CN104289855A - Copper bush installation process - Google Patents
Copper bush installation process Download PDFInfo
- Publication number
- CN104289855A CN104289855A CN201410401232.8A CN201410401232A CN104289855A CN 104289855 A CN104289855 A CN 104289855A CN 201410401232 A CN201410401232 A CN 201410401232A CN 104289855 A CN104289855 A CN 104289855A
- Authority
- CN
- China
- Prior art keywords
- copper sheathing
- copper bush
- mounting process
- install
- freezing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P11/00—Connecting or disconnecting metal parts or objects by metal-working techniques not otherwise provided for
- B23P11/02—Connecting or disconnecting metal parts or objects by metal-working techniques not otherwise provided for by first expanding and then shrinking or vice versa, e.g. by using pressure fluids; by making force fits
- B23P11/025—Connecting or disconnecting metal parts or objects by metal-working techniques not otherwise provided for by first expanding and then shrinking or vice versa, e.g. by using pressure fluids; by making force fits by using heat or cold
Abstract
The invention aims to provide a copper bush installation process. According to the thermal expansion and cold extraction principle, the size of a copper bush is reduced, then the copper bush is installed on a component and the problem that the copper bush is difficult to install is solved. The size of the copper bush is reduced after the copper bush is cooled, the copper bush can be conveniently installed, installation efficiency of the copper bush is improved, damage to the copper bush and the component caused by the fact that the copper bush is knocked violently is reduced, quality of components of an injection molding machine and a die-casting machine is improved and the service life is prolonged.
Description
Technical field
The present invention relates to injection machine and die casting machine manufacture field, particularly relate to a kind of mounting process of the convenient copper sheathing installed on injection machine and die casting machine accessory.
Background technology
When manufacturing injection machine and die casting machine, the parts in injection machine and die casting machine need to install copper sheathing, and to improve the quality of parts, guard block is not damaged.And screw or rivet cannot be used to install because copper sheathing is installed, therefore need to be connected with the tensile force between parts by copper sheathing itself, and due to the size of copper sheathing can not be too much less than parts, therefore when mounted can be very difficult, carrying out installation copper sheathing by knocking, damage can be caused to copper sheathing and parts.Therefore, the problem solving copper sheathing installation difficulty just seems particularly important.
Summary of the invention
The object of this invention is to provide a kind of mounting process of the convenient copper sheathing installed on injection machine and die casting machine accessory, by the principle of expanding with heat and contract with cold, first the size of copper sheathing is reduced, then be arranged on parts, solve the problem that copper sheathing installs difficulty.
The invention provides a kind of copper sheathing mounting process, described installation steps are following steps compositions:
Step one: put into refrigerator by needing the copper sheathing installed and carry out freezing 3 ~ 6 hours;
Step 2: the copper sheathing after cooled is installed to the position needing to install by the mode of knocking;
Step 3: can use after rising again under the parts installing copper sheathing are placed on normal temperature condition 3 ~ 4 hours.
Further improvement is: temperature freezing in described step one is-80 DEG C ~-95 DEG C, and freezing complete after need to install at once.
Further improvement is: use the hammer with sheath to knock when knocking copper sheathing in described step 2, prevents from damaging copper sheathing.
Further improvement is: auxiliary blower or device of rising again can carry out acceleration and rise again when rising again under normal temperature condition in described step 3, reduce and rise again the time.
Beneficial effect of the present invention: by cooling copper sheathing, the size of copper sheathing is reduced, conveniently copper sheathing is installed, improve the efficiency that copper sheathing is installed, and the damage decreased owing to knocking copper sheathing that copper sheathing causes and parts energetically, improve the quality of injection machine and die casting machine parts, increase the service life.
Detailed description of the invention
In order to deepen the understanding of the present invention, below in conjunction with embodiment, the invention will be further described, and this embodiment only for explaining the present invention, does not form limiting the scope of the present invention.
Embodiment one:
The present embodiment provides a kind of copper sheathing mounting process, and described installation steps are following steps compositions:
Step one: put into refrigerator by needing the copper sheathing installed and carry out freezing 5 hours;
Step 2: the copper sheathing after cooled is installed to the position needing to install by the mode of knocking;
Step 3: can use after rising again under the parts installing copper sheathing are placed on normal temperature condition 3 hours.
Temperature freezing in described step one is-90 DEG C, and freezing complete after need to install at once.Use the hammer with sheath to knock when knocking copper sheathing in described step 2, prevent from damaging copper sheathing.Auxiliary blower or device of rising again can carry out acceleration and rise again when rising again under normal temperature condition in described step 3, reduce and rise again the time.
Embodiment two:
The present embodiment provides a kind of copper sheathing mounting process, and described installation steps are following steps compositions:
Step one: put into refrigerator by needing the copper sheathing installed and carry out freezing 6 hours;
Step 2: the copper sheathing after cooled is installed to the position needing to install by the mode of knocking;
Step 3: can use after rising again under the parts installing copper sheathing are placed on normal temperature condition 4 hours.
Temperature freezing in described step one is-95 DEG C, and freezing complete after need to install at once.Use the hammer with sheath to knock when knocking copper sheathing in described step 2, prevent from damaging copper sheathing.Auxiliary blower or device of rising again can carry out acceleration and rise again when rising again under normal temperature condition in described step 3, reduce and rise again the time.
By cooling copper sheathing, the size of copper sheathing is reduced, conveniently copper sheathing is installed, improve the efficiency that copper sheathing is installed, and the damage decreased owing to knocking copper sheathing that copper sheathing causes and parts energetically, improves the quality of injection machine and die casting machine parts, increases the service life.
Claims (4)
1. a copper sheathing mounting process, is characterized in that: described installation steps are following steps compositions:
Step one: put into refrigerator by needing the copper sheathing installed and carry out freezing 3 ~ 6 hours;
Step 2: the copper sheathing after cooled is installed to the position needing to install by the mode of knocking;
Step 3: can use after rising again under the parts installing copper sheathing are placed on normal temperature condition 3 ~ 4 hours.
2. a kind of copper sheathing mounting process as claimed in claim 1, is characterized in that: temperature freezing in described step one is-80 DEG C ~-95 DEG C, and freezing complete after need to install at once.
3. a kind of copper sheathing mounting process as claimed in claim 1, is characterized in that: use the hammer with sheath to knock when knocking copper sheathing in described step 2, prevents from damaging copper sheathing.
4. a kind of copper sheathing mounting process as claimed in claim 1, is characterized in that: auxiliary blower or device of rising again can carry out acceleration and rise again when rising again under normal temperature condition in described step 3, reduce and rise again the time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410401232.8A CN104289855A (en) | 2014-08-15 | 2014-08-15 | Copper bush installation process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410401232.8A CN104289855A (en) | 2014-08-15 | 2014-08-15 | Copper bush installation process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104289855A true CN104289855A (en) | 2015-01-21 |
Family
ID=52309929
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410401232.8A Pending CN104289855A (en) | 2014-08-15 | 2014-08-15 | Copper bush installation process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104289855A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108627258A (en) * | 2018-04-24 | 2018-10-09 | 中国科学院合肥物质科学研究院 | A kind of installation method applied to armoured thermocouple in large component |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB944788A (en) * | 1961-07-24 | 1963-12-18 | Philips Nv | Improvements in or relating to a combination of two members and a sleeve adapted to be shrunk on one another with the sleeve interposed between the two members |
CN102211266A (en) * | 2011-04-02 | 2011-10-12 | 宁波钜德精工机械有限公司 | Interference fit freezing method applied to main rollers |
CN202571725U (en) * | 2012-04-29 | 2012-12-05 | 扬州市昌盛车业有限公司 | Device for mounting guide column and guide sleeve by liquid nitrogen freezing method |
CN103691875A (en) * | 2012-09-28 | 2014-04-02 | 刘福平 | Connecting rod bushing interference assembling method |
-
2014
- 2014-08-15 CN CN201410401232.8A patent/CN104289855A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB944788A (en) * | 1961-07-24 | 1963-12-18 | Philips Nv | Improvements in or relating to a combination of two members and a sleeve adapted to be shrunk on one another with the sleeve interposed between the two members |
CN102211266A (en) * | 2011-04-02 | 2011-10-12 | 宁波钜德精工机械有限公司 | Interference fit freezing method applied to main rollers |
CN202571725U (en) * | 2012-04-29 | 2012-12-05 | 扬州市昌盛车业有限公司 | Device for mounting guide column and guide sleeve by liquid nitrogen freezing method |
CN103691875A (en) * | 2012-09-28 | 2014-04-02 | 刘福平 | Connecting rod bushing interference assembling method |
Non-Patent Citations (1)
Title |
---|
戚殿兴等: "复合轴套的冷装工艺", 《工程机械与维修》, no. 5, 4 May 2010 (2010-05-04) * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108627258A (en) * | 2018-04-24 | 2018-10-09 | 中国科学院合肥物质科学研究院 | A kind of installation method applied to armoured thermocouple in large component |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104289855A (en) | Copper bush installation process | |
CN104308459A (en) | Nut processing process | |
CN103451483B (en) | A kind of aluminium alloy extrusions continuous casting extrusion process | |
CN203752382U (en) | Device for exchanging and installing two-blade-profile molds rapidly | |
CN203917816U (en) | Heat preserving type blind riser | |
CN203805243U (en) | Rear mould insertassembly of mould | |
CN201486928U (en) | Blower bearing housing | |
CN102728803A (en) | Heat radiating fin air-cooled car door pump casting machine | |
CN102581234A (en) | Cleaning device of iron mould sand-covering process iron mould sand ejecting hole | |
CN202872565U (en) | Automatic control heat radiation device of motor | |
CN204270889U (en) | A kind of super capacitor cooling system | |
CN201615145U (en) | Self-cooling ball bearing | |
CN201361693Y (en) | Cylinder cover die with cooling structure | |
CN203437593U (en) | Precoated sand mold provided with marking movable block | |
CN205035442U (en) | Clock hood -type annealing furnace with buffering heat -proof device | |
CN103882195A (en) | Heat treatment technique for normalizing and tempering ZG275-485H steel | |
CN202857018U (en) | PTC air heating assembly | |
CN204505151U (en) | A kind of dismounting electric motor fan draw bench special | |
CN203993708U (en) | A kind of radar seeker covering extracting tool | |
CN202545544U (en) | Crank assembling structure | |
CN105986064A (en) | Casting aging treatment technology | |
CN203621844U (en) | Removal device for screws on metal plates | |
CN204102738U (en) | A kind of vibration-damping radiating device of circuit breaker | |
CN203037062U (en) | Water distribution device for water cooling of middle-frequency electric furnace | |
CN204247915U (en) | A kind of large size bearing foundry goods hot investment casting mould |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150121 |