CN104264704A - 一种用于海上测风塔的组装式六边形浮箱基础 - Google Patents

一种用于海上测风塔的组装式六边形浮箱基础 Download PDF

Info

Publication number
CN104264704A
CN104264704A CN201410534950.2A CN201410534950A CN104264704A CN 104264704 A CN104264704 A CN 104264704A CN 201410534950 A CN201410534950 A CN 201410534950A CN 104264704 A CN104264704 A CN 104264704A
Authority
CN
China
Prior art keywords
buoyancy tank
anemometer tower
buoyancy
seaborne
combination type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410534950.2A
Other languages
English (en)
Inventor
张浦阳
丁红岩
练继建
何少华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Frontier Technology Research Institute of Tianjin University Co Ltd
Original Assignee
Frontier Technology Research Institute of Tianjin University Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Frontier Technology Research Institute of Tianjin University Co Ltd filed Critical Frontier Technology Research Institute of Tianjin University Co Ltd
Priority to CN201410534950.2A priority Critical patent/CN104264704A/zh
Publication of CN104264704A publication Critical patent/CN104264704A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/04Flat foundations in water or on quicksand
    • E02D27/06Floating caisson foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

一种用于海上测风塔的组装式六边形浮箱基础,由六个长方形浮箱和六个三角形小浮箱依次拼装连接并组成基础平面为正六边形的浮箱,长方形浮箱上设有注水阀门,长方形浮箱内设有加强肋板以加强浮箱的刚度,加强肋板底部设有方孔,在六个小浮箱底部设有底部开口的阻滑裙板箱,浮箱基础浮运至预定施工位置下沉后插入海床以阻止浮箱基础水平滑移。本发明的优点是:该浮箱基础结构稳定、对称性好、受力性能好且便于海上浮运安装。上部可安装桁架式测风塔结构,塔架和浮箱基础之间通过焊接连接成整体,浮箱可为测风塔整体结构拖航时提供浮力,只需采用小型拖船即可达到目的地进行沉放和安装,降低工程成本。大大缩短测风塔结构的建造时间。

Description

一种用于海上测风塔的组装式六边形浮箱基础
技术领域
本发明涉及港口、海洋和风电工程的基础结构技术领域,尤其涉及一种用于海上测风塔的组装式六边形浮箱基础。
背景技术
风电是一种可再生的清洁能源,近几年陆地风电发展迅速,但陆地可开发利用的风能与近海可利用的风能储量相比非常有限。因此,我国海上风电更具有开发潜力。近海风电场前期开发的一项重要工作是风资源的获取与评估,其最常用的手段就是建立测风塔。
在海上测风塔结构中,基础部分投资所占据的比重约60-70%,塔架的选型往往也依赖于基础的型式,测风塔是一种高耸结构建筑物,传统测风塔基础形式有单立柱钢管桩基础、重力式基础、吸力桶基础、多根钢管桩承台基础等等基础形式。这些传统基础型式海上施工和安装费用较高并且回收利用难度比较大,从目前国内的工程实例来看,最常用的是桩基础和重力式基础,单立柱钢管桩一般采用大直径钢桩,结构形式简单,受力明确,国外使用较普遍,但是受施工设备限制,国内应用尚有困难; 重力式基础不仅工程量大且施工难度也大,现在也很少采用;吸力桶式基础无需打桩也便于拆除,但技术上还不太成熟;因此,开发一种施工简便,建造周期短,工程成本较低,并且适合于我国海域特点和装备制造业水平的新型测风塔基础具有重要意义。
发明内容
本发明的目的是为解决上述存在问题,提供一种用于海上测风塔的组装式六边形浮箱基础,该浮箱基础结构稳定、对称性好、受力性能好且便于海上浮运安装;上部可安装桁架式测风塔结构,塔架和浮箱基础之间通过焊接连接成整体,浮箱可为测风塔整体结构拖航时提供浮力,只采用小型拖船即可达到目的地进行沉放和安装,从而大大缩短建造时间,降低工程成本。
本发明的技术方案:
一种用于海上测风塔的组装式六边形浮箱基础,由六个长方形浮箱和六个三角形小浮箱依次拼装连接并组成基础平面为正六边形的浮箱,长方形浮箱上设有注水阀门,长方形浮箱内设有加强肋板以加强浮箱的刚度,加强肋板底部设有方孔,在六个小浮箱底部设有底部开口的阻滑裙板箱,浮箱基础浮运至预定施工位置下沉后插入海床以阻止浮箱基础水平滑移。
所述长方形浮箱均为边长12.5m、宽2.5m、高2.2m、壁厚25mm,浮箱内部沿长度方向布置有横向加强肋板,肋板厚度18mm,加强肋板底部方孔的宽度为20cm、高度为10cm,加强肋板间距为1.5m。
所述小浮箱为五块钢板围成的截面为梯形且底部开口的四面箱体,梯形平面的短边长0.2m、长边长2.7m、高2.165m、高度为2.7m、壁厚25mm。
本发明的实施方法:
六边形浮箱基础的大浮箱和小浮箱在岸上焊接并拼装成型,或者与上部测风塔过渡段结构整体焊接,通过驳船进行一步式拖航安装施工。整体六边形浮箱基础浮运拖航至预定施工位置后,可通过箱体上预留的阀门向浮箱内注水下沉至设计标高。下沉过程中可同时对裙板围成的箱体采取抽负压的方式辅助下沉,裙板同时插入海床固定基础,防止浮箱基础水平向的滑移。
本发明的有益效果是:
该浮箱基础结构稳定、对称性好、受力性能好且便于海上浮运安装。上部可安装桁架式测风塔结构,塔架和浮箱基础之间通过焊接连接成整体,浮箱可为测风塔整体结构拖航时提供浮力,只需采用小型拖船即可达到目的地进行沉放和安装,降低工程成本。大大缩短测风塔结构的建造时间。
附图说明
图1为该六边形浮箱基础主视图。
图2为该六边形浮箱基础侧视图。
图3为该六边形浮箱基础俯视图。
图4为该六边形浮箱基础三维结构示意图。
图中:1.浮箱   2.小浮箱   3.加强肋板    4.注水阀门   5.阻滑裙板箱。
具体实施方式
为能进一步了解本发明的发明内容、特点及功效,现例举以下实施例,并配合附图详细说明如下。
实施例:
一种用于海上测风塔的组装式六边形浮箱基础,如图1-4所示,由六个长方形浮箱1和六个三角形小浮箱2依次拼装连接并组成基础平面为正六边形的浮箱,长方形浮箱1上设有注水阀门4,长方形浮箱1内设有加强肋板3以加强浮箱的刚度,加强肋板3底部设有方孔,在六个小浮箱2底部设有底部开口的阻滑裙板箱5,浮箱基础浮运至预定施工位置下沉后插入海床以阻止浮箱基础水平滑移。
该实施例中,六个长方形浮箱均为边长12.5m、宽2.5m、高2.2m、壁厚25mm,浮箱内部沿长度方向均布有18mm厚的横向加强肋板以加强浮箱的刚度,加强肋板底部方孔的宽度为20cm、高度为10cm,加强肋板间距为1.5m;阻滑裙板箱由五块25mm厚钢板焊接围成有盖无底的四面箱体,梯形平面的短边长0.2m、长边长2.7m、高2.165m、高度为2.7m、壁厚25mm。
该整体基础在岸上焊接拼装完毕,通过小型拖船进行海上拖航施工,基础托运至施工位置定位后,可通过浮箱预留阀门向箱内注水下沉,同时各小浮箱通过抽取负压的方式辅助下沉。

Claims (3)

1.一种用于海上测风塔的组装式六边形浮箱基础,其特征在于:由六个长方形浮箱和六个三角形小浮箱依次拼装连接并组成基础平面为正六边形的浮箱,长方形浮箱上设有注水阀门,长方形浮箱内设有加强肋板以加强浮箱的刚度,加强肋板底部设有方孔,在六个小浮箱底部设有底部开口的阻滑裙板箱,浮箱基础浮运至预定施工位置下沉后插入海床以阻止浮箱基础水平滑移。
2.根据权利要求1所述用于海上测风塔的组装式六边形浮箱基础,其特征在于:所述长方形浮箱均为边长12.5m、宽2.5m、高2.2m、壁厚25mm,浮箱内部沿长度方向布置有横向加强肋板,肋板厚度18mm,加强肋板底部方孔的宽度为20cm、高度为10cm,加强肋板间距为1.5m。
3.根据权利要求1所述用于海上测风塔的组装式六边形浮箱基础,其特征在于:所述小浮箱为五块钢板围成的截面为梯形且底部开口的四面箱体,梯形平面的短边长0.2m、长边长2.7m、高2.165m、高度为2.7m、壁厚25mm。
CN201410534950.2A 2014-10-13 2014-10-13 一种用于海上测风塔的组装式六边形浮箱基础 Pending CN104264704A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410534950.2A CN104264704A (zh) 2014-10-13 2014-10-13 一种用于海上测风塔的组装式六边形浮箱基础

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410534950.2A CN104264704A (zh) 2014-10-13 2014-10-13 一种用于海上测风塔的组装式六边形浮箱基础

Publications (1)

Publication Number Publication Date
CN104264704A true CN104264704A (zh) 2015-01-07

Family

ID=52156268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410534950.2A Pending CN104264704A (zh) 2014-10-13 2014-10-13 一种用于海上测风塔的组装式六边形浮箱基础

Country Status (1)

Country Link
CN (1) CN104264704A (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105370081A (zh) * 2015-11-18 2016-03-02 三一重型能源装备有限公司 海上测风塔及其基座
CN107542101A (zh) * 2017-09-28 2018-01-05 天津大学 一种海上四浮筒‑浮箱组合式基础结构及其施工方法
CN107542102A (zh) * 2017-09-28 2018-01-05 天津大学 一种海上五浮筒‑浮箱组合式基础结构及其施工方法
CN107630462A (zh) * 2017-09-28 2018-01-26 天津大学 一种海上六浮筒‑浮箱组合式基础结构及其施工方法
CN107630461A (zh) * 2017-09-28 2018-01-26 天津大学 一种组合式海上四浮筒浮箱基础结构及其施工方法
CN107653895A (zh) * 2017-09-28 2018-02-02 天津大学 一种组合式海上六浮筒浮箱基础结构及其施工方法
CN107724414A (zh) * 2017-09-28 2018-02-23 天津大学 一种组合式海上五浮筒浮箱基础结构及其施工方法
CN107806108A (zh) * 2017-09-28 2018-03-16 天津大学 一种组合式海上三浮筒浮箱基础结构及其施工方法
CN113089712A (zh) * 2021-03-31 2021-07-09 河北工程大学 一种大尺度预制水下沉垫的移位装置及方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004116124A (ja) * 2002-09-26 2004-04-15 Tokyo Electric Power Co Inc:The 鉄塔の基礎構造
CN202559371U (zh) * 2012-05-08 2012-11-28 山东电力工程咨询院有限公司 打入式独柱、独桩海上测风塔基础
CN103758147A (zh) * 2014-02-13 2014-04-30 天津大学前沿技术研究院有限公司 一种重力式海上风电机组基础及其拖航与下沉方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004116124A (ja) * 2002-09-26 2004-04-15 Tokyo Electric Power Co Inc:The 鉄塔の基礎構造
CN202559371U (zh) * 2012-05-08 2012-11-28 山东电力工程咨询院有限公司 打入式独柱、独桩海上测风塔基础
CN103758147A (zh) * 2014-02-13 2014-04-30 天津大学前沿技术研究院有限公司 一种重力式海上风电机组基础及其拖航与下沉方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张峰等: ""一种新型测风塔的稳性分析"", 《低温建筑技术》 *
肖新强等: ""南平樟湖库区大桥钢浮箱施工图设计"", 《湖南理工学院学报(自然科学版)》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105370081A (zh) * 2015-11-18 2016-03-02 三一重型能源装备有限公司 海上测风塔及其基座
CN105370081B (zh) * 2015-11-18 2018-11-06 三一重型能源装备有限公司 海上测风塔
CN107542101A (zh) * 2017-09-28 2018-01-05 天津大学 一种海上四浮筒‑浮箱组合式基础结构及其施工方法
CN107542102A (zh) * 2017-09-28 2018-01-05 天津大学 一种海上五浮筒‑浮箱组合式基础结构及其施工方法
CN107630462A (zh) * 2017-09-28 2018-01-26 天津大学 一种海上六浮筒‑浮箱组合式基础结构及其施工方法
CN107630461A (zh) * 2017-09-28 2018-01-26 天津大学 一种组合式海上四浮筒浮箱基础结构及其施工方法
CN107653895A (zh) * 2017-09-28 2018-02-02 天津大学 一种组合式海上六浮筒浮箱基础结构及其施工方法
CN107724414A (zh) * 2017-09-28 2018-02-23 天津大学 一种组合式海上五浮筒浮箱基础结构及其施工方法
CN107806108A (zh) * 2017-09-28 2018-03-16 天津大学 一种组合式海上三浮筒浮箱基础结构及其施工方法
CN113089712A (zh) * 2021-03-31 2021-07-09 河北工程大学 一种大尺度预制水下沉垫的移位装置及方法

Similar Documents

Publication Publication Date Title
CN104264704A (zh) 一种用于海上测风塔的组装式六边形浮箱基础
CN201538971U (zh) 高桩承台式海上风力发电机基础结构
CN102277878B (zh) 一种可浮运的浮式基础施工方法
CN205653814U (zh) 一种沉箱式海上测风雷达基础结构
CN102182203B (zh) 一种钢排式测风塔基础及测风塔结构
CN102677694B (zh) 一种海上风电潜式基础结构及其整机安装施工方法
US10443574B2 (en) Gravity foundation for the installation of offshore wind turbines
EP2463524B1 (en) Marine wind turbine whole machine
CN202672129U (zh) 一种近海风电自升式海上升压站
CN104627331A (zh) 一种风力发电浮式基础
CN201952809U (zh) 钢桁架式海上测风塔基础结构
CN102425182B (zh) 一种环形负压基础围堰及其施工方法
KR101665979B1 (ko) 콘크리트 베이스를 이용한 해상풍력 지지구조물 및 그 시공방법
JP5738643B2 (ja) 洋上風力発電設備の施工方法
CN110155264B (zh) 海上风机复合筒基础拖航结构及拖航方法
CN203096180U (zh) 拉伸式牺牲阳极串
CN104278692B (zh) 一种用于海上测风塔的带侧向支撑的整体三边形浮箱基础
CN202610825U (zh) 预制钢筋混凝土沉箱式海上风力发电机基础结构
CN103195080B (zh) 一种重力式基础的拖航方法
CN107795438B (zh) 一种辅助平台的施工方法
CN105155568A (zh) 海上风电机组、海上风电机组基础及其安装方法
CN108791738B (zh) 一种大型海上风机整体浮托安装方法
CN104404977A (zh) 一种用于海上测风塔的整体式三边形浮箱基础
CN202987472U (zh) 一种可坐底桁架式海上风机安装驳船
CN104404976A (zh) 一种用于海上测风塔的整体式六边形浮箱基础结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150107

RJ01 Rejection of invention patent application after publication