CN104303948B - 一种夏季大型树木的移植方法 - Google Patents
一种夏季大型树木的移植方法 Download PDFInfo
- Publication number
- CN104303948B CN104303948B CN201410440860.7A CN201410440860A CN104303948B CN 104303948 B CN104303948 B CN 104303948B CN 201410440860 A CN201410440860 A CN 201410440860A CN 104303948 B CN104303948 B CN 104303948B
- Authority
- CN
- China
- Prior art keywords
- trees
- tree
- root
- transplantation
- scale
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G23/00—Forestry
- A01G23/02—Transplanting, uprooting, felling or delimbing trees
- A01G23/04—Transplanting trees; Devices for grasping the root ball, e.g. stump forceps; Wrappings or packages for transporting trees
Abstract
本发明涉及树木移植技术领域,特别是南方地区夏季移植大型树木时,大幅度提高树木移植存活率的一种夏季大型树木的移植方法;首先提前断根,在移植前先切断树木的主根,促使主根上长出侧根;修剪树冠,截去病虫枝和多余的树枝;接着在树冠的周围架起遮荫棚;然后采用冰水对树木进行充分浇灌,并在树木根部周围埋入若干个冰水袋,然后在树木根部的上方盖上保温棉;最后栽植,栽植后对苗木喷洒蒸腾抑制剂;本方法能使移植前的大型树木进入休眼状态,减缓了植物的蒸腾作用,从而提高大型树木移植的成活率。
Description
技术领域
本发明涉及树木移植技术领域,特别是南方地区夏季移植大型树木时,大幅度提高树木移植存活率的一种夏季大型树木的移植方法。
背景技术
树木对保护人类的生存环境和地球的生态平衡有着重大的作用,特别在当前的城市建设及道路工程建设中,为了加快城市绿化速度、优化城市绿地的植物配置和空间结构,都会遇到树木移植,在进行园林绿化的建设过程中,为了尽快达到园林设计师所要求的景观效果,往往会采用大树移植;此外,若要对建设项目区域内的大树进行异地保护或是对古树名木进行保护时都要进行大树的移植,大树移植已经成为当前城市绿化建设中一项必不可少的技术和手段。
大树在移植过程中根系会受到大量伤害,而大树由于树龄较大,细胞再生能力下降,根系的恢复较慢。同时,经过多年的生长,大树新根的形成主要处于深层和树冠投影附近,而移植所带土球内的吸收根较少,根系吸水能力较弱。而大树又因为树体高大,蒸腾作用较强,特别是在夏季温度较高的南方地区,地上部分的蒸腾速率远大于根系的吸水速率,树木吸收水分90%是通过叶片的蒸腾作用丧失的,当叶片蒸腾失水量超过根部吸收进水量时就会使树木萎蔫,从而造成移植大树的枯萎死亡,影响大树移植的成活率,增加工程施工成本。
为减少移植大树的水分散失,当前所采取的措施一方面是对移植大树进行包干:用草绳、蒲包、苔藓等材料严密包裹树干和比较粗壮的分枝,但该方法减少水分散失的效能有限,直接在树体上进行操作也容易对树体造成损伤;另一方面是对树干进行喷水,保持树干湿润,减少树木的水分散失,但该方法费时、费工,水资源浪费严重,大量的浇水还可能会造成大树根部积水,导致大树根部腐烂,影响移植的成活率。
实用新型内容
本发明为了解决目前大型树木在移植时成活率不高的问题而提供的一种夏季大型树木的移植方法。
为达到上述功能,本发明提供的技术方案是:
一种夏季大型树木的移植方法,所述的移植方法包括以下步骤:
步骤A、提前断根,在移植前先切断树木的主根,促使主根上长出侧根;
步骤B、修剪树冠,截去病虫枝和多余的树枝;
步骤C、在所述树冠的周围架起遮荫棚;
步骤D、采用冰水对树木进行充分浇灌,并在树木根部周围埋入若干个冰水袋,然后在所述树木根部的上方盖上保温棉,通过降低所述树木周围温度的方法,使所述树木进入休眠状态;
步骤E、起苗,在树木休眼后,迅速按常规带土起苗,依据树木规格确定土球的尺寸,土球直径为树木地径的5~7倍;
步骤F、挖树木种植穴;
步骤G、树木栽植,栽植后对树木喷洒蒸腾抑制剂。
步骤D中,采用所述冰水袋对树木进行逐步降温的方法,即每隔3~5天对树木进行浇灌的冰水以及埋入树木根部的冰水袋的温度比上一次的低1℃~3℃,所述冰水和所述冰水袋的温度为0℃~10℃。
优选地,所述种植穴的尺寸为所述土球直径的140%~180%。
本发明的有益效果在于:移植树木前通过对树木进行冰水浇灌,并在树木根部周围埋入若干个冰水袋,同时在修剪后的树冠的周围搭上遮荫棚,从而有效地降低了树木根部和树冠的温度,使树木进入休眼状态,因此在移植后有利于减缓了植物的蒸腾作用,从而提高发大型树木移植的成活率。
具体实施方式
移植树种:云杉(直径20cm~30cm)
移植地最高气温34℃,地表最高温度47℃。
具体移植步骤如下:
步骤A、选好需要移植的直径为20多厘米的云杉树,在移植的前3个月进行断根,断根的目的是促使主根上生出有利于成活的侧根;
步骤B、修剪树冠,截去病虫枝和多余的树枝,对剩余的树干打好草绳,截去树枝伤口部分应用专业的药物进行涂补,在实际使用中,采用伤口涂补剂的效果较好;
步骤C、在树冠的周围架起遮荫棚,遮荫棚的目的是有效地降低从树根到树冠顶部的温度;
步骤D、采用5℃的冰水对树木进行充分浇灌,并在树木根部周围埋入12个装有5℃冰水的冰水袋,然后在树木根部的土壤上方盖上保温棉,这样使树木根部的土壤处于10℃以下的温度,经过一段时间后,树冠上的树叶便会逐渐变黄,树木逐渐进入休眠状态;
步骤E、起苗,在树木的树叶开始脱落,进入休眼后,迅速按常规带土起苗,土球直径为100cm,对土球进行挖掘时,要尽量少伤根和保证根部伤口的整齐性,用可重复使用的塑料布对土球进行包扎防止土球破碎,导致母土漏掉;
步骤F、种植穴的直径的150cm,深度不低于土球的深度;
步骤G、树木栽植,栽植后对树木喷洒蒸腾抑制剂。
经调查统计,采用本方法在夏季进行大型树木移植时,三年内的成活率能达98%,而同期采用常规方法进行移植的三年内的成活率仅有68%,
需要说明的是为了防止树根被冻坏,在用冰水对树木进行浇灌和在树木根部埋入冰水袋时,冰水或冰水袋的温度不能太低,在条件允许的情况下,建议采用逐步降温的方法,即每隔3~5天对树木进行浇灌的冰水以及埋入树木根部的冰水袋的温度比上一次的低1℃~3℃,采用这种方式把温度逐渐降低使树木逐渐进入休眠状态。但是冰水和冰水袋的温度也不宜太低或太高,实践表明选用0℃~10℃的效果较好。
另外,土球和种植穴的直径需要根据移植的树木的实际情况进行选择,一般来说,土球直径为树木地径的5~7倍,种植穴的尺寸为土球直径的140%~180%。
以上所述实施例,只是本发明的较佳实例,并非来限制本发明的实施范围,故凡依本发明申请专利范围所述的构造、特征及原理所做的等效变化或修饰,均应包括于本发明专利申请范围内。
Claims (2)
1.一种夏季大型树木的移植方法,其特征在于:所述的移植方法包括以下步骤:
步骤A、提前断根,在移植前先切断树木的主根,促使主根上长出侧根;
步骤B、修剪树冠,截去病虫枝和多余的树枝;
步骤C、在所述树冠的周围架起遮荫棚;
步骤D、采用冰水对树木进行充分浇灌,并在树木根部周围埋入若干个冰水袋,然后在所述树木根部的上方盖上保温棉,通过降低所述树木周围温度的方法,使所述树木进入休眠状态;
步骤E、起苗,在树木休眼后,迅速按常规带土起苗,依据树木规格确定土球的尺寸,土球直径为树木地径的5~7倍;
步骤F、挖树木种植穴;
步骤G、树木栽植,栽植后对树木喷洒蒸腾抑制剂;
步骤D中,采用所述冰水和所述冰水袋对树木进行逐步降温的方法,即每隔3~5天对树木进行浇灌的冰水以及埋入树木根部的冰水袋的温度比上一次的低1℃~3℃,所述冰水和所述冰水袋的温度为0℃~10℃。
2.如权利要求1所述的夏季大型树木的移植方法,其特征在于:所述种植穴的尺寸为所述土球直径的140%~180%。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410440860.7A CN104303948B (zh) | 2014-09-01 | 2014-09-01 | 一种夏季大型树木的移植方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410440860.7A CN104303948B (zh) | 2014-09-01 | 2014-09-01 | 一种夏季大型树木的移植方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104303948A CN104303948A (zh) | 2015-01-28 |
CN104303948B true CN104303948B (zh) | 2019-07-16 |
Family
ID=52359389
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410440860.7A Active CN104303948B (zh) | 2014-09-01 | 2014-09-01 | 一种夏季大型树木的移植方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104303948B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105340687B (zh) * | 2015-12-03 | 2018-03-02 | 宜宾云辰乔木园林有限责任公司 | 一种树木裸根移栽的方法 |
CN112314384A (zh) * | 2020-10-24 | 2021-02-05 | 湖南高尔园林绿化工程有限公司 | 一种夏季大树移植方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1593102A (zh) * | 2004-06-26 | 2005-03-16 | 李子东 | 夏季树木移植方法 |
CN101530051A (zh) * | 2008-03-12 | 2009-09-16 | 王立安 | 一种树木栽植方法 |
CN101669439A (zh) * | 2008-09-13 | 2010-03-17 | 广东棕榈园林股份有限公司 | 大树全冠移植方法 |
CN102487780A (zh) * | 2011-12-12 | 2012-06-13 | 宋慎汉 | 一种大香樟树的移栽方法 |
CN102511356A (zh) * | 2011-12-26 | 2012-06-27 | 杭州市园林绿化工程有限公司 | 一种桂花大苗容器化裸根移栽方法 |
CN102511357A (zh) * | 2011-12-23 | 2012-06-27 | 中国科学院沈阳应用生态研究所 | 一种冰冻季节的树木移植方法 |
CN103238499A (zh) * | 2013-05-22 | 2013-08-14 | 宜宾云辰乔木园林有限责任公司 | 大树移植方法 |
CN103518589A (zh) * | 2013-10-19 | 2014-01-22 | 江苏天亮园林建设有限公司 | 一种大树的移栽方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2359529A1 (en) * | 2001-10-03 | 2003-04-03 | Paul Brown | Quick wrap burlap |
-
2014
- 2014-09-01 CN CN201410440860.7A patent/CN104303948B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1593102A (zh) * | 2004-06-26 | 2005-03-16 | 李子东 | 夏季树木移植方法 |
CN101530051A (zh) * | 2008-03-12 | 2009-09-16 | 王立安 | 一种树木栽植方法 |
CN101669439A (zh) * | 2008-09-13 | 2010-03-17 | 广东棕榈园林股份有限公司 | 大树全冠移植方法 |
CN102487780A (zh) * | 2011-12-12 | 2012-06-13 | 宋慎汉 | 一种大香樟树的移栽方法 |
CN102511357A (zh) * | 2011-12-23 | 2012-06-27 | 中国科学院沈阳应用生态研究所 | 一种冰冻季节的树木移植方法 |
CN102511356A (zh) * | 2011-12-26 | 2012-06-27 | 杭州市园林绿化工程有限公司 | 一种桂花大苗容器化裸根移栽方法 |
CN103238499A (zh) * | 2013-05-22 | 2013-08-14 | 宜宾云辰乔木园林有限责任公司 | 大树移植方法 |
CN103518589A (zh) * | 2013-10-19 | 2014-01-22 | 江苏天亮园林建设有限公司 | 一种大树的移栽方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104303948A (zh) | 2015-01-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103081777B (zh) | 一种树木反季节移栽方法 | |
CN101669439A (zh) | 大树全冠移植方法 | |
CN102308744B (zh) | 一种榉树的大苗移栽方法 | |
CN103283561B (zh) | 一种榉树裸根移栽保活方法 | |
CN104396693A (zh) | 大树木的移植方法 | |
CN102057854A (zh) | 滨海盐碱地大苗木移植方法 | |
CN102499013B (zh) | 一种干旱区反季节乔木移植方法 | |
CN204616542U (zh) | 一种提高大树在高黏性土里成活率的种植结构 | |
CN104067902A (zh) | 提高树木移栽成活率的方法 | |
CN103461067B (zh) | 夏季大树移栽的方法 | |
CN102511356A (zh) | 一种桂花大苗容器化裸根移栽方法 | |
CN105359929A (zh) | 干旱区祁连圆柏大规格苗木移植方法 | |
CN104705073A (zh) | 一种观赏茶花的嫁接栽培方法 | |
CN103155833A (zh) | 一种果树栽可培持续保水、保肥生产技术 | |
CN104719085A (zh) | 一种提高乔木裸根栽植成活率的方法 | |
CN108770628A (zh) | 一种苗木的栽植方法 | |
CN103988651A (zh) | 一种乔木丛植的培育方法 | |
CN102812844A (zh) | 一种朴树种植管理方法 | |
CN105875110A (zh) | 一种山茶花移植技术 | |
CN107439334A (zh) | 一种夏季高温白玉兰的移植方法 | |
CN104303948B (zh) | 一种夏季大型树木的移植方法 | |
CN104429804A (zh) | 大树移植日常养护管理方法 | |
CN102499014B (zh) | 一种干旱区反季节乔木假植方法 | |
CN105210782A (zh) | 一种防止园林树木移栽爆皮的方法 | |
CN102668837A (zh) | 低成活率树木种植方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |