open hot-working Workshop layout method of the present invention, hot-working workshop is arranged at machine works, and method for arranging includes arranging a forge along a first direction;One heat treatment department is arranged in parallel with forge and is arranged in the side of forge;One first steelshop and a steel foundry is parallel positioned opposite along a second direction vertical with first direction, and it is arranged in the opposite side of forge;One first electric flat carriage supply line is arranged between heat treatment department forge and the first steelshop;And one second electric flat carriage supply line is arranged between the first steelshop and steel foundry;Wherein, forge, heat treatment department, the first steelshop and steel foundry form double class Г type horizontal layout.Hot-working Workshop layout method of the present invention uses double class Г type planar architectural form, and compact conformation, floor space is little, and supply line is short out.

Description

A kind of hot-working Workshop layout method
Technical field
The present invention relates to that a kind of machine works are large-scale or the extensive hot-working production center always schemes to arrange and types of transportation Conceptual design, specifically, relates to the side using double class Г type planar architectural form to be arranged in a kind of hot-working workshop Method.
Background technology
The inside transport of the large-scale or extensive hot-working production center of machine works, traditional design scheme is to use train Railroad mode transports, and each workshop carries out in picturesque disorder layout by the regulation of railway turning radius, and such plant area floor space is very Greatly, railway roundabout transport distance is the longest.
Summary of the invention
Present invention aim to address that the large-scale of existing machinery factory or extensive hot-working production center floor space are big, The problem using train railway transport distance length, it is provided that a kind of hot-working plant layout method, uses double class Г type planar architectural Form, compact conformation, floor space is little, and supply line is short out.
To achieve these goals, the hot-working Workshop layout method of the present invention, described hot-working workshop is arranged at One machine works, described method for arranging includes:
One forge is arranged along a first direction;
One heat treatment department is arranged in parallel with described forge and is arranged in the side of described forge;
One first steelshop and a steel foundry is parallel relative along a second direction vertical with described first direction Arrange, and be arranged in the opposite side of described forge;
One first electric flat carriage supply line is arranged at forge described in described heat treatment department and described first steel-making Between workshop;And
One second electric flat carriage supply line is arranged between described first steelshop and described steel foundry;
Wherein, described forge, described heat treatment department, described first steelshop and described steel foundry are formed double Class Г type horizontal layout.
Above-mentioned hot-working Workshop layout method, wherein, sets between described heat treatment department and described forge Put one first outdoor storehouse, one second outdoor storehouse is set between described first steelshop and described steel foundry.
Above-mentioned hot-working Workshop layout method, wherein, described first steelshop and described steel foundry with One road is set between described forge.
Above-mentioned hot-working Workshop layout method, wherein, described first steelshop arranges a casting aisle, by described First electric flat carriage supply line extends to described casting aisle.
Above-mentioned hot-working Workshop layout method, wherein, between described first steelshop and described steel foundry One the 3rd electric flat carriage supply line arranged along described first direction is set.
Above-mentioned hot-working Workshop layout method, wherein, sets between described heat treatment department and described forge Put a 4th electric flat carriage supply line arranged along described second direction.
Above-mentioned hot-working Workshop layout method, wherein, described machine works are provided with a raw and auxiliary material storehouse, by institute State the second electric flat carriage supply line and/or described 3rd electric flat carriage supply line extends to described raw and auxiliary material storehouse.
Above-mentioned hot-working Workshop layout method, wherein, described machine works are provided with a raw and auxiliary material storehouse, described It is connected by arranging another electric flat carriage supply line or a trolley-bus between first steelshop and described raw and auxiliary material storehouse.
Above-mentioned hot-working Workshop layout method, wherein, described machine works are provided with one second steelshop, will Described second electric flat carriage supply line and/or described 3rd electric flat carriage supply line extend to described second steelshop.
Above-mentioned hot-working Workshop layout method, wherein, described machine works are provided with one second steelshop, institute State between the second steelshop and described first steelshop connected by arranging another electric flat carriage supply line or a trolley-bus Connect.
Above-mentioned hot-working Workshop layout method, wherein, described machine works are provided with an engineering shop, will Described first electric flat carriage supply line, described second electric flat carriage supply line, described 3rd electric flat carriage supply line and described In 4th electric flat carriage supply line one or more extends to described engineering shop.
Above-mentioned hot-working Workshop layout method, wherein, described machine works are provided with an engineering shop, institute State and be connected by arranging another electric flat carriage supply line or a trolley-bus between engineering shop and described steel foundry.
Above-mentioned hot-working Workshop layout method, wherein, described machine works are provided with an engineering shop, institute State and be connected by arranging another electric flat carriage supply line or a trolley-bus between engineering shop and described heat treatment department.
Above-mentioned hot-working Workshop layout method, wherein, described machine works are provided with an engineering shop, institute State the two ends in engineering shop and described first outdoor storehouse to be connected by arranging another electric flat carriage supply line respectively.
Above-mentioned hot-working Workshop layout method, wherein, described machine works are provided with an engineering shop, institute The end away from described forge stating engineering shop and described second outdoor storehouse is transported by arranging another electric flat carriage Defeated line is connected.
Steelshop, steel foundry, heat treatment department and forge are arranged in double class Г by the present invention targetedly In 4 Factory Buildings of type composite plane building, and cross across transport with battery cart supply line, with substitute train railway length away from From roundabout transport, make the master plan transportation call by pattern in traditional hot-working workshop break through with essence.Face is taken up an area in its plant area Long-pending short circuit little, logistics is unobstructed be domestic and international Big Steel Castings forging enterprise incomparable.
Describe the present invention below in conjunction with the drawings and specific embodiments, but not as a limitation of the invention.
Accompanying drawing explanation
Fig. 1 is the layout schematic diagram of an embodiment in the hot-working workshop of double class Г type planar architectural forms of the present invention;
Fig. 2 is the positive mirror-image arrangement schematic diagram of Fig. 1;
Fig. 3 is that the mirror image reversal of Fig. 1 arranges schematic diagram;
Fig. 4 is that the mirror image reversal of Fig. 2 arranges schematic diagram;
Fig. 5 be Fig. 1 rotate forward 90 degree arrange schematic diagrams;
Fig. 6 is the layout signal of another embodiment in the hot-working workshop of double class Г type planar architectural forms of the present invention Figure.
Wherein, reference
10 forges
20 heat treatment departments
30 first steelshops
31 casting aisles
40 steel foundries
51 first electric flat carriage supply lines
52 second electric flat carriage supply lines
53 the 3rd electric flat carriage supply lines
54 the 4th electric flat carriage supply lines
55,56,57 electric flat carriage supply line
61 first outdoor storehouses
62 second outdoor storehouses
70 roads
Detailed description of the invention
With specific embodiment, technical solution of the present invention is described in detail below in conjunction with the accompanying drawings, to be further understood that The purpose of the present invention, scheme and effect, but it is not intended as the restriction of scope of the appended claims of the present invention.
The present invention is the new model of a kind of hot-working workshop site Planning, is to change for the upgrading of land resource in great shortage old factory Make, its total figure is arranged a kind of innovative design made, can be certainly also used to the construction of new plant area to economize the land resource.Г (reading brother's sound) is Russion letter, and described in the present invention, double class Г type composite plane construction styles, mean that its vertical and horizontal set respectively Having two Factory Buildings being parallel to each other, it is preferred that do not form right angle intersection in the plane, it act as, and can vacate one and can use In the road of transport walking, facilitate the traffic of on-site.
As it is shown in figure 1, hot-working workshop includes forge 10, heat treatment department the 20, first steelshop 30 and cast steel Workshop 40, according to production outline require first by technology major designer determine respectively forge 10, heat treatment department 20, Site plan between 40 4 new cars of the first steelshop 30 and steel foundry.It is combined into by general layout designer again Double class Г type horizontal layout forms, forge 10 X in the first direction arranges;Heat treatment department 20 cloth parallel with forge 10 Put and be arranged in the side of forge 10;First steelshop 30 with steel foundry 40 along vertical with first direction X second Direction Y is parallel positioned opposite, and is arranged in the opposite side of forge 10.Will build about longitudinally by double class Г type composite planes Two Factory Buildings are used separately as the first steelshop 30 and steel foundry 40, and the most lower two Factory Buildings are used separately as heat treatment department 10 and forge 20.
So, heat treatment department 20, forge's the 10, first steelshop 30 and steel foundry 40 define double class Г type Horizontal layout.
Technology major designer is according to total figure arrangement requirement adjusting process site plan, and in the parallel Factory Building of each two Battery cart supply line is set, is respectively used to steel-making and cast steel, forging and the inside transport of heat treatment department.Specifically For, heat treatment department 20, be provided with between forge 10 and the first steelshop 30 that Y in a second direction arranges first electronic Flat car transportation line 51;Be provided with between first steelshop 30 and steel foundry 40 that X in the first direction arranges second is electronic flat Car supply line 52.Forge 10, between heat treatment department the 20, first steelshop 30 and steel foundry 40 by first electronic Flat car transportation line the 51, second electric flat carriage supply line 52 achieves connection.
On the left of longitudinal direction steelshop and right side steel foundry, in the horizontal heat treatment department, side and lower section forge it Between be respectively provided with 1 across Lu Tianku, to solve sand mold, tool and mould, the depositing and improve the logical of adjacent two hot-working workshops of blank Wind condition, as it is shown in figure 1, be provided with the first outdoor storehouse 61, the first steelshop between heat treatment department 20 and forge 10 The second outdoor storehouse 62 it is provided with between 30 and steel foundry 40.
