CN104264673A - Pouring method for reinforced concrete protective layer of iron tower foundation - Google Patents

Pouring method for reinforced concrete protective layer of iron tower foundation Download PDF

Info

Publication number
CN104264673A
CN104264673A CN201410470657.4A CN201410470657A CN104264673A CN 104264673 A CN104264673 A CN 104264673A CN 201410470657 A CN201410470657 A CN 201410470657A CN 104264673 A CN104264673 A CN 104264673A
Authority
CN
China
Prior art keywords
iron tower
pouring
tower foundation
protective layer
rectangle hoop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410470657.4A
Other languages
Chinese (zh)
Other versions
CN104264673B (en
Inventor
张殿越
刘新宇
王静
王文博
陈晓垒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410470657.4A priority Critical patent/CN104264673B/en
Publication of CN104264673A publication Critical patent/CN104264673A/en
Application granted granted Critical
Publication of CN104264673B publication Critical patent/CN104264673B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Abstract

The invention discloses a pouring method for a reinforced concrete protective layer of an iron tower foundation. The pouring method comprises the following steps: firstly building a reinforced structure at a position where the iron tower foundation is prebuilt; welding two supporting ribs with length of 5 cm on the two sides or two ends of each edge of rectangular stirrups in the horizontal direction respectively, wherein the supporting ribs are perpendicular to a corresponding edge of each rectangular stirrup, and the space between upper and lower groups of adjacent supporting ribs is 100-150 mm; fixedly arranging four formworks on the outer side of the rectangular stirrups and bundling together to form a closed pouring space, wherein the inner surface of each formwork is abutted against the corresponding supporting rib; pouring concrete in the pouring space defined by the formworks by using a concrete pouring vehicle, and closing the top end with an upper cover after the pouring space is filled up; disassembling the formworks after three days, wrapping with plastic cloth and placing in a pit for curing to finish operation. The method can guarantee that the thickness of protective layer of the reinforced concrete is uniform and reaches 5 cm to prevent oxidation of the reinforcements and prolong the life cycle of the iron tower foundation.

Description

A kind of casting method of iron tower foundation reinforced concrete protective layer
Technical field
The present invention relates to a kind of casting method of iron tower foundation reinforced concrete protective layer.
Background technology
Reinforced concrete protective layer, be protection reinforcing bar not by corrosion, be also the guarantee of iron tower foundation life cycle, technical standard require institute placing of concrete Hou Du Wei≤5cm.Because when concrete baffle plate is fixed, there is no fixed standard in, probably due to fixing shakiness, cause concrete baffle plate crooked, or reinforcing bar distortion does not keep vertical state.During placing of concrete, it is in uneven thickness, local thickness less than 5cm, cause reinforced concrete protective layer to be not enough to prevent reinforcing bar to be oxidized, iron tower foundation life cycle shortened.
Summary of the invention
The present invention is the deficiency that will solve prior art existence, provides a kind of casting method of iron tower foundation reinforced concrete protective layer, ensures that Minimum Concrete Protective Coating Thickness is even, reach 5cm, prevents reinforcing bar to be oxidized, extend the life cycle of iron tower foundation.
A casting method for iron tower foundation reinforced concrete protective layer, its step is as follows:
1, first build the bar construction be made up of the reinforcing bar vertically placed, rectangle hoop building iron tower foundation position in advance, described reinforcing bar and rectangle hoop are linked together by iron wire binding;
2, welding two length respectively in the horizontal direction in the both sides on each limit of rectangle hoop or two ends is the brace rod of 5cm, and described brace rod is perpendicular to the corresponding edge of rectangle hoop; The spacing of two groups of neighbouring brace rods is 100mm-150mm;
3, outside rectangle hoop, set firmly four pieces of templates and tie, form the pouring space closed, every block template inner surface leans on the brace rod of correspondence;
4, in utilize concrete mobile to be filled in by concrete casting pouring space that template surrounds, rear top end cover upper cover plate is filled;
5, after 3 days, template of dismantling, with Polypropylence Sheet parcel, puts into heatable adobe sleeping platform and carries out health, fulfil assignment.
Beneficial effect of the present invention: operation is simple; under the prerequisite substantially not increasing cost; by the both sides on each limit at rectangle hoop or two ends, brace rod is set; template is made to lean on brace rod; solve because of template tilt or reinforcing bar be out of shape cause Minimum Concrete Protective Coating Thickness inequality, less than the problem of 5cm; make reinforced concrete protective layer reach design standard, reduce the reinforcing bar oxidation rate of steel tower pedestal, extend steel tower pedestal life cycle.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the top view of Fig. 1.
In figure: 1-reinforcing bar, 2-rectangle hoop, 3-brace rod, 4-template.
Detailed description of the invention
As shown in the figure, the casting method of this iron tower foundation reinforced concrete protective layer, step is as follows:
1, first build the bar construction be made up of the reinforcing bar 1 vertically placed, rectangle hoop 2 building iron tower foundation position in advance, described reinforcing bar 1 and rectangle hoop 2 are linked together by iron wire binding;
2, weld the brace rod 3 that two length are 5cm respectively in the horizontal direction in the both sides on each limit of rectangle hoop 2 or two ends, described brace rod 3 is perpendicular to the corresponding edge of rectangle hoop 2; The spacing of two groups of neighbouring brace rods 3 is 120mm(or 140mm);
3, outside rectangle hoop 2, set firmly four pieces of templates 4 and tie, form the pouring space closed, every block template inner surface leans on the brace rod of correspondence;
4, concrete casting is filled in pouring space that template 4 surrounds, fills rear top end cover upper cover plate;
5, after 3 days, template 4 of dismantling, with Polypropylence Sheet parcel, puts into heatable adobe sleeping platform and carries out health, fulfil assignment.

Claims (1)

1. a casting method for iron tower foundation reinforced concrete protective layer, is characterized in that: its step is as follows:
1), first building iron tower foundation position in advance build the bar construction be made up of the reinforcing bar vertically placed, rectangle hoop, described reinforcing bar and rectangle hoop are linked together by iron wire binding;
2), to weld two length respectively in the horizontal direction in the both sides on each limit of rectangle hoop or two ends be the brace rod of 5cm, and described brace rod is perpendicular to the corresponding edge of rectangle hoop; The spacing of two groups of neighbouring brace rods is 100mm-150mm;
3), set firmly four pieces of templates and tie outside rectangle hoop, form the pouring space closed, every block template inner surface leans on the brace rod of correspondence;
4), in utilize concrete mobile to be filled in by concrete casting pouring space that template surrounds, rear top end cover upper cover plate is filled;
5), after 3 days, template of dismantling, with Polypropylence Sheet parcel, puts into heatable adobe sleeping platform and carries out health, fulfil assignment.
CN201410470657.4A 2014-09-16 2014-09-16 A kind of casting method of iron tower foundation reinforced concrete protective layer Active CN104264673B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410470657.4A CN104264673B (en) 2014-09-16 2014-09-16 A kind of casting method of iron tower foundation reinforced concrete protective layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410470657.4A CN104264673B (en) 2014-09-16 2014-09-16 A kind of casting method of iron tower foundation reinforced concrete protective layer

Publications (2)

Publication Number Publication Date
CN104264673A true CN104264673A (en) 2015-01-07
CN104264673B CN104264673B (en) 2016-04-20

Family

ID=52156237

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410470657.4A Active CN104264673B (en) 2014-09-16 2014-09-16 A kind of casting method of iron tower foundation reinforced concrete protective layer

Country Status (1)

Country Link
CN (1) CN104264673B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS598836A (en) * 1982-07-08 1984-01-18 Nippon Carbide Ind Co Ltd Manufacture of concrete foundation structure
CN201443072U (en) * 2009-07-18 2010-04-28 中冶东北建设有限公司管道工程公司 Detachable combined tower crane foundation
CN201865117U (en) * 2010-11-23 2011-06-15 江苏省电力公司句容市供电公司 Line terminal tower foundation with cable protecting pipe
CN103343548A (en) * 2013-07-31 2013-10-09 山东电力工程咨询院有限公司 Foundation type for power transmission tower and bearing capacity calculation method for same
CN203403431U (en) * 2013-08-08 2014-01-22 维蒙特工业(中国)有限公司 Quick installing tower structure with precast foundation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS598836A (en) * 1982-07-08 1984-01-18 Nippon Carbide Ind Co Ltd Manufacture of concrete foundation structure
CN201443072U (en) * 2009-07-18 2010-04-28 中冶东北建设有限公司管道工程公司 Detachable combined tower crane foundation
CN201865117U (en) * 2010-11-23 2011-06-15 江苏省电力公司句容市供电公司 Line terminal tower foundation with cable protecting pipe
CN103343548A (en) * 2013-07-31 2013-10-09 山东电力工程咨询院有限公司 Foundation type for power transmission tower and bearing capacity calculation method for same
CN203403431U (en) * 2013-08-08 2014-01-22 维蒙特工业(中国)有限公司 Quick installing tower structure with precast foundation

Also Published As

Publication number Publication date
CN104264673B (en) 2016-04-20

Similar Documents

Publication Publication Date Title
CN106968367A (en) A kind of new 3D printing reinforced wall and its construction method
CN106032706B (en) A kind of integral type pouring molding construction method of reinforced concrete shear wall
CN104532754B (en) A kind of prestressed concrete box girder end-blocking template construction method
CN212358846U (en) Assembled concrete composite beam
CN102787684A (en) Steel wire net rack demolition-free formwork system and manufacturing method thereof
CN104074285A (en) ultra-long concrete wall body structure and method for controlling structural cracks by constructing wall body
CN107524294B (en) Slurry leakage prevention construction structure for vertical construction joint plate bottom of floor slab and construction method thereof
CN104074392B (en) A kind of foundation-free plate column type assembling enclosure wall manufacture method
CN202706266U (en) Dismounting-free die system of steel wire net rack
CN204139466U (en) A kind of concrete prefabricated cushion block
CN104264673A (en) Pouring method for reinforced concrete protective layer of iron tower foundation
CN202064636U (en) Closed stair formwork erecting device
CN104131635B (en) Method and platform for constructing peripheral shear wall of prefabricated staircase
CN105369816A (en) Formwork structure of cushion course of oblique side face of well pit foundation and construction method of formwork structure
CN203097282U (en) Floorslab concrete ridge platform whole-pouring formwork support
CN205444915U (en) Cast in situ concrete structure electronic thermometer protection device
CN203347110U (en) Section steel stirrup applied to high-rise building raft foundation construction
KR20120069263A (en) Half slab providing hollow material construction method and half slab using the same
CN210622027U (en) Cavity node structure of assembled wall and building frame
CN204040485U (en) Bars In Poured Concrete Slab thickness and reinforcement cover control support
CN204252403U (en) A kind of positioning stool for Bars In Poured Concrete Slab negative bending moment rib
CN202164555U (en) Bottom support of concrete box culvert template bracket post
CN104234432B (en) Shed deckhead construction method
CN105155695A (en) Outer wall post-pouring strip blocking method
CN105672653A (en) Method for erecting building formwork and building formwork

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
CB03 Change of inventor or designer information

Inventor after: Xue Yan

Inventor before: Zhang Dianyue

Inventor before: Liu Xinyu

Inventor before: Wang Jing

Inventor before: Wang Wenbo

Inventor before: Chen Xiaolei

COR Change of bibliographic data
GR01 Patent grant