CN104317988B - A kind of method, equipment and system for automatically generating looped network figure along Butut based on GIS - Google Patents

A kind of method, equipment and system for automatically generating looped network figure along Butut based on GIS Download PDF

Info

Publication number
CN104317988B
CN104317988B CN201410524932.6A CN201410524932A CN104317988B CN 104317988 B CN104317988 B CN 104317988B CN 201410524932 A CN201410524932 A CN 201410524932A CN 104317988 B CN104317988 B CN 104317988B
Authority
CN
China
Prior art keywords
gis
looped network
butut
along butut
automatically
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410524932.6A
Other languages
Chinese (zh)
Other versions
CN104317988A (en
Inventor
林裕新
黄辉
黄习弘
彭细近
钟悦
马博
陈友全
吴少兵
林敏锐
蔡玲嘉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANTOU POWER SUPPLY BUREAU GUANGDONG GRID CO Ltd
Original Assignee
SHANTOU POWER SUPPLY BUREAU GUANGDONG GRID CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANTOU POWER SUPPLY BUREAU GUANGDONG GRID CO Ltd filed Critical SHANTOU POWER SUPPLY BUREAU GUANGDONG GRID CO Ltd
Priority to CN201410524932.6A priority Critical patent/CN104317988B/en
Publication of CN104317988A publication Critical patent/CN104317988A/en
Application granted granted Critical
Publication of CN104317988B publication Critical patent/CN104317988B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The invention discloses a kind of method, equipment and system for automatically generating looped network figure along Butut based on GIS, belong to layout design field.Methods described includes:Single line of the Distribution GIS of power network along Butut is extracted, topological analysis, abstract and conversion are carried out to single lines of the GIS along Butut, obtains pels of the GIS along the single line of Butut;Receive the configuration parameter that GIS automatically generates the transmission of looped network figure storage server along Butut;According to pel and configuration parameter, the first GIS of generation automatically generates looped network figure along Butut;GIS is analyzed along Butut, generates analysis result, and according to analysis result, looped network figure is automatically generated along Butut to the first GIS and is updated, the 2nd GIS is obtained and automatically generates looped network figure along Butut;According to default placement rule, looped network figure is automatically generated along Butut to the 2nd GIS and is laid out adjustment, the 3rd GIS of generation automatically generates looped network figure along Butut;Looped network figure is automatically generated along Butut using the 3rd GIS, monitors the power network.The present invention can improve the uniformity of drawing information and field data in network operation, reduce drawing labor intensity, improve drawing renewal speed and monitoring efficiency by a kind of method for automatically generating looped network figure along Butut based on GIS.

