CN104278837A - Construction method of beam-slab type reinforced concrete domed chamber structure - Google Patents
Construction method of beam-slab type reinforced concrete domed chamber structure Download PDFInfo
- Publication number
- CN104278837A CN104278837A CN201410570525.9A CN201410570525A CN104278837A CN 104278837 A CN104278837 A CN 104278837A CN 201410570525 A CN201410570525 A CN 201410570525A CN 104278837 A CN104278837 A CN 104278837A
- Authority
- CN
- China
- Prior art keywords
- dome
- mold plate
- chamber structure
- support
- shuttering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The invention relates to a construction method of a beam-slab type reinforced concrete domed chamber structure. The method comprises the following steps: setting out in advance, prefabricating a mold plate and a square wood bar, pre-splicing the mold plate, connecting steel pipes, installing the mold plate, repairing the mold plate and carrying out other working procedures, thereby realizing concrete pouring of the domed chamber structure finally. Sleeves, the steel pipes and the other materials are used when a framework in an arc-shaped area is set up, and the sleeves and the steel pipes are sequentially abut-jointed, so that a closed hemispherical mold plate system is formed and the implementation of setting up the framework is ensured.
Description
Technical field
The present invention relates to a kind of dome-type beam and slab type steel concrete dome structure construction method.
Background technology
At present, dome structure mostly now is the building of ethnic group's style, belong to typical special-shaped building, the technical data of the existing dome construction aspect of country is incomplete, a kind of complete method is not had to the construction of small beams board-like steel concrete dome roof structure, the beam and slab structure template of dome construction and support are the key of dome construction, directly have influence on concrete construction safety, quality.Adopt common support for shuttering to carry out concrete placings, its molded appearance mass effect is undesirable, therefore needs to adopt special template, and domestic this type of typified form of template manufacturer production that there is no, special processing template, material cost will be very large.
Summary of the invention
In order to overcome the deficiency that existing falsework is applied at dome structure, the invention provides a kind of new type formwork support erection method.The method adopts steel pin hand support for shuttering and composite board formwork system scheme, runs through support for shuttering and sets up to template, the overall process such as to build construct to reinforcing bar binding, concrete vault.The method can be suitable for dome structure, and implementation result is very good, and building products is quite attractive in appearance, and comprehensive benefit is better.
The technical solution adopted for the present invention to solve the technical problems is: when dome-type dome structure falsework is set up, support bracket adopts conventional fastener formula steel-tube die support, when setting up arc area support for shuttering, select the material such as sleeve, steel pipe, sleeve is utilized to dock with steel pipe order, thus form closed dome-type template system, ensure the exploitativeness of support for shuttering.First on smooth flooring, amplification sample is carried out according to the size of design before construction, steel pin hand support for shuttering is set up according to amplifying the size of sample, according to stupefied at the bottom of the horizontal stupefied and beam of full-page proof size prefab form level, precast assembly beam forms, horizontal steel tube at the bottom of mounting rail, mounting rail template, installing plate soffit formwork, after whole installation passed examination, with high-strength putty, template seam is carefully scraped benefit to fill and lead up, then segmentation colligation slab muscle, outer unit template is installed in segmentation, last segmentation concreting.
The invention has the beneficial effects as follows: can complete that semi-circular dome structure is concrete builds with flying colors, and achieve recycling for the material setting up template, reduce consumed resource, cost-saving.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is further described.
Fig. 1 support for shuttering control line full-size drawing
Fig. 2 support for shuttering sets up figure
Fig. 3 precast beam wooden form figure
Horizontal steel tube (sleeve connection) and beam forms installation drawing at the bottom of Fig. 4 beam
Fig. 5 dome bed die level, longitudinal keel installation figure
Fig. 6 dome soffit formwork lays figure
Detailed description of the invention
(1) preparation of construction
In FIG, carry out template construction control line and the setting-out of formwork bearing frame control line by size, tissue engineering technique person, Quality Inspector check and accept vault construction control line.
(2) load-bearing support for shuttering is set up
In the embodiment depicted in figure 2, support for shuttering adopts fastener type steel pipe scaffold, and the fastener of material Φ 48 × 3.5 steel pipe scaffold and correspondence, wall side vertical pole ' s span is not more than 1.5m.Under dome, by-level plate portion vertical pole ' s span is 0.6m.Wall construction is complete, reaches the condition setting up load-bearing support for shuttering, by amplifying sample dimensioned support for shuttering steel pipe and starting to set up load-bearing support for shuttering.
(3) precast beam wooden form
In figure 3, by amplifying the size precast beam wooden form of sample, the bed die of every root beam, side form three face die plate is pre-formed on ground.
(4) horizontal steel tube at the bottom of mounting rail mounting rail template
In embodiment illustrated in fig. 4, before horizontal steel tube at the bottom of mounting rail first by amplify sample comparatively to upper plane absolute altitude and under shelve absolute altitude a little, horizontal steel tube is installed stupefied after errorless again, then puts by-level steel pipe stupefied, install moulding board of precast beam, the gap of adjustment support for shuttering and beam makes the stupefied uniform force of level.
(5) dome bed die level, longitudinal keel are installed
In Figure 5, dome level adopts Φ 48 × 3.5 steel pipe pipe nipple to end keel, radial load is born primarily of bearing frame horizontal steel tube, horizontal steel tube requires to arrange by amplification master drawing length to put in place, horizontal keel is connected with bearing frame horizontal steel tube fastener, longitudinal keel 30 × 50 lumps of wood, adopt 14# galvanized iron wire with fastener for connection.
(6) dome soffit formwork is laid
In Figure 5, because six roots of sensation beam is not decile in domed-face, therefore amplifying sample can not accurate prefab form, by the wood lath that wooden form electric saw becomes 300mm wide, due to employing is outer vertical stupefied, the wide wooden form of 300mm adopts horizontal spelling, with 3 cun of steel nails be fixed on vertical stupefied on, to unify sawing shaping for electric saw by hand.
Claims (1)
1. a dome-type beam and slab type steel concrete dome structure construction, when dome-type dome structure falsework is set up, support bracket adopts conventional fastener formula steel-tube die support, when setting up wall arc area support for shuttering, select the material such as sleeve, steel pipe, realized the arc in template face by the connected mode adjusting horizontal steel tube, it is characterized in that: horizontal steel tube docking at the bottom of beam is linked in sequence by adopting sleeve, Nodes is without the need to adopting fastener to connect or welding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410570525.9A CN104278837A (en) | 2014-10-21 | 2014-10-21 | Construction method of beam-slab type reinforced concrete domed chamber structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410570525.9A CN104278837A (en) | 2014-10-21 | 2014-10-21 | Construction method of beam-slab type reinforced concrete domed chamber structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104278837A true CN104278837A (en) | 2015-01-14 |
Family
ID=52254138
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410570525.9A Pending CN104278837A (en) | 2014-10-21 | 2014-10-21 | Construction method of beam-slab type reinforced concrete domed chamber structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104278837A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108678258A (en) * | 2018-06-20 | 2018-10-19 | 中国建筑局(集团)有限公司 | Large-span hemispherical reinforced concrete dome structure and construction method thereof |
CN114266087A (en) * | 2021-10-14 | 2022-04-01 | 中国建筑第二工程局有限公司 | Thin-shell structure formwork system construction method and management system based on BIM technology |
-
2014
- 2014-10-21 CN CN201410570525.9A patent/CN104278837A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108678258A (en) * | 2018-06-20 | 2018-10-19 | 中国建筑局(集团)有限公司 | Large-span hemispherical reinforced concrete dome structure and construction method thereof |
CN108678258B (en) * | 2018-06-20 | 2024-04-19 | 中国建筑一局(集团)有限公司 | Large-span hemispherical reinforced concrete dome structure and construction method thereof |
CN114266087A (en) * | 2021-10-14 | 2022-04-01 | 中国建筑第二工程局有限公司 | Thin-shell structure formwork system construction method and management system based on BIM technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108678258B (en) | Large-span hemispherical reinforced concrete dome structure and construction method thereof | |
CN105888108B (en) | Built-in positioning prefabricated component reinforced concrete shear wall and construction method | |
CN101818527B (en) | Assembled integral shear wall structure system and construction method thereof | |
CN201687102U (en) | Assembled integral type shear wall structure system | |
CN105839846A (en) | Prefabricated reinforced concrete composite beam | |
CN104612241A (en) | Civil building prefabricated member set and assembly method thereof | |
CN205475882U (en) | Cast -in -place dismounting -free assembled heat preservation exterior sheathing component of building | |
CN106836479A (en) | A kind of prefabricated PC concrete frame structure | |
CN103982041A (en) | Method for constructing reinforced-concrete prefabricated element fabricated building with frame structure system | |
CN108951962A (en) | A kind of autoclaved aerated concrete slab exterior wall and construction method | |
CN206903022U (en) | A kind of steel bar truss floor support plate | |
CN110485553A (en) | A kind of assembled architecture and its assembly method on prefabricated assembled basis | |
CN105220808A (en) | Large-span prestressed arch bar site prefabrication construction method of installation | |
CN104895193A (en) | Precast outer wallboard connecting box and connecting joint | |
CN104863296A (en) | Integrally modular steel bar truss floor plate and construction method thereof | |
CN109610708A (en) | A kind of the bidirectional laminated slab bottom plate and construction method of close piece connection | |
CN205475677U (en) | Steel house room unit | |
CN104895221B (en) | Assembled shaped steel confined concrete shear wall structure | |
CN104278837A (en) | Construction method of beam-slab type reinforced concrete domed chamber structure | |
CN202324501U (en) | Full clamping piece connecting member for mounting low carbon board on building outer brim | |
CN204059661U (en) | A kind of ALC body of wall assembly | |
CN211850272U (en) | Assembled superimposed sheet bearing structure | |
CN101886470B (en) | Construction method of exposed concrete ribbed beams | |
CN206916990U (en) | Assembled cast-in-place concrete sandwiched thermal-insulating wall steel skeleton template system and connector | |
CN211421637U (en) | Connecting structure of prefabricated gutter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150114 |