When the scale in workshop and bigger grade, can increase and electric flat carriage supply line is set.As it is shown in figure 1, the first refining The 3rd electric flat carriage supply line 53 that X is arranged in the first direction, heat treatment department are set between steel workshop 30 and steel foundry 40 The 4th electric flat carriage supply line 54 that Y is arranged in a second direction is set between 20 and forge 10, improves between workshop Transport capacity.First electric flat carriage supply line 51 and the 4th electric flat carriage supply line about 54 are arranged, the second electric flat carriage transport Line 52 is setting up and down with the 3rd electric flat carriage supply line 53.
Wherein, the first steelshop 30 arranges a casting aisle 31, and the first electric flat carriage supply line 51 on the horizontal left side extends In the casting aisle 31 of longitudinal left part the first steelshop 30, for the transport of red-hot forging steel ingot.
Wherein, it is preferred that the first steelshop 30 and steel foundry 40 are non-intersect with forge 10, between arrange one For the road 70 of transport, beneficially traffic in factory.
It addition, the extended line of each electric flat carriage supply line can be connected to solve itself and outside transport with neighbouring workshop.Tool Body can be arranged as follows:
Machine works are provided with raw and auxiliary material storehouse, by 2 or 1 accumulator electric of the first steelshop 30 on the left of longitudinal direction Flatcar line extends out to raw and auxiliary material storehouse, will the second electric flat carriage supply line 52 and/or the 3rd electric flat carriage supply line 53 Extend to raw and auxiliary material storehouse, when these 2 battery cart lines cannot lead to raw and auxiliary material storehouse, can be at the first steelshop 30 left sides across the suitable position in left side or lower end separately set an electric flat carriage supply line, it is also possible to trackless vehicle transport.
Machine works also have old steelshop, and the i.e. second steelshop, by the right side of longitudinal direction 2 or 1 of steel foundry Battery cart line extends out to old steelshop to allocate and transport the molten steel big part of many ladle combined castings, when be designed with conjunction water require time This design must assure that.I.e. second electric flat carriage supply line 52 and/or the 3rd electric flat carriage supply line 53 extend to Two steelshops.When these 2 battery cart lines cannot lead to the second steelshop, can be by separately setting an electric flat carriage Supply line, it is also possible to trackless vehicle transports.
Machine works are additionally provided with engineering shop, by 2 or 1 accumulator electric of steel foundry on the right side of longitudinal direction 40 Flatcar line also can extend out to engineering shop's transport with solution blank steel-casting, will the second electric flat carriage supply line 52 and/or the 3rd electric flat carriage supply line 53 extend to engineering shop, when these 2 battery cart lines cannot lead to During engineering shop, can on the right of longitudinal steel foundry 40 across the suitable position in right side or lower end separately set 1 electric flat carriage fortune Defeated line, it is also possible to trackless vehicle transports.
2 of laterally heat treatment department 20, top or 1 battery cart line are extended out to machining car Between return the transport of heat treatment department 20 with the outwards transport and roughing forged steel pieces solving blank forged steel pieces, will be first electronic Flat car transportation line 51 and/or the 4th electric flat carriage supply line 54 extend to engineering shop, when these 2 battery carts When line cannot lead to engineering shop, side can be stepped up or two ends, left and right, workshop are suitable in top, heat treatment department 20, side in the horizontal Position separately set 1 electric flat carriage supply line, it is also possible to trackless vehicle transport.
As shown in Figure 6, blank steel-casting and blank forged steel pieces can be increased as electric flat carriage is set up in the termination in storehouse in the open Transport the transport pathway of job shop to, it is possible to increase roughing forged steel pieces and return the transport pathway of heat treatment department.As it can be seen, Engineering shop is led to by arranging another electric flat carriage supply line 55,56 respectively in the two ends in the first outdoor storehouse 61, the second dew Engineering shop is led to also by arranging another electric flat carriage supply line 57 in the end in it storehouse 62.
Fig. 2, Fig. 3 and Fig. 4 are the different mirror-image arrangement forms of Fig. 1, and Fig. 5 is the arrangement form that Fig. 1 rotates forward 90 degree, its Also can reversely rotate 90 degree of layouts, both rotated versions also have its mirror-image arrangement form.The different mirror-image arrangement forms of Fig. 1 are also Rotation can be had to arrange and corresponding mirror-image arrangement form.Fig. 6 also same as in figure 1 can have different mirror-image arrangement form, rotate and arrange Corresponding mirror-image arrangement form after form, and rotation.There is varied variation in a word, but the basic phase of inside and outside means of transportation With, simply the direction of transport is different with orientation statement, is not repeated at this.
Generally speaking, the application will make steel, cast steel, forging, between 4 new cars of heat treatment and old plant area is on total figure, both from Integral not interfereing with each other, melting again is that an organic whole brings out the best in each other.
Certainly, the present invention also can have other various embodiments, in the case of without departing substantially from present invention spirit and essence thereof, ripe Know those skilled in the art to work as and can make various corresponding change and deformation according to the present invention, but these change accordingly and become Shape all should belong to the protection domain of appended claims of the invention.

