CN104314056A - 一种高地温深埋引水隧洞施工的通风降温方法 - Google Patents

一种高地温深埋引水隧洞施工的通风降温方法 Download PDF

Info

Publication number
CN104314056A
CN104314056A CN201410484551.XA CN201410484551A CN104314056A CN 104314056 A CN104314056 A CN 104314056A CN 201410484551 A CN201410484551 A CN 201410484551A CN 104314056 A CN104314056 A CN 104314056A
Authority
CN
China
Prior art keywords
cooling
ventilation
aeration
construction
high temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410484551.XA
Other languages
English (en)
Inventor
宿辉
唐阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei University of Engineering
Original Assignee
Hebei University of Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei University of Engineering filed Critical Hebei University of Engineering
Priority to CN201410484551.XA priority Critical patent/CN104314056A/zh
Publication of CN104314056A publication Critical patent/CN104314056A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B9/00Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B9/00Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
    • E02B9/02Water-ways
    • E02B9/06Pressure galleries or pressure conduits; Galleries specially adapted to house pressure conduits; Means specially adapted for use therewith, e.g. housings, valves, gates
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

本发明提供了一种高地温深埋引水隧洞施工的通风降温方法,包括如下步骤:1、人员健康管理;2、通风降温;3、炮孔冷却;4、制冰降温;5、测量设备冷却。本发明所述的高地温深埋引水隧洞施工的通风降温方法,将通风技术与低温冷水技术融为一体,可实现对高温环境下施工,减少了施工人员在高温环境下中暑症状的发生;防止施工机械的机油温度增高、粘度下降、润滑效果降低,致使机械零部件的磨损;防止高温造成的爆管、接头漏油、电磁阀线圈烧毁,密封件加速老化;防止高温环境下乳化炸药失效,导爆管软化、哑炮现象的发生,防止监测设备高温环境下不能正常使用。

Description

一种高地温深埋引水隧洞施工的通风降温方法
技术领域
本发明涉及一种深埋引水隧洞施工方法,尤其是一种高地温深埋引水隧洞施工的通风降温方法。
背景技术
随着我国西部大开发战略的实施,西部基础设施建设日新月异,由于水利和交通建设的需要,经常需要进行深埋隧洞的施工。由于西部许多地区蕴藏丰富的地热资源,在深埋隧洞的施工中可能遇到高地温问题。如新疆布仑口-公格尔水电站引水隧洞3#支洞内岩壁最高温度达到105℃,空气温度达到72℃,新疆齐热哈塔尔水电站3#支洞、4#支洞内均出现高地温现象洞内岩壁温度高达110℃,围岩破碎带伴有高压蒸汽喷出,气体温度达到160℃-170℃,空气温度高达70℃,目前对于高地温隧洞的施工技术是一个难点,在这方面的研究较为少见。
发明内容
为解决上述问题,本发明的目的就在于提供效果好的高地温深埋引水隧洞施工的通风降温方法。
本发明通过以下技术方案来实现上述目的:
一种高地温深埋引水隧洞施工的通风降温方法,包括如下步骤:(1)人员健康管理;(2)通风降温;(3)炮孔冷却;(4)制冰降温;(5)测量设备冷却。
所述人员健康管理的具体方法如下:
缩短高温隧洞内停留时间,增加施工班次,保证隧洞内作业时间(2小时);
加强高温补贴以及劳保用品的发放,隧洞内部安装有害气体检测仪和自动报警装置;
预埋监控地热、风向的组织系统,时常监测隧洞内部的地热、风向参数。
所述通风降温的具体方法如下:
采用送排混合通风方式,充分利用当地的环境气温,全天不间断的向洞内送入新鲜空气,改善洞内空气质量;
同时在洞内增设一台抽风机将废尘废气等有害物质吸出并排到洞外,加快气体的流动速度,尽可能降低作业区温度。
所述炮孔冷却的具体方法如下:
设置抽水输送系统、分散制冷系统和抽水输出系统;
抽水输送系统由抽水装置和输送管道组成,在河道旁建造一个泵房,通过Φ150mm的钢管输送冷水至掌子面30m,然后在输水管道上解出4个分水闸阀,通过橡胶软管分别连接到钻爆台车上,分散制冷系统主要是通过分流,将冷水分成多股,直接插入到炮孔中,直至冷却至合理的爆破温度,抽水输出系统是为了避免冷却水到处乱流影响洞内的施工环境,在距离掌子面40m处设置集水坑,通过污水泵将集水坑中的循环水经排水管排出洞外。
所述制冰降温的具体方法如下:
利用冰柜生产制备冰块,将冰块放置于隧洞通风口,利用冰块液化吸热的原理将产生的的冷空气循环流动,使得隧洞内部的温度有效的降低,最终达到降温效果。
所述测量设备冷却的具体方法如下:
测量设备的实际尺寸,定制冰块降温套,使其设备在高温环境下能在一个适宜的温度下正常运行,提高其在高温环境下的工作时间和寿命。
本发明所述的一种高地温深埋引水隧洞施工的通风降温方法具有以下优点:
1、减少了施工人员热痉挛、热虚脱和热射症等中暑症状。
2、保证施工机械设备在高海拔地区隧洞施工发动机功率正常运转,有效的提高了施工机械零部件的利用率。
3、有效的提高乳化炸药、导爆管的利用率,减少了乳化炸药变质、硫化、导爆管软化的现象,很大程度上杜绝了由于导爆管软化致使哑炮现象的发生。
4、既保证了施工人员的安全,又保证了施工的进度且节约了施工成本。
具体实施方式
一种高地温深埋引水隧洞施工的通风降温方法,包括如下步骤:(1)人员健康管理;(2)通风降温;(3)炮孔冷却;(4)制冰降温;(5)测量设备冷却。
所述人员健康管理的具体方法如下:
缩短高温隧洞内停留时间,增加施工班次,保证隧洞内作业时间(2小时);加强高温补贴以及劳保用品的发放,隧洞内部安装有害气体检测仪和自动报警装置;
预埋监控地热、风向的组织系统,时常监测隧洞内部的地热、风向参数。
所述通风降温的具体方法如下:
采用送排混合通风方式,充分利用当地的环境气温,全天不间断的向洞内送入新鲜空气,改善洞内空气质量;
同时在洞内增设一台抽风机将废尘废气等有害物质吸出并排到洞外,加快气体的流动速度,尽可能降低作业区温度。
所述炮孔冷却的具体方法如下:
设置抽水输送系统、分散制冷系统和抽水输出系统;
抽水输送系统由抽水装置和输送管道组成,在河道旁建造一个泵房,通过Φ150mm的钢管输送冷水至掌子面30m,然后在输水管道上解出4个分水闸阀,通过橡胶软管分别连接到钻爆台车上,分散制冷系统主要是通过分流,将冷水分成多股,直接插入到炮孔中,直至冷却至合理的爆破温度,抽水输出系统是为了避免冷却水到处乱流影响洞内的施工环境,在距离掌子面40m处设置集水坑,通过污水泵将集水坑中的循环水经排水管排出洞外。
所述制冰降温的具体方法如下:
利用冰柜生产制备冰块,将冰块放置于隧洞通风口,利用冰块液化吸热的原理将产生的的冷空气循环流动,使得隧洞内部的温度有效的降低,最终达到降温效果。
所述测量设备冷却的具体方法如下:
测量设备的实际尺寸,定制冰块降温套,使其设备在高温环境下能在一个
适宜的温度下正常运行,提高其在高温环境下的工作时间和寿命。
上面所述的实施例仅仅是对本发明的优选实施方式进行描述,并非对本发明的范围进行限定,在不脱离本发明设计精神前提下,本领域普通工程技术人员对本发明技术方案做出的各种变形和改进,均应落入本发明的权利要求书确定的保护范围内。

Claims (6)

1.一种高地温深埋引水隧洞施工的通风降温方法,其特征在于,包括如下步骤:(1)人员健康管理;(2)通风降温;(3)炮孔冷却;(4)制冰降温;(5)测量设备冷却。
2.根据权利要求1所述的高地温深埋引水隧洞施工的通风降温方法,其特征在于:所述人员健康管理的具体方法如下:
缩短高温隧洞内停留时间,增加施工班次,保证隧洞内作业时间(2小时);加强高温补贴以及劳保用品的发放,隧洞内部安装有害气体检测仪和自动报警装置;
预埋监控地热、风向的组织系统,时常监测隧洞内部的地热、风向参数。
3.根据权利要求1所述的高地温深埋引水隧洞施工的通风降温方法,其特征在于:所述通风降温的具体方法如下:
采用送排混合通风方式,充分利用当地的环境气温,全天不间断的向洞内送入新鲜空气,改善洞内空气质量;
同时在洞内增设一台抽风机将废尘废气等有害物质吸出并排到洞外,加快气体的流动速度,尽可能降低作业区温度。
4.根据权利要求1所述的高地温深埋引水隧洞施工的通风降温方法,其特征在于:
所述炮孔冷却的具体方法如下:
设置抽水输送系统、分散制冷系统和抽水输出系统;
抽水输送系统由抽水装置和输送管道组成,在河道旁建造一个泵房,通过Φ150mm的钢管输送冷水至掌子面30m,然后在输水管道上解出4个分水闸阀,通过橡胶软管分别连接到钻爆台车上,分散制冷系统主要是通过分流,将冷水分成多股,直接插入到炮孔中,直至冷却至合理的爆破温度,抽水输出系统是为了避免冷却水到处乱流影响洞内的施工环境,在距离掌子面40m处设置集水坑,通过污水泵将集水坑中的循环水经排水管排出洞外。
5.根据权利要求1所述的高地温深埋引水隧洞施工的通风降温方法,其特征在于:所述制冰降温的具体方法如下:
利用冰柜生产制备冰块,将冰块放置于隧洞通风口,利用冰块液化吸热的原理将产生的的冷空气循环流动,使得隧洞内部的温度有效的降低,最终达到降温效果。
6.根据权利要求1所述的高地温深埋引水隧洞施工的通风降温方法,其特征在于:所述测量设备冷却的具体方法如下:
测量设备的实际尺寸,定制冰块降温套,使其设备在高温环境下能在一个适宜的温度下正常运行,提高其在高温环境下的工作时间和寿命。
CN201410484551.XA 2014-09-22 2014-09-22 一种高地温深埋引水隧洞施工的通风降温方法 Pending CN104314056A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410484551.XA CN104314056A (zh) 2014-09-22 2014-09-22 一种高地温深埋引水隧洞施工的通风降温方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410484551.XA CN104314056A (zh) 2014-09-22 2014-09-22 一种高地温深埋引水隧洞施工的通风降温方法

Publications (1)

Publication Number Publication Date
CN104314056A true CN104314056A (zh) 2015-01-28

Family

ID=52369357

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410484551.XA Pending CN104314056A (zh) 2014-09-22 2014-09-22 一种高地温深埋引水隧洞施工的通风降温方法

Country Status (1)

Country Link
CN (1) CN104314056A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988749A (zh) * 2017-04-13 2017-07-28 中铁建大桥工程局集团第五工程有限公司 超高地热条件下特长引水隧洞施工工法
CN109184775A (zh) * 2018-09-29 2019-01-11 中国水利水电第四工程局有限公司 一种高温地热隧道支护施工方法
CN111206958A (zh) * 2020-03-18 2020-05-29 武汉大学 长距离深埋隧洞tbm掘进施工中排水和降温系统及方法
CN111520147A (zh) * 2020-05-12 2020-08-11 中建六局水利水电建设集团有限公司 一种长距离引水隧洞施工方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4420622A1 (de) * 1994-06-13 1995-12-14 Ruhrkohle Ag Kühleinheit für untertägige Abbaubetriebe
CN101949298A (zh) * 2010-09-29 2011-01-19 煤炭科学研究总院重庆研究院 煤矿井下制冷降温装置
CN202391454U (zh) * 2011-12-09 2012-08-22 西安工程大学 矿井用蒸发冷却通风降温装置
CN203441516U (zh) * 2013-05-10 2014-02-19 玉溪大红山矿业有限公司 一种可有效排尘降温的溜破系统通风结构
CN103615277A (zh) * 2013-12-09 2014-03-05 丁文军 一种矿井降温系统
CN203484172U (zh) * 2013-08-01 2014-03-19 江苏康为世纪生物科技有限公司 一种冷却槽
CN103912241A (zh) * 2014-04-10 2014-07-09 西安博深煤矿安全科技有限公司 一种矿井下制冷降温系统
KR20140102412A (ko) * 2013-02-14 2014-08-22 주식회사 인타코퍼레이션 터널 공기 냉각 방식의 냉풍기 시스템
CN104508952A (zh) * 2012-07-25 2015-04-08 西门子公司 冷却罩

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4420622A1 (de) * 1994-06-13 1995-12-14 Ruhrkohle Ag Kühleinheit für untertägige Abbaubetriebe
CN101949298A (zh) * 2010-09-29 2011-01-19 煤炭科学研究总院重庆研究院 煤矿井下制冷降温装置
CN202391454U (zh) * 2011-12-09 2012-08-22 西安工程大学 矿井用蒸发冷却通风降温装置
CN104508952A (zh) * 2012-07-25 2015-04-08 西门子公司 冷却罩
KR20140102412A (ko) * 2013-02-14 2014-08-22 주식회사 인타코퍼레이션 터널 공기 냉각 방식의 냉풍기 시스템
CN203441516U (zh) * 2013-05-10 2014-02-19 玉溪大红山矿业有限公司 一种可有效排尘降温的溜破系统通风结构
CN203484172U (zh) * 2013-08-01 2014-03-19 江苏康为世纪生物科技有限公司 一种冷却槽
CN103615277A (zh) * 2013-12-09 2014-03-05 丁文军 一种矿井降温系统
CN103912241A (zh) * 2014-04-10 2014-07-09 西安博深煤矿安全科技有限公司 一种矿井下制冷降温系统

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
宿辉等: "《齐热哈嗒尔高地温引水发电隧洞施工影响分析及降温措施研究》", 《隧道建设》 *
李湘权等: "《发电引水隧洞高地温洞段施工降温技术》", 《水利水电技术》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988749A (zh) * 2017-04-13 2017-07-28 中铁建大桥工程局集团第五工程有限公司 超高地热条件下特长引水隧洞施工工法
CN109184775A (zh) * 2018-09-29 2019-01-11 中国水利水电第四工程局有限公司 一种高温地热隧道支护施工方法
CN111206958A (zh) * 2020-03-18 2020-05-29 武汉大学 长距离深埋隧洞tbm掘进施工中排水和降温系统及方法
CN111206958B (zh) * 2020-03-18 2021-01-26 武汉大学 长距离深埋隧洞tbm掘进施工中排水和降温系统及方法
CN111520147A (zh) * 2020-05-12 2020-08-11 中建六局水利水电建设集团有限公司 一种长距离引水隧洞施工方法

Similar Documents

Publication Publication Date Title
CN104314056A (zh) 一种高地温深埋引水隧洞施工的通风降温方法
Wojdyga et al. Chances for Polish district heating systems
Xiaojie et al. Progress of heat-hazard treatment in deep mines
Feng et al. A full air cooling and heating system based on mine water source
CN108150214B (zh) 一种隧道施工过程中自动降雾除尘降温系统及方法
CN104319669A (zh) 一种带有喷雾降温装置的变电站
CN104695998A (zh) 一种高温采煤工作面供水降温系统
CN108692407A (zh) 一种利用城市管廊空气对建筑环境进行调节的装置
Belsky et al. Electrotechnical complex for autonomous power supply of oil leakage detection systems and stop valves drive control systems for pipelines in arctic region
CN205001871U (zh) 一种基于互联网管网远程监控系统
Guo et al. Field experimental study on the cooling effect of mine cooling system acquiring cold source from return air
Schoeman The integrated effect of DSM on mine chilled water systems
CN204827769U (zh) 一种用于观察推力油槽的专用工具
CN103090553A (zh) 寒区隧道衬砌太阳能-地源热泵联合蓄热加热系统及方式
CN206555718U (zh) 一种新型管道泄漏报警装置
CN204138689U (zh) 一种高炉多级连接密闭循环冷却水系统查漏装置
Qi et al. Working principle and application of HEMS with lack of a cold source
CN109529236B (zh) 一种隧道分区接力补水管道干式水消防控制系统
CN204460847U (zh) 深井热泵装置
CN210198651U (zh) 冷油器微泄露在线检测装置及冷油器组件
CN203272484U (zh) 一种空气预热器轴承外部风冷装置
CN203908790U (zh) 一种模拟冷温水机系统负荷的装置
CN207672615U (zh) 地下综合管廊通风口风管排风构造
CN205719409U (zh) 一种自来水管道漏水检测装置
CN206465768U (zh) 一种拖拉机罩散热口风道门装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150128