CN104299058A - Power grid fault recovery and personnel training system thereof - Google Patents
Power grid fault recovery and personnel training system thereof Download PDFInfo
- Publication number
- CN104299058A CN104299058A CN201310297240.8A CN201310297240A CN104299058A CN 104299058 A CN104299058 A CN 104299058A CN 201310297240 A CN201310297240 A CN 201310297240A CN 104299058 A CN104299058 A CN 104299058A
- Authority
- CN
- China
- Prior art keywords
- fault
- recovery
- module
- power supply
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/20—Education
- G06Q50/205—Education administration or guidance
- G06Q50/2057—Career enhancement or continuing education service
Abstract
The invention discloses a power grid fault recovery and personnel training system thereof, which belongs to the technical field of power system fault monitoring. The system consists of a search module, a processing module, a display module and a training module. A fault recovery system searches a power supply recovery path for a non-fault power loss area, and gives the corresponding power supply recovery path; load with electricity retention or power limitation requirements is subjected to special processing; and meanwhile, the given power supply recovery path is displayed in an operation order way, and calling personnel training can be realized. The system is simple and intuitional, can quickly find a power grid fault recovery path, exhibits comprehensive path consideration and specific operation content and is convenient for operation personnel to operate. In addition, the training personnel can be trained to help the operation personnel to comprehensively understand fault recovery, and convenience is brought for carrying out recovery processing when corresponding faults happen. The invention provides a favorable path for the safe operation and the scientific and automatic management of a power system and has the advantages of being advanced in monitoring technology and stable and reliable in working performance and is suitable for industrial promotion.
Description
Technical field
The present invention relates to electric power system fault monitoring technique field, relate to specifically carry out searching for non-faulting dead electricity block supply path in a kind of electric network fault process and recover, and the system that simulating grid failure process gives training personnel.
Background technology
Traditional Restoring System of Power System Faults is general only finds out feasible service restoration path according to operation of power networks rule, seldom considers the concrete guarantor's electricity in area power grid actual moving process, requirement of rationing the power supply; And traditional recovery system generally only provides and simply recovers sequence of switching operations, carry out reference for management and running personnel, but this recovery operation sequence is concrete not, management and running personnel need oneself to fill in corresponding operation order could carry out fault recovery to electrical network; And general fault recovery system provides reference only to management and running personnel, can not give training it.
Summary of the invention
A kind of electric network fault is the object of the present invention is to provide to recover and staff training system, the service restoration path mainly solving prior art existence is considered comprehensive not, recovery operation sequence is concrete not, management and running personnel need oneself to fill in corresponding operation order, and could to carry out fault recovery to electrical network cumbersome, and the problem that can not give training personnel.
Electric network fault of the present invention recovers and staff training system, comprises following functions module:
search module, utilize fault recovery system for the non-faulting dead electricity range searching service restoration path after electric network fault, and provide corresponding service restoration path;
processing module, carry out special processing to having the load protected electricity or ration the power supply requirement;
display module, the service restoration path provided after search and process is presented on operation interface with operation order form;
training moduleby manually arranging fault, and be presented on operation interface by failure message, trainee fills in recovery operation ticket according to failure message and submits recovery scheme on operation interface, system automatically to submission scheme evaluate, provide corresponding evaluation score and standard recovery scheme.
Beneficial outcomes of the present invention: the present invention is after grid collapses, service restoration path, automatic search non-faulting dead electricity district, and carry out special processing according to electrical network practical operation situation to having the load protected electricity, ration the power supply requirement, write each restoration path as operation order form simultaneously.Described system simple, intuitive, restoration path considers that comprehensively, content of operation is concrete, is convenient to management and running personnel and operates.And by the training to scheduling operations staff, improve its complete understanding to fault recovery, be convenient to Recovery processing when running into corresponding failure.The present invention provides good approach by the safe operation of electric system and science automatic management.There is monitoring technique advanced person, stable and reliable working performance, be applicable to the advantages such as popularization in the industry.
Accompanying drawing explanation
Fig. 1 is somewhere partial electric grid electric main wiring diagram;
Fig. 2 is electric network fault recovery operation tickets sample formula;
Fig. 3 is electrical network power cuts to limit consumption table;
Fig. 4 is electric network fault modeling interface;
Fig. 5 is utility personnel training operation interface.
Embodiment
By the present invention shown in Fig. 1-Fig. 5, be that a kind of electric network fault provided based on VC2010 programming tool recovers and staff training system, this system is made up of search module, processing module, display module and training module.Wherein said search module utilizes fault recovery system for the non-faulting dead electricity range searching service restoration path after electric network fault, and by out-of-limit to path trend, switch tool number of operations, busbar voltage are out-of-limit, the good and bad comprehensive evaluation of grid net loss rate, reserve capacity of power grid five indexs provides service restoration path.Described processing module carries out special processing to having the load protected electricity or ration the power supply requirement.Described special processing automatically generates restoration path to guarantor's electric load, and contrasted with the power cuts to limit consumption table that power supply department provides by the load required of rationing the power supply, and adjust according to power cuts to limit consumption table.To meet the particular/special requirement of area power grid.Described display module system after namely searching for through said process, processing is provided corresponding service restoration path be presented on operation interface with operation order form.Described training module is artificial setting or selection fault, and failure message is presented on operation interface, trainee fills in recovery operation ticket according to described failure message and submits recovery scheme on operation interface, system automatically operating personnel are submitted to result and system compare to recovery operation ticket, to submission scheme evaluate, provide corresponding evaluation score and standard recovery scheme to realize the object to staff training.
Below in conjunction with accompanying drawing, the present invention is described in further detail:
As shown in Figure 1, weaving transformer station No. 2 transformers are faulty equipment, and transformer two ends isolating switch 1662,1691 trips, and fault causes 110kV deer to spin second line dead electricity, the female dead electricity of weaving change 10kV II, and all the other equipment lives run.After electric network fault, startup separator recovery system isolated fault equipment is non-faulting dead electricity equipment search supply path.First isolated fault equipment weaving change No. 2 transformers; To dead electricity equipment 10kV II section bus, its restoration path is isolating switch 1688; Spin second line to dead electricity equipment 110kV deer, its restoration path is after isolated fault, its two end switch closed.Start-up operation bill system, is write as operation order form and is presented on operation interface by fault isolation, restoration path etc.Specifically as shown in Figure 2.
Shown in Fig. 3 is power cuts to limit consumption table, is mainly used to the load of rationing the power supply checked in electrical network.Need to contrast with power cuts to limit consumption table in rejuvenation, thus meet the particular/special requirement of area power grid.Also can be modified to the load of rationing the power supply of different times by power cuts to limit consumption table, click " interpolation " and selected load is presented in the display box of below.Choose circuit in display box, click " deletion " and this load can be deleted from display box of rationing the power supply.
Shown in Fig. 4 is fault simulation interface, artificially can arrange fault, and start recovery system, provide recovery scheme, carried out the practicality of nucleus correcting system by simulating grid fault by graphical interfaces.Training modeling interface " opening the fault diagnosis example of having preserved " topmost can pass through drop-down menu, selects the fault diagnosis example be kept in history library; Right side " current state saves as " combo box, can be saved in history library by the fault of certain simulated maneuver, and to its name, is convenient to recall demonstration next time.In middle boxes, fault is set, the relevant information of certain equipment can be selected according to transformer station, device type, device name, information etc., by the interpolation of below or delete button by this information displaying arranged in simulated failure list.Click " fault simulation " button and can directly obtain fault recovery scheme; Clicking " staff training " button, to arranging fault analysis, ejecting staff training interface.
Shown in Fig. 5 is staff training interface, staff training refers to that dispatcher artificially can arrange fault, training pattern is entered by the personnel accepting training, recover arranging fault, and fill in failure recovery operation ticket, submit recovery scheme to, system for submission scheme provide corresponding evaluation, and provide correct recovery scheme.The personnel accepting training fill in failure recovery operation ticket according to failure message, clicking " interpolation " button is presented in the list box of below, information in list can be edited by " amendment ", " deletion " button simultaneously, click " submission " button and submit recovery scheme to, system for submission scheme provide corresponding evaluation, and provide standard recovery scheme.
In sum, electric network fault of the present invention recovers and staff training system, can after electric network fault, find grid fault recovery path fast, and special processing is carried out to the guarantor's electricity in electrical network, load of rationing the power supply, each restoration path is provided with operation order form, is convenient to scheduling and carries out recovery operation.This system can also give training scheduling operations staff simultaneously, improves the understanding to power system restoration operation and understanding.By carrying out fault simulation to somewhere partial electric grid, carrying out route searching, providing recovery operation ticket, and dispatcher is giveed training, obtain good technique effect.
The foregoing is only preferred embodiment of the present invention, be not intended to limit protection scope of the present invention.All any amendments done within the spirit and principles in the present invention, equivalent replacement, improvement etc., be all included in protection scope of the present invention.
Claims (2)
1. electric network fault recovers and a staff training system, it is characterized in that: comprise following functions module:
Search module, utilizes fault recovery system for the non-faulting dead electricity range searching service restoration path after electric network fault, and provides corresponding service restoration path;
Processing module, carries out special processing to having the load protected electricity or ration the power supply requirement;
Display module, is presented on operation interface by the service restoration path provided after search and process with operation order form;
Training module, by manually arranging fault, and be presented on operation interface by failure message, trainee fills in recovery operation ticket according to failure message and submits recovery scheme on operation interface, system automatically to submission scheme evaluate, provide corresponding evaluation score and standard recovery scheme.
2. electric network fault according to claim 1 recovers and staff training system, it is characterized in that: described processing module carries out special processing to having the load protected electricity or ration the power supply requirement, that guarantor's electric load is generated restoration path automatically, and the load required of rationing the power supply is contrasted with the power cuts to limit consumption table that power supply department provides, and adjust according to power cuts to limit consumption table.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310297240.8A CN104299058A (en) | 2013-07-16 | 2013-07-16 | Power grid fault recovery and personnel training system thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310297240.8A CN104299058A (en) | 2013-07-16 | 2013-07-16 | Power grid fault recovery and personnel training system thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104299058A true CN104299058A (en) | 2015-01-21 |
Family
ID=52318779
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310297240.8A Pending CN104299058A (en) | 2013-07-16 | 2013-07-16 | Power grid fault recovery and personnel training system thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104299058A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101615357A (en) * | 2009-05-15 | 2009-12-30 | 郑州万特电气有限公司 | Electricity meter-reading check charging training device |
CN101944766A (en) * | 2010-06-01 | 2011-01-12 | 中国电力科学研究院 | Operation and safety monitoring simulation system for power system |
CN102916493A (en) * | 2012-09-28 | 2013-02-06 | 华北电力大学 | Imaging method for dynamically displaying failure recovery path of power grid |
-
2013
- 2013-07-16 CN CN201310297240.8A patent/CN104299058A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101615357A (en) * | 2009-05-15 | 2009-12-30 | 郑州万特电气有限公司 | Electricity meter-reading check charging training device |
CN101944766A (en) * | 2010-06-01 | 2011-01-12 | 中国电力科学研究院 | Operation and safety monitoring simulation system for power system |
CN102916493A (en) * | 2012-09-28 | 2013-02-06 | 华北电力大学 | Imaging method for dynamically displaying failure recovery path of power grid |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102236841B (en) | Method for handling accidents of electric power system | |
CN103607042B (en) | The distribution network failure processing method of long fault indicator for overhead lines towards outskirts of a town | |
CN102035202B (en) | Network reconfiguration system | |
CN102508081B (en) | Distribution network fault simulating method and device and distribution network system | |
CN105093033A (en) | Power grid multi-source information-based fault integrated analysis system and analysis method | |
CN105576660B (en) | Local distribution network in-circuit emulation analytical equipment and system | |
CN102436766B (en) | Simulation training method of relay protection in subway OCC power dispatching | |
CN102169570A (en) | Two tickets combined inference billing method of power grid based on work task analysis | |
CN102982230A (en) | Short circuit current exceeding auxiliary decision method based on node impedance sensitivity | |
CN104360835A (en) | Automatic sequential control operation ticket generation method based on topologic mode | |
CN106451384A (en) | Power grid self-healing decision support system based on scheduling emergency plan | |
Cirio et al. | Wide area monitoring in the Italian power system: architecture, functions and experiences | |
CN102967839B (en) | Detection method and device for online monitoring communication system of transformer substation | |
CN104201766B (en) | The method determining prepared auto restart sequential and combination is followed the trail of based on power supply point | |
CN103063983A (en) | On-line mixing determination method of primary system and secondary system of power distribution network | |
CN110021995A (en) | A kind of distribution network automated information joint debugging emulation test system | |
CN111224396B (en) | Comprehensive analysis system and method for power transmission, transformation and distribution low integrated power grid information | |
CN103647279A (en) | Plant wiring information based anticipatory fault set generation method | |
CN102508052A (en) | Test method for field band channel operation of automatic bus transfer system of area network | |
CN104299058A (en) | Power grid fault recovery and personnel training system thereof | |
CN202422463U (en) | Simulation training system of relay protection in subway OCC (Open Circuit Characteristic) electric power dispatching | |
CN201993427U (en) | Data collection and analysis device for substation | |
Saha et al. | Smart grid and WAMS in Indian context-A review | |
CN106600451A (en) | Power grid fault diagnosis graphic element graphical display interface system based on plug-in architecture | |
CN106159948A (en) | Based on matrix disappear unit grid fault recovery path search method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150121 |