A kind of combined jet fog chamber
Technical field
The present invention relates to a kind of combined jet fog chamber.
Background technology
At present, the deficiency of the spray tank of conventional cleaner mainly contains 3 points: 1, casing material is aluminium alloy, and shower nozzle is directly screwed on aluminium alloy box, and its heat insulation effect is bad, and easily causing spray tank to freeze cannot work when the outdoor study of cold district.2, because the material of shower nozzle is different with the material of spray tank, electrolyte reaction can be there is after Long-Time Service and produce corrosion phenomenon, cause poorly sealed and then drip serious.3, mostly current system is a solenoid control multiple stage spray tank, is not easy investigation like this goes wrong casing when there is dripping phenomenon.And whole system all cannot work when magnetic valve goes wrong.
Summary of the invention
In order to overcome existing spray tank work at low ambient temperatures heat insulation effect bad and drip a water problem, the invention provides a kind of combined jet fog chamber.
Technical scheme of the present invention is: a kind of combined jet fog chamber, the nozzle boss comprising casing and formed by metal, plastics injection moulding, the water lines that be arranged in parallel in described casing and air pipe, described nozzle boss is connected by the mode of welding with air pipe, water lines, described water lines and air pipe are through with described nozzle boss respectively, and described water lines is positioned at below nozzle boss, described nozzle boss connects atomizer, and described casing one end is provided with the magnetic valve be connected with water lines.
Preferably, described tank ends is separately installed with end cap, and casing one side end cap is provided with the nipple be connected with air pipe, and casing opposite side end cap is provided with the magnetic valve that to be connected with water lines.
Preferably, the casing lateral surface installing atomizer side is provided with and protects rib up and down.
Preferably, described cabinet wall posts rubber and plastic warming plate.
Preferably, above described nozzle boss, heating tape is installed.
Preferably, described magnetic valve is arranged in solenoid valve box.
Preferably, described casing is 4 mouthfuls, 6 mouthfuls, 8 mouthfuls or 10 mouthfuls of casings.
The useful effect that the present invention has is: the present invention is by adopting the nozzle boss formed by metal, plastics injection moulding, combined box is made to greatly reduce cost, in addition, avoid the corrosion phenomenon that nozzle boss and casing generation electrolyte react and produce, thoroughly solve poorly sealed and drip water problem, in addition, each casing is equipped with a magnetic valve, is easy to investigation and goes wrong casing when there is dripping phenomenon.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of embodiment of the low temperature resistant spray tank of combined type of the present invention;
Fig. 2 is the sectional view of Fig. 1;
In figure: 1 casing, 2 nozzle bosses, 3 atomizers, 4 air pipes, 5 water lines, 6 end caps, 7 nipples, 8 rubber and plastic warming plates, 9 solenoid valve boxs, 10 plastics circles are female, 11 plastics glands, 12 ribs.
Specific implementation method
The present invention is described further by reference to the accompanying drawings:
As Fig. 1, shown in 2, this spray tank comprise strip casing 1 and by metal (copper, stainless steel), the nozzle boss 2 that the injection moulding of PPR plastics is formed, nozzle boss 2 and air pipe 4 is provided with in casing 1, water lines 5, and nozzle boss 2 and air pipe 4, water lines 5 is together in series by the mode of welding, avoid nozzle boss and air pipe 4, water lines 5 junction occurs that the situation of leaking occurs, described water lines 5 is through with described nozzle boss 2 respectively with air pipe 4, and described water lines 5 is positioned at below nozzle boss 2, thoroughly solve shower nozzle and drip water problem, atomizer 3 be screwed on nozzle boss 2, nozzle boss 2 is fixed with casing 1 by plastics circle female 10 and plastics gland 11.Be separately installed with end cap 6 at the two ends of casing 1, end cap 6 pairs of casings have supporting role, and this end cap 6 is mounted on the two ends end face of casing 1 through bolt.The nipple 7 being provided with and being connected with compressed air line 4 is covered in casing 1 left-hand end, cover at casing right-hand end and be provided with the solenoid valve box 9(that to be connected with water lines 5 and include magnetic valve), each casing 1 is equipped with a magnetic valve, is easy to investigation and goes wrong casing when there is dripping phenomenon.The casing lateral surface installing atomizer 3 side is provided with and protects rib 12 up and down, prevent surrounding objects from clashing into and damage shower nozzle.
Heating tape of the present invention is arranged on above nozzle boss 2, open heating tape when needs heat, avoid spray tank water lines to freeze to work, cabinet wall all sticks rubber and plastic warming plate 8 simultaneously, heat insulation effect is very good, and the equipment that ensure that water lines when cold district outwork is freezed.
Casing 1 of the present invention also can as water, gas distributor box, for the water, the gas combination unit that need water, gas to distribute supply simultaneously.
Last it is noted that the foregoing is only explanation embodiments of the present invention; be not limited to the present invention; for a person skilled in the art; within the spirit and principles in the present invention all; any amendment of doing, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.