CN104258542B - A kind of body-building gallery complete set of equipments - Google Patents

A kind of body-building gallery complete set of equipments Download PDF

Info

Publication number
CN104258542B
CN104258542B CN201410363890.2A CN201410363890A CN104258542B CN 104258542 B CN104258542 B CN 104258542B CN 201410363890 A CN201410363890 A CN 201410363890A CN 104258542 B CN104258542 B CN 104258542B
Authority
CN
China
Prior art keywords
motor
controller
base
bearing
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410363890.2A
Other languages
Chinese (zh)
Other versions
CN104258542A (en
Inventor
黄永良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Ocean University ZJOU
Original Assignee
Zhejiang Ocean University ZJOU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Ocean University ZJOU filed Critical Zhejiang Ocean University ZJOU
Priority to CN201410363890.2A priority Critical patent/CN104258542B/en
Publication of CN104258542A publication Critical patent/CN104258542A/en
Application granted granted Critical
Publication of CN104258542B publication Critical patent/CN104258542B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Invalid Beds And Related Equipment (AREA)
  • Rehabilitation Tools (AREA)

Abstract

A kind of body-building gallery complete set of equipments, including passing through netting equipment, for the swaying platform of physical training, it is multi-functional to swing wooden bridge, quincuncial pile, height garden wood railing, pass through fish shape equipment, tyre type sports equipment, rock horizontal ladder, go through the veil of time tunnel sports equipment, climbing mast ladder, V-type road, final spurt platform and adjustable obstacle wall, the swaying platform for physical training is arranged on the right side for passing through netting equipment, it is multi-functional to swing the right side that wooden bridge is arranged on the swaying platform for physical training, quincuncial pile is arranged on the multi-functional right side for swinging wooden bridge, height garden wood railing is arranged on the right side of quincuncial pile, fish shape equipment is passed through installed in the right side of height garden wood railing, tyre type sports equipment is arranged on the right side for passing through fish shape equipment, horizontal ladder is rocked installed in the right side of tyre type sports equipment;It is an advantage of the invention that:With regulatory function, the person of participating in training that can be adapted to different height different age groups uses.

Description

A kind of body-building gallery complete set of equipments
Technical field
The present invention relates to a kind of body-building gallery complete set of equipments, belong to sporting equipment technical field.
Background technology
Outward bound be it is a kind of have the Comprehensive Literacy Education of physical efficiency and practice concurrently to improve psychological quality as main purpose, It is relied on moving, and is mode to train, for the purpose of perception.It is few compared with traditional knowledge training and skills training Experience and perception in some preachings and implantation, more some motions, are a kind of brand-new experiential training modes.Sunlight is good for Height corridor complete set of equipments is the plurality of devices set of outward bound, and existing body-building gallery complete set of equipments does not have regulatory function, The person of participating in training for being not suitable for different height different age groups uses, and reduces the difficulty and interest of the complete set of equipments.To understand Certainly above-mentioned difficulties are, it is necessary to develop a with regulatory function, and can be adapted to that the person of participating in training of different height different age groups uses is strong Height corridor complete set of equipments.
The content of the invention
It is an object of the invention to provide a kind of body-building gallery complete set of equipments.
The problem to be solved in the present invention is that the body-building gallery complete set of equipments of prior art does not have regulatory function, is not suitable for not With the problem that the person of participating in training of height different age group uses.
To realize the purpose of the present invention, the technical solution adopted by the present invention is:
A kind of body-building gallery complete set of equipments, including pass through netting equipment, the swaying platform for physical training, multi-functional swing Wooden bridge, quincuncial pile, height garden wood railing, pass through fish shape equipment, tyre type sports equipment, rock horizontal ladder, go through the veil of time tunnel body Educate equipment, climbing mast ladder, V-type road, final spurt platform and adjustable obstacle wall, the swaying platform peace for physical training It is multi-functional to swing the right side that wooden bridge is arranged on the swaying platform for physical training, quincuncial pile mounted in the right side for passing through netting equipment Installed in the multi-functional right side for swinging wooden bridge, height garden wood railing is arranged on the right side of quincuncial pile, passes through fish shape equipment and is arranged on height The right side of low garden wood railing, tyre type sports equipment is arranged on the right side for passing through fish shape equipment, rocks horizontal ladder and is arranged on tyre type The right side of sports equipment, the tunnel sports equipment that goes through the veil of time is arranged on the right side for rocking horizontal ladder, and climbing mast ladder is arranged on and passes through The right side of time tunnel sports equipment, V-type road is arranged on the right side of climbing mast ladder, and final spurt platform is arranged on the right side in V-type road Side, can adjust the right side that obstacle wall is arranged on final spurt platform, pass through the netting equipment, swaying platform for physical training, many Function is swung wooden bridge, quincuncial pile, height garden wood railing, passes through fish shape equipment, tyre type sports equipment, rock horizontal ladder, go through the veil of time Mutually sequence composition one is complete successively for tunnel sports equipment, climbing mast ladder, V-type road, final spurt platform and adjustable obstacle wall Whole body-building equipment.
It is described to pass through netting equipment, including the second motor, first shaft coupling, timber, bobbin winoler, the first rope, the first electricity Machine, the first motor cabinet, frame, the first base plate, first bearing seat, ball-screw, ball nut, the first controller, first support And groove, the first base plate left and right sides is symmetrically installed frame, installs five the second motors on frame, and the second motor is by the One shaft coupling is connected with ball-screw, and ball-screw is arranged in two first bearing seats, and first bearing seat is arranged on frame, Ball nut is arranged on ball-screw, and first support is arranged under ball nut, and first support is arranged on groove, and groove sets Put in frame, groove is located under ball-screw, timber is arranged on ball nut, ball nut outer surface is square, coiling Device is arranged on timber, and the first motor is arranged on the first motor cabinet, and the first motor cabinet is arranged on frame right-hand member, the first controller On frame, the first controller is connected with the first motor and the second motor respectively by wire;First rope is successively from a left side First bobbin winoler of side be wound into second bobbin winoler on the frame of opposite, with the 3rd bobbin winoler, opposite on side frame The 4th bobbin winoler on frame, with the 5th bobbin winoler on side frame, with the output shaft of the first motor on side frame.
