CN104295308A - 锚杆拉拔装置及其方法 - Google Patents
锚杆拉拔装置及其方法 Download PDFInfo
- Publication number
- CN104295308A CN104295308A CN201410484265.3A CN201410484265A CN104295308A CN 104295308 A CN104295308 A CN 104295308A CN 201410484265 A CN201410484265 A CN 201410484265A CN 104295308 A CN104295308 A CN 104295308A
- Authority
- CN
- China
- Prior art keywords
- anchor rod
- stretch
- lockset
- draw mechanism
- extension bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
- E21D21/008—Anchoring or tensioning means
Abstract
本发明涉及锚杆预紧设备技术领域,公开了一种锚杆拉拔装置及其方法。锚杆拉拔装置包括:锚杆、托盘、锁具和张拉机构;所述锚杆包括通过锚固体固定在煤岩体的锚杆孔中的锚固部和外露在锚杆孔外的空余部;所述托盘安装在锚杆孔外端口;所述锁具安装在所述空余部上,顶压在所述托盘外侧;所述张拉机构与所述空余部连接,向外拉拔所述锚杆且顶压所述锁具。本发明的装置结构简单,充分使用现有的工具,施工方法简便,具有快速有效张拉锚杆,提高锚杆预紧力、消除螺纹扭矩、减少锚杆复合应力集中的优点。
Description
技术领域
本发明涉及锚杆预紧设备技术领域,特别是涉及一种锚杆拉拔装置及其方法。
背景技术
现在的煤矿巷道支护普遍采用锚杆支护技术,锚杆预紧力是煤矿巷道支护刚度主要指标,提高锚杆预紧力可以有效提高支护整体刚度。现有锚杆预紧力主要利用增加锚杆螺母扭矩方法增加预紧力,此方法对锚杆预紧力增加效果不明显,同时对锚杆螺纹根部增加附加扭转作用,产生复合应力集中,容易损伤锚杆,甚至经常导致大扭矩受力锚杆沿螺纹根部断裂损坏。
随着深部开采高应力巷道支护和大断面巷道支护的需求,对锚杆支护的预紧力要求越来越大,现有通过旋转预紧锚杆螺母增加锚杆预紧力的方法已经无法满足现场需求。
发明内容
(一)要解决的技术问题
本发明的目的是提供一种能够快速有效张拉锚杆,提高锚杆预紧力、降低螺纹扭矩、减少锚杆复合应力集中的锚杆拉拔装置及其方法。
(二)技术方案
为了解决上述技术问题,本发明提供一种锚杆拉拔装置,包括:锚杆、托盘、锁具和张拉机构;所述锚杆包括通过锚固体固定在煤岩体的锚杆孔中的锚固部和外露在锚杆孔外的空余部;所述托盘安装在锚杆孔外端口;所述锁具安装在所述空余部上,顶压在所述托盘外侧;所述张拉机构与所述空余部连接,向外拉拔所述锚杆且顶压所述锁具。
其中,该锚杆拉拔装置还包括压力套管和加长杆;所述加长杆与所述空余部连接;所述张拉机构与所述加长杆连接;所述压力套管空套在所述空余部和加长杆外,且顶压在所述张拉机构与所述锁具之间。
其中,所述张拉机构为张拉千斤顶。
其中,所述锁具与所述托盘之间设有调心球垫。
其中,所述托盘通过所述锚杆和所述锁具安装在煤岩体上。
本发明还提供一种锚杆拉拔方法,包括以下步骤:
S1:煤岩体中开设锚杆孔,使用锚固体将锚杆固定在锚杆孔中,部分外露作为空余部;
S2:在锚杆孔的外端口安装托盘,并在托盘外侧安装调心球垫和锁具;
S3:将张拉机构与空余部连接且顶压锁具,启动张拉机构对锚杆进行拉拔。
其中,所述步骤S3包括:
S31:使用加长杆与空余部连接,在空余部与加长杆外侧空套一个压力套管;
S32:将加长杆与张拉机构连接,使压力套管顶压在张拉机构与锁具之间,启动张拉机构对加长杆进行拉拔。
(三)有益效果
本发明提供的锚杆拉拔装置及其方法,装置结构简单,充分使用现有的工具,施工方法简便,具有快速有效张拉锚杆,提高锚杆预紧力、消除螺纹扭矩、减少锚杆复合应力集中的优点。
附图说明
图1为本发明锚杆拉拔装置安装在煤岩体的剖视图。
图中,1:煤岩体;2:锚杆;3:托盘;4:调心球垫;5:锁具;6:压力套管;7:加长杆;8:张拉机构;9:锚固体;11:锚杆孔;21:锚固部;22:空余部。
具体实施方式
下面结合附图和实施例,对本发明的具体实施方式作进一步详细描述。以下实例用于说明本发明,但不用来限制本发明的范围。
参照图1所示,本发明的锚杆拉拔装置,包括:锚杆2、托盘3、调心球垫4、锁具5和张拉机构8;锚杆2包括通过锚固体9固定在煤岩体1的锚杆孔中11的锚固部21和外露在锚杆孔11外的空余部22。托盘3通过锚杆2和锁具5固定安装在煤岩体1上,具体的,托盘3安装在煤岩体1的锚杆孔11外端口,锚杆2的空余部22穿过托盘3。锁具5安装在空余部22上,顶压在托盘3外侧。在托盘3与锁具5之间安装调心球垫4,锁具5通过调心球垫4顶压托盘3。张拉机构8与空余部22连接,向外拉拔锚杆2且顶压锁具3,将力传递到锁具3上。优选的,本发明的张拉机构8采用穿心式张拉千斤顶。
进一步的,锚杆拉拔装置还包括加长杆7和压力套管6,加长杆7与空余部22的端部连接,张拉机构8与加长杆7连接。压力套管6空套在空余部22和加长杆7外侧,且顶压在张拉机构8与锁具5之间。一般情况下锚杆2外露在锚杆孔11外的空余部22仅有100~150mm,在安装托盘3、锁具5后,锚杆2的空余部22难以与张拉机构8连接。将加长杆7的一端与锚杆2的空余部22相连接,加长杆7的另一端从张拉机构8的中心穿过。张拉机构8与加长杆7相连接,通过张拉机构8拉拔加长杆7,从而拉拔锚杆2。根据力的相互作用,张拉机构8通过压力套管6将力传递给锁具5,实现张拉预紧的目的。
本发明还提供锚杆拉拔方法,包括以下步骤:
步骤S1:在煤岩体1中开设锚杆孔11,使用锚固体9将锚杆2的锚固部21固定在锚杆孔11中,使锚杆2部分外露作为空余部22。
步骤S2:在锚杆孔11的外端口安装托盘3,并在托盘3外侧安装调心球垫4和锁具5。通过锚杆2和锁具5将托盘固定在锚杆孔11外端口的煤岩体1上,供锚杆2的空余部22穿过。在托盘3外侧依次安装调心球垫4和锁具5,使锁具5通过调心球垫4顶压托盘3。
步骤S3:将张拉机构8与空余部22连接且顶压锁具5,启动张拉机构8对锚杆2进行拉拔。具体的,使用加长杆7与空余部22连接,在空余部22与加长杆7外侧空套一个压力套管6;加长杆7穿过张拉机构8,将加长杆7与张拉机构8连接,使压力套管6顶压在张拉机构8与锁具5之间,启动张拉机构8对加长杆7进行拉拔,从而拉拔锚杆2。在力的相互作用下,张拉机构8通过压力套管6将力传递给锁具5,实现张拉预紧。
本发明的锚杆拉拔装置及其方法,装置结构简单,充分使用现有的工具,施工方法简便,具有快速有效张拉锚杆,提高锚杆预紧力、消除螺纹扭矩、减少锚杆复合应力集中的优点,能够有效避免锚杆损伤,防止锚杆断裂。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (7)
1.一种锚杆拉拔装置,其特征在于,包括:锚杆、托盘、锁具和张拉机构;所述锚杆包括通过锚固体固定在煤岩体的锚杆孔中的锚固部和外露在锚杆孔外的空余部;所述托盘安装在锚杆孔外端口;所述锁具安装在所述空余部上,顶压在所述托盘外侧;所述张拉机构与所述空余部连接,向外拉拔所述锚杆且顶压所述锁具。
2.如权利要求1所述的锚杆拉拔装置,其特征在于,该锚杆拉拔装置还包括压力套管和加长杆;所述加长杆与所述空余部连接;所述张拉机构与所述加长杆连接;所述压力套管空套在所述空余部和加长杆外,且顶压在所述张拉机构与所述锁具之间。
3.如权利要求2所述的锚杆拉拔装置,其特征在于,所述张拉机构为张拉千斤顶。
4.如权利要求1所述的锚杆拉拔装置,其特征在于,所述锁具与所述托盘之间设有调心球垫。
5.如权利要求1所述的锚杆拉拔装置,其特征在于,所述托盘通过锚杆和所述锁具固定安装在煤岩体上。
6.一种锚杆拉拔方法,其特征在于,包括以下步骤:
S1:煤岩体中开设锚杆孔,使用锚固体将锚杆固定在锚杆孔中,部分外露作为空余部;
S2:在锚杆孔的外端口安装托盘,并在托盘外侧安装调心球垫和锁具;
S3:将张拉机构与空余部连接且顶压锁具,启动张拉机构对锚杆进行拉拔。
7.如权利要求6所述的锚杆拉拔方法,其特征在于,所述步骤S3包括:
S31:使用加长杆与空余部连接,在空余部与加长杆外侧空套一个压力套管;
S32:将加长杆与张拉机构连接,使压力套管顶压在张拉机构与锁具之间,启动张拉机构对加长杆进行拉拔。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410484265.3A CN104295308A (zh) | 2014-09-19 | 2014-09-19 | 锚杆拉拔装置及其方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410484265.3A CN104295308A (zh) | 2014-09-19 | 2014-09-19 | 锚杆拉拔装置及其方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104295308A true CN104295308A (zh) | 2015-01-21 |
Family
ID=52315224
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410484265.3A Pending CN104295308A (zh) | 2014-09-19 | 2014-09-19 | 锚杆拉拔装置及其方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104295308A (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105370303A (zh) * | 2015-11-26 | 2016-03-02 | 湖南科技大学 | 用于深部巷道高预应力锚杆支护的张拉装置及其操作方法 |
CN105863294A (zh) * | 2016-05-31 | 2016-08-17 | 浙江大学 | 一种复合式锚杆装置及利用锚杆装置锚固来加固截面的方法 |
CN106049893A (zh) * | 2016-05-31 | 2016-10-26 | 浙江大学 | 一种可延长式锚杆装置及利用锚杆装置锚固来加固截面的方法 |
CN107478514A (zh) * | 2017-08-09 | 2017-12-15 | 宿州云宏建设安装有限公司 | 一种便携式钢筋握裹力快速检测仪 |
CN107701214A (zh) * | 2017-11-24 | 2018-02-16 | 河南理工大学 | 一种可实现多次预紧的防脱落让压锚索锁具装置 |
CN108999625A (zh) * | 2018-07-30 | 2018-12-14 | 天地科技股份有限公司 | 锚杆张拉施工装置及施工方法 |
CN112611626A (zh) * | 2020-11-19 | 2021-04-06 | 铜陵有色金属集团铜冠建筑安装股份有限公司 | 膨胀式锚杆拉拔试验用连接装置 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4904122A (en) * | 1987-08-06 | 1990-02-27 | Dyckerhoff & Widmann Aktiengesellschaft | Anchoring device, such as a rock anchor |
CN2436652Y (zh) * | 2000-07-18 | 2001-06-27 | 雷进 | 锚杆预紧安装器 |
CN1456790A (zh) * | 2003-06-06 | 2003-11-19 | 中国科学院武汉岩土力学研究所 | 一种砂固结内锚头预应力锚杆及其锚固方法 |
CN103437796A (zh) * | 2013-09-12 | 2013-12-11 | 韩雪峰 | 一种零扭矩锚杆预紧机具 |
CN104018862A (zh) * | 2014-06-26 | 2014-09-03 | 河北联合大学 | 高预紧锚杆张拉装置 |
CN204152532U (zh) * | 2014-09-19 | 2015-02-11 | 天地科技股份有限公司 | 锚杆拉拔装置 |
-
2014
- 2014-09-19 CN CN201410484265.3A patent/CN104295308A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4904122A (en) * | 1987-08-06 | 1990-02-27 | Dyckerhoff & Widmann Aktiengesellschaft | Anchoring device, such as a rock anchor |
CN2436652Y (zh) * | 2000-07-18 | 2001-06-27 | 雷进 | 锚杆预紧安装器 |
CN1456790A (zh) * | 2003-06-06 | 2003-11-19 | 中国科学院武汉岩土力学研究所 | 一种砂固结内锚头预应力锚杆及其锚固方法 |
CN103437796A (zh) * | 2013-09-12 | 2013-12-11 | 韩雪峰 | 一种零扭矩锚杆预紧机具 |
CN104018862A (zh) * | 2014-06-26 | 2014-09-03 | 河北联合大学 | 高预紧锚杆张拉装置 |
CN204152532U (zh) * | 2014-09-19 | 2015-02-11 | 天地科技股份有限公司 | 锚杆拉拔装置 |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105370303A (zh) * | 2015-11-26 | 2016-03-02 | 湖南科技大学 | 用于深部巷道高预应力锚杆支护的张拉装置及其操作方法 |
CN105863294A (zh) * | 2016-05-31 | 2016-08-17 | 浙江大学 | 一种复合式锚杆装置及利用锚杆装置锚固来加固截面的方法 |
CN106049893A (zh) * | 2016-05-31 | 2016-10-26 | 浙江大学 | 一种可延长式锚杆装置及利用锚杆装置锚固来加固截面的方法 |
CN107478514A (zh) * | 2017-08-09 | 2017-12-15 | 宿州云宏建设安装有限公司 | 一种便携式钢筋握裹力快速检测仪 |
CN107478514B (zh) * | 2017-08-09 | 2019-11-26 | 上海市市政工程管理咨询有限公司 | 一种便携式钢筋握裹力快速检测仪 |
CN107701214A (zh) * | 2017-11-24 | 2018-02-16 | 河南理工大学 | 一种可实现多次预紧的防脱落让压锚索锁具装置 |
CN108999625A (zh) * | 2018-07-30 | 2018-12-14 | 天地科技股份有限公司 | 锚杆张拉施工装置及施工方法 |
CN108999625B (zh) * | 2018-07-30 | 2020-06-09 | 天地科技股份有限公司 | 锚杆张拉施工装置及施工方法 |
CN112611626A (zh) * | 2020-11-19 | 2021-04-06 | 铜陵有色金属集团铜冠建筑安装股份有限公司 | 膨胀式锚杆拉拔试验用连接装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104295308A (zh) | 锚杆拉拔装置及其方法 | |
CN206397530U (zh) | 一种自伸缩大变形锚杆 | |
CN205330701U (zh) | 一种可延伸吸能锚固装置 | |
CN104143483A (zh) | 用于拆卸分闸弹簧的工装 | |
CN205025117U (zh) | 装配式建筑预制构件安装用可调节斜支撑 | |
CN204152532U (zh) | 锚杆拉拔装置 | |
CN203546717U (zh) | 一种可回收预应力锚杆 | |
CN201599046U (zh) | 拉力锚杆 | |
CN203905974U (zh) | 高预紧锚杆张拉装置 | |
CN201090226Y (zh) | 锚杆防断裂装置 | |
CN203114315U (zh) | 一种自测预应力让压锚杆 | |
CN204113316U (zh) | 一种间隔螺旋杆体式大变形锚杆 | |
CN206600182U (zh) | 一种适应于大变形巷道围岩的抗断锚固装置 | |
CN103498690B (zh) | 一种双锚索联合锁紧装置及其方法 | |
CN204753388U (zh) | 防回弹桥梁预应力钢绞线张拉器 | |
CN101487396B (zh) | 一种超静定等强支护锚索锁紧机构及方法 | |
CN203582049U (zh) | 卸船机防风拉揽 | |
CN203654279U (zh) | 一种用于玻璃纤维筋锚杆的预应力加载设备 | |
CN204200256U (zh) | 挤压嵌入式柔性锚杆 | |
CN106837394A (zh) | 一种适应于大变形巷道围岩的抗断锚固装置及其施工方法 | |
CN203961293U (zh) | 一种建筑模板连接紧固结构 | |
CN203096731U (zh) | 一端无端板的预应力空心方桩组件 | |
CN203257439U (zh) | 一种用于煤矿软岩巷道的锚索全长锚固装置 | |
CN201810327U (zh) | 一种带外螺纹挤压锚具的钢绞线锚杆 | |
CN206190301U (zh) | 锚索锁头防坠装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150121 |