CN104294838A - High-voltage transmission line iron tower pile foundation structure - Google Patents

High-voltage transmission line iron tower pile foundation structure Download PDF

Info

Publication number
CN104294838A
CN104294838A CN201410534933.9A CN201410534933A CN104294838A CN 104294838 A CN104294838 A CN 104294838A CN 201410534933 A CN201410534933 A CN 201410534933A CN 104294838 A CN104294838 A CN 104294838A
Authority
CN
China
Prior art keywords
pile
pile cap
transmission line
voltage transmission
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410534933.9A
Other languages
Chinese (zh)
Inventor
徐宁生
程智余
陈建社
李凤
郑卫锋
鲍电
毛念奎
朱建宁
罗正帮
王捷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410534933.9A priority Critical patent/CN104294838A/en
Publication of CN104294838A publication Critical patent/CN104294838A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations

Abstract

The invention discloses a high-voltage transmission line iron tower pile foundation structure. The high-voltage transmission line iron tower pile foundation structure comprises a pile cap, a pile, anchor rods, a foundation pit and surface soil. The upper end of the pile is arranged inside the pile cap, the pile cap is arranged inside the foundation pit, and the foundation pit is formed by digging the surface soil; the cross section of the pile cap is in an N shape, the inside of the pile cap is provided with reinforcing ribs and a reinforcing steel bar bottom plate, wherein the reinforcing ribs are arranged in a ring shape, and the reinforcing steel bar bottom plate is arranged in the center of the pile cap; the portion of the upper end of the pile, which is protruded from the bottom surface of the pile cap, is radially inclined to form a certain included angle from the vertical direction and upwards provided with threads from the anchoring bottom end of the pile. The high-voltage transmission line iron tower pile foundation structure is low in construction difficulty, high in horizontal loading capacity and tensile strength and capable of effectively bearing action force born by a high-voltage transmission line iron tower.

Description

A kind of high-voltage transmission line towers piling strtucture
Technical field
The present invention relates to pile foundation, be specifically related to high-voltage transmission line towers piling strtucture.
Background technology
Along with the raising of transmission line of electricity voltage conveying, the requirement of power transmission line iron tower foundation to Its ultimate bearing capacity improves thereupon, simultaneously in foundation construction process, need avoid adopting the basis of opening and digging as far as possible, improves the supporting capacity of pile foundation.
Summary of the invention
For the problems referred to above, it is large that the problem to be solved in the present invention is to provide a kind of supporting capacity, and short construction period, protection of the environment is suitable for the wide iron tower of power transmission line pile foundation of soil property scope simultaneously.
For solving the problems of the technologies described above, the technical solution used in the present invention is, a kind of high-voltage transmission line towers piling strtucture, comprise pile cap, stake, anchor pole, foundation ditch, the top layer soil body, the upper end of described stake is arranged in pile cap, and pile cap is positioned at foundation ditch, and foundation ditch excavates to form in the soil body of top layer; The cross section of described pile cap is п type, pile cap inside is provided with reinforcing rib, reinforcing bar base plate and anchor pole, and described reinforcing rib is that annular is arranged, and described anchor pole and reinforcing bar base plate are positioned at the center of pile cap, anchor pole is that annular is arranged, and reinforcing bar base plate is arranged in the inner space that anchor pole surrounds; The upper end of described stake is arranged in the part protruded pile cap bottom surface, and radial skew is arranged, and in vertical direction with certain angle, the bottom along stake is upwards provided with spiral.
As preferably, described reinforcing rib spud pile, in pile cap, prevents the rotation of stake, improves the tension pull out force ability of stake simultaneously; Reinforcing rib can effectively by stress transfer that stake is subject to on anchor pole, increase effectively the effect of the anchorage of pile foundation, reduce horizontal applied force and pulling capacity that pile is subject to simultaneously.
As preferably, described pile cap is connected with high-voltage transmission line towers.
As preferably, the height that described stake is arranged in pile cap is 30cm ~ 90cm,
As preferably, described foundation ditch excavates very shallow foundation ditch, and only on the top layer of the soil body.
Beneficial effect of the present invention, structure is simple, and difficulty of construction is little, and the horizontal loading ability of pile foundation is large, and tension pull out force ability is strong, effectively can carry the active force that high-voltage transmission line towers bears, and applicable soil property scope is wide, simultaneously to environment almost without destroying.
Accompanying drawing explanation
Fig. 1 is the sectional view of structure of the present invention
Wherein, steel tower 12, pile cap 14, stake 16, foundation ditch 18, soil body top layer 20, anchor pole 22, spiral 24, piled anchor bottom 26
Fig. 2 is structure top view of the present invention
Wherein, steel tower 12, pile cap 14, stake 16, anchor pole 22, piled anchor bottom 26, reinforcing rib 30, reinforcing bar base plate 32
Fig. 3 is the phantom drawing of stake of the present invention
Wherein, stake 16, spiral 24, piled anchor bottom 26
Detailed description of the invention
By reference to the accompanying drawings, structure of the present invention is described further.
A kind of high-voltage transmission line towers piling strtucture, pile foundation 10 comprises pile cap 14, stake 16, anchor pole 22, foundation ditch 18, the top layer soil body 20, the upper end of described piled anchor 16 is arranged in pile cap 14, and pile cap 14 is positioned at foundation ditch 18, and foundation ditch 18 excavates to form in the top layer soil body 20.
Further, the cross section of described pile cap 14 is п types, anchor pole 22, reinforcing rib 30 and reinforcing bar base plate 32 is provided with in pile cap 14, described reinforcing rib 30 is that annular is arranged, described anchor pole 22 and reinforcing bar base plate 32 are positioned at the center of pile cap 14, anchor pole 22 is that annular is arranged, and reinforcing bar base plate 32 is arranged in the inner space that anchor pole 22 surrounds, and described pile cap 14 is connected with high-voltage transmission line towers 12.
Further, the upper end of described stake 16 is arranged in the part radial direction protruded pile cap 14 bottom surface and is obliquely installed, and the height that stake 16 is arranged in pile cap 14 is 30cm ~ 90cm, in vertical direction with certain angle; Bottom along stake 16 is upwards provided with spiral 24.
Further, described reinforcing rib 32 spud pile 16, in pile cap 14, prevents the rotation of stake 16, improves the tension pull out force ability of stake 16 simultaneously; Stress transfer that stake 16 is subject to on anchor pole 22, be increase effectively the effect of the anchorage of pile foundation 10 by reinforcing rib 32, reduces horizontal applied force and pulling capacity that stake 16 bears simultaneously.
Further, described foundation ditch 18 is shallow foundation holes.

Claims (2)

1. a high-voltage transmission line towers piling strtucture, comprises pile cap, stake, anchor pole, foundation ditch, the top layer soil body, it is characterized in that: the upper end of described stake is arranged in pile cap, and pile cap is positioned at foundation ditch, and foundation ditch excavates to form in the soil body of top layer; The cross section of described pile cap is п type, pile cap inside is provided with anchor pole, reinforcing rib and reinforcing bar base plate, and described reinforcing rib is that annular is arranged, and described anchor pole and reinforcing bar base plate are positioned at the center of pile cap, anchor pole is that annular is arranged, and reinforcing bar base plate is arranged in the inner space that anchor pole surrounds; The upper end of described stake is arranged in the part protruded pile cap bottom surface, and radial skew is arranged, and in vertical direction with certain angle, the bottom along stake is upwards provided with spiral.
2. a kind of high-voltage transmission line towers piling strtucture according to claim 1, is characterized in that: the height that described stake is arranged in pile cap is 30cm ~ 90cm.
CN201410534933.9A 2014-10-11 2014-10-11 High-voltage transmission line iron tower pile foundation structure Pending CN104294838A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410534933.9A CN104294838A (en) 2014-10-11 2014-10-11 High-voltage transmission line iron tower pile foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410534933.9A CN104294838A (en) 2014-10-11 2014-10-11 High-voltage transmission line iron tower pile foundation structure

Publications (1)

Publication Number Publication Date
CN104294838A true CN104294838A (en) 2015-01-21