Claims (15)

1. a hot-working Workshop layout method, described hot-working workshop is arranged at machine works, it is characterised in that institute State method for arranging to include:
One forge is arranged along a first direction;
One heat treatment department is arranged in parallel with described forge and is arranged in the side of described forge;
One first steelshop and a steel foundry is parallel positioned opposite along a second direction vertical with described first direction, And it is arranged in the opposite side of described forge;
One first electric flat carriage supply line is arranged at forge described in described heat treatment department and described first steelshop Between;And
One second electric flat carriage supply line is arranged between described first steelshop and described steel foundry;
Wherein, described forge, described heat treatment department, described first steelshop and described steel foundry form double class Г Type horizontal layout.
Hot-working Workshop layout method the most according to claim 1, it is characterised in that described heat treatment department and institute State and one first outdoor storehouse is set between forge, one second dew is set between described first steelshop and described steel foundry It storehouse.
Hot-working Workshop layout method the most according to claim 1, it is characterised in that described first steelshop with And between described steel foundry and described forge, a road is set.
Hot-working Workshop layout method the most according to claim 1, it is characterised in that described first steelshop sets Put a casting aisle, described first electric flat carriage supply line is extended to described casting aisle.
Hot-working Workshop layout method the most according to claim 1, it is characterised in that described first steelshop and One the 3rd electric flat carriage supply line arranged along described first direction is set between described steel foundry.
Hot-working Workshop layout method the most according to claim 5, it is characterised in that described heat treatment department and institute State and a 4th electric flat carriage supply line arranged along described second direction is set between forge.
Hot-working Workshop layout method the most according to claim 5, it is characterised in that described machine works are provided with One raw and auxiliary material storehouse, extends to described former by described second electric flat carriage supply line and/or described 3rd electric flat carriage supply line Auxiliary material storehouse.
Hot-working Workshop layout method the most according to claim 5, it is characterised in that described machine works are provided with One second steelshop, extends to described by described second electric flat carriage supply line and/or described 3rd electric flat carriage supply line Second steelshop.
Hot-working Workshop layout method the most according to claim 1, it is characterised in that described machine works are provided with One raw and auxiliary material storehouse, between described first steelshop and described raw and auxiliary material storehouse by arrange another electric flat carriage supply line or One trolley-bus is connected.
Hot-working Workshop layout method the most according to claim 1, it is characterised in that described machine works are arranged There is one second steelshop, by arranging another electric flat carriage fortune between described second steelshop and described first steelshop Defeated line or a trolley-bus are connected.
11. hot-working Workshop layout methods according to claim 6, it is characterised in that described machine works are arranged There is an engineering shop, by described first electric flat carriage supply line, described second electric flat carriage supply line, described 3rd electronic In flat car transportation line and described 4th electric flat carriage supply line one or more extends to described engineering shop.
12. hot-working Workshop layout methods according to claim 1, it is characterised in that described machine works are arranged There is an engineering shop, by arranging another electric flat carriage supply line between described engineering shop and described steel foundry Or one trolley-bus be connected.
13. hot-working Workshop layout methods according to claim 1, it is characterised in that described machine works are arranged There is an engineering shop, by arranging the transport of another electric flat carriage between described engineering shop and described heat treatment department Line or a trolley-bus are connected.
14. hot-working Workshop layout methods according to claim 2, it is characterised in that described machine works are arranged Having an engineering shop, the two ends in described engineering shop and described first outdoor storehouse are electronic flat by arranging another respectively Car supply line is connected.
15. hot-working Workshop layout methods according to claim 2, it is characterised in that described machine works are arranged An engineering shop, the end away from described forge in described engineering shop and described second outdoor storehouse is had to pass through Arrange another electric flat carriage supply line to be connected.
CN201410495330.2A 2014-09-24 A kind of hot-working Workshop layout method Active CN104328930B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410495330.2A CN104328930B (en) 2014-09-24 A kind of hot-working Workshop layout method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410495330.2A CN104328930B (en) 2014-09-24 A kind of hot-working Workshop layout method

Publications (2)

Publication Number Publication Date
CN104328930A CN104328930A (en) 2015-02-04
CN104328930B true CN104328930B (en) 2017-01-04

Family

ID=

Similar Documents

Publication Publication Date Title
CN104118486B (en) A kind of production technology of guide wheel wheel body
CN106917356B (en) A kind of novel steel truss girder bridge railway ballast frid Efficient installation method
CN107284331A (en) The beam car of two-way fortune beam on a kind of asymmetric whole opening box girder beam of achievable large-tonnage
CN103240408B (en) Hydraulic turnover device of hot metal ladle
CN104328930B (en) A kind of hot-working Workshop layout method
CN105170965B (en) Molten iron transport system
CN205689214U (en) One is grown up flexible transport inclined shaft vehicle danger avoidance system
CN107933597A (en) Combined type unwheeling auxiliary mould and car method is fallen based on the frock
CN104669434A (en) Construction method of large reinforced concrete prefabricated column and beam lifting auxiliary embedded part
CN105735686B (en) Ultra-large type complex factories and its horizontal layout method
CN106640131B (en) A kind of modular variable cross-section tunnel lining trolley
CN206938575U (en) The beam car of two-way fortune beam on a kind of asymmetric whole opening box girder beam of achievable large-tonnage
CN104328930A (en) Thermal processing workshop plane arranging method
CN204023921U (en) The hollow stair of assembling beam type sliding support
CN106042168A (en) Parallel double-station manufacturing shop for CRTS III type pre-tensioning method track boards
CN203034897U (en) Forming mold for embedded bolts of struts of contact nets of passenger rail lines
CN203957724U (en) A kind of low-floor bus front axle
CN208496859U (en) Convenient driving wheel replacing device
CN105544408B (en) A kind of support cast-in-place box beam side template removes carriage and its application process
CN208789662U (en) A kind of suspension type rail transit system vehicle goes out Input System
CN203570323U (en) Steel form carrier with main structure capable of passing through conventional cross sections integrally
CN207435921U (en) Build beam body ruggedized construction
CN103963566A (en) Front axle of low-floor passenger car
SE532547C2 (en) Joint mechanism connecting two vehicles or vehicle parts, as well as method for manufacturing a link arm to a link mechanism
CN205638489U (en) A construction trolley car that is used for shield to construct intermediate layer soil slip casting of superimposing thread tunnel

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant