CN104269858A - 一种高压配电网无功规划优化方法 - Google Patents
一种高压配电网无功规划优化方法 Download PDFInfo
- Publication number
- CN104269858A CN104269858A CN201410495907.XA CN201410495907A CN104269858A CN 104269858 A CN104269858 A CN 104269858A CN 201410495907 A CN201410495907 A CN 201410495907A CN 104269858 A CN104269858 A CN 104269858A
- Authority
- CN
- China
- Prior art keywords
- node
- compensation
- capacity
- power
- network
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 14
- 238000005457 optimization Methods 0.000 title abstract 4
- 239000003990 capacitor Substances 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract 1
- 230000005611 electricity Effects 0.000 description 2
- 230000002068 genetic effect Effects 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/18—Arrangements for adjusting, eliminating or compensating reactive power in networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/30—Reactive power compensation
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明公开了一种高压配电网无功规划优化方法。特征是在已确定网架的基础上,合理地规划无功补偿装置的容量,减小配电网无功功率流动,保证配电网安全、优质、经济地向用户供电。具体实施步骤见摘要附图。本发明用于电网部门合理配置高压配电网无功补偿装置建设。
Description
技术领域
本发明属于电网无功补偿领域,尤其涉及一种高压配电网无功规划优化方法。
背景技术
无功规划是在电源规划和电网规划的基础上,确定无功补偿设备的安装位置和容量大小,实现系统的安全经济运行。无功规划是含有众多离散变量的多约束复杂优化问题,目前国内对于高压配电网的实际研究应用针对性还不强,使用的方法多为遗传算法等。遗传算法是一种搜索方法,存在早熟和时间过长等问题,对于大型配电网,这一矛盾更加突出,其实用性有待提高。选取典型区域推广的方法在很多供电公司中应用,实用性较强,但准确度较弱。
本发明以全网电能损耗最小为目标函数,约束条件选取实际变量约束,重点考虑实际无功补偿方法,根据规划年负荷和变电站的潮流结果,结合规划年运行方式,对各相关变电站进行实际的无功规划,
发明内容
本发明的目的在于,提供一种高压配电网无功规划优化方法,用以电网部门合理配置配电网无功补偿装置。
其特征是以降损节能为目标,目标函数为全网电能损耗最小:
约束条件:
式中PGi、QGi——节点i注入的有功和无功功率;
PDi、QDi——节点i的负荷有功和无功功率;
n——节点总数;
QCi——电容器无功补偿容量;
k——系统不同的负荷水平参数;
——控制变量,分别为有载变压器变比和i节点的补偿容量;
Vi、Sref——状态变量,分别是负荷点电压和平衡节点的出力;
——支路通过的功率。
求解过程可用附图表示,Pm为假定的最小网损值,通过优化潮流算法,得到网络各节点和支路等的实际运行状态。然后通过无功优化配置计算,对不满足网络约束的节点或支路进行无功的自动补偿。在轻负荷时不允许过补偿,否则由于无功补偿容量过大,会使功率因数超前,向电网倒送无功,是不经济的。在不同功率因数的条件下,每千乏补偿容量取得的补偿效益是不相同的。
当节点不满足电压约束水平时,加装补偿电容所需无功补偿容量为
式中jx——该条线路电抗为;
U2L′——投入电容后变电站母线线电压值;
ΔUL——电压增量。
当节点不满足功率因数约束时,通过提高功率因数需要确定补偿容量。具体方法如下:如果该节点的有功功率为P,补偿前的功率因数为补偿后的功率因数为则所需补偿容量若需要将提高到大于小于则补偿容量应满足当节点不满足网损约束时,则需要根据目前网损和目标网损之间值的比较来确定补偿容量,则补偿容量
式中ΔIX——补偿前后容性电流差值;
U——该节点电压;
P——该线路有功功率。
附图说明
图1是高压配电网无功补偿优化规划流程图;
具体实施方式
下面结合附图,对优选实施例作详细说明。应该强调的是,下述说明仅仅是示例性的,而不是为了限制本发明的范围及其应用。
图1是高压配电网无功补偿优化规划流程图。
步骤1:设定尽量小的网损值,输入原始数据。
步骤2:进行潮流计算。
步骤3:判断是否违反约束条件,若是则对不满足的节电进行无功补偿,回到步骤2,若否进行步骤4。
步骤4:求出目标函数。
步骤5:判断目标函数是否小于设定值,若是则计算完毕,若否则对不满足的节电进行无功补偿,回到步骤2。
Claims (1)
1.一种高压配电网无功规划优化方法,其特征是算法以降损节能为目标,目标函数为全网电能损耗最小:
约束条件:
式中PGi、QGi——节点i注入的有功和无功功率;
PDi、QDi——节点i的负荷有功和无功功率;
n——节点总数;
QCi——电容器无功补偿容量;
k——系统不同的负荷水平参数;
——控制变量,分别为有载变压器变比和i节点的补偿容量;
Vi、Sref——状态变量,分别是负荷点电压和平衡节点的出力;
——支路通过的功率。
求解过程可用附图表示,Pm为假定的最小网损值,通过优化潮流算法,得到网络各节点和支路等的实际运行状态。然后通过无功优化配置计算,对不满足网络约束的节点或支路进行无功的自动补偿。在轻负荷时不允许过补偿,否则由于无功补偿容量过大,会使功率因数超前,向电网倒送无功,是不经济的。在不同功率因数的条件下,每千乏补偿容量取得的补偿效益是不相同的。
当节点不满足电压约束水平时,加装补偿电容所需无功补偿容量为
式中jx——该条线路电抗为;
U2L′——投入电容后变电站母线线电压值;
ΔUL——电压增量。
当节点不满足功率因数约束时,通过提高功率因数需要确定补偿容量。具体方法如下:如果该节点的有功功率为P,补偿前的功率因数为补偿后的功率因数为则所需补偿容量若需要将提高到大于小于则补偿容量应满足当节点不满足网损约束时,则需要根据目前网损和目标网损之间值的比较来确定补偿容量,则补偿容量
式中ΔIX——补偿前后容性电流差值;
U——该节点电压;
P——该线路有功功率。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410495907.XA CN104269858A (zh) | 2014-09-24 | 2014-09-24 | 一种高压配电网无功规划优化方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410495907.XA CN104269858A (zh) | 2014-09-24 | 2014-09-24 | 一种高压配电网无功规划优化方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104269858A true CN104269858A (zh) | 2015-01-07 |
Family
ID=52161360
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410495907.XA Pending CN104269858A (zh) | 2014-09-24 | 2014-09-24 | 一种高压配电网无功规划优化方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104269858A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104734150A (zh) * | 2015-03-30 | 2015-06-24 | 国家电网公司 | 配电网优化方法 |
CN104795823A (zh) * | 2015-04-01 | 2015-07-22 | 国家电网公司 | 基于分层优化的电网最小新增无功补偿容量计算方法 |
CN106655207A (zh) * | 2017-03-21 | 2017-05-10 | 国网山东省电力公司枣庄供电公司 | 基于多数据分析的配电网无功优化系统及方法 |
CN109038605A (zh) * | 2018-08-03 | 2018-12-18 | 国网山东省电力公司经济技术研究院 | 一种考虑电压响应特性的电网无功规划方法 |
CN113708383A (zh) * | 2021-09-16 | 2021-11-26 | 安徽海螺建材设计研究院有限责任公司 | 电能损耗和电能质量综合处理方法及系统 |
-
2014
- 2014-09-24 CN CN201410495907.XA patent/CN104269858A/zh active Pending
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104734150A (zh) * | 2015-03-30 | 2015-06-24 | 国家电网公司 | 配电网优化方法 |
CN104795823A (zh) * | 2015-04-01 | 2015-07-22 | 国家电网公司 | 基于分层优化的电网最小新增无功补偿容量计算方法 |
CN104795823B (zh) * | 2015-04-01 | 2017-09-26 | 国家电网公司 | 基于分层优化的电网最小新增无功补偿容量计算方法 |
CN106655207A (zh) * | 2017-03-21 | 2017-05-10 | 国网山东省电力公司枣庄供电公司 | 基于多数据分析的配电网无功优化系统及方法 |
CN106655207B (zh) * | 2017-03-21 | 2020-03-27 | 国网山东省电力公司枣庄供电公司 | 基于多数据分析的配电网无功优化系统及方法 |
CN109038605A (zh) * | 2018-08-03 | 2018-12-18 | 国网山东省电力公司经济技术研究院 | 一种考虑电压响应特性的电网无功规划方法 |
CN113708383A (zh) * | 2021-09-16 | 2021-11-26 | 安徽海螺建材设计研究院有限责任公司 | 电能损耗和电能质量综合处理方法及系统 |
CN113708383B (zh) * | 2021-09-16 | 2024-05-17 | 安徽海螺建材设计研究院有限责任公司 | 电能损耗和电能质量综合处理方法及系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Li et al. | Convex optimization for DES planning and operation in radial distribution systems with high penetration of photovoltaic resources | |
Nick et al. | Optimal siting and sizing of distributed energy storage systems via alternating direction method of multipliers | |
Dharmakeerthi et al. | Impact of electric vehicle fast charging on power system voltage stability | |
Ranamuka et al. | Flexible AC power flow control in distribution systems by coordinated control of distributed solar-PV and battery energy storage units | |
Liu et al. | Multi‐objective restoration optimisation of power systems with battery energy storage systems | |
Rahimzadeh et al. | Looking for optimal number and placement of FACTS devices to manage the transmission congestion | |
CN104269858A (zh) | 一种高压配电网无功规划优化方法 | |
CN105140907B (zh) | 直流微网多智能体自适应下垂一致性协调控制方法及装置 | |
Hung et al. | Determining the size of PHEV charging stations powered by commercial grid-integrated PV systems considering reactive power support | |
CN103020853B (zh) | 一种短期交易计划安全校核的方法 | |
US20150261892A1 (en) | Integrated optimal placement, sizing, and operation of energy storage devices in electric distribution networks | |
CN106777586B (zh) | 一种计算配电网中分布式电源和微网的运行域求解方法 | |
CN106685239B (zh) | 一种变流器多重化的载波移相方法 | |
CN103532142B (zh) | 电力系统精细化稳定控制方法和系统 | |
CN103439609A (zh) | 一种电力电缆实时应急载流量的计算方法 | |
CN104979849A (zh) | 一种适用于用户侧微电网的并网运行控制方法 | |
CN104241720A (zh) | 一种微网中的电动汽车直流快速充电站充电控制方法 | |
CN101764404B (zh) | 省地协调电压控制中省地协调运行状态的判断方法 | |
CN103401249B (zh) | 一种基于无功设备可用资源的无功自动安排方法 | |
CN104868468B (zh) | 基于全寿命周期成本的upfc优化配置方法 | |
CN103715687B (zh) | 一种主动配电网支路功率拥塞实时控制方法 | |
CN104836260A (zh) | 一种电压约束下主动配电网中dg准入容量的计算方法 | |
Jayawardena et al. | Microgrid capability diagram: A tool for optimal grid-tied operation | |
KR20130104538A (ko) | Facts 기기 운전점 제어 장치 및 방법 | |
CN106647251A (zh) | 一种车载系统能量管理的自适应模糊控制方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150107 |