Family

ID=52314768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410534933.9A Pending CN104294838A (en) 2014-10-11 2014-10-11 High-voltage transmission line iron tower pile foundation structure

Country Status (1)

Country Link
CN (1) CN104294838A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111395381A (en) * 2020-03-25 2020-07-10 丁红岩 Rotary pile raft type apron board foundation and construction method thereof
EP4061697A4 (en) * 2019-11-22 2023-12-27 Triton Systems, Inc. Helical anchor group installation system
US11965303B2 (en) 2022-06-10 2024-04-23 Triton Systems, Inc. Group anchor system, subsea installation system, method for using and installing same

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6665990B1 (en) * 2000-03-06 2003-12-23 Barr Engineering Co. High-tension high-compression foundation for tower structures
US20080232906A1 (en) * 2003-12-15 2008-09-25 Henderson Allan P Pile anchor foundation
CN203755334U (en) * 2014-01-22 2014-08-06 深圳市海能通信股份有限公司 Single-pipe tower prefabricated spiral steel pipe pile foundation
CN204151814U (en) * 2014-10-11 2015-02-11 国家电网公司 A kind of high-voltage transmission line towers piling strtucture

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6665990B1 (en) * 2000-03-06 2003-12-23 Barr Engineering Co. High-tension high-compression foundation for tower structures
US20080232906A1 (en) * 2003-12-15 2008-09-25 Henderson Allan P Pile anchor foundation
CN203755334U (en) * 2014-01-22 2014-08-06 深圳市海能通信股份有限公司 Single-pipe tower prefabricated spiral steel pipe pile foundation
CN204151814U (en) * 2014-10-11 2015-02-11 国家电网公司 A kind of high-voltage transmission line towers piling strtucture

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4061697A4 (en) * 2019-11-22 2023-12-27 Triton Systems, Inc. Helical anchor group installation system
CN111395381A (en) * 2020-03-25 2020-07-10 丁红岩 Rotary pile raft type apron board foundation and construction method thereof
US11965303B2 (en) 2022-06-10 2024-04-23 Triton Systems, Inc. Group anchor system, subsea installation system, method for using and installing same

Similar Documents

Publication Publication Date Title
CN101812842B (en) Tensionless filling pile structure
US9359741B2 (en) Wind turbine generator foundation with pressure-dispersive high strength pre-stressed anchors
US20130302096A1 (en) Wind turbine foundation
KR101307165B1 (en) Fiber Reinforced Plastic Suction Foundation and Construction Method
KR101515347B1 (en) Pile with reinforced tip
CN104110353B (en) Antidumping blower foundation ring structure and construction method thereof
CN104294838A (en) High-voltage transmission line iron tower pile foundation structure
RU2014125424A (en) DEVICE AND METHOD FOR ANCHOR FASTENING OF A WIND POWER INSTALLATION
CN104278690B (en) A kind of novel high-pressure iron tower of power transmission line pile foundation
CN106088133B (en) Power transmission line composite foundation for desert area
KR101626423B1 (en) Support structure of offshore wind turbines and structure method thereof
CN204151814U (en) A kind of high-voltage transmission line towers piling strtucture
US9151437B2 (en) Stand structure
JP2019100070A (en) Foundation structure of offshore wind power generation facility, and construction method of the same
KR101384167B1 (en) single complex hybrid foundation type offshore wind tower
JP6542036B2 (en) Pile foundation structure
CN205617369U (en) Shoe of efficient hollow pile
CN102134856B (en) Tower crane foundation
CN105822333B (en) Mechanical linkage Pulling-Resistant Anchor Rod
CN204125965U (en) There is the blower foundation that pressure dispersing type arranges high-strength prestressed anchor bar/anchor cable
KR101237983B1 (en) Offshore structure and structure method thereof
CN204151815U (en) A kind of high-voltage transmission line towers pile foundation
CN104532873A (en) Rock anchor rod foundation structure
CN204151816U (en) A kind of novel high-pressure iron tower of power transmission line pile foundation
KR101398910B1 (en) Extended pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150121