Description

A kind of method, equipment and system for automatically generating looped network figure along Butut based on GIS
Technical field
The present invention relates to layout design field, it is more particularly to a kind of based on GIS along Butut automatically generate looped network figure method, Equipment and system.
Background technology
In operation of power networks, because the wiring of power network netting twine is complicated, device category is numerous, dispatcher needs to grasp power network at any time Field data, station-line-change-family relation of power network can be depicted as in the prior art the drawing person of being scheduled for use, to facilitate him Understand in time and solve power network and the produced problem such as grid equipment.
The side being combined in the prior art using Distribution GIS along Butut with the CAD diagram paper of OPEN3000 systems Formula is carried out the work, and wherein Distribution GIS along cloth drawing is drawn by office of network operation area related personnel, passes through electronics Change handoff procedure, finally carrying out the whole network issue by dispatcher realizes that GIS drawings update, and the CADGIS in OPEN3000 systems is along cloth It is then to be updated reality in OPEN3000 systems again according to scheme hand drawn is started by dispatcher that figure, which automatically generates looped network figure, Existing GIS automatically generates the issue of looped network figure the whole network along Butut, so that the renewal of drawing is slow, it is impossible to ensures drawing information and scene Data are consistent, easily cause mistuning degree, the maloperation of dispatcher.
The content of the invention
In order to solve problem of the prior art, ring is automatically generated along Butut based on GIS the embodiments of the invention provide one kind The method of net figure.The technical scheme is as follows:
First aspect, there is provided a kind of method for being automatically generated looped network figure along Butut based on GIS, methods described are included:
Single line of the Distribution GIS of power network along Butut is extracted, the GIS is entered along the single line of Butut Row topological analysis, abstract and conversion, obtain pels of the GIS along the single line of Butut;
Receive the configuration parameter that GIS automatically generates the transmission of looped network figure storage server along Butut;
According to the pel and the configuration parameter, the first GIS of generation automatically generates looped network figure along Butut;
The GIS is analyzed along Butut, generates analysis result, and according to the analysis result, to the first GIS Looped network figure is automatically generated along Butut to be updated, and is obtained the 2nd GIS and is automatically generated looped network figure along Butut;
According to default placement rule, looped network figure is automatically generated along Butut to the 2nd GIS and is laid out adjustment, generation the Three GIS automatically generate looped network figure along Butut;
Looped network figure is automatically generated along Butut using the 3rd GIS, monitors the power network.
It is described that first GIS is automatically generated along Butut with reference in a first aspect, in the first possible implementation Looped network figure be updated including:
The GIS is tracked and filtered along the relation of opening up of flutterring of Butut, generates the first analysis result;
Looped network is automatically generated along Butut to the first GIS according to first analysis result and the predetermined placement rule Figure is updated, and is generated the 2nd GIS and is automatically generated looped network figure along Butut;Or
Analyze the first GIS and automatically generate looped network figure and line topological differences of the GIS along Butut along Butut, generate Second analysis result;
According to second analysis result, looped network figure is automatically generated along Butut to the first GIS and is updated, generate institute State the 2nd GIS and automatically generate looped network figure along Butut.
With reference in a first aspect, in second of possible implementation, the basis presets placement rule, to described second GIS, which along Butut automatically generates looped network figure and is laid out adjustment, to be included:
According to the default placement rule, looped network figure is automatically generated along Butut to the 2nd GIS and is laid out adjustment;Or Person,
The adjust instruction that user triggers in distributing adjustment equipment is obtained, according to the adjust instruction, to the 2nd GIS Looped network figure, which is automatically generated, along Butut is laid out adjustment.
With reference in a first aspect, in the third possible implementation, methods described also includes;
The verification of looped network figure progress topological relation is automatically generated along Butut to the 3rd GIS;
The verification of looped network figure progress inclusion relation is automatically generated along Butut to the 3rd GIS;
The verification of looped network figure progress subordinate relation is automatically generated along Butut to the 3rd GIS.
With reference in a first aspect, in the 4th kind of possible implementation, methods described also includes;
The 3rd GIS is sent to output equipment automatically generate looped network figure along Butut by preset pattern form;Or
The 3rd GIS, which is sent, to printing device automatically generates looped network figure along Butut.
With reference in a first aspect, in the 5th kind of possible implementation, methods described also includes:
First GIS is set along Butut automatically generates looped network figure, the 2nd GIS automatically generates looped network figure and the 3rd along Butut GIS automatically generates figure layer corresponding with different types of equipment difference in looped network figure along Butut;
Display all devices corresponding with the figure layer.
With reference in a first aspect, in the 6th kind of possible implementation, methods described includes:
To the first GIS along Butut automatically generates looped network figure, the 2nd GIS automatically generates looped network figure and the 3rd along Butut GIS automatically generates looped network figure along Butut and carries out version management, and generation automatically generates looped network figure, the with the first GIS along Butut Two GIS automatically generate looped network figure and the 3rd GIS along Butut and automatically generate start context corresponding to looped network figure difference along Butut;
Wherein, the start context be with the first GIS along Butut automatically generate looped network figure, the 2nd GIS along Butut from Dynamic generation looped network figure and the 3rd GIS automatically generate unique beacon information corresponding to looped network figure difference, the start context along Butut Including:GIS along Butut automatically generate the looped network figure map title, GIS along Butut automatically generate looped network figure creation time and GIS along Butut from Dynamic generation looped network figure descriptive information.
With reference in a first aspect, in the 7th kind of possible implementation, methods described also includes:
Looped network figure storage server transmission the 3rd GIS is automatically generated to the GIS along Butut to automatically generate along Butut Looped network figure, automatically generated so that the GIS automatically generates looped network figure storage server storage the 3rd GIS along Butut along Butut Looped network figure.
Second aspect, there is provided a kind of equipment for being automatically generated looped network figure along Butut based on GIS, the equipment are included:
Extraction module, for extracting the Distribution GIS of power network along the single line of Butut, to the GIS along cloth The single line of figure carries out topological analysis, abstract and conversion, obtains pels of the GIS along the single line of Butut;
Receiving module, for receive GIS along Butut automatically generate looped network figure storage server transmission configuration parameter;
Processing module, for automatically generating looped network along Butut according to the pel and the configuration parameter, the first GIS of generation Figure;
Update module, for being analyzed along Butut the GIS, analysis result is generated, and according to the analysis result, Looped network figure is automatically generated along Butut to be updated, obtain the 2nd GIS and automatically generate looped network figure along Butut to the first GIS;
Adjusting module, for according to default placement rule, automatically generating looped network figure along Butut to the 2nd GIS and carrying out cloth Office's adjustment, the 3rd GIS of generation automatically generate looped network figure along Butut;
Monitoring module, for automatically generating looped network figure along Butut using the 3rd GIS, monitor the power network.
With reference to second aspect, in the first possible implementation, the update module is specifically used for:
The GIS is tracked and filtered along the relation of opening up of flutterring of Butut, generates the first analysis result;
Looped network is automatically generated along Butut to the first GIS according to first analysis result and the predetermined placement rule Figure is updated, and is generated the 2nd GIS and is automatically generated looped network figure along Butut;Or
Analyze the first GIS and automatically generate looped network figure and line topological differences of the GIS along Butut along Butut, generate Second analysis result;
According to second analysis result, looped network figure is automatically generated along Butut to the first GIS and is updated, generate institute State the 2nd GIS and automatically generate looped network figure along Butut.
With reference to second aspect, in second of possible implementation, the adjusting module is specifically used for:
According to the default placement rule, looped network figure is automatically generated along Butut to the 2nd GIS and is laid out adjustment;Or Person,
The adjust instruction that user triggers in distributing adjustment equipment is obtained, according to the adjust instruction, to the 2nd GIS Looped network figure, which is automatically generated, along Butut is laid out adjustment.
With reference to second aspect, in the third possible implementation, the equipment also includes correction verification module, the verification Module is used for:
The verification of looped network figure progress topological relation is automatically generated along Butut to the 3rd GIS;
The verification of looped network figure progress inclusion relation is automatically generated along Butut to the 3rd GIS;
The verification of looped network figure progress subordinate relation is automatically generated along Butut to the 3rd GIS.
With reference to second aspect, in the 4th kind of possible implementation, the equipment also includes output module, the output Module is used for:
The 3rd GIS is sent to output equipment automatically generate looped network figure along Butut by preset pattern form;Or
The 3rd GIS, which is sent, to printing device automatically generates looped network figure along Butut.
With reference to second aspect, in the 5th kind of possible implementation, the equipment also includes layer management module, uses In:
First GIS is set along Butut automatically generates looped network figure, the 2nd GIS automatically generates looped network figure and the 3rd along Butut GIS automatically generates figure layer corresponding with different types of equipment difference in looped network figure along Butut;
Display all devices corresponding with the figure layer.
With reference to second aspect, in the 6th kind of possible implementation, the equipment also includes version management module, uses In:
To the first GIS along Butut automatically generates looped network figure, the 2nd GIS automatically generates looped network figure and the 3rd along Butut GIS automatically generates looped network figure along Butut and carries out version management, and generation automatically generates looped network figure, the with the first GIS along Butut Two GIS automatically generate looped network figure and the 3rd GIS along Butut and automatically generate start context corresponding to looped network figure difference along Butut;
Wherein, the start context be with the first GIS along Butut automatically generate looped network figure, the 2nd GIS along Butut from Dynamic generation looped network figure and the 3rd GIS automatically generate unique beacon information corresponding to looped network figure difference, the start context along Butut Including:GIS along Butut automatically generate the looped network figure map title, GIS along Butut automatically generate looped network figure creation time and GIS along Butut from Dynamic generation looped network figure descriptive information.
With reference to second aspect, in the 7th kind of possible implementation, it is characterised in that the equipment also includes sending mould Block, it is used for:
Looped network figure storage server transmission the 3rd GIS is automatically generated to the GIS along Butut to automatically generate along Butut Looped network figure, automatically generated so that the GIS automatically generates looped network figure storage server storage the 3rd GIS along Butut along Butut Looped network figure.
The third aspect, there is provided a kind of system for being automatically generated looped network figure along Butut based on GIS, the system are included:
Being given birth to automatically along Butut based on GIS described in second aspect to the 7th kind of any possible implementation of second aspect Equipment and GIS into looped network figure automatically generate looped network figure storage server along Butut;
Wherein, the GIS automatically generates looped network figure storage server along Butut and is used for described automatic along Butut based on GIS Generate the equipment send configuration parameter of looped network figure.
With reference to the third aspect, in the first possible implementation,
The system also includes distributing adjustment equipment, for automatically generating setting for looped network figure along Butut based on GIS to described Preparation send the adjust instruction that user triggers.
With reference to the third aspect, in second of possible implementation,
The system also includes output equipment and printing device;
The 3rd GIS that the output equipment is used to receive the monitoring device transmission automatically generates looped network figure along Butut, and Export the figure of SVG, CAD, PDF, JPG preset format;
The 3rd GIS that the printing device is used to receive the monitoring device transmission automatically generates looped network figure along Butut, and The 3rd GIS is printed to the print command that the printing device triggers automatically generate looped network figure along Butut by user.
With reference to the third aspect, in the third possible implementation,
The GIS along Butut automatically generate looped network figure storage server be additionally operable to receive and store the 3rd GIS along Butut from Dynamic generation looped network figure.
The present invention is by extracting the Distribution GIS of power network along the single line of Butut, to wall scrolls of the GIS along Butut Circuit carries out topological analysis, abstract and conversion, obtains pels of the GIS along the single line of Butut;GIS is received to give birth to automatically along Butut The configuration parameter sent into looped network figure storage server;According to pel and configuration parameter, the first GIS of generation automatically generates along Butut Looped network figure;GIS is analyzed along Butut, generates analysis result, and according to analysis result, the first GIS is given birth to automatically along Butut It is updated into looped network figure, obtains the 2nd GIS and automatically generate looped network figure along Butut;According to default placement rule, to the 2nd GIS edges Butut automatically generates looped network figure and is laid out adjustment, and the 3rd GIS of generation automatically generates looped network figure along Butut;Utilize the 3rd GIS edges Butut automatically generates looped network figure, monitors the power network.The present invention passes through a kind of side for automatically generating looped network figure along Butut based on GIS Method, the uniformity of drawing information and field data in network operation can be improved, reduce drawing labor intensity, improve drawing renewal Speed and monitoring efficiency.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, make required in being described below to embodiment Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for For those of ordinary skill in the art, on the premise of not paying creative work, other can also be obtained according to these accompanying drawings Accompanying drawing.
Fig. 1 is a kind of method flow diagram for automatically generating looped network figure along Butut based on GIS provided in an embodiment of the present invention;
Fig. 2 is the method flow diagram that another kind provided in an embodiment of the present invention automatically generates looped network figure based on GIS along Butut;
Fig. 3 is that a kind of device structure for being automatically generated looped network figure along Butut based on GIS provided in an embodiment of the present invention is illustrated Figure;
Fig. 4 is a kind of system schematic for automatically generating looped network figure along Butut based on GIS provided in an embodiment of the present invention.
Embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with accompanying drawing to embodiment party of the present invention Formula is described in further detail.Below in conjunction with the accompanying drawing in the embodiment of the present invention, to the technical side in the embodiment of the present invention Case is clearly and completely described, it is clear that and described embodiment is only part of the embodiment of the present invention, rather than all Embodiment.Based on the embodiment in the present invention, those of ordinary skill in the art institute under the premise of creative work is not made The every other embodiment obtained, belongs to the scope of protection of the invention.
Embodiment one:
Based on GIS along Butut automatically generating looped network figure the embodiments of the invention provide one kind, (GIS automatically generates along Butut GIS automatically generates looped network figure along Butut) method, shown in Figure 1, this method flow includes:
101st, single line of the Distribution GIS of power network along Butut is extracted, GIS is entered along the single line of Butut Row topological analysis, abstract and conversion, obtain pels of the GIS along the single line of Butut.
102nd, the configuration parameter that GIS automatically generates the transmission of looped network figure storage server along Butut is received.
103rd, looped network figure is automatically generated along Butut according to pel and configuration parameter, the first GIS of generation.
104th, GIS is analyzed along Butut, generates analysis result, and according to analysis result, to the first GIS along Butut from Dynamic generation looped network figure is updated, and is obtained the 2nd GIS and is automatically generated looped network figure along Butut.
105th, according to default placement rule, looped network figure is automatically generated along Butut to the 2nd GIS and is laid out adjustment, generate the Three GIS automatically generate looped network figure along Butut.
106th, looped network figure is automatically generated along Butut using the 3rd GIS, monitors power network.
The present invention is by extracting the Distribution GIS of power network along the single line of Butut, to wall scrolls of the GIS along Butut Circuit carries out topological analysis, abstract and conversion, obtains pels of the GIS along the single line of Butut;GIS is received to give birth to automatically along Butut The configuration parameter sent into looped network figure storage server;According to pel and configuration parameter, the first GIS of generation automatically generates along Butut Looped network figure;GIS is analyzed along Butut, generates analysis result, and according to analysis result, the first GIS is given birth to automatically along Butut It is updated into looped network figure, obtains the 2nd GIS and automatically generate looped network figure along Butut;According to default placement rule, to the 2nd GIS edges Butut automatically generates looped network figure and is laid out adjustment, and the 3rd GIS of generation automatically generates looped network figure along Butut;Utilize the 3rd GIS edges Butut automatically generates looped network figure, monitors the power network.So as to improve one of drawing information and field data in network operation Cause property, drawing renewal speed is improved, improve monitoring efficiency.
Embodiment two:
The embodiments of the invention provide a kind of construction method of power network drawing, referring to Fig. 2, method flow includes:
201st, single line of the Distribution GIS of power network along Butut is extracted, GIS is entered along the single line of Butut Row topological analysis, abstract and conversion, obtain pels of the GIS along the single line of Butut.
Specifically, the step is the initialization step of the power network drawing, by Distribution GIS along Butut single line Road carries out topological analysis, abstract and conversion, detects line of the Distribution GIS of power network along Butut under the single line Road, breaker, disconnecting switch, electric room and transformer etc., and generate and circuit, breaker, disconnecting switch, electric room and transformer point Not corresponding pel.
Wherein it is possible to the Distribution GIS of power network is detected along Butut by configuring the detection device in power network Circuit, breaker, disconnecting switch, electric room and transformer under the single line etc., the embodiment of the present invention is to specific detection side Formula is not limited.
Wherein, Distribution GIS single line along Butut is also referred to as feeder line.
202nd, the configuration parameter that GIS automatically generates the transmission of looped network figure storage server along Butut is received.
Pre-set GIS specifically, GIS along Butut automatically generates looped network figure storage server and automatically generate looped network along Butut Configuration parameter corresponding to figure,
Wherein, the configuration parameter is that any one GIS automatically generates logic diagram data corresponding to looped network figure along Butut, bag Include that map file collects, GIS is along Butut automatically generates looped network drawing equipment, GIS automatically generates looped network figure line equipment, GIS edges along Butut Butut automatically generates looped network figure point device, GIS along Butut automatically generates looped network icon note, GIS automatically generates looped network figure along Butut Face device model, GIS are along Butut automatically generates looped network figure line device model, GIS automatically generates looped network figure point device sample along Butut Formula and GIS automatically generate the data module belonging to the data structures such as looped network icon note sample along Butut.
In order to facilitate expression, any one GIS automatically generates logic diagram data corresponding to looped network figure along Butut can be with GIS is stored in a manner of graph object to automatically generate in looped network figure storage server along Butut, and as the specification logic chart For data drawing list object using SCM_XX_ table names as unified name, XX represents the data module belonging to the data structure.
Specifically, logic chart data table object includes:SCM_GRAPHICDOCUMENT map files summary sheet (referring to table 1), SSCM_AREA GIS are along Butut automatically generates looped network drawing equipment list (referring to table 2), SSCM_LINE GIS give birth to automatically along Butut Looped network figure point device table is automatically generated (referring to table along Butut into looped network figure line equipment list (referring to table 3), SSCM_POINT GIS 4), SSCM_TEXT GIS along Butut automatically generate looped network icon note table (referring to table 5), SCM_AREASTYLE GIS along Butut from Dynamic generation looped network drawing device model table (referring to table 6), SCM_LINESTYLE GIS automatically generate looped network figure line equipment along Butut CSS (referring to table 7), SCM_POINTSTYLE GIS along Butut automatically generate looped network figure point device CSS (referring to table 8) and SC1M_TEXTSTYLE GIS automatically generate looped network icon note CSS along Butut (referring to table 9).
Table 1
Table 2
Table 3
Table 4
Table 5
Table 6
Table 7
Table 8
Table 9
It is worth noting that, the configuration parameter is only to show that routinely in actual applications, the configuration parameter can also be Other specification.
203rd, looped network figure is automatically generated along Butut according to pel and configuration parameter, the first GIS of generation.
Specifically, the first GIS of generation automatically generates looped network figure along Butut and smooth vertical and horizontal GIS can be made automatic along Butut Generation looped network figure or GIS automatically generate looped network figure along Butut.
204th, GIS is analyzed along Butut, generates analysis result, and according to analysis result, to the first GIS along Butut from Dynamic generation looped network figure is updated, and is obtained the 2nd GIS and is automatically generated looped network figure along Butut.
Specifically, GIS is tracked and filtered along the relation of opening up of flutterring of Butut, the first analysis result is generated;According to first Analysis result and predetermined placement rule automatically generate looped network figure along Butut to the first GIS and are updated, and generate the 2nd GIS along Butut Automatically generate looped network figure;Or
Analyze the first GIS and automatically generate looped network figure and line topological differences of the GIS along Butut, the analysis of generation second along Butut As a result;According to the second analysis result, looped network figure is automatically generated along Butut to the first GIS and is updated, generate the 2nd GIS along Butut Automatically generate looped network figure.
Wherein, the update method includes full dose renewal and incremental update.
Particularly, full dose renewal is system by the tracking and filtering along Butut, completing to divide GIS topological relations Analysis, looped network figure is automatically generated along Butut according to the placement rule generation GIS that user formulates;
Incremental update is that analysis GIS automatically generates looped network figure with along Butut line topological difference, not changing GIS along Butut The renewal of discrepancy device is automatically performed in the case of automatically generating the existing layout of looped network figure along Butut.
205th, according to default placement rule, looped network figure is automatically generated along Butut to the 2nd GIS and is laid out adjustment, generate the Three GIS automatically generate looped network figure along Butut.
Specifically, regulative mode can include automatically adjusting and adjusting manually.
Wherein, self-regulating process can be:
According to default placement rule, the 2nd GIS of adjustment automatically generates the layout of looped network figure along Butut;
Manual regulation process can be:
The adjust instruction that user triggers in distributing adjustment equipment is obtained, according to adjust instruction, adjusts the 2nd GIS along Butut Automatically generate the layout of looped network figure.
Several placement rules are provided for user's selection specifically, autoplacement is system, and the layout specified by user is advised Then (from left to right, from top to bottom etc.), system realizes the distributing adjustment for automatically generating looped network figure along Butut to GIS automatically;Manually Layout is that system provides and automatically generates looped network figure along Butut for GIS and move, scale, mirror image, rotation, node editor, beat It is disconnected to wait distributing adjustment instrument, adjust and use for hand-layout, by these distributing adjustment instruments, user can quickly change The layout type that GIS automatically generates looped network figure along Butut completes layout, while provides the local beautifying functions of electric connecting relation.
206th, automatically generate looped network figure along Butut to the 3rd GIS to verify, generate check results.
Specifically, the 3rd GIS is automatically generated in looped network figure with " electrically connected relation ", with " subordinate is closed along Butut System " (including be subordinated to and be subordinated to), must with " inclusion relation " (including be contained in and be contained in), " functional location " etc. The equipment of word filling section is tested.
Specific verification can include:The verification of topological relation, the verification of inclusion relation and the verification of subordinate relation.
207th, determine that check results indicate whether to need to automatically generate looped network figure along Butut to the 3rd GIS and be finely adjusted section, If desired step 208 is then performed;If check results instruction need not automatically generate looped network figure along Butut to the 3rd GIS and be finely adjusted Section, then perform step 209.
Specifically, if the device relationships in active view meet the setting for not meeting standard space topology rule, figure number is not Unanimously, any one during data are imperfect, then confirm as needing automatically generating looped network figure along Butut to the 3rd GIS and be finely adjusted Section.Otherwise looped network figure need not be automatically generated to the 3rd GIS along Butut by, which confirming as, is finely adjusted section.
Wherein, the parameter that standard is user's input and the parameter that system starts are verified, what deserves to be explained is user's input Parameter is the parameter that GIS automatically generates the generation of looped network figure along Butut, and system start-up parameter is consistent with the parameter that user is set.
208th, looped network figure is automatically generated along Butut to the 3rd GIS and is finely adjusted section, and after 208, perform step 209.
Specifically, the 3rd GIS of adjustment automatically generates looped network figure along Butut, it is allowed to meet to meet standard space topology rule simultaneously Setting then, figure number is consistent, and data are complete.
209th, looped network figure is automatically generated along Butut using the 3rd GIS, monitors power network.
Specifically, due to the 3rd GIS along Butut automatically generate looped network figure have recorded circuit in power network, breaker, every Pass, electric room and transformer etc. are left, so, the 3rd GIS can be utilized to automatically generate looped network figure along Butut, monitor power network.This hair Bright embodiment is not limited to specific monitor mode.
Optionally, it can also carry out step 210.
The 210th, first GIS is set along Butut automatically generates looped network figure, the 2nd GIS automatically generates looped network figure and the 3rd along Butut GIS automatically generates figure layer corresponding with different types of equipment difference in looped network figure along Butut and shown corresponding with figure layer all Equipment.
Specifically, realizing the device class layer management for automatically generating looped network figure along Butut to GIS, user can pass through figure Layer-management function filter plant is classified, and completes the figure displaying of different demands.
Check that the 3rd GIS automatically generates looped network figure along Butut by using figure layer, user can be made more clear directly perceived The each equipment of acquisition running status.
211st, to the first GIS along Butut automatically generates looped network figure, the 2nd GIS automatically generates looped network figure and the 3rd along Butut GIS automatically generates looped network figure along Butut and carries out version management, and generation automatically generates looped network figure, the 2nd GIS with the first GIS along Butut Looped network figure and the 3rd GIS, which are automatically generated, along Butut automatically generates start context corresponding to looped network figure difference along Butut.
Wherein, start context is along Butut automatically generates looped network figure, the 2nd GIS automatically generates ring along Butut with the first GIS Net figure and the 3rd GIS automatically generate unique beacon information corresponding to looped network figure difference along Butut, and start context includes:GIS is along cloth Figure automatically generates the looped network figure map title, GIS automatically generates looped network figure creation time and GIS along Butut and automatically generates looped network figure along Butut Descriptive information.
Specifically, system realizes the version management function to thematic map, when intelligence is into figure, system automatically generates GIS along cloth Figure automatically generates looped network figure start context, automatically generates the information of looped network figure, Yong Hulu along Butut as the width GIS of unique mark one Enter the description that GIS automatically generates the essential informations such as the looped network map title, creation time, descriptive information along Butut, by GIS along Butut from Dynamic this maintenance tool of generation looped network plate, can preserve, show that each time point GIS automatically generates looped network figure along Butut, realize the time The GIS of dimension aspect automatically generates looped network figure management along Butut.
212nd, by the first GIS along Butut automatically generates looped network figure, the 2nd GIS automatically generates looped network figure and the 3rd along Butut GIS, which along Butut automatically generates looped network figure and stored to GIS along Butut, automatically generates looped network figure storage server.
By by the first GIS along Butut automatically generates looped network figure, the 2nd GIS automatically generates looped network figure and the 3rd along Butut GIS, which along Butut automatically generates looped network figure and stored to GIS along Butut, automatically generates looped network figure storage server, it is possible to achieve first GIS is along Butut automatically generates looped network figure, the 2nd GIS automatically generates looped network figure along Butut and the 3rd GIS automatically generates ring along Butut The backup and synchronization of net figure.
Optionally, it can also carry out step 209.
213rd, send the 3rd GIS to output equipment or printing device and automatically generate looped network figure along Butut.
Specifically, datagraphic export or graphic printing can be passed through.
Wherein, output equipment is after receiving the 3rd GIS and automatically generating looped network figure along Butut, by the 3rd GIS along cloth Figure automatically generates file of the looped network figure output for forms such as SVG, CAD, PDF, JPG;
3rd GIS can be automatically generated looped network figure along Butut and print to drawing form by printing device.
The embodiment of the present invention provides a kind of method for automatically generating looped network figure along Butut based on GIS, by extracting power network Single line of the Distribution GIS along Butut, topological analysis, abstract and conversion are carried out to single lines of the GIS along Butut, Obtain pels of the GIS along the single line of Butut;Receive the configuration that GIS automatically generates the transmission of looped network figure storage server along Butut Parameter;According to pel and configuration parameter, the first GIS of generation automatically generates looped network figure along Butut;GIS is analyzed along Butut, Analysis result is generated, and according to analysis result, looped network figure is automatically generated along Butut to the first GIS and is updated, obtains the 2nd GIS Looped network figure is automatically generated along Butut;According to default placement rule, looped network figure is automatically generated along Butut to the 2nd GIS and is laid out tune Whole, the 3rd GIS of generation automatically generates looped network figure along Butut;Looped network figure is automatically generated along Butut using the 3rd GIS, monitors the electricity Net.The uniformity of drawing information and field data in network operation can be improved, reduces drawing labor intensity, improves drawing renewal Speed and monitoring efficiency.
Embodiment three
The embodiments of the invention provide a kind of equipment 3, and shown in reference picture 3, the equipment includes:
Extraction module 31, for extracting the Distribution GIS of power network along the single line of Butut, to GIS along Butut Single line carry out topological analysis, abstract and conversion, obtain pels of the GIS along the single line of Butut;
Receiving module 32, for receive GIS along Butut automatically generate looped network figure storage server transmission configuration parameter;
Processing module 33, for automatically generating looped network figure along Butut according to pel and configuration parameter, the first GIS of generation;
Update module 34, for being analyzed along Butut GIS, analysis result is generated, and according to analysis result, to first GIS automatically generates looped network figure along Butut and is updated, and obtains the 2nd GIS and automatically generates looped network figure along Butut;
Adjusting module 35, for according to default placement rule, automatically generating looped network figure along Butut to the 2nd GIS and being laid out Adjustment, the 3rd GIS of generation automatically generate looped network figure along Butut;
Monitoring module 36, for automatically generating looped network figure along Butut using the 3rd GIS, monitor power network.
Optionally, update module is specifically used for:
GIS is tracked and filtered along the relation of opening up of flutterring of Butut, generates the first analysis result;
Looped network figure is automatically generated according to the first analysis result and predetermined placement rule along Butut to the first GIS to be updated, Generate the 2nd GIS and automatically generate looped network figure along Butut;Or
Analyze the first GIS and automatically generate looped network figure and line topological differences of the GIS along Butut, the analysis of generation second along Butut As a result;
According to the second analysis result, looped network figure is automatically generated along Butut to the first GIS and is updated, generate the 2nd GIS edges Butut automatically generates looped network figure.
Optionally, adjusting module is specifically used for:
According to default placement rule, looped network figure is automatically generated along Butut to the 2nd GIS and is laid out adjustment;Or
Obtain the adjust instruction that is triggered in distributing adjustment equipment of user, according to adjust instruction, to the 2nd GIS along Butut from Dynamic generation looped network figure is laid out adjustment.
Optionally, it is characterised in that equipment also includes correction verification module, and correction verification module is used for:
The verification of looped network figure progress topological relation is automatically generated along Butut to the 3rd GIS;
The verification of looped network figure progress inclusion relation is automatically generated along Butut to the 3rd GIS;
The verification of looped network figure progress subordinate relation is automatically generated along Butut to the 3rd GIS.
Optionally, equipment also includes output module, and output module is used for:
The 3rd GIS is sent to output equipment automatically generate looped network figure along Butut by preset pattern form;Or
The 3rd GIS, which is sent, to printing device automatically generates looped network figure along Butut.
Optionally, equipment also includes layer management module, is used for:
First GIS is set along Butut automatically generates looped network figure, the 2nd GIS automatically generates looped network figure and the 3rd GIS along Butut Figure layer corresponding with different types of equipment difference in looped network figure is automatically generated along Butut;
Display all devices corresponding with figure layer.
Optionally, equipment also includes version management module, is used for:
To the first GIS along Butut automatically generates looped network figure, the 2nd GIS automatically generates looped network figure and the 3rd GIS edges along Butut Butut automatically generates looped network figure and carries out version management, and generation automatically generates looped network figure, the 2nd GIS along cloth with the first GIS along Butut Figure automatically generates looped network figure and the 3rd GIS and automatically generates start context corresponding to looped network figure difference along Butut;
Wherein, start context is along Butut automatically generates looped network figure, the 2nd GIS automatically generates ring along Butut with the first GIS Net figure and the 3rd GIS automatically generate unique beacon information corresponding to looped network figure difference along Butut, and start context includes:GIS is along cloth Figure automatically generates the looped network figure map title, GIS automatically generates looped network figure creation time and GIS along Butut and automatically generates looped network figure along Butut Descriptive information.
Optionally, equipment also includes sending module, is used for:
The 3rd GIS of looped network figure storage server transmission is automatically generated along Butut automatically generate looped network figure along Butut to GIS, with GIS is automatically generated the 3rd GIS of looped network figure storage server storage along Butut and automatically generate looped network figure along Butut.
The present invention provides a kind of equipment for automatically generating looped network figure along Butut based on GIS, and the equipment can improve power network work The uniformity of drawing information and field data in work, drawing labor intensity is reduced, improve drawing renewal speed and monitoring efficiency.
Example IV
The embodiment of the present invention provides a kind of system for automatically generating looped network figure along Butut based on GIS, should shown in reference picture 4 System includes:
Equipment and GIS automatically generate looped network figure storage server along Butut;
Wherein, GIS automatically generates looped network figure storage server along Butut and is used for equipment send configuration parameter.
Optionally,
System also includes distributing adjustment equipment, for sending the adjust instruction of user's triggering to equipment.
Optionally,
System also includes output equipment and printing device, and output equipment is used for the 3rd GIS edges for receiving monitoring device transmission Butut automatically generates looped network figure, and exports the figure of SVG, CAD, PDF, JPG preset format;Printing device is set for receiving monitoring The 3rd GIS that preparation is sent automatically generates looped network figure, and the print command printing the 3rd triggered by user to printing device along Butut GIS automatically generates looped network figure along Butut.
Optionally,
GIS along Butut automatically generates looped network figure storage server and is additionally operable to receive and stores the 3rd GIS to be given birth to automatically along Butut Into looped network figure.
The invention provides a kind of system for automatically generating looped network figure along Butut based on GIS, by the way that GIS is automatic along Butut It is integrated in a system to generate looped network figure storage server, equipment, distributing adjustment equipment, output equipment and printing device, can To improve the uniformity of drawing information and field data in network operation, drawing labor intensity is reduced, improves drawing renewal speed And monitoring efficiency.
It should be noted that:The equipment that above-described embodiment provides along Butut based on GIS when automatically generating looped network figure, only With the division progress of above-mentioned each functional module for example, in practical application, can as needed and by above-mentioned function distribution by Different functional modules is completed, i.e., the internal structure of equipment is divided into different functional modules, described above complete to complete Portion or partial function.In addition, the equipment of above-described embodiment offer and the method for automatically generating looped network figure along Butut based on GIS are real Apply example and belong to same design, its specific implementation process refers to embodiment of the method, repeats no more here.
One of ordinary skill in the art will appreciate that hardware can be passed through by realizing all or part of step of above-described embodiment To complete, by program the hardware of correlation can also be instructed to complete, described program can be stored in a kind of computer-readable In storage medium, storage medium mentioned above can be read-only storage, disk or CD etc..
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent substitution and improvements made etc., it should be included in the scope of the protection.

Claims (9)

  1. A kind of 1. method for automatically generating looped network figure along Butut based on GIS, it is characterised in that methods described includes:
    Single line of the Distribution GIS of power network along Butut is extracted, the GIS is opened up along the single line of Butut Analysis, abstract and conversion are flutterred, obtains pels of the GIS along the single line of Butut;
    Receive the configuration parameter that GIS automatically generates the transmission of looped network figure storage server along Butut;
    According to the pel and the configuration parameter, the first GIS of generation automatically generates looped network figure along Butut;
    The GIS is analyzed along Butut, generates analysis result, and according to the analysis result, to the first GIS along cloth Figure automatically generates looped network figure and is updated, and obtains the 2nd GIS and automatically generates looped network figure along Butut;
    According to default placement rule, looped network figure is automatically generated along Butut to the 2nd GIS and is laid out adjustment, generation the 3rd GIS automatically generates looped network figure along Butut;
    Looped network figure is automatically generated along Butut using the 3rd GIS, monitors the power network;
    Wherein, the basis presets placement rule, automatically generates looped network figure along Butut to the 2nd GIS and is laid out adjustment, Generate the 3rd GIS and automatically generate looped network figure along Butut, or,
    The adjust instruction that is triggered in distributing adjustment equipment of user is obtained, according to the adjust instruction, to the 2nd GIS along cloth Figure automatically generates looped network figure and is laid out adjustment, including:
    By system provide for GIS along Butut automatically generate looped network figure move, scale, mirror image, rotation, node editor, Interrupt, adjust and use for hand-layout;
    Wherein, it is described to the first GIS along Butut automatically generate looped network figure be updated including:
    Topological relations of the GIS along Butut is tracked and filtered, generates the first analysis result;
    Looped network figure is automatically generated according to first analysis result and the default placement rule along Butut to the first GIS to enter Row renewal, generate the 2nd GIS and automatically generate looped network figure along Butut;Or
    Analyze the first GIS and automatically generate looped network figure and line topological differences of the GIS along Butut, generation second along Butut Analysis result;
    According to second analysis result, looped network figure is automatically generated along Butut to the first GIS and is updated, generation described the Two GIS automatically generate looped network figure along Butut.
  2. 2. according to the method for claim 1, it is characterised in that the basis presets placement rule, to the 2nd GIS edges Butut, which automatically generates looped network figure and is laid out to adjust, also to be included:
    According to the default placement rule, looped network figure is automatically generated along Butut to the 2nd GIS and is laid out adjustment.
  3. 3. according to the method for claim 1, it is characterised in that methods described also includes;
    The verification of looped network figure progress topological relation is automatically generated along Butut to the 3rd GIS;
    The verification of looped network figure progress inclusion relation is automatically generated along Butut to the 3rd GIS;
    The verification of looped network figure progress subordinate relation is automatically generated along Butut to the 3rd GIS.
  4. 4. according to the method for claim 1, it is characterised in that methods described also includes;
    The 3rd GIS is sent to output equipment automatically generate looped network figure along Butut by preset pattern form;Or
    The 3rd GIS, which is sent, to printing device automatically generates looped network figure along Butut.
  5. 5. according to the method for claim 1, it is characterised in that methods described also includes:
    First GIS is set along Butut automatically generates looped network figure, the 2nd GIS automatically generates looped network figure and the 3rd GIS along Butut Figure layer corresponding with different types of equipment difference in looped network figure is automatically generated along Butut;
    Display all devices corresponding with the figure layer.
  6. 6. according to the method for claim 1, it is characterised in that methods described also includes:
    To the first GIS along Butut automatically generates looped network figure, the 2nd GIS automatically generates looped network figure and the 3rd GIS edges along Butut Butut automatically generates looped network figure and carries out version management, and generation automatically generates looped network figure, the 2nd GIS with the first GIS along Butut Looped network figure and the 3rd GIS, which are automatically generated, along Butut automatically generates start context corresponding to looped network figure difference along Butut;
    Wherein, the start context is along Butut automatically generates looped network figure, the 2nd GIS gives birth to automatically along Butut with the first GIS Unique beacon information corresponding to looped network figure difference is automatically generated along Butut into looped network figure and the 3rd GIS, the start context includes: GIS is along Butut automatically generates the looped network figure map title, GIS automatically generates looped network figure creation time and GIS along Butut and given birth to automatically along Butut Into looped network figure descriptive information.
  7. 7. according to the method for claim 1, it is characterised in that methods described also includes:
    Looped network figure storage server transmission the 3rd GIS is automatically generated along Butut automatically generate looped network along Butut to the GIS Figure, so that the GIS automatically generates looped network figure storage server storage the 3rd GIS along Butut automatically generates looped network along Butut Figure.
  8. 8. a kind of equipment for automatically generating looped network figure along Butut based on GIS, it is characterised in that the equipment includes:
    Extraction module, for extracting the Distribution GIS of power network along the single line of Butut, to the GIS along Butut Single line carries out topological analysis, abstract and conversion, obtains pels of the GIS along the single line of Butut;
    Receiving module, for receive GIS along Butut automatically generate looped network figure storage server transmission configuration parameter;
    Processing module, for automatically generating looped network figure along Butut according to the pel and the configuration parameter, the first GIS of generation;
    Update module, the update module are specifically used for:
    Topological relations of the GIS along Butut is tracked and filtered, generates the first analysis result;According to the described first analysis As a result automatically generate looped network figure along Butut to the first GIS with default placement rule to be updated, generate the 2nd GIS along Butut Automatically generate looped network figure;Or analysis the first GIS automatically generates looped network figure and circuits of the GIS along Butut along Butut Topological variation, generate the second analysis result;According to second analysis result, ring is automatically generated along Butut to the first GIS Net figure is updated, and is generated the 2nd GIS and is automatically generated looped network figure along Butut;
    Adjusting module, the adjusting module are specifically used for:According to the default placement rule, to the 2nd GIS along Butut from Dynamic generation looped network figure is laid out adjustment, and the 3rd GIS of generation automatically generates looped network figure along Butut;Or obtain user and be laid out The adjust instruction triggered in adjusting device, according to the adjust instruction, looped network figure is automatically generated along Butut to the 2nd GIS and entered Row distributing adjustment, the 3rd GIS of generation automatically generate looped network figure along Butut;
    Monitoring module, for automatically generating looped network figure along Butut using the 3rd GIS, monitor the power network;
    Correction verification module, the correction verification module are used for:Looped network figure is automatically generated along Butut to the 3rd GIS and carries out topological relation Verification;The verification of looped network figure progress inclusion relation is automatically generated along Butut to the 3rd GIS;To the 3rd GIS along Butut Automatically generate the verification that looped network figure carries out subordinate relation;
    Output module, the output module are used for:By preset pattern form to output equipment send the 3rd GIS along Butut from Dynamic generation looped network figure;Or send the 3rd GIS to printing device and automatically generate looped network figure along Butut;
    Layer management module, is used for:First GIS is set along Butut automatically generates looped network figure, the 2nd GIS gives birth to automatically along Butut Into looped network figure and the 3rd GIS figure layer corresponding with different types of equipment difference in looped network figure is automatically generated along Butut;Display with All devices corresponding to the figure layer;
    Version management module, it is used for:To the first GIS along Butut automatically generates looped network figure, the 2nd GIS automatically generates along Butut Looped network figure and the 3rd GIS automatically generate looped network figure along Butut and carry out version management, and generation is given birth to automatically with the first GIS along Butut Looped network figure and the 3rd GIS are automatically generated along Butut automatically generate version corresponding to looped network figure difference along Butut into looped network figure, the 2nd GIS This numbering;Wherein, the start context is that to automatically generate looped network figure, the 2nd GIS along Butut with the first GIS automatic along Butut Generation looped network figure and the 3rd GIS automatically generate unique beacon information corresponding to looped network figure difference, the start context bag along Butut Include:GIS along Butut automatically generates the looped network figure map title, GIS, and along Butut to automatically generate looped network figure creation time and GIS automatic along Butut Generate looped network figure descriptive information;
    Sending module, it is used for:Looped network figure storage server is automatically generated along Butut send the 3rd GIS along cloth to the GIS Figure automatically generates looped network figure, so that the GIS automatically generates looped network figure storage server along Butut stores the 3rd GIS along cloth Figure automatically generates looped network figure.
  9. 9. a kind of system for automatically generating looped network figure along Butut based on GIS, it is characterised in that the system includes:
    Described in claim 8 the equipment of looped network figure is automatically generated along Butut based on GIS and GIS automatically generates looped network figure along Butut Storage server, the GIS are automatically generated looped network figure storage server along Butut and are used to be given birth to automatically along Butut based on GIS to described Into the equipment send configuration parameter of looped network figure, it is additionally operable to receive and stores the 3rd GIS and automatically generate looped network figure along Butut;
    Distributing adjustment equipment, for it is described based on GIS along Butut automatically generate looped network figure equipment send user triggering tune Whole instruction;
    Output equipment and printing device, the 3rd GIS that the output equipment is used to receive monitoring device transmission give birth to automatically along Butut Into looped network figure, and export the figure of SVG, CAD, PDF, JPG preset format;The printing device is used to receive the monitoring device The 3rd GIS sent automatically generates looped network figure along Butut, and prints institute to the print command that the printing device triggers by user State the 3rd GIS and automatically generate looped network figure along Butut.
CN201410524932.6A 2014-10-08 2014-10-08 A kind of method, equipment and system for automatically generating looped network figure along Butut based on GIS Active CN104317988B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410524932.6A CN104317988B (en) 2014-10-08 2014-10-08 A kind of method, equipment and system for automatically generating looped network figure along Butut based on GIS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410524932.6A CN104317988B (en) 2014-10-08 2014-10-08 A kind of method, equipment and system for automatically generating looped network figure along Butut based on GIS

Publications (2)

Publication Number Publication Date
CN104317988A CN104317988A (en) 2015-01-28
CN104317988B true CN104317988B (en) 2018-01-23

Family

ID=52373219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410524932.6A Active CN104317988B (en) 2014-10-08 2014-10-08 A kind of method, equipment and system for automatically generating looped network figure along Butut based on GIS

Country Status (1)

Country Link
CN (1) CN104317988B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105427356B (en) * 2015-11-12 2018-03-23 江苏省电力公司扬州供电公司 It is a kind of based on the method that line chart and network are quickly generated along Butut
CN108536723B (en) * 2018-02-09 2019-05-10 鼎信信息科技有限责任公司 Distribution power network GIS electric wire figure multiplexing list cooperates with drafting method and device
CN108711941A (en) * 2018-06-20 2018-10-26 国网湖北省电力公司咸宁供电公司 Repair apparatus electriferous state detection method in a kind of power distribution network
CN110889237A (en) * 2019-12-05 2020-03-17 中国南方电网有限责任公司 Ring network diagram management method and device, computer equipment and storage medium
CN111600384B (en) * 2020-05-12 2022-01-25 广东电网有限责任公司 Method and system for generating and checking fixed value of distribution network strategy switch ring network diagram
CN112182813B (en) * 2020-09-09 2023-03-31 成都深瑞同华科技有限公司 Power distribution network line path generation method, device, equipment and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103473714A (en) * 2013-09-06 2013-12-25 国家电网公司 Graph model automatic maintaining method in distribution network system
CN103530743A (en) * 2013-11-03 2014-01-22 国网安徽省电力公司蚌埠供电公司 Method for establishing information management system for distribution network line
CN103593402A (en) * 2013-10-16 2014-02-19 广东电网公司电力科学研究院 Grid equipment graphic element allocation method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10049391B2 (en) * 2010-03-31 2018-08-14 Mediamath, Inc. Systems and methods for providing a demand side platform

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103473714A (en) * 2013-09-06 2013-12-25 国家电网公司 Graph model automatic maintaining method in distribution network system
CN103593402A (en) * 2013-10-16 2014-02-19 广东电网公司电力科学研究院 Grid equipment graphic element allocation method
CN103530743A (en) * 2013-11-03 2014-01-22 国网安徽省电力公司蚌埠供电公司 Method for establishing information management system for distribution network line

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
GIS与配网自动化系统图模交互实践研究;郑文杰等;《南方能源建设》;20140131;第1卷(第1期);第34-37页 *
基于地理信息系统的配电运行管理信息系统的图形编辑系统;刘今;《中国优秀硕士学位论文全文数据库<工程科技Ⅱ辑>》;20120315;参见摘要、第1-52页 *

Also Published As

Publication number Publication date
CN104317988A (en) 2015-01-28

Similar Documents

Publication Publication Date Title
CN104317988B (en) A kind of method, equipment and system for automatically generating looped network figure along Butut based on GIS
CN106650161B (en) Electrical single line diagram mapping method and system based on power grid GIS
CN104537573A (en) Power grid operation information panoramic visualized display system
CN104123271B (en) Intelligent substation secondary design system based on Excel
CN102957205A (en) Method and system for establishing distribution network model
CN106157167A (en) A kind of secondary device remote manipulation bill system and the implementation method of secondary device remote operation ticket
CN104135069B (en) Method for configuring operating parameters of secondary equipment of intelligent substation
CN106059067A (en) Power supply system remote monitoring system
CN104133953A (en) Secondary design system of intelligent substation
CN201904024U (en) Truly simulation training system of distribution live line works
CN103248127B (en) Multi-space-time navigating power system restoration decision support system and restoration decision method
CN109190772A (en) A kind of highway electrical equipment operation maintenance method based on mobile Internet
CN104363122B (en) A kind of method for pre-configuration and system of network element
CN104318006B (en) A kind of optimization method of virtual terminals of intelligent substation design
CN105302954A (en) Multiplayer online intelligent transformer substation design system
CN105760272B (en) Monitoring backstage business customizing method and its system based on plug-in unit
WO2023098374A1 (en) Network resource deployment method and apparatus, and electronic device and storage medium
CN112183821A (en) APP management system
CN105867864A (en) Method and device for displaying of K virtual machines (KVMs)
CN108764409A (en) Secondary device machine account management system
CN108038332A (en) A kind of online artwork rapid generation for the state power grid that faces the future
CN103903103A (en) Online model parameter collection method based on process cross-region power grid running method
CN107392266A (en) It is a kind of that cloud platform is transmitted for the wisdom of mark by Quick Response Code
CN104361151B (en) Transformer station&#39;s image generation method based on pattern
CN101807289A (en) Modeling method for distributed image processing system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant