CN104301176B - A kind of more ONU equipment test system and methods - Google Patents
A kind of more ONU equipment test system and methods Download PDFInfo
- Publication number
- CN104301176B CN104301176B CN201410514320.9A CN201410514320A CN104301176B CN 104301176 B CN104301176 B CN 104301176B CN 201410514320 A CN201410514320 A CN 201410514320A CN 104301176 B CN104301176 B CN 104301176B
- Authority
- CN
- China
- Prior art keywords
- onu equipment
- onu
- test
- olt device
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Small-Scale Networks (AREA)
Abstract
The invention discloses a kind of more ONU equipments to test system and method, belongs to ONU productivity test technical fields.System includes OLT device, more ONU equipments and corresponding more test equipments:OLT device includes:Granted unit;First dispensing unit;Second dispensing unit;Third dispensing unit;4th dispensing unit;Method includes:OLT device connects more ONU equipments and corresponding test equipment;Automatic authorization is carried out to ONU equipment;Configure vlan ID and the vlan patterns of ONU equipment port;Configure vlan ID and the vlan patterns of OLT device port;The MAC ageing times that OLT device is arranged are 0;ONU equipment to connecting and obtaining mandate carries out flow rate test and exports corresponding test result;The ONU equipment that test is completed and disconnected authorize.The advantageous effect of above-mentioned technical proposal is:It realizes that more ONU equipments are carried out at the same time flow rate test, abandons complicated manual configuration procedures, save the operating time of producing line operator, promote the efficiency of flow rate test.
Description
Technical field
The present invention relates to ONU productivity tests technical fields more particularly to a kind of more ONU equipments to test system and method.
Background technology
In the prior art, at Ethernet passive optical network (Ethernet Passive Optical Network, EPON)
Or in gigabit passive optical network (Gigabit-Capable PON, GPON), the optical line terminal that uses when production
(optical line terminal, OLT) is all the OLT device that each producer develops under Commercialization Model.In procedure for producing
In test process, each station can only use an OLT device, and a passive optical network can only be used in every OLT device
Interface (Passive Optical Network, PON).Above-mentioned limitation makes to ONT Optical Network Terminal (Optical Network
When Unit) carrying out flow rate test, tester is needed to connect ONU equipment to be measured one by one manually, and match manually accordingly
The operations such as set, the testing time is longer, and testing efficiency is poor, many time and efforts of waste producing line operating personnel.
Chinese patent (CN103560829A) discloses a kind of automated testing method and system of uni port, this method
Including:Test environment is built, whole uni ports of tested ONU are accessed into a downlink access device, by tested ONU connections one
OLT is separately connected downlink access device and OLT using a network data analyzer, and control is separately connected using a test terminal
Downlink access device, OLT and network data analyzer;The test parameter and test case of uni port are configured by testing terminal;
Test terminal adjust automatically test case executes sequence, and by the sequence implementation of test cases after adjustment, generates test log
And test report.Above-mentioned technical proposal only describes specific ONU test process, not to the complexity of manual configuration and test
The problems such as low with testing efficiency, is improved, and can not solve problems of the prior art.
Chinese patent (CN102917285A) discloses a kind of test method of Ethernet passive optical network equipment, including:
It is virtual to add optical network unit ONU registration and reaches the standard grade after getting test instruction, and to ONU distribution Logical link ID and
Fixed-bandwidth;Ethernet test message is pushed to down channel, and the test packet is packaged into unicast in down channel
Data frame, and the Logical link ID is carried in the unicast data frames;And the unicast data frames are looped back to described
Up channel;The unicast data frames are decapsulated in the up channel, and the test packet after decapsulation is pushed out institute
State up channel;When the test report for detecting the test packet being pushed out from up channel with being pushed to the down channel
When text is identical, the normal response of Ethernet passive optical network equipment test is exported.Above-mentioned technical proposal is only for testing
Test packet how is sent and received in the process to be described, and can not solve problems of the prior art.
Invention content
According to problems of the prior art, a kind of more ONU equipment test system and methods are now provided, are specifically included:
A kind of more ONU equipments test system, wherein including an OLT device, more ONU equipments and more corresponding
Test equipment;
The passive optical network interface of each ONU equipment connects the passive optical network interface of the OLT device, Mei Gesuo
The user network side interface for stating ONU equipment connects a corresponding test equipment;The upper united mouth of the OLT device connects
The corresponding test equipment of the ONU equipment entered;
The OLT device includes:
Granted unit, for when the ONU equipment connects the OLT device to the corresponding ONU equipment into
Row authorizes, and to the corresponding ONU equipment authorize when the ONU equipment cancels connection with the OLT device;
First dispensing unit connects the granted unit, for will obtain the uplink band of the ONU equipment of mandate
Wide and downlink bandwidth is disposed as a preset value;
Second dispensing unit connects the granted unit, the user network for the ONU equipment to having obtained mandate
Network side interface carries out corresponding vlan ID configurations and vlan pattern configurations;
Third dispensing unit carries out corresponding vlan ID configurations and vlan patterns for the upper united mouth to the OLT device
Configuration;
4th dispensing unit, for the MAC ageing times of the OLT to be set as 0.
Preferably, which tests system, wherein the ONU equipment connects the OLT by optical branching device and sets
It is standby.
Preferably, which tests system, wherein use of second dispensing unit to the ONU equipment of connection
Family Network Side Interface issues 1000 vlan ID, and the user network side interface of the ONU equipment of connection is configured to
Vlan tag patterns.
Preferably, which tests system, wherein the third dispensing unit is by the upper united mouth of the OLT device
Vlan ID are set as 1000, and by the vlan mode settings of the upper united mouth of the OLT device at vlan untag patterns.
Preferably, which tests systems, wherein the OLT device further includes:
Judging unit connects the granted unit, for judging whether the ONU equipment of connection powers on completion, and
The ONU equipment of connection starts the granted unit after the completion of powering on.
A kind of more ONU equipment test methods, wherein including an OLT device, more ONU equipments and more corresponding
Test equipment;
The passive optical network interface of each ONU equipment connects the passive optical network interface of the OLT device, Mei Gesuo
The user network side interface for stating ONU equipment connects a corresponding test equipment;The upper united mouth of the OLT device connects
The corresponding test equipment of the ONU equipment entered;
More ONU equipment test methods include:
Step S1, the ONU equipment to being connected to the OLT device carry out Authorized operation;
Step S2 configures the user network side interface and the institute of the OLT device of the authorized ONU equipment
Vlan ID and the vlan patterns of upper united mouth are stated, and the MAC ageing times of the OLT device are set as 0;
Step S3 carries out uplink and downlink flow rate test to the authorized ONU equipment, and exports corresponding test knot
Fruit;
Step S4 after the completion of test, disconnects the connection of the ONU equipment and the OLT device, and to being disconnected
The ONU equipment carries out Authorized operation.
Preferably, more ONU equipment test methods, wherein the ONU equipment passes through optical branching device and the OLT device
Connection.
Preferably, more ONU equipment test methods, wherein the step S1 is specifically included:
The ONU equipment to be detected is connected to the OLT device, and is executed to the ONU equipment by step S11
It is electrically operated;
Step S12 after the completion of the OLT device detects that the ONU equipment powers on, goes to the step S2.
Preferably, more ONU equipment test methods, wherein in the step S2:
Issue 1000 vlan ID to the user network side interface of the ONU equipment, and by the ONU equipment
The user network side interface be configured under vlan tag patterns;
The vlan ID of the upper united mouth of the OLT device are arranged to 1000, and will be described in the OLT device
Upper united mouth is disposed under vlan untag patterns.
A kind of OLT device, wherein be applied in above-mentioned more ONU equipment test systems.
A kind of OLT device, wherein use above-mentioned more ONU equipment test methods.
The advantageous effect of above-mentioned technical proposal is:Realize that more ONU equipments are carried out at the same time flow rate test, abandoning tradition test
The processes such as complicated manual authorisation, configuration, flow editor in the process save the operating time of producing line operator, promote flow and survey
The efficiency of examination.
Description of the drawings
Fig. 1 is the knot that single ONU equipment, OLT device are connected with single test equipment in the preferred embodiment of the present invention
Structure schematic diagram;
Fig. 2 is in the preferred embodiment of the present invention, and OLT device is connected with Duo Tai ONU equipments and more test equipments
Structural schematic diagram;
Fig. 3 is the structural schematic diagram of OLT device in the preferred embodiment of the present invention;
Fig. 4 is in the preferred embodiment of the present invention, and one PON mouthfuls of OLT device connect more ONU by optical branching device
The structural schematic diagram of equipment;
Fig. 5-6 is a kind of flow diagram of more ONU equipment test methods in the preferred embodiment of the present invention.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art obtained under the premise of not making creative work it is all its
His embodiment, shall fall within the protection scope of the present invention.
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase
Mutually combination.
The invention will be further described in the following with reference to the drawings and specific embodiments, but not as limiting to the invention.
In the prior art, when testing in the production line ONU equipment, one can only be accommodated on a usual station
OLT device, and the OLT device of test is typically only capable to use one PON mouthfuls and a corresponding upper united mouth, therefore in same a period of time
Between be typically only capable to test an ONU equipment.In the prior art, when testing an ONU equipment, it is necessary first to hand
It is dynamic that tested ONU equipment is authorized, then according to the template type in different ONU equipment matching OLT devices, and want
Ask every ONU equipment of input MAC Address or No. SN:Usually authorized using MAC Address in EPON networks, and
It is authorized using No. SN in GPON networks.Then, flow editor, and manual allocation bandwidth are carried out to tested ONU equipment.
Also need to each user network side interface (User Network Interface, UNI) of ONU equipment configuration vlan ID and
Vlan patterns.It finally, will also be in OLT device left-hand seat after an ONu equipment test is completed and disconnects the connection with OLT device
Dynamic operation goes to authorize, and causes follow-up ONU equipment to be unable to get mandate too much to avoid because authorizing.Above-mentioned entire testing process adds
Pickup powers on before test and some other operating time, the time of one ONU equipment of test substantially need 3-4 minutes, then phase
Ying Di tests more ONU equipments, can consume more times, generates more complicated repetitive operation if necessary.These are cumbersome
Operating procedure cause the working efficiency of producing line operator relatively low.
Based on the above problem in the prior art, the present invention provides a kind of more ONU equipment test systems.
As shown in Figure 1, a kind of more ONU equipment test systems include:
One OLT device 2;
More ONU equipments 1;And
With the one-to-one more test equipments 3 of ONU equipment.
In the preferred embodiment of the present invention, as shown in Figure 1, the PON mouths 12 of each ONU equipment 1 access OLT device 2
PON mouths 21, (UNI mouthfuls) access test equipments 3 of user network side interface 11 of each ONU equipment 1, correspondingly, OLT device 2
Test equipment 3 is accessed in upper united mouth 22, to form OLT device 2 as shown in Figure 1 and a corresponding ONU equipment 1 and accordingly
A test equipment 3 composition a test loop.By this test loop, test equipment 3 can test corresponding ONU
The uplink and downlink flow of equipment 1.Such as:When test equipment 3 needs to test the uplink traffic of ONU equipment 1, that is, send datagram
Text passes through ONU equipment 1 to OLT device 2;Correspondingly, when test equipment 3 needs to test the downlink traffic of ONU equipment, equally
It can send datagram, pass through OLT device 2 to ONU equipment 1.In the preferred embodiment of the present invention, Fig. 1 is individual one
Platform ONU equipment 1 to be measured and corresponding test equipment 3 are connect with OLT device 1.
As shown in Fig. 2, in the preferred embodiment of the present invention, using an OLT device 2, more ONU equipments 1 and phase
The mode that the more test equipments 3 answered are connected forms more ONU equipment test systems of the present invention.In the test system,
More ONU equipments 1 and corresponding test equipment 3 can be connected using an OLT device 2 simultaneously, support while test is more
The uplink and downlink flow of platform ONU equipment 1.
As shown in figure 3, in the preferred embodiment of the present invention, above-mentioned OLT device 2 further comprises:
Granted unit 21.In the preferred embodiment of the present invention, when there is ONU equipment to be connected in OLT device, authorize single
The ONU equipment of 21 pairs of connections of member authorizes.Further, in preferred embodiment of the invention, granted unit 21 is by obtaining
The model etc. of the ONU equipment of connection is taken, matches the information such as preset model in OLT device, it is determined whether to the ONU of connection
Equipment is authorized.
In the preferred embodiment of the present invention, granted unit 21 is other than authorizing ONU equipment 1, also to testing
The ONU equipment 1 that Cheng Bingyu OLT devices 2 disconnect carries out Authorized operation, is authorized to avoid because of the PON of OLT device 2 mouths 21
Excessive ONU equipment 1 and cause subsequent ONU equipment 1 to be unable to get mandate.
In the preferred embodiment of the present invention, further include in above-mentioned OLT device 2:
Judging unit 22 connects above-mentioned granted unit 21.In the preferred embodiment of the present invention, each ONU equipment 1 is being surveyed
It usually requires to carry out the sequence of operations such as electrifying startup before examination.After the completion of ONU equipment 1 powers on, the OLT of connection ONU equipment 1 is set
Standby 2 can be correctly detecting ONU equipment, and carry out subsequent configuration.Therefore, in preferred embodiment of the invention, judge list
Member 22 starts granted unit for judging whether the ONU equipment 1 of connection has already powered on completion after the completion of ONU equipment powers on
21, it is authorized with the ONU equipment 1 to connection.
First dispensing unit 23, connects above-mentioned granted unit 21.In the preferred embodiment of the present invention, the first dispensing unit
23 by the upstream and downstream bandwidth for the ONU equipment 1 for having obtained mandate for being limited to a preset value.Further, of the invention
In preferred embodiment, above-mentioned preset value is 1000M, i.e. the first dispensing unit 23 by the upstream bandwidth of the ONU equipment 1 of connection and
Downlink bandwidth is limited in 1000M.
Second dispensing unit 24, connects above-mentioned granted unit 21.In the preferred embodiment of the present invention, the second dispensing unit
The 24 UNI mouths 11 for being used for the ONU equipment 1 to having obtained mandate are configured.Specifically, preferred embodiment of the invention
In, the second dispensing unit 24 issues 1000 vlan ID to UNI mouths 11, and is tag moulds by UNI mouthfuls of vlan mode settings
Formula.In the preferred embodiment of the present invention, so-called tag patterns refer to that ONU equipment 1 is stamped when upstream data enters UNI mouths 11
Tag labels, and the tag labels when downlink data flows out mouth 11 UNI in removal data packet.The preferred embodiment of the present invention
In, set the UNI mouths 11 of ONU equipment 1 to tag patterns, it is therefore intended that reduce the configuration in test equipment 3.
Third dispensing unit 25.In the preferred embodiment of the present invention, third dispensing unit 25 is used for OLT device 2
Upper united mouth 22 is configured.Specifically, in preferred embodiment of the invention, third dispensing unit 25 is used for OLT device 2
The vlan ID of upper united mouth 22 are configured to 1000, while upper united mouth 22 being disposed under vlan untag patterns.The present invention's
In preferred embodiment, so-called untag patterns refer to that OLT device 2 stamps 1000 when downlink data enters upper united mouth 22
Vlan ID, and when upstream data is flowed out from upper united mouth removal 1000 vlan ID.
Therefore, in preferred embodiment of the invention, in conjunction with above-mentioned second dispensing unit 24 and third dispensing unit 25
Configuration, it is meant that for test equipment 3, connect one end of the UNI mouths 11 of ONU equipment 1, and connect OLT device 2
One end of upper united mouth 22 need not be configured to carry vlan ID.
In the preferred embodiment of the present invention, the PON mouths 21 of OLT device 2 are equally configured to transparent transmission mode, you can with saturating
The data with 1000 vlan ID are passed, any processing are not done to the data of transmission itself.
In the preferred embodiment of the present invention, further include in above-mentioned OLT device 2:
4th dispensing unit 26.In the preferred embodiment of the present invention, the 4th dispensing unit 26 is used for OLT device 2
The MAC address aging time is set as 0.
Specifically, in the prior art, it will usually which certain MAC address aging time is set, then when passing through certain aging
Between, each port of OLT device 2 does not receive the data frame for carrying out self-corresponding MAC Address, then turns the MAC Address from dynamic
Hair address table in delete, that is, MAC Address ageing process.But in actual ONU equipment flow rate test, once MAC
Address aging, then OLT device 2 can re-initiate find MAC Address process, during finding MAC Address, OLT device 2
Broadcast packet is will produce, therefore can occur that broadcast floodings occur.For one-to-one ONU equipment test process in the prior art
Speech, broadcast floodings may can't affect greatly, but for the technical side of the test simultaneously of more ONU equipments in the present invention
For case, under same OLT device 2, during executing broadcast lookup MAC Address to a certain ONU equipment 1, broadcast packet
The case where the be easy to causeing packet loss or crossfire that flood, be easy influence other ONU equipments 1 flow rate test result.Therefore, this hair
In bright preferred embodiment, the MAC address aging time of the port of OLT device 2 is set as 0, that is, it is not old to set MAC Address
Change, the flow rate test result that the broadcast floodings sent out by MAC address learning lead to ONU equipment 1 can be prevented inaccurate.
In the preferred embodiment of the present invention, as shown in figure 4, being connected to optical branching device between OLT device 2 and ONU equipment 1
4, i.e., ONU equipment 1 to be tested connects optical branching device 4 by optical fiber, to be connected to OLT device 2.Further, of the invention
Preferred embodiment in, the PON mouths 11 of ONU equipment 1 are connected to the PON mouths 21 of OLT device 2 by optical branching device 4.
In the preferred embodiment of the present invention, the purpose of setting optical branching device 4 is the same PON so that OLT device 2
Multiple ONU equipments 1 to be tested can be connected simultaneously, to further expand the ONU equipment 1 that can be carried out at the same time test mouthfuls 21 time
Quantity.
In the preferred embodiment of the present invention, above-mentioned optical branching device 4 can be 1 to 32 optical branching device.
In conclusion it is an object of the invention to:By the configuration to OLT device 2, and the configuration to ONU equipment 1,
Such as configuration OLT device 2 is authorized and is gone to ONU equipment 1 to authorize automatically, configures the vlan of the upper united mouth 22 of OLT device 2
The MAC of ID and vlan patterns, vlan ID and the vlan pattern and configuration OLT device 2 that configure the UNI mouths 11 of ONU equipment 1 is old
Change time etc. so that an OLT device 2 can connect more ONU equipments 1 to be tested simultaneously and corresponding more tests are set
Standby 3, and support that the more ONU equipments 1 to connection carry out flow rate test simultaneously.The time of test ONU equipment 1 is reduced, is promoted and is surveyed
Try efficiency.
In the preferred embodiment of the present invention, test equipment 3 can be configured, such as configure the data of this test
Frame length is 512 bytes, and the flow rate of configuration testing is the 90% of ONU equipment handling capacity, and configuration flow rate test when
Between be 60 seconds etc..Above-mentioned test configurations can carry out different set according to actual conditions, can also be according to the ONU equipment tested
Model carry out respective settings.
In the preferred embodiment of the present invention, after carrying out flow rate test to ONU equipment, it is qualified or two kinds unqualified to obtain
The ONU equipment of test passes is flowed into lower one of production process by test result, and is answered the ONU equipment of test failure
Survey or flow it into area to be measured.
In the preferred embodiment of the present invention, as shown in figure 5, offer is a kind of to test systems based on above-mentioned more ONU equipments
More ONU equipment test methods, specifically include:
Step S1, the ONU equipment to being connected to OLT device carry out Authorized operation;
The process of Authorized operation can hereinafter be described in detail.
Step S2 configures the user network side interface of authorized ONU equipment and the vlan of the upper united mouth of OLT device
ID and vlan patterns, and the MAC ageing times of OLT device are set as 0;
In the preferred embodiment of the present invention:
Determine that ONU equipment has been authorized first;
Then, 1000 vlan ID are issued to the UNI of ONU equipment mouths, and the UNI mouths of ONU equipment are configured to be in
Under vlan tag patterns;
Correspondingly, the upper united mouth of OLT device is configured to 1000 vlan ID, and the upper united mouth of OLT device is configured
To be under vlan untag patterns.
In the preferred embodiment of the present invention, while the upstream bandwidth of the UNI of ONU equipment mouths and downlink bandwidth being limited
For 1000M.
Step S3 carries out uplink and downlink flow rate test to authorized ONU equipment, and exports corresponding test result;
In the preferred embodiment of the present invention, it can be pre-configured with test pattern and test parameter, such as configure this survey
The data frame length of examination is 512 bytes, and the flow rate of configuration testing is the 90% of ONU equipment handling capacity, and configuration flow
The time of test is 60 seconds etc.
Step S4 after the completion of test, disconnects the connection of ONU equipment and OLT device, and the ONU equipment to being disconnected
Carry out Authorized operation.
In the preferred embodiment of the present invention, in order to avoid PON oral instruction power excessively causes subsequent ONU equipment that can not obtain
It authorizes, then Authorized operation is carried out to it after ONU equipment tests completion and disconnects the connection with OLT device.
In the preferred embodiment of the present invention, as shown in fig. 6, above-mentioned steps S1 is specifically included:
ONU equipment to be detected is connected to OLT device, and executes power on operation to ONU equipment by step S11;
Step S12 after the completion of OLT device detects that ONU equipment powers on, goes to step S2.
In the preferred embodiment of the present invention, after the completion of only ONU equipment is connected and powered on, OLT device can just detect
The ONU equipment of connection, and carry out subsequent operation.Therefore, when being authorized to ONU equipment, it is necessary first to judge it whether
It is via power up completion, and judging whether it can obtain by way of matching the model of preset ONU equipment after the completion of powering on
It authorizes.
In the preferred embodiment of the present invention, multiple ONU equipments are connected to OLT device by 1 to 32 optical branching device
In PON mouthfuls same, and different PON mouthfuls of OLT device can also connect different ONU equipments, to be tested to further expand
ONU equipment quantity.
The foregoing is merely preferred embodiments of the present invention, are not intended to limit embodiments of the present invention and protection model
It encloses, to those skilled in the art, should can appreciate that all with made by description of the invention and diagramatic content
Equivalent replacement and obviously change obtained scheme, should all be included within the scope of the present invention.
Claims (9)
1. a kind of more ONU equipments test system, which is characterized in that including an OLT device, more ONU equipments and corresponding
More test equipments;
The passive optical network interface of each ONU equipment connects the passive optical network interface of the OLT device, each described
The user network side interface of ONU equipment connects a corresponding test equipment;The upper united mouth connection access of the OLT device
The corresponding test equipment of the ONU equipment;
The OLT device includes:
Granted unit, for being awarded to the corresponding ONU equipment when an ONU equipment connects the OLT device
Power, and the corresponding ONU equipment authorize when the ONU equipment cancels connection with the OLT device;
First dispensing unit connects the granted unit, for by obtained the ONU equipment of mandate upstream bandwidth and
Downlink bandwidth is disposed as a preset value;
Second dispensing unit connects the granted unit, for will obtain the user network side of the ONU equipment of mandate
Interface carries out corresponding vlan ID configurations and vlan pattern configurations;
Third dispensing unit carries out corresponding vlan ID configurations and vlan pattern configurations for the upper united mouth to OLT device;
4th dispensing unit, for the MAC ageing times of the OLT to be set as 0.
2. more ONU equipments as described in claim 1 test system, which is characterized in that the ONU equipment is connected by optical branching device
Connect the OLT device.
3. ONU equipment as described in claim 1 tests system, which is characterized in that institute of second dispensing unit to connection
The user network side interface for stating ONU equipment issues 1000 vlan ID, and by the user network of the ONU equipment of connection
Side interface is configured to vlan tag patterns.
4. ONU equipment as described in claim 1 tests system, which is characterized in that the third dispensing unit sets the OLT
The vlan ID of standby upper united mouth are set as 1000, and by the vlan mode settings of the upper united mouth of the OLT device at vlan
Untag patterns.
5. more ONU equipments as described in claim 1 test systems, which is characterized in that the OLT device further includes:
Judging unit connects the granted unit, for judging whether the ONU equipment of connection powers on completion, and is connecting
The ONU equipment power on after the completion of start the granted unit.
6. a kind of more ONU equipment test methods, which is characterized in that including an OLT device, more ONU equipments and corresponding
More test equipments;
The passive optical network interface of each ONU equipment connects the passive optical network interface of the OLT device, each described
The user network side interface of ONU equipment connects a corresponding test equipment;The upper united mouth connection access of the OLT device
The corresponding test equipment of the ONU equipment;
More ONU equipment test methods include:
Step S1, the ONU equipment to being connected to the OLT device carry out Authorized operation;
Step S2 is configured on the user network side interface of the authorized ONU equipment and the described of the OLT device
Join vlan ID and the vlan patterns of mouth, and the MAC ageing times of the OLT device are set as 0;
Step S3 carries out uplink and downlink flow rate test to the authorized ONU equipment, and exports corresponding test result;
Step S4 after the completion of test, disconnects the connection of the ONU equipment and the OLT device, and to described in being disconnected
ONU equipment carries out Authorized operation.
7. more ONU equipment test methods as claimed in claim 6, which is characterized in that the ONU equipment by optical branching device with
The OLT device connection.
8. more ONU equipment test methods as claimed in claim 6, which is characterized in that the step S1 is specifically included:
The ONU equipment to be detected is connected to the OLT device, and powers on behaviour to ONU equipment execution by step S11
Make;
Step S12 after the completion of the OLT device detects that the ONU equipment powers on, goes to the step S2.
9. more ONU equipment test methods as claimed in claim 6, which is characterized in that in the step S2:
Issue 1000 vlan ID to the user network side interface of the ONU equipment, and by the institute of the ONU equipment
User network side interface is stated to be configured under vlan tag patterns;
The vlan ID of the upper united mouth of the OLT device are arranged to 1000, and by the first line of a couplet of the OLT device
Mouth is disposed under vlan untag patterns.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410514320.9A CN104301176B (en) | 2014-09-29 | 2014-09-29 | A kind of more ONU equipment test system and methods |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410514320.9A CN104301176B (en) | 2014-09-29 | 2014-09-29 | A kind of more ONU equipment test system and methods |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104301176A CN104301176A (en) | 2015-01-21 |
CN104301176B true CN104301176B (en) | 2018-09-28 |
Family
ID=52320754
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410514320.9A Expired - Fee Related CN104301176B (en) | 2014-09-29 | 2014-09-29 | A kind of more ONU equipment test system and methods |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104301176B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104660327B (en) * | 2015-03-04 | 2017-11-10 | 太仓市同维电子有限公司 | A kind of method of raising OLT utilization rates |
CN105163206A (en) * | 2015-08-06 | 2015-12-16 | 上海斐讯数据通信技术有限公司 | ONU VLAN ID automatic configuration method and device under PON system |
CN105471679B (en) * | 2015-12-09 | 2018-10-12 | 上海斐讯数据通信技术有限公司 | The configuration method and system of ONU transparent transmission modes |
CN106656562B (en) * | 2016-11-11 | 2019-10-15 | 成都广达新网科技股份有限公司 | A kind of OLT batch issues the detection method and device of ONU configuration |
CN107835110B (en) * | 2017-12-15 | 2021-06-08 | 四川天邑康和通信股份有限公司 | ONU one-stop type flow test system and method |
CN108667665A (en) * | 2018-05-18 | 2018-10-16 | 烽火通信科技股份有限公司 | A kind of ONT automated testing methods of PON system |
CN111385679B (en) * | 2018-12-29 | 2022-08-02 | 达发科技(苏州)有限公司 | Automatic test system for optical network unit |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101753209A (en) * | 2008-12-02 | 2010-06-23 | 华为技术有限公司 | Passive optical network testing terminal |
CN101778313A (en) * | 2009-01-13 | 2010-07-14 | 中兴通讯股份有限公司 | Method used for realizing timely report of optical network unit |
CN102904777A (en) * | 2012-10-15 | 2013-01-30 | 上海斐讯数据通信技术有限公司 | Port-based multi-equipment testing implementing method |
CN102917285A (en) * | 2012-10-30 | 2013-02-06 | 华为机器有限公司 | Method and device for testing Ethernet passive optical network devices |
CN103560829A (en) * | 2013-10-31 | 2014-02-05 | 上海斐讯数据通信技术有限公司 | Method and system for automatic testing of UNI ports |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101448184B (en) * | 2009-01-04 | 2011-05-04 | 烽火通信科技股份有限公司 | A method for realizing automatic work unit in EPON and system thereof |
CN102082605B (en) * | 2009-12-01 | 2014-03-12 | 华为技术有限公司 | Optical network testing method, deice and system |
CN102447568B (en) * | 2011-11-18 | 2014-12-24 | 烽火通信科技股份有限公司 | Method for treating downlinking broadcast, flooding business and multicasting business in gigabit passive optical network (GPON) system |
CN102932171B (en) * | 2012-10-22 | 2015-07-01 | 烽火通信科技股份有限公司 | Optical network unit (ONU) certification authorization management method based on License resource control |
CN103763148B (en) * | 2014-02-25 | 2019-12-20 | 上海斐讯数据通信技术有限公司 | ONU automatic authorization configuration recovery method |
-
2014
- 2014-09-29 CN CN201410514320.9A patent/CN104301176B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101753209A (en) * | 2008-12-02 | 2010-06-23 | 华为技术有限公司 | Passive optical network testing terminal |
CN101778313A (en) * | 2009-01-13 | 2010-07-14 | 中兴通讯股份有限公司 | Method used for realizing timely report of optical network unit |
CN102904777A (en) * | 2012-10-15 | 2013-01-30 | 上海斐讯数据通信技术有限公司 | Port-based multi-equipment testing implementing method |
CN102917285A (en) * | 2012-10-30 | 2013-02-06 | 华为机器有限公司 | Method and device for testing Ethernet passive optical network devices |
CN103560829A (en) * | 2013-10-31 | 2014-02-05 | 上海斐讯数据通信技术有限公司 | Method and system for automatic testing of UNI ports |
Also Published As
Publication number | Publication date |
---|---|
CN104301176A (en) | 2015-01-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104301176B (en) | A kind of more ONU equipment test system and methods | |
CN107835110B (en) | ONU one-stop type flow test system and method | |
CN105207712B (en) | A kind of optical module multi-channel parallel test system and method | |
CN104767657B (en) | The registration of light cat and test system and method | |
US9577749B2 (en) | Testing a passive optical network | |
WO2015158178A1 (en) | System, method and apparatus for automatically testing otn protection switching | |
KR100605846B1 (en) | Method for controlling loopback procedure in ethernet passive optical network | |
EP2600543A1 (en) | Method and optical line terminal for optical fiber fault diagnosis in passive optical network | |
CN103281117B (en) | ONU detects also method and the device of adaptive EPON, GPON automatically | |
CN105227234B (en) | A kind of detection method for growing luminous faulted ONU | |
EP3244571B1 (en) | Configuration data distribution method and apparatus | |
CN205693674U (en) | The multichannel debugging system of integrating device on a kind of bi-directional light device board | |
CN104639468A (en) | Optical port adaptive Ethernet switch and adaptive method thereof | |
CN102497229B (en) | Performance testing system and method for passive optical network (PON) card hardware | |
CN102413484A (en) | System and method for testing network link performance of terminal equipment | |
CN103731205A (en) | Method for automatically testing optical network unit | |
CN105814841A (en) | Base device, substation device, control device, optical communication system, and connection management method | |
CN105790832A (en) | Method and device for detecting and diagnosing abnormal luminous optical network unit ONU | |
CN104518840B (en) | A kind of method of wavelength calibration, optical network unit and optical line terminal | |
CN102648590A (en) | Method, system and device for communication in the optical network system | |
CN105490741B (en) | Detect the method, apparatus and optical line terminal, ONT Optical Network Terminal of loopback link | |
CN104468261A (en) | Monitoring system of Ethernet passive optical network and monitoring method thereof | |
CN103281116B (en) | A kind of ONU long luminescence detection circuits and application system and its application process | |
CN103269296B (en) | A kind of user side of passive optical network system detection system and detection method | |
CN109347548B (en) | Optical path integration test platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180928 Termination date: 20190929 |