CN104270771B - A kind of small base station networking method for electric power real-time Communication for Power - Google Patents

A kind of small base station networking method for electric power real-time Communication for Power Download PDF

Info

Publication number
CN104270771B
CN104270771B CN201410542308.9A CN201410542308A CN104270771B CN 104270771 B CN104270771 B CN 104270771B CN 201410542308 A CN201410542308 A CN 201410542308A CN 104270771 B CN104270771 B CN 104270771B
Authority
CN
China
Prior art keywords
base station
small base
electric power
gateway device
control terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410542308.9A
Other languages
Chinese (zh)
Other versions
CN104270771A (en
Inventor
梁云
吕立冬
朱亮
姚继明
张�浩
郭经红
缪巍巍
何金陵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Information and Telecommunication Branch of State Grid Jiangsu Electric Power Co Ltd
Smart Grid Research Institute of SGCC
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Global Energy Interconnection Research Institute
Information and Telecommunication Branch of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI, Global Energy Interconnection Research Institute, Information and Telecommunication Branch of State Grid Jiangsu Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410542308.9A priority Critical patent/CN104270771B/en
Publication of CN104270771A publication Critical patent/CN104270771A/en
Application granted granted Critical
Publication of CN104270771B publication Critical patent/CN104270771B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W16/00Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
    • H04W16/24Cell structures
    • H04W16/32Hierarchical cell structures
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/02Arrangements for optimising operational condition
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W16/00Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
    • H04W16/18Network planning tools

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The present invention provides a kind of small base station networking method for electric power real-time Communication for Power, comprises the following steps:Small base station is grouped by gateway device;The small base station configuration of gateway device amendment, realizes co-channel interference control;Gateway device optimizes to wireless channel.The present invention provides a kind of small base station networking method for electric power real-time Communication for Power, commercial small base station equipment based on maturation, set up for the personal communication system under power system complex environment, high-speed radiocommunication can be realized in the area that public network signal does not cover, real-time, highly reliable means of communication can be provided for industry control message, be particularly suitable for the wireless communication needs of the applications such as power distribution network, new energy.

Description

A kind of small base station networking method for electric power real-time Communication for Power
Technical field
The present invention relates to a kind of network-building method, and in particular to a kind of small base station networking method for electric power real-time Communication for Power.
Background technology
Small base station (Small Cell) be comprising Femtocell, Picocell, Microcell etc. using authorized frequency with And fusion Wi-Fi uses the radio access node of unlicensed frequency.Small base station has that small volume, cost be low, easy deployment, covering The characteristics of " being able to stoop or to stand ", the needs of indoor 10 meters or so coverage distances can be met, can also realize outdoor about 2 kilometers covering Distance.With comprehensive arrival in 4G epoch, status of the small base station in mobile internet construction will catch up with and surpass macro base station, main suitable With three kinds of scenes:First, using in macro base station coverage area, it is mainly used in expanding the coverage rate of network edge, lifting network speed Rate, it is generally deployed in the hot spot region in city;Second, being used outside macro base station coverage area, macro base station can not be touched blind Area is supplemented, mainly the distinctive hot spot region of enterprise, such as power distribution network, wind power plant region;Third, make indoors under environment With, be mainly used in mobile office etc. application.
In above-mentioned three kinds of scenes, two, 3 two kind of scene be widely present in power system.With the hair of mobile Internet Exhibition, power system is more and more to the demand of broadband wireless communications, and bandwidth, the speed of particularly 4G communications are higher, can carry Wireless real-time Communication for Power in local scope.Such as power system National Key Laboratory of Tsing-Hua University is in paper《Wind-powered electricity generation field distribution Formula EMS:Architectural framework and key technology》Point out, wind power plant EMS must give full play to local control advantage, lead to Cross agile control and suppress wind-powered electricity generation fluctuation, controlling cycle is usually second level;Configuration PMU in wind field, or even Millisecond can be realized Quick emergent control.And power distribution network, wind power plant etc. apply, all exist network often adjust, fiber deployment difficulty the problems such as, because This, the 4G communications for having broken away from bandwidth constraint are the effective schemes of electric power real-time Communication for Power, and the special nothing of electric power is established based on the small base stations of 4G Line communication system is important technological means.
Compared with technologies such as traditional base station, electric power 230MHz private radio communications, small base station equipment quantity is big, uses public affairs Frequency range altogether, is problematic in that in networking, management, multiple service supporting, anti-interference etc., and current research considers less.Such as Application No. 201380000298.X patent provides a kind of interference control method and device for same frequency network of macro and micro base stations, mainly Consider interfering for macro base station edge mobile terminal and micro-base station, and electric power real-time Communication for Power terminal majority is fixed terminal;Shen Number a kind of data transmission method and system, macro base station, small base station and user equipment please be provided for 201210358356.3 patent, Main consideration mobile terminal influences each other with macro base station, small base station communication the problem of reducing data transmission efficiency simultaneously, does not examine Consider the problem of specific service feature is with enterprise-specific communication system;The patent of Application No. 201310735372.4 provides a kind of honeybee The method and system cooperateed between the small base station of nest net and wireless router, mainly consider integrated, the solution of small base station and wireless router Certainly wireless access and the problem of network rate, can be used for Enterprise Special Network, but lack and real-time Communication for Power and multiple service supporting are examined Consider.
Electric power is compared using being applied with public network, network be present and business be adjusted flexibly, fiber deployment difficulty the problems such as, for Real-time Communication for Power in the local scopes such as power distribution network, new energy, electric power private communication is set up based on common frequency band and commercial small base station System, it is a kind of effective solution.Therefore, it is necessary to take into full account the feature of electric power real-time Communication for Power, the commercialization based on maturation Small base station equipment, the network-building method being adapted under power system complex environment is proposed, realized in the area that public network signal does not cover high Fast radio communication, real-time, highly reliable means of communication is provided for industry control message.
The content of the invention
In order to overcome the above-mentioned deficiencies of the prior art, the present invention provides a kind of small base station networking for electric power real-time Communication for Power Method, based on the commercial small base station equipment of maturation, set up for the personal communication system under power system complex environment, Ke Yi High-speed radiocommunication is realized in the area that public network signal does not cover, and real-time, highly reliable communication can be provided for industry control message Means, it is particularly suitable for the wireless communication needs of the applications such as power distribution network, new energy.
In order to realize foregoing invention purpose, the present invention adopts the following technical scheme that:
The present invention provides a kind of small base station networking method for electric power real-time Communication for Power, the described method comprises the following steps:
Step 1:Small base station is grouped by gateway device;
Step 2:The small base station configuration of gateway device amendment, realizes co-channel interference control;
Step 3:Gateway device optimizes to wireless channel.
The step 1 specifically includes following steps:
Step 1-1:Small base station is grouped by gateway device according to electric power observation and control terminal and the positional information of small base station, is made Same group of small base station and electric power observation and control terminal have unique sequence of cells number;
Step 1-2:Electric power observation and control terminal and small base station are managed during communication link foundation, avoid electric power from surveying Switching between control terminal and small base station.
The step 2 specifically includes following steps:
Step 2-1:Wireless environment of the small base station scans residing for it, reports gateway by scanning result according to cell group and sets It is standby;
Step 2-2:Wireless environment of the electric power observation and control terminal scanning residing for it, reports scanning result according to cell group Gateway device;
Step 2-3:According to small base station and the scanning result of electric power observation and control terminal, the signal intensity configuration of small base station is corrected;
Step 2-4:Whether the transmitting request that gateway device verification electric power observation and control terminal is initiated is carried by corresponding small base station, Reduce small base station with frequency deployment in the range of interfere with electric power observation and control terminal caused by uplink interference.
The step 3 specifically includes following steps:
Step 3-1:It is small that small base station perceives the cell of neighbouring deployment, the comprehensive signal quality of this cell and power system capacity, sheet The information such as the electric power observation and control number of terminals that is carried in area, type of service;
Step 3-2:The control information of small base station perception data channel, including the position of electric power observation and control terminal, carrying are in real time The information such as transmission mode, modulation system and the code check of business;
Step 3-3:Gateway device is according to the characteristic and the characteristic of channel of small base station, channel configuration corresponding to optimization business, protects Demonstrate,prove real-time Communication for Power.
The electric power observation and control terminal is provided with the 4G communication interfaces with small base station intercommunication.
Compared with prior art, the beneficial effects of the present invention are:
Commercial small base station equipment of the present invention based on maturation, sets up for the private communication system under power system complex environment System, can realize high-speed radiocommunication in the area that public network signal does not cover, and real-time, Gao Ke can be provided for industry control message The means of communication leaned on, it is particularly suitable for the wireless communication needs of the applications such as power distribution network, new energy.
Brief description of the drawings
Fig. 1 is the small base station networking method FB(flow block) for being used for electric power real-time Communication for Power in the embodiment of the present invention;
Fig. 2 is network architecture schematic diagram in the embodiment of the present invention;
Fig. 3 is the interference control flow block diagram of small base station identical networking in the embodiment of the present invention;
Fig. 4 is the channel management FB(flow block) of small base station networking in the embodiment of the present invention.
Embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings.
Such as Fig. 1, the present invention provides a kind of small base station networking method for electric power real-time Communication for Power, and methods described includes following Step:
Step 1:Small base station is grouped by gateway device;
Step 2:The small base station configuration of gateway device amendment, realizes co-channel interference control;
Step 3:Gateway device optimizes to wireless channel.
The network architecture such as Fig. 2, including gateway device, small base station and electric power observation and control terminal, it is hard that gateway device includes computer Part and management software, it can be optimized according to practical business;Small base station can use ripe commercial product;Electric power observation and control terminal needs Possess the 4G communication interfaces with small base station intercommunication.
The step 1 specifically includes following steps:
Step 1-1:Small base station is grouped by gateway device according to electric power observation and control terminal and the positional information of small base station, is made Same group of small base station and electric power observation and control terminal have unique sequence of cells number;
Step 1-2:Electric power observation and control terminal and small base station are managed during communication link foundation, avoid electric power from surveying Switching between control terminal and small base station.
Such as Fig. 3, the step 2 specifically includes following steps:
Step 2-1:Wireless environment of the small base station scans residing for it, reports gateway by scanning result according to cell group and sets It is standby;
Step 2-2:Wireless environment of the electric power observation and control terminal scanning residing for it, reports scanning result according to cell group Gateway device;
Step 2-3:According to small base station and the scanning result of electric power observation and control terminal, the signal intensity configuration of small base station is corrected;
Step 2-4:Whether the transmitting request that gateway device verification electric power observation and control terminal is initiated is carried by corresponding small base station, Reduce small base station with frequency deployment in the range of interfere with electric power observation and control terminal caused by uplink interference.
Such as Fig. 4, the step 3 specifically includes following steps:
Step 3-1:It is small that small base station perceives the cell of neighbouring deployment, the comprehensive signal quality of this cell and power system capacity, sheet The information such as the electric power observation and control number of terminals that is carried in area, type of service;
Step 3-2:The control information of small base station perception data channel, including the position of electric power observation and control terminal, carrying are in real time The information such as transmission mode, modulation system and the code check of business;
Step 3-3:Gateway device is according to the characteristic and the characteristic of channel of small base station, channel configuration corresponding to optimization business, protects Demonstrate,prove real-time Communication for Power.
The electric power observation and control terminal is provided with the 4G communication interfaces with small base station intercommunication.
Commercial small base station equipment of the present invention based on maturation and the gateway device based on power business feature, set up for electricity Personal communication system under Force system complex environment, high-speed radiocommunication can be realized in the area that public network signal does not cover, can To provide real-time, highly reliable means of communication for industry control message, it is particularly suitable for the channel radio of the applications such as power distribution network, new energy Letter demand.
Finally it should be noted that:The above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof, institute The those of ordinary skill in category field with reference to above-described embodiment still can to the present invention embodiment modify or Equivalent substitution, these are applying for this pending hair without departing from any modification of spirit and scope of the invention or equivalent substitution Within bright claims.

Claims (1)

  1. A kind of 1. small base station networking method for electric power real-time Communication for Power, it is characterised in that:It the described method comprises the following steps:
    Step 1:Small base station is grouped by gateway device;
    Step 2:The small base station configuration of gateway device amendment, realizes co-channel interference control;
    Step 3:Gateway device optimizes to wireless channel;
    The step 1 specifically includes following steps:
    Step 1-1:Small base station is grouped by gateway device according to electric power observation and control terminal and the positional information of small base station, is made same The small base station and electric power observation and control terminal of group have unique sequence of cells number;
    Step 1-2:Electric power observation and control terminal and small base station are managed during communication link foundation, avoid electric power observation and control whole Switching between end and small base station;
    The step 2 specifically includes following steps:
    Step 2-1:Wireless environment of the small base station scans residing for it, gateway device is reported according to cell group by scanning result;
    Step 2-2:Wireless environment of the electric power observation and control terminal scanning residing for it, gateway is reported according to cell group by scanning result Equipment;
    Step 2-3:According to small base station and the scanning result of electric power observation and control terminal, the signal intensity configuration of small base station is corrected;
    Step 2-4:Whether the transmitting request that gateway device verification electric power observation and control terminal is initiated is carried by corresponding small base station, is reduced Small base station with frequency deployment in the range of interfere with electric power observation and control terminal caused by uplink interference;
    The step 3 specifically includes following steps:
    Step 3-1:Small base station is perceived in the nearby cell of deployment, the comprehensive signal quality and power system capacity, this cell of this cell The electric power observation and control number of terminals and type of service of carrying;
    Step 3-2:The control information of small base station perception data channel, including the position of electric power observation and control terminal, carrying real time business Transmission mode, modulation system and code check;
    Step 3-3:Gateway device is according to the characteristic and the characteristic of channel of small base station, channel configuration corresponding to optimization business, ensures real Shi Tongxin;
    The electric power observation and control terminal is provided with the 4G communication interfaces with small base station intercommunication.
CN201410542308.9A 2014-10-14 2014-10-14 A kind of small base station networking method for electric power real-time Communication for Power Active CN104270771B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410542308.9A CN104270771B (en) 2014-10-14 2014-10-14 A kind of small base station networking method for electric power real-time Communication for Power

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410542308.9A CN104270771B (en) 2014-10-14 2014-10-14 A kind of small base station networking method for electric power real-time Communication for Power

Publications (2)

Publication Number Publication Date
CN104270771A CN104270771A (en) 2015-01-07
CN104270771B true CN104270771B (en) 2017-12-05

Family

ID=52162238

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410542308.9A Active CN104270771B (en) 2014-10-14 2014-10-14 A kind of small base station networking method for electric power real-time Communication for Power

Country Status (1)

Country Link
CN (1) CN104270771B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105357680A (en) * 2015-10-23 2016-02-24 江苏省电力公司南京供电公司 Method for selecting access point positions in power wireless access network
CN105554795B (en) * 2015-12-28 2021-12-28 中广核工程有限公司 Wireless communication method and device for nuclear power plant

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102036327A (en) * 2009-09-25 2011-04-27 杰脉通信技术(上海)有限公司 Method for switching UE (User Equipment) from outdoor base station to indoor base station in TD-SCDMA (Time Division-Synchronization Code Division Multiple Access)
CN102612037A (en) * 2012-04-13 2012-07-25 北京邮电大学 Dynamic clustering-based sub-band allocation method in femtocell network
CN103118374A (en) * 2013-01-22 2013-05-22 苏州智铸通信科技有限公司 Method for allocating indoor area in self-adaptive mode
US8606191B2 (en) * 2009-03-24 2013-12-10 Kyocera Corporation Radio communication system, radio terminal, radio base station, controller device and radio communication method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8606191B2 (en) * 2009-03-24 2013-12-10 Kyocera Corporation Radio communication system, radio terminal, radio base station, controller device and radio communication method
CN102036327A (en) * 2009-09-25 2011-04-27 杰脉通信技术(上海)有限公司 Method for switching UE (User Equipment) from outdoor base station to indoor base station in TD-SCDMA (Time Division-Synchronization Code Division Multiple Access)
CN102612037A (en) * 2012-04-13 2012-07-25 北京邮电大学 Dynamic clustering-based sub-band allocation method in femtocell network
CN103118374A (en) * 2013-01-22 2013-05-22 苏州智铸通信科技有限公司 Method for allocating indoor area in self-adaptive mode

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
LTE_A协作多点传输中的多用户协作技术的研究;王盛;《中国优秀硕士学位论文全文数据库 信息科技辑 2013年第11期》;20131115;正文第15页,图2-11 *
LTE网络中家庭基站之间的干扰和容量分析;范超;《中国优秀硕士学位论文全文数据库 信息科技辑,2013年第11期》;20131115;正文第19页第1行到第20页第13行,附图3-3 *

Also Published As

Publication number Publication date
CN104270771A (en) 2015-01-07

Similar Documents

Publication Publication Date Title
Gandotra et al. Green communication in next generation cellular networks: A survey
Hoydis et al. Green small-cell networks
Jafari et al. Small cell backhaul: challenges and prospective solutions
Talwar et al. Capacity and coverage enhancement in heterogeneous networks
Han et al. On greening cellular networks via multicell cooperation
Khirallah et al. Energy and cost impacts of relay and femtocell deployments in long-term-evolution advanced
Monti et al. Mobile backhaul in heterogeneous network deployments: Technology options and power consumption
Attar et al. Green last mile: how fiber-connected massively distributed antenna systems can save energy
Checko et al. Optimizing small cell deployment by the use of C-RANs
Hoydis et al. Green, cost-effective, flexible, small cell networks
CN102111816A (en) Energy-saving femto-network system and energy-saving method
Guo et al. Capacity-energy-cost tradeoff in small cell networks
Zhu et al. Energy-efficient user association for heterogenous cloud cellular networks
CN103401929A (en) Self-adaptive networking method based on baseband with large-scale processing ability and business
He et al. Spectrum efficiency and energy efficiency tradeoff for heterogeneous wireless networks
CN104270771B (en) A kind of small base station networking method for electric power real-time Communication for Power
CN104660703B (en) The system of selection of multiple networks fusion power information acquisition system and optimal communication network
Ahmed et al. Techno-economics of green mobile networks considering backhauling
Arthi et al. Quality of service aware multi-hop relay networks for green radio communication
CN102695255A (en) Heterogeneous network energy saving method based on cognition technology
Portelinha et al. The impact of electric energy consumption from telecommunications systems on isolated microgrids
Liu et al. Price-based uplink resource allocation for hybrid-spectrum femtocell networks
Al Haddad et al. Green novel power control framework for dense femtocell grids
Danve et al. Energy efficient cellular network base station: A survey
Aktar Energy efficient hybrid powered C-Ran architectures with dynamic user association

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160408

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: China Electric Power Research Institute

Applicant after: State Grid Smart Grid Institute

Applicant after: Information & Telecommunication Branch of State Grid Jiangsu Electric Power Company

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: China Electric Power Research Institute

Applicant before: Information & Telecommunication Branch of State Grid Jiangsu Electric Power Company

CB02 Change of applicant information

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: China Electric Power Research Institute

Applicant after: GLOBAL ENERGY INTERCONNECTION RESEARCH INSTITUTE

Applicant after: Information & Telecommunication Branch of State Grid Jiangsu Electric Power Company

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: China Electric Power Research Institute

Applicant before: State Grid Smart Grid Institute

Applicant before: Information & Telecommunication Branch of State Grid Jiangsu Electric Power Company

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant