CN104268344B - 一种地下水库调蓄库容计算方法 - Google Patents

一种地下水库调蓄库容计算方法 Download PDF

Info

Publication number
CN104268344B
CN104268344B CN201410510635.6A CN201410510635A CN104268344B CN 104268344 B CN104268344 B CN 104268344B CN 201410510635 A CN201410510635 A CN 201410510635A CN 104268344 B CN104268344 B CN 104268344B
Authority
CN
China
Prior art keywords
recharge
groundwater reservoir
groundwater
storage capacity
reservoir
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410510635.6A
Other languages
English (en)
Other versions
CN104268344A (zh
Inventor
柴福鑫
谢新民
方樟
赵元
梁籍
姚旭初
石维新
刘俊秋
周翔南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Institute of Water Resources and Hydropower Research
Original Assignee
China Institute of Water Resources and Hydropower Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Institute of Water Resources and Hydropower Research filed Critical China Institute of Water Resources and Hydropower Research
Priority to CN201410510635.6A priority Critical patent/CN104268344B/zh
Publication of CN104268344A publication Critical patent/CN104268344A/zh
Application granted granted Critical
Publication of CN104268344B publication Critical patent/CN104268344B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明涉及一种地下水库调蓄库容计算方法,它采用如下的技术方案,其步骤包括:地下水库范围的确定、水库储水空间的确定、回灌场地与方式的选择、三维地质模型和数值模拟模型的构建、模型的参数率定、均衡条件的选择(降水入渗、边界补给或排泄等)与开采方案的确定等;它通过分区测定和计算水库体积及库容系数获得地下水库库容,并通过不同方案的开采和回灌方案计算地下水库调蓄能力,藉此解决地下水库库容计算精度低,调蓄能力难于计算的问题,实现对地下水的合理开发和有效保护。

Description

一种地下水库调蓄库容计算方法
技术领域
本发明所属技术领域为地下水工程,本发明涉及一种地下水库调蓄库容计算方法。
背景技术
随着社会经济的快速发展,地下水的过渡开采,形成了大量的地下水漏斗。为此,我们国家建立了多个调水工程,在调水工程水源区和受水区的丰水时段,剩余水量人工补给地下水成为可能,地下水库的构建成为了迫切需要和未来建设的热点。但与地表水库不同,地下水库结构复杂、水力联系密切,受天然地质条件、边界条件和人工的开采和回灌规模等多因素制约,如何构建一种可以计算地下水库可调蓄库容的方法,使得地下水库能灌得进、存得住和采得出,是非常有意义和实用的工作,为此本发明给出了综合考虑地下水库水文地质条件、边界条件、天然入渗补给条件和人工开采等因素,计算并确定地下水库的调蓄能力和回灌规模的方法。
发明内容
本发明的目的在于针对现有技术的缺陷和不足,提供一种结构简单,设计合理、使用方便的一种地下水库调蓄库容计算方法,它通过分区测定和计算水库体积及库容系数获得地下水库库容,便于获知地下水库的储水能力,藉此解决地下水库库容计算精度低,调蓄能力难于计算的问题,实现对地下水的合理开发和有效保护。
为实现上述目的,本发明采用的技术方案是:
本发明所述的一种地下水库调蓄库容计算方法,采用如下的技术步骤:
步骤1:地下水库范围的确定,根据地下水库范围内水文地质条件,选择水文地质单元比较完整、边界有详细的地下水位监测井以及考虑回灌和开采能影响到的范围等作为地下水库的范围;
步骤2:储水空间的确定,选择可回灌地下水的补给含水层作为地下水库的储水空间,如果地下水库范围内多层含水层水力联系比较密切又难于监测,选择多层含水层作为储水空间;
步骤3:回灌场地与方式的选择,回灌场地选择地下水渗透系数大、回灌场地没有受到污染并且利于地下水回灌的天然河道、沙坑等作为回灌场地,回灌方式选择回灌井、天然河道或构建河道内的大口井等;
步骤4:以步骤2的储水空间作为基准建立三维地质模型和数值模拟模型,建立地下水地质空间结构和模拟模型,便于对地下水库的库容计算和调蓄库容计算;
步骤5:数值模型参数率定,根据步骤4设定参数率定,确定地下水库水文地质参数和补排条件,为地下水库容调算提供数据信息和模型基础;
步骤6:均衡条件的选择,包括降水入渗、边界补给或排泄等以及开采方案的确定等;
步骤7:地下水调蓄库容计算,根据不同回灌规模,在保证地下水位不超过上下限水位的条件下,计算地下水库的水位变化以及流场变化和边界补排量,并确定年或多年可调蓄库容。
进一步地,步骤7中所述的回灌规模包括步骤3所述的回灌方式以及回灌时间。
采用上述结构后,本发明有益效果为:本发明所述的一种地下水库调蓄库容计算方法,它主要用在无坝、非封闭地下水回灌补给区地下水水库调蓄库容的计算,并且综合考虑地下水库能不能灌下去、存得住和取的出,为调蓄地下水库,确定可行的开采及回灌规模提供技术方法;它通过分区测定和计算水库体积及库容系数获得地下水库库容,便于获知地下水库的储水能力,藉此解决地下水库库容计算精度低,调蓄能力难于计算的问题,实现对地下水的合理开发和有效保护
附图说明
图1是本发明的结构示意图。
具体实施方式
下面结合附图对本发明作进一步的说明。
如图1所示,本发明所述的一种地下水库调蓄库容计算方法,采用如下的技术步骤:
步骤1:地下水库范围的确定,根据地下水库范围内水文地质条件,选择水文地质单元比较完整、边界有详细的地下水位监测井以及回灌和考虑开采能影响到的范围等作为地下水库的范围;
步骤2:储水空间的确定,选择可回灌地下水的补给含水层作为地下水库的储水空间,如果地下水库范围内多层含水层水力联系比较密切又难于监测,选择多层含水层作为储水空间;
步骤3:回灌场地与方式的选择,回灌场地选择地下水渗透系数大、回灌场地没有受到污染并且利于地下水回灌的天然河道、沙坑等作为回灌场地,回灌方式选择回灌井、天然河道或构建河道内的大口井等;
步骤4:以步骤2的储水空间作为基准建立三维地质模型和数值模拟模型,建立地下水地质空间结构和模拟模型,便于对地下水库的库容计算和调蓄库容计算;
步骤5:数值模型参数率定,根据步骤4设定参数率定,确定地下水库水文地质参数和补排条件,为地下水库容调算提供数据信息和模型基础;
步骤6:均衡条件的选择,包括降水入渗、边界补给或排泄等与开采方案的确定等;
步骤7:地下水调蓄库容计算,根据不同回灌规模,在保证地下水位不超过上下限水位的条件下,计算地下水库的水位变化以及流场变化和边界补排量,并确定年或多年可调蓄库容。
步骤7中所述的回灌规模包括步骤3所述的回灌方式以及回灌时间。
本发明这种计算方法主要用在无坝、非封闭地下水回灌补给区地下水水库调蓄库容的计算。一般的地下水库库容计算都是以天然的水文地质条件为基础,计算地下水库的最大库容,并跟最大库容建立某种联系确定每年或多年的调蓄库容,而忽视了地下水库能不能灌下去、存得住和取的出,本方法综合考虑了这些因素,为调蓄地下水库,确定可行的开采及回灌规模提供了帮助。
本发明通过分区测定和计算水库体积及库容系数获得地下水库库容,便于获知地下水库的储水能力,藉此解决地下水库库容计算精度低,调蓄能力难于计算的问题,实现对地下水的合理开发和有效保护。
以上所述仅是本发明的较佳实施方式,故凡依本发明专利申请范围所述的构造、特征及原理所做的等效变化或修饰,均包括于本发明专利申请范围内。

Claims (2)

1.一种地下水库调蓄库容计算方法,其特征在于:
采用如下的方法步骤:
步骤1:地下水库范围的确定,根据地下水库范围内水文地质条件,选择水文地质单元比较完整、边界有详细的地下水位监测井以及考虑回灌和开采能影响到的范围作为地下水库的范围;
步骤2:储水空间的确定,选择可回灌地下水的补给含水层作为地下水库的储水空间,如果地下水库范围内多层含水层水力联系比较密切又难于监测,选择多层含水层作为储水空间;
步骤3:回灌场地与方式的选择,回灌场地选择地下水渗透系数大、回灌场地没有受到污染并且利于地下水回灌的天然河道、沙坑作为回灌场地,回灌方式选择回灌井、天然河道或构建河道内的大口井;
步骤4:以步骤2的储水空间作为基准建立三维地质模型和数值模拟模型,建立地下水地质空间结构和模拟模型,便于对地下水库的库容计算和调蓄库容计算;所述地下水库的库容计算通过分区测定和计算水库体积及库容系数获得;
步骤5:数值模型参数率定,根据步骤4设定参数率定,确定地下水库水文地质参数和补排条件,为地下水库容调算提供数据信息和模型基础;
步骤6:均衡条件的选择,包括降水入渗、边界补给或排泄以及开采方案的确定;
步骤7:地下水调蓄库容计算,根据不同回灌规模,在保证地下水位不超过上下限水位的条件下,计算地下水库的水位变化以及流场变化和边界补排量,并确定年或多年可调蓄库容。
2.根据权利要求1所述的一种地下水库调蓄库容计算方法,其特征在于:
步骤7所述回灌规模包括步骤3所述的回灌方式以及回灌时间。
CN201410510635.6A 2014-09-28 2014-09-28 一种地下水库调蓄库容计算方法 Expired - Fee Related CN104268344B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410510635.6A CN104268344B (zh) 2014-09-28 2014-09-28 一种地下水库调蓄库容计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410510635.6A CN104268344B (zh) 2014-09-28 2014-09-28 一种地下水库调蓄库容计算方法

Publications (2)

Publication Number Publication Date
CN104268344A CN104268344A (zh) 2015-01-07
CN104268344B true CN104268344B (zh) 2018-04-17

Family

ID=52159865

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410510635.6A Expired - Fee Related CN104268344B (zh) 2014-09-28 2014-09-28 一种地下水库调蓄库容计算方法

Country Status (1)

Country Link
CN (1) CN104268344B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057861B (zh) * 2018-08-28 2023-07-04 清华大学 一种露天煤矿地下水库、水库储水体及水库库容计算方法
CN110298473A (zh) * 2019-04-17 2019-10-01 中国水利水电科学研究院 一种超采区地下水库选址及确定调蓄库容的方法
CN113309171A (zh) * 2021-06-01 2021-08-27 河海大学 一种离岸海岛水资源调蓄系统和方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102778215A (zh) * 2012-07-23 2012-11-14 中国神华能源股份有限公司 一种矿井地下水库的库容确定方法
CN102927941A (zh) * 2012-11-20 2013-02-13 中国神华能源股份有限公司 一种露天煤矿地下水库的库容确定方法
CN103215937A (zh) * 2013-02-28 2013-07-24 中国地质大学(武汉) 基于多层含水层结构的雨水回灌地下水系统
CN103344297A (zh) * 2013-06-28 2013-10-09 中铁隧道集团一处有限公司 地下水封洞库的库容测量方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102778215A (zh) * 2012-07-23 2012-11-14 中国神华能源股份有限公司 一种矿井地下水库的库容确定方法
CN102927941A (zh) * 2012-11-20 2013-02-13 中国神华能源股份有限公司 一种露天煤矿地下水库的库容确定方法
CN103215937A (zh) * 2013-02-28 2013-07-24 中国地质大学(武汉) 基于多层含水层结构的雨水回灌地下水系统
CN103344297A (zh) * 2013-06-28 2013-10-09 中铁隧道集团一处有限公司 地下水封洞库的库容测量方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
《北京市西效地下水库调蓄能力与利用模式研究》;刘颖超;《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》;20121015;第23-25、48-64页 *
北京市永定河地下水库水资源储蓄能力研究;王立发; 邢国章; 江剑; 郝奇琛;《城市地质》;20130315;第8卷(第1期);第18-22页 *
沈阳市地下水库建设的技术可行性分析;叶勇,谢新民,柴福鑫,杨丽丽;《中国水利水电科学研究院学报》;20100315;第8卷(第1期);第66-70页 *

Also Published As

Publication number Publication date
CN104268344A (zh) 2015-01-07

Similar Documents

Publication Publication Date Title
Linderfelt et al. Interaction between shallow groundwater, saline surface water and nutrient discharge in a seasonal estuary: the Swan–Canning system
De Louw et al. Rainwater lens dynamics and mixing between infiltrating rainwater and upward saline groundwater seepage beneath a tile-drained agricultural field
CN103075142B (zh) 一种注水开发油田堵水油井选井方法
Zuurbier et al. Identification of potential sites for aquifer storage and recovery (ASR) in coastal areas using ASR performance estimation methods
CN104268344B (zh) 一种地下水库调蓄库容计算方法
Nofal et al. Adaptation to the impact of sea level rise in the Nile Delta coastal zone, Egypt
CN206495266U (zh) 一种蔬菜棚区地下水自动回灌装置
CN104915463A (zh) 一种地下水库调蓄库容的计算方法
Han et al. Seasonal groundwater storage anomaly and vadose zone soil moisture as indicators of precipitation recharge in the piedmont region of Taihang Mountain, North China Plain
Zhu Management strategy of groundwater resources and recovery of over-extraction drawdown funnel in Huaibei City, China
Aghbolagh et al. The study of changes in Ardabil plain groundwater level using GIS
CN109147047A (zh) 一种渗渠型傍河水源地数值模型构建方法
Puttiwongrak et al. Groundwater recharge estimation in Kathu, Phuket using groundwater modelling
Ding et al. Drainage and ecological service of irrigation schemes in China
Masciale et al. Impact of a very low enthalpy plant on a costal aquifer: a case study in Southern Italy
Yanxun et al. Research and Application of Groundwater Numerical Simulation-A Case Study in Balasu Water Source
Meng et al. Crisis of Water Resources on the Ulan Buh Desert Oases, Inner Mongolia, China-A Case Study of Dengkou County
Zhou et al. Study on the groundwater sustainable problem by numerical simulation in a multi-layered coastal aquifer system of Zhanjiang, China
Novický et al. Vulnerability of groundwater resources in different hydrogeological conditions to climate change
CN207096022U (zh) 基于物联网技术的地下水潜水蒸发测量系统
Yao et al. Assessment of groundwater reservoir and the influence of its characteristics on water dynamic control
Wei et al. Numerical simulation of karst groundwater system for discharge prediction and protection design of spring in Fangshan District, Beijing
Bejranonda et al. Improving traditional conjunctive use management with surface water and groundwater dynamic interactions modeling
Nieć et al. Numerical Simulation of Groundwater Level Changes: A Case Study of the Struzyna Reservoir
Gao et al. Formation of pit lake and slope stability following mine closure: a case study of Fushun West Open-pit Mine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180417

Termination date: 20180928

CF01 Termination of patent right due to non-payment of annual fee