The swaying platform for physical training, including circular arc platform, first base, the axis of rolling, second bearing seat, cunning Road, wheel, second shaft coupling, the second motor cabinet, the 3rd motor, second controller, the first support frame and the first pillar, described nine Individual first pillar is arranged on circular arc platform, and nine the first pillars are mutually installed in zigzag, and circular arc platform is located at first base On, plane is plane on circular arc platform, and circular arc platform lower plane is outer convex, and plane is indent arc in first base, the One base lower plane is plane, and circular arc platform lower plane mutually agrees with plane in first base, and circular arc platform upper berth is set up defences cunning Pad, circular arc platform base is symmetrically installed four second bearing seats, and an axis of rolling, rolling are respectively installed between each two second bearing seat End shaft each passes through second bearing seat, and wheel is arranged on the axis of rolling, and axis of rolling one end passes through second shaft coupling and the 3rd Motor is connected, and the 3rd motor is arranged on the second motor cabinet, and the second motor cabinet is arranged on second bearing seat side, second controller On the first support frame, the 3rd motor is connected by wire with second controller, and the first support frame is arranged on circular arc platform Bottom surface, installs two slideways in first base, wheel is arranged in slideway.
It is described multi-functional to swing wooden bridge, including first crossbeam, second cross beam, the second pillar, the first flake bearing, the first bullet Spring, the second rope, the first magnetic valve, first flange, second support, the first fairlead, the first cylinder, the first cylinder block, second Base, riding boogie board, cross groove, second spring, the 3rd controller and the second flake bearing, described two first crossbeam two ends are each First flake bearing is installed, the first flake bearings are respectively installed at two second cross beam two ends, the first flake bearing is arranged on four the On two pillars, four the first springs are installed under second cross beam, second rope one end is arranged under the first spring, and the second rope is another End is arranged on riding boogie board, and first flange is arranged on the second pillar, and four the second flake bearings are symmetrically installed in first flange, the With first flange in 45 ° of installations, second support one end is arranged on the second flake bearing two flake bearings, the second support other end On the first fairlead, the first fairlead is arranged on the first cylinder, and the first cylinder is arranged on the first cylinder block, and second Pillar lower end is arranged in second base, and four the first magnetic valves are installed on the wall of second base side, and the first magnetic valve passes through tracheae With the first cylinders, on the second pillar, the 3rd controller is connected the 3rd controller by wire with the first magnetic valve, Second base lower end is provided with cross groove, and the second pillar lower end is arranged on cross groove center, four second spring one end It is symmetrically mounted in cross groove, four second spring other ends connect the second pillar lower end.
It is described to pass through fish shape equipment, including main board, bolt, cylinder, sleeve, semicircular ring, handle, circular hole, electric up-down Bar, square set, the second base plate, the 4th motor, the 3rd shaft coupling, first rotating shaft, flange seat and the 4th controller, the main body plate shape Shape is fish shape, and main board is provided with two circular holes, and a diameter of 55cm of circular hole, circular hole upper and lower ends respectively install cylinder, sleeve one End is arranged in semicircular ring, and sleeve is enclosed within outside cylinder, and sleeve is externally provided with bolt, and sleeve is fixed by bolts on cylinder, top The semicircular ring back side is provided with two handles, and main board is arranged on two electric lifting rods, and electric lifting rod is arranged in square set, side It is enclosed within outside first rotating shaft, first rotating shaft two ends are respectively arranged on flange seat, flange seat is arranged on the second base plate, first rotating shaft It is connected with the 4th motor by the 3rd shaft coupling, the 4th motor and the 4th controller are arranged on the second base plate.
The tyre type sports equipment, including fishing net, the 5th controller, movable block, linear electric motors, the 3rd crossbeam, elastic force Rope, the 3rd pillar, the 4th crossbeam, iron chains, tongue piece eye hook, the first iron hoop and tire, described two 3rd crossbeams or so two ends The 3rd pillar of each installation, installs the 4th crossbeam between two the 3rd pillars that are connected, fishing net is arranged on the 4th crossbeam and the left side in left side Between two the 3rd pillars of side, the 4th crossbeam on the left of the connection of fishing net upper end, each the 3rd pillar of connection in fishing net or so two ends, the Five controllers are arranged on the 3rd crossbeam, and four linear electric motors are installed on the 3rd crossbeam, and linear electric motors are by wire and the 5th control Device processed is connected, and movable block is arranged on linear electric motors, and stretch cord is arranged under movable block, and stretch cord is turned left from the right side and gradually shorten, Iron chains one end connects stretch cord, and iron chains other end connection tongue loop eye hook, iron chains is turned left from the right side and gradually shorten, and tongue piece eye hook is worn Cross the first iron hoop to be clipped on iron chains, the first iron hoop is arranged on tire.
The tunnel sports equipment that goes through the veil of time, including doorframe, the 4th pillar, the 5th crossbeam, the second iron hoop, three-iron Ring, iron ring, the 3rd rope, the string bag and the 6th crossbeam, install two the 5th crossbeams, the 5th crossbeam between described two 4th pillars The second iron hoop of upper installation, the 4th pillar installs the second iron hoop, and iron ring surrounding respectively installs the 3rd iron hoop, the 3rd rope one end connection the Two iron hoops, the 3rd rope other end connect the 3rd iron hoop, the 4th pillar, the 5th crossbeam, the second iron hoop, the 3rd iron hoop, iron ring and 3rd rope constitutes doorframe, and doorframe is provided with six, and doorframe is installed successively from left to right, and spacing is between two neighboring doorframe 140cm, each side installs the 6th crossbeam between two neighboring doorframe, the string bag is arranged on iron ring, the string bag using warp and Parallel is all that the braiding of two strands is formed.
The climbing mast ladder, including rotation mast, the second support frame, cylinder, the first rope, the 7th crossbeam, the 5th Pillar, platform, the first dividing plate, bearing, rotating disk, the first ladder, connecting shaft, chute, the second rotating shaft, the second ladder, the 4th shaft coupling Device, the 5th motor, second partition, the 6th controller and the 3rd base, three rotation masts are mutually solid successively from top to bottom Fixed, underlying rotation mast is arranged on the 3rd base, and on rotation mast above, the 6th controls stage+module Device is mounted in the rotation mast of centre, and two the 5th pillars are installed on platform, and the 7th crossbeam is arranged on two the 5th posts On son, the first rope is arranged on the 7th crossbeam;Rotation mast include the second support frame, cylinder, the first dividing plate, bearing, turn Disk, the first ladder, connecting shaft, chute, the second rotating shaft, the second ladder, the 4th shaft coupling, the 5th motor and second partition, first Dividing plate is installed on the cylinder, and second partition is arranged under cylinder, and the 5th motor, the second rotating shaft lower end are installed on second partition It is connected with the 5th motor by the 4th shaft coupling, the second rotating shaft upper end is mounted on bearings, bearing is arranged under the first dividing plate, the Four shaft couplings are arranged on the second support frame, and the second support frame is arranged on second partition, and two rotating disks are installed in the second rotating shaft, The left and right sides is respectively provided with two chutes on cylinder, and chute is ring-shaped, and track length is a quarter of cylinder diameter, even Spindle one end connects the first ladder, and the connecting shaft other end is stretched into cylinder through chute and is connected with rotating disk, cylinder lower end side Face is symmetrically installed the second ladder, and the second ladder is located at two chute lower sections.
The final spurt platform, including pedal, connecting plate, the 8th crossbeam, the second rope, the 6th pillar, plateau, convenience Ladder, connecting rod, bearing pin, the second fairlead, the second cylinder, slide rail, sliding block, support base, screw, leading screw, the 4th base, the 7th control Device, 3rd bearing seat, the 8th controller, the 6th motor, the 3rd motor cabinet, the second magnetic valve and the 5th shaft coupling, the plateau Two the 6th pillars of upper installation, the 8th crossbeam is arranged on two the 6th pillars, and two the second ropes are installed on the 8th crossbeam, high Two the 4th bases are installed in platform side ladder easy for installation, plateau lower end, slide rail are each side installed on the 4th base, on slide rail Two sliding blocks are installed, two 3rd bearing seats are installed on the 4th base, 3rd bearing seat is located between two slide rails, and leading screw is installed On two 3rd bearing seats, outside leading screw, leading screw left end is connected nut sleeve by the 5th shaft coupling with the 6th motor, the 6th electricity Machine is arranged on the 3rd motor cabinet, and the 3rd motor cabinet is arranged on the 4th pan frontward end, and the 4th pan frontward end installs the 7th control Device processed, the 7th controller is connected by wire with the 6th motor, and another the 4th pan frontward end installs the 8th controller, support base On four sliding blocks, support base bottom surface is connected with screw, and two the second magnetic valves and two second are installed on support base Cylinder, the 8th controller is connected by wire with the second magnetic valve, and the second magnetic valve is by pipeline and the second cylinders, second Fairlead is arranged on the second cylinder, and connecting rod is arranged on the second fairlead;Ten pedals are arranged in order from top to bottom, pedal with Equal to the width of pedal, pedal left and right side is respectively provided with two bearing pins to the distance between pedal, and connecting rod is by hinge ten Individual pedal side, first pedal is hinged on connecting plate left end, and connecting plate is hinged in plateau.
The adjustable obstacle wall, including the second rock-climbing face, tooth bar, Bearing gear, top cap, the first rock-climbing face, flange shaft Hold, the 5th base, the 9th controller, first reducing motors, the 6th shaft coupling, the first screw jack, the 3rd support frame, the 4th Motor cabinet, second reducing motors, the 7th shaft coupling, the second screw jack, step on pin point, the 8th shaft coupling, the 3rd reducing motor With the 5th motor cabinet, on two flange bearings, flange bearing is arranged on the 5th base, flange in the first rock-climbing face Bearing is inner ring flange bearing long, and two top caps are installed under the first rock-climbing face, and the first screw jack upper end is connected with top cap, the One screw jack lower end is arranged on the 5th base, and the first screw jack passes through the 6th shaft coupling and first reducing motors phase Even, first reducing motors and the 9th controller are arranged on the 5th base, and first reducing motors pass through wire and the 9th controller It is connected, Bearing gear is arranged on upper end in the first rock-climbing face, Bearing gear is connected by the 8th shaft coupling with the 3rd reducing motor, 3rd reducing motor is arranged on the 5th motor cabinet, and the 5th motor cabinet is arranged on the first rock-climbing side, and the 3rd reducing motor leads to Wire is crossed to be connected with the 9th controller;Tooth bar and the second rock-climbing face right-hand member are extend into the first rock-climbing face, and tooth bar is arranged on second Rock-climbing face outer bottom, tooth bar is arranged on Bearing gear, and tooth bar can mutually coincide with Bearing gear, and the 3rd support frame is installed in the Under two rock-climbing faces, the 3rd support frame is located at the left side of tooth bar, and the second screw jack is reverse mounted under the 3rd support frame, and second Screw jack top is lifted position and is withstood on the 5th base, and the second screw jack passes through the 7th shaft coupling and second reducing motors phase Even, second reducing motors are arranged under the 4th motor cabinet, and the 4th motor cabinet is arranged on the 3rd support frame side, second reducing motors It is connected with the 9th controller by wire;Plane Installation multiple steps on pin point on first rock-climbing face and the second rock-climbing face.
It is an advantage of the invention that:The crossover sites that netting equipment can be adjusted between the first rope and the first rope are passed through, is used In the swaying platform energy automatic swinging of physical training, rocking tendency is uniform, the multi-functional riding boogie board for swinging wooden bridge can not only stretch up and down but also Can vacillate now to the left, now to the right and riding boogie board waves that degree is larger, the circular hole adjustable size passed through on the main board of fish shape equipment and can adjust The distance between pitch circle hole and ground, the angle adjustable between main board and ground, tire and the ground of tyre type sports equipment Height adjustable between face, and tire can move left and right, the tunnel sports equipment that goes through the veil of time can adjust the height in string bag tunnel, and String bag tunnel can be rocked in use, and the ladder of climbing mast ladder can be rotated around mast, and the spurt face of final spurt platform is inclined Rake angle is adjustable and spurt face on pedal it is rotatable, adjustable obstacle wall can adjust the angle between rock-climbing part and ground, Also the length of rock-climbing part can be adjusted, the difficulty and interest of the complete set of equipments is increased, and the complete set of equipments is adapted to difference The person of participating in training of height different age group uses.
Brief description of the drawings
Fig. 1 is integral installation schematic diagram of the present invention;
Fig. 2 is that the present invention passes through netting equipment overall structure schematic diagram;
Fig. 3 is swaying platform overall structure diagram of the present invention for physical training;
Fig. 4 is that the present invention is multi-functional swings wooden bridge overall structure diagram;
Fig. 5 is quincuncial pile overall structure diagram of the present invention;
Fig. 6 is wood railing overall structure diagram in height garden of the present invention;
Fig. 7 is that the present invention passes through fish shape equipment overall structure schematic diagram;
Fig. 8 is tyre type sports equipment overall structure diagram of the present invention;
Fig. 9 is that the present invention rocks horizontal ladder overall structure diagram;
Figure 10 is that the present invention goes through the veil of time tunnel sports equipment overall structure diagram;
Figure 11 is present invention climbing mast ladder back side cut-away illustration;
Figure 12 is V-type road of the present invention overall structure diagram;
Figure 13 is final spurt platform overall structure diagram of the present invention;
Figure 14 is the adjustable obstacle wall side structure schematic diagram of the present invention;
Figure 15 is a kind of enlarged diagram for passing through netting equipment a portions of the present invention;
Figure 16 is swaying platform internal structure schematic diagram of the present invention for physical training;
Figure 17 is swaying platform left view of the present invention for physical training;
Figure 18 is that the present invention is multi-functional swings wooden bridge b portions enlarged diagram;
Figure 19 is tyre type sports equipment c portions of the present invention enlarged diagram;
Figure 20 is that the present invention goes through the veil of time tunnel sports equipment d portions enlarged diagram;
Figure 21 is present invention climbing mast ladder side schematic view;
Figure 22 is the enlarged diagram of present invention rotation mast;
Figure 23 is final spurt platform e portions of the present invention enlarged diagram;
Figure 24 is final spurt platform f portions of the present invention enlarged diagram;
Figure 25 is the adjustable obstacle wall positive structure schematic of the present invention;
Figure 26 is the adjustable obstacle wall structure schematic diagram of the present invention;
In figure:1st, netting equipment 2, the swaying platform 3 for physical training are passed through, multi-functional wooden bridge 4, quincuncial pile is swung 5th, height garden wood railing 6, pass through fish shape equipment 7, tyre type sports equipment 8, rock horizontal ladder 9, go through the veil of time tunnel physical culture Equipment 10, climbing mast ladder 11, V-type road 12, final spurt platform 13, adjustable obstacle wall 101, the second motor 102, the One shaft coupling 103, timber 104, bobbin winoler 105, the first rope 106, the first motor 107, the first motor cabinet 108, side Frame 109, the first base plate 1010, first bearing seat 1011, ball-screw 1012, ball nut 1013, the first controller 1014th, first support 1015, groove 201, circular arc platform 202, first base 203, the axis of rolling 204, second bearing seat 205th, slideway 206, wheel 207, second shaft coupling 208, the second motor cabinet 209, the 3rd motor 2010, second controller 2011st, the first support frame 2012, the first pillar 301, first crossbeam 302, second cross beam 303, the second pillar 304, first Flake bearing 305, the first spring 306, the second rope 307, the first magnetic valve 308, first flange 309, second support 3010th, the first fairlead 3011, the first cylinder 3012, the first cylinder block 3013, second base 3014, riding boogie board 3015, ten Font groove 3016, second spring 3017, the 3rd controller 3018, the second flake bearing 601, main board 602, bolt 603rd, cylinder 604, sleeve 605, semicircular ring 606, handle 607, circular hole 608, electric lifting rod 609, square set 6010, Second base plate 6011, the 3rd motor 6012, the 3rd shaft coupling 6013, first rotating shaft 6014, flange seat the 6015, the 4th are controlled Device processed 701, fishing net 702, the 5th controller 703, movable block 704, linear electric motors 705, the 3rd crossbeam 706, stretch cord 707th, the 3rd pillar 708, the 4th crossbeam 709, iron chains 7010, tongue piece eye hook 7011, the first iron hoop 7012, tire 901st, doorframe 902, the 4th pillar 903, the 5th crossbeam 904, the second iron hoop 905, the 3rd iron hoop 906, iron ring 907, Three ropes 908, the string bag 909, the 6th crossbeam 111, rotation mast 112, the second support frame 113, cylinder 114, first Rope 115, the 7th crossbeam 116, the 5th pillar 117, platform 118, the first dividing plate 119, bearing 1110, rotating disk 1111, First ladder 1112, connecting shaft 1113, chute 1114, the second rotating shaft 1115, the second ladder 1116, the 4th shaft coupling 1117th, the 5th motor 1118, second partition 1119, the 6th controller 1120, the 3rd base 121, pedal 122, connecting plate 123rd, the 8th crossbeam 124, the second rope 125, the 6th pillar 126, plateau 127, convenient ladder 128, connecting rod 129, bearing pin 1210th, the second fairlead 1211, the second cylinder 1212, slide rail 1213, sliding block 1214, support base 1215, screw 1216, Leading screw 1217, the 4th base 1218, the 7th controller 1219,3rd bearing the 1220, the 8th controller the 1221, the 6th of seat Motor 1222, the 3rd motor cabinet 1223, the second magnetic valve 1224, the 5th the 131, second rock-climbing of shaft coupling face 132, tooth bar 133rd, Bearing gear 134, the rock-climbing of top cap 135, first face 136, flange bearing 137, the 5th base 138, the 9th controller 139th, first reducing motors 1310, the 6th shaft coupling 1311, the first screw jack 1312, the 3rd support frame 1313, Four motor cabinets 1314, second reducing motors 1315, the 7th shaft coupling 1316, the second screw jack 1317, step on pin point 1318th, the 8th shaft coupling 1319, the 3rd reducing motor 1320, the 5th motor cabinet.
Specific embodiment
Below in conjunction with the accompanying drawings and embodiment the present invention is further illustrated.
A kind of body-building gallery complete set of equipments, including pass through the netting equipment 1, swaying platform 2 for physical training, multi-functional Swing wooden bridge 3, quincuncial pile 4, height garden wood railing 5, when passing through fish shape equipment 6, tyre type sports equipment 7, rocking horizontal ladder 8, pass through Empty tunnel sports equipment 9, climbing mast ladder 10, V-type road 11, final spurt platform 12 and adjustable obstacle wall 13, it is described for body The swaying platform 2 for educating exercise is arranged on the right side for passing through netting equipment 1, and the multi-functional wooden bridge 3 that swings is arranged on for physical training The right side of swaying platform 2, quincuncial pile 4 is arranged on the multi-functional right side for swinging wooden bridge 3, and height garden wood railing 5 is arranged on quincuncial pile 4 Right side, passes through fish shape equipment 6 installed in the right side of height garden wood railing 5, and tyre type sports equipment 7 is arranged on and passes through fish shape equipment 6 right side, rocks the right side that horizontal ladder 8 is arranged on tyre type sports equipment 7, and the tunnel sports equipment 9 that goes through the veil of time is arranged on and rocks The right side of horizontal ladder 8, climbing mast ladder 10 is arranged on the right side of the tunnel sports equipment 9 that goes through the veil of time, and V-type road 11 is arranged on climbing mast The right side of bar ladder 10, final spurt platform 12 is arranged on the right side in V-type road 11, can adjust obstacle wall 13 and is arranged on final spurt platform 12 Right side, pass through netting equipment 1, the swaying platform 2 for physical training, multi-functional swing wooden bridge 3, quincuncial pile 4, height garden Mu Lan Bar 5, pass through fish shape equipment 6, tyre type sports equipment 7, rock horizontal ladder 8, the tunnel sports equipment 9 that goes through the veil of time, climbing mast ladder 10th, mutually sequence constitutes a complete body-building equipment successively for V-type road 11, final spurt platform 12 and adjustable obstacle wall 13.
It is described to pass through netting equipment 1, including the second motor 101, first shaft coupling 102, timber 103, bobbin winoler 104, One rope 105, the first motor 106, the first motor cabinet 107, frame 108, the first base plate 109, first bearing seat 1010, ball wire Thick stick 1011, ball nut 1012, the first controller 1013, first support 1014 and groove 1015, first base plate 109 or so Both sides are symmetrically installed frame 108, and five the second motors 101 are installed on frame 108, and the second motor 101 passes through first shaft coupling 102 It is connected with ball-screw 1011, ball-screw 1011 is arranged in two first bearing seats 1010, and first bearing seat 1010 is installed On frame 108, ball nut 1012 is arranged on ball-screw 1011, the outer surface of ball nut 1012 for square, first Frame 1014 is arranged under ball nut 1012, and first support 1014 is arranged on groove 1015, first support 1014 and groove 1015 are not interfixed, and groove 1015 is arranged in frame 108, and groove 1015 is located under ball-screw 1011, first support 1014 make timber 103 not incline, and timber 103 is arranged on ball nut 1012, and the first controller 1013 controls the second motor 101 Forward or reverse, drive the forward or reverse of ball-screw 1011 so that ball nut 1012 be moved to the left with timber 103 or It is moved right to the distance between regulation timber 103 and timber 103, the mobile drive of ball nut 1012 or left or right first Frame 1014 in the groove 1015 or left or right movement, bobbin winoler 104 is arranged on timber 103, and bobbin winoler 104 prevents the first rope Rope 105 is glided, and the first motor 106 is arranged on the first motor cabinet 107, and the first motor cabinet 107 is arranged on the right-hand member of frame 108, the One controller 1013 is arranged on frame 108, the first controller 1013 by wire respectively with the first motor 106 and the second motor 101 are connected, and the first rope 105 is wound into second coiling on opposite frame 108 from the first of left side bobbin winoler 104 successively Device 104, with the 3rd bobbin winoler 104 on side frame 108, the 4th bobbin winoler 104, same side frame on opposite frame 108 The 5th bobbin winoler 104 on 108, with the output shaft of the first motor 106 on side frame 108, the first controller 1013 is controlled The forward or reverse of first motor 106, increase the number of turns that the first rope 105 is wrapped on the output shaft of the first motor 106 so as to Make the first rope 105 tense or make the number of turns that the first rope 105 is wrapped on the output shaft of the first motor 106 to reduce so that the One rope 105 loosens.
The swaying platform 2 for physical training, including circular arc platform 201, first base 202, the axis of rolling 203, Two bearing bracket 204, slideway 205, wheel 206, second shaft coupling 207, the second motor cabinet 208, the 3rd motor 209, second are controlled Device 2010, the first support frame 2011 and the first pillar 2012, first pillar 2012 are arranged on circular arc platform 201, nine First pillar 2012 is mutually installed in zigzag, and user can walk zigzag and play on circular arc platform 201, circular arc platform 201 are located in first base 202, and plane is plane on circular arc platform 201, and the lower plane of circular arc platform 201 is outer convex, first Plane is indent arc on base 202, and the lower plane of first base 202 is plane, the lower plane of circular arc platform 201 and first base Plane is mutually agreed with 202, and the bottom surface of circular arc platform 201 is symmetrically installed four second bearing seats 204, is laid on circular arc platform 201 Slipmat, slipmat can increase the frictional force of shoes, prevent user from slipping, and respectively be installed between each two second bearing seat 204 One axis of rolling 203, the two ends of the axis of rolling 203 each pass through second bearing seat 204, and wheel 206 is arranged on the axis of rolling 203, rolling The one end of moving axis 203 is connected by second shaft coupling 207 with the 3rd motor 209, and the 3rd motor 209 is rotated and drives 203 turns of the axis of rolling Dynamic, the axis of rolling 203 rotates driven wheel 206 and rotates, and the 3rd motor 209 is arranged on the second motor cabinet 208, the second motor cabinet 208 are arranged on the side of second bearing seat 204, and second controller 2010 is arranged on the first support frame 2011, and the 3rd motor 209 leads to Cross wire to be connected with second controller 2010, the control forward or reverse of the 3rd motor 209 of second controller 2010, the first support frame 2011 are arranged on the bottom surface of circular arc platform 201, and two slideways 205 are installed in first base 202, and wheel 206 is arranged on slideway 205 Interior, wheel 206 is rotated makes circular arc platform 201 be waved to the left or to the right in first base 202 with wheel 206.
It is described multi-functional to swing wooden bridge 3, including first crossbeam 301, second cross beam 302, the second pillar 303, the first flake axle The 304, first spring 305, the second rope 306, the first magnetic valve 307, first flange 308, second support 309, first is held to be oriented to The 3010, first cylinder 3011 of set, the first cylinder block 3012, second base 3013, riding boogie board 3014, cross groove 3015, second Spring 3016, the 3rd controller 3017 and the second flake bearing 3018, the two ends of described two first crossbeams 301 are respectively installed by the first fish Axis oculi holds 304, and the first flake bearing 304 is respectively installed at two two ends of second cross beam 302, and the first flake bearing 304 is arranged on four On second pillar 303, the first flake bearing 304 can change first crossbeam 301 and the pillar 303 of second cross beam 302 and second it Between angle, four the first springs 305 of installation of second cross beam 302 times, one end of the second rope 306 is arranged under the first spring 305, The other end of second rope 306 is arranged on riding boogie board 3014, and the first spring 305 enables riding boogie board to be stretched about 3014, the second rope 306 enable riding boogie board 3014 to vacillate now to the left, now to the right, and first flange 308 is arranged on the second pillar 303, is symmetrically pacified in first flange 308 Four the second flake bearings 3018 are filled, the second flake bearing 3018 is with first flange 308 in 45 ° of installations, the one end of second support 309 On the second flake bearing 3018, the other end of second support 309 is arranged on the first fairlead 3010, the second flake bearing 3018 can change the angle between the pillar 303 of second support 309 and second, and the first fairlead 3010 is arranged on the first cylinder On 3011, the first cylinder 3011 is arranged on the first cylinder block 3012, and the lower end of second base 3013 is provided with cross groove 3015, The lower end of second pillar 303 is arranged on the center of cross groove 3015, and the lower end of the second pillar 303 is not mutually solid with second base 3013 Fixed, four one end of second spring 3016 are symmetrically mounted in cross groove 3015, four other end of second spring 3016 connections The lower end of second pillar 303, installs four the first magnetic valves 307 on the side wall of second base 3013, the first magnetic valve 307 passes through tracheae Be connected with the first cylinder 3011, the 3rd controller 3017 is arranged on the second pillar 303, the 3rd controller 3017 by wire with First magnetic valve 307 is connected, and the 3rd controller 3017 is produced using circuit in input circuit in electromagnet core and armature residual gap Suction controls the energization and power-off of the first magnetic valve 307, and the energization and power-off of the first magnetic valve 307 control the first gas The piston of cylinder 3011 moves reciprocatingly, and makes the second pillar 303 or waving forward or backward or to the left or to the right, first crossbeam 301 and second cross beam 302 can together be waved with the second pillar 303 by the first flake bearing 304, increase riding boogie board 3014 and shake Swing degree, increases the training difficulty and interest of swinging wooden bridge.
It is described to pass through fish shape equipment 6, including main board 601, bolt 602, cylinder 603, sleeve 604, semicircular ring 605, hand Handle 606, circular hole 607, electric lifting rod 608, square set 609, the second base plate 6010, the 4th motor 6011, the 3rd shaft coupling 6012, First rotating shaft 6013, the controller 6015 of flange seat 6014 and the 4th, the main board 601 are provided with two circular holes 607, main board 601 are shaped as fish shape, increase the interest of the equipment, and a diameter of 55cm of circular hole 607, the upper and lower ends of circular hole 607 respectively install circle Post 603, one end of sleeve 604 is arranged in semicircular ring 605, and sleeve 604 is enclosed within outside cylinder 603, and sleeve 604 is externally provided with bolt 602, Sleeve 604 is fixed on cylinder 603 with bolt 602, sleeve 604 on cylinder 603 or up or down slide, make semicircular ring 605 or Up or down movement covers the surrounding of circular hole 607, or circular hole 607 is kept complete, make circular hole 607 be sized for it is different fat or thin The person of participating in training uses, and the back side of semicircular ring 605 of top is provided with two handles 606, and the person that conveniently do not participate in training of handle 606 holds main board 601; Main board 601 is arranged on two electric lifting rods 608, and electric lifting rod 608 is arranged in square set 609, electric lifting rod 608 The distance between adjustable circular hole 607 and ground, the person of participating in training for making the height between circular hole 607 and ground be adapted to different heights makes With square set 609 is enclosed within outside first rotating shaft 6013, and the two ends of first rotating shaft 6013 are respectively arranged on flange seat 6014, flange seat 6014 On the second base plate 6010, first rotating shaft 6013 is connected by the 3rd shaft coupling 6012 with the 4th motor 6011, the 4th electricity The controller 6015 of machine 6011 and the 4th is arranged on the second base plate 6010, and the 4th controller 6015 controls the 4th motor 6011 to rotate forward Or reversion, make the forward or reverse of first rotating shaft 6013, main board 601 is turned forward or is tilted backwards and adjust main board 601 Angle between ground, increases the difficulty and interest of passing through equipment.
The tyre type sports equipment 7, including fishing net 701, the 5th controller 702, movable block 703, linear electric motors 704, 3rd crossbeam 705, stretch cord 706, the 3rd pillar 707, the 4th crossbeam 708, iron chains 709, tongue piece eye hook 7010, the first iron hoop 7011 and tire 7012, the 3rd pillar 707 is respectively installed at described two two ends of 3rd crossbeam 705 or so, and be connected two the 3rd pillars 4th crossbeam 708 is installed, fishing net 701 is arranged on the 4th crossbeam 708 in left side and two the 3rd pillars 707 in left side between 707 Between, the 4th crossbeam 708 on the left of the connection of the upper end of fishing net 701, the two ends of fishing net 701 or so respectively connect the 3rd pillar 707, the 5th control Device processed 702 is arranged on the 3rd crossbeam 705, and four linear electric motors 704 are installed on the 3rd crossbeam 705, and linear electric motors 704 are by leading Line is connected with the 5th controller 702, and the movable block 703 of the 5th controller 702 is arranged on linear electric motors 704, and stretch cord 706 is installed Under movable block 703, stretch cord 706 makes tire 7012 to swing up and down, the one end of iron chains 709 connection stretch cord 706, iron chains 709 Other end connection tongue loop eye hook 7010, tongue piece eye hook 7010 is clipped on iron chains 709 through the first iron hoop 7011, by tongue piece Eye hook 7010 is clipped in the diverse location of iron chains 709 to adjust the height between tire 7012 and ground, the equipment is adapted to not Used with the person of participating in training of height, stretch cord 706 is turned left from the right side and gradually shorten, iron chains 709 is turned left from the right side and gradually shorten, and makes tire 7012 is turned left from the right side gradually uprise, and increases the difficulty of the equipment, and the first iron hoop 7011 is arranged on tire 7012, the 5th controller 702 control linear electric motors 704 drive movable block 703 or left or right movement, tire 7012 or left or right is rocked.
The tunnel sports equipment 9 that goes through the veil of time, including doorframe 901, the 4th pillar 902, the 5th crossbeam 903, the second iron Ring 904, the 3rd iron hoop 905, iron ring 906, the 3rd rope 907, the crossbeam 909 of the string bag 908 and the 6th, described two 4th pillars Two the 5th crossbeams 903 are installed between 902, the second iron hoop 904 is installed on the 5th crossbeam 903, the 4th pillar 902 installs the second iron Ring 904, the surrounding of iron ring 906 respectively installs the 3rd iron hoop 905, and the one end of the 3rd rope 907 connects the second iron hoop 904, the 3rd rope 907 The other end connects the 3rd iron hoop 905, the 4th pillar 902, the 5th crossbeam 903, the second iron hoop 904, the 3rd iron hoop 905, iron ring 906 Doorframe 901 is constituted with the 3rd rope 907, doorframe 901 is provided with six, and doorframe 901 is installed successively from left to right, two neighboring doorframe Vertical range is 140cm between 901, in 50 ° of installations between two neighboring doorframe 901, by changing what the 3rd rope 907 knotted Length adjusts the height between iron ring 906 and ground, and the 6th crossbeam is each side installed between two neighboring doorframe 901 909, the string bag 908 is arranged on iron ring 906, the string bag 908 is easily rocked, and the string bag 908 is all two strands using warp and parallel Braiding is formed, and the string bag 908 is born larger weight, and the string bag 908 is not in degree installation between two neighboring doorframe 901 On straight line, the difficulty and interest of the equipment are increased.
The climbing mast ladder 10, including rotation mast 111, the second support frame 112, cylinder 113, the first rope 114, 7th crossbeam 115, the 5th pillar 116, platform 117, the first dividing plate 118, bearing 119, rotating disk 1110, the first ladder 1111, company Spindle 1112, chute 1113, the second rotating shaft 1114, the second ladder 1115, the 4th shaft coupling 1116, the 5th motor 1117, second Dividing plate 1118, the 6th controller 1119 and the 3rd base 1120, three rotation masts 111 are mutually solid successively from top to bottom Fixed, underlying rotation mast 111 is arranged on the 3rd base 1120, and the 6th controller 1119 is mounted on the rotation of centre Turn in mast 111, platform 117 is mounted on the rotation mast 111 of top, two the 5th pillars are installed on platform 117 116, the 7th crossbeam 115 is arranged on two the 5th pillars 116, and the first rope 114 is arranged on the 7th crossbeam 115, the first rope Son 114 person that conveniently do not participate in training drop on ground from platform 117;Rotation mast 111 include the second support frame 112, cylinder 113, First dividing plate 118, bearing 119, rotating disk 1110, the first ladder 1111, connecting shaft 1112, chute 1113, the second rotating shaft 1114, Two ladders 1115, the 4th shaft coupling 1116, the 5th motor 1117 and second partition 1118, the first dividing plate 118 are arranged on cylinder On 113, second partition 1118 is arranged under cylinder 113, and the 5th motor 1117, the second rotating shaft are installed on second partition 1118 1114 lower ends are connected by the 4th shaft coupling 1116 with the 5th motor 1117, and the upper end of the second rotating shaft 1114 is arranged on bearing 119, Bearing 119 is arranged under the first dividing plate 118, and the 4th shaft coupling 1116 is arranged on the second support frame 112, the second support frame 112 On second partition 1118, two rotating disks 1110 are installed in second rotating shaft 1114, the left and right sides is respectively provided with cylinder 113 Two chutes 1113, chute 1113 is ring-shaped, and the length of chute 1113 is a quarter of the diameter of cylinder 113, connecting shaft 1112 one end connect the first ladder 1111, and the other end of connecting shaft 1112 is stretched into cylinder 113 and rotating disk through chute 1113 1110 are connected, and the lower end side of cylinder 113 is symmetrically installed the second ladder 1115, and the second ladder 1115 is located under two chutes 1113 Side, controls the forward or reverse of the 5th motor 1117, the 5th motor 1117 to drive the second rotating shaft 1114 by the 6th controller 1119 Forward or reverse, the second rotating shaft 1114 rotarily drives the forward or reverse of rotating disk 1110, connecting shaft 1112 is existed with rotating disk 1110 Slide to the left or slide to the right in chute 1113, make the first ladder 1111 as connecting shaft 1112 is slided to the left or is slided to the right, Control three the 5th motors 1117 there is different rotating speeds by the 6th controller 1119, make the on three rotation masts 111 One ladder 1111 has different rotary speeies, increased the training difficulty and interest of climbing mast ladder.
The final spurt platform 12, including pedal 121, connecting plate 122, the 8th crossbeam 123, the second rope 124, the 6th post Son 125, plateau 126, convenient ladder 127, connecting rod 128, bearing pin 129, the second fairlead 1210, the second cylinder 1211, slide rail 1212, Sliding block 1213, support base 1214, screw 1215, leading screw 1216, the 4th base 1217, the 7th controller 1218,3rd bearing seat 1219th, the 8th controller 1220, the 6th motor 1221, the 3rd motor cabinet 1222, the second magnetic valve 1223 and the 5th shaft coupling 1224, two the 6th pillars 125 are installed in the plateau 126, the 8th crossbeam 123 is arranged on two the 6th pillars 125, and the 8th Two the second ropes 124 are installed, the second rope 124 provides power-assisted for the person of participating in training, and the side of plateau 126 is easy for installation on crossbeam 123 Ladder 127, the person that conveniently do not participate in training goes to ground from plateau 126, and two the 4th bases 1217, the 4th base are installed in the lower end of plateau 126 Slide rail 1212 is each side installed on 1217, two sliding blocks 1213 are installed on slide rail 1212, two are installed on the 4th base 1217 Individual 3rd bearing seat 1219,3rd bearing seat 1219 is located between two slide rails 1212, and leading screw 1216 is arranged on two the 3rd axles In bearing 1219, screw 1215 is enclosed within outside leading screw 1216, and the left end of leading screw 1216 passes through the 5th shaft coupling 1224 and the 6th motor 1221 are connected, and the 6th motor 1221 is arranged on the 3rd motor cabinet 1222, and the 3rd motor cabinet 1222 is arranged on the 4th base 1217 The 7th controller 1218 is installed in front end a, front end of the 4th base 1217, and the 7th controller 1218 passes through wire and the 6th motor 1221 are connected, and the 8th controller 1220 is installed in another front end of the 4th base 1217, and support base 1214 is arranged on four sliding blocks On 1213, the bottom surface of support base 1214 is connected with screw 1215, controls the 6th motor 1221 to rotate forward by the 7th controller 1218 Or reversion, the 6th motor 1221 drive the forward or reverse of leading screw 1216, make screw 1215 be moved to the left on leading screw 1216 or to Move right, drive support base 1214 to be moved to the left or move right, realize the adjustable angle between connecting rod 128 and ground, and then Make the tilt adjustable in the spurt face of the spurt platform, increase the training difficulty and interest of the spurt platform, on support base 1214 Two the second magnetic valves 1223 and two the second cylinders 1211 are installed, the 8th controller 1220 passes through wire and the second magnetic valve 1223 are connected, and the 8th controller 1220 controls the using input circuit in the suction that electromagnet core and armature residual gap are produced The energization and power-off of two magnetic valves 1223, the second magnetic valve 1223 are connected by pipeline with the second cylinder 1211, the second fairlead 1210 are arranged on the second cylinder 1211, and connecting rod 128 is arranged on the second fairlead 1210;Ten pedals 121 from top to bottom according to , equal to the width of pedal 121, the left and right side of pedal 121 is respectively provided with two for the distance between secondary arrangement, pedal 121 and pedal 121 Bearing pin 129, connecting rod 128 is hinged on ten sides of pedal 121 by bearing pin 129, and first pedal 121 is hinged on connecting plate 122 Left end, connecting plate 122 is hinged in plateau 126, and connecting plate 122 both plays a part of to support pedal 121, and connecting rod 128 is realized again With the adjustable angle between plateau 126, the work of the second cylinder 1211 is controlled by the energization and power-off of the second magnetic valve 1223 Plug does stretching motion, moves downward two connecting rods 128 of the front end of pedal 121, and two connecting rods 128 of the rear end of pedal 121 are upward Move to change the angle between pedal 121 and connecting rod 128, make pedal 121 become inclined state by horizontality to increase The difficulty of the spurt platform.
The adjustable obstacle wall 13, including the second rock-climbing face 131, tooth bar 132, Bearing gear 133, top cap 134, first Rock-climbing face 135, flange bearing 136, the 5th base 137, the 9th controller 138, first reducing motors 139, the 6th shaft coupling 1310th, the first screw jack 1311, the 3rd support frame 1312, the 4th motor cabinet 1313, second reducing motors the 1314, the 7th Axle device 1315, the second screw jack 1316, step on pin point 1317, the 8th shaft coupling 1318, the 3rd reducing motor 1319 and the 5th Motor cabinet 1320, the first rock-climbing face 135 is arranged on two flange bearings 136, and flange bearing 136 is arranged on the 5th base On 137, flange bearing 136 is inner ring flange bearing 136 long, the 135 times installations in the first rock-climbing face, two top caps 134, the first spiral The upper end of jack 1311 is connected with top cap 134, and the stress surface of top cap 134 and the first screw jack 1311 in vertical state, make The upper end of first screw jack 1311 can push up in the horizontal plane, and the lower end of the first screw jack 1311 is arranged on the 5th base 137 On, the first screw jack 1311 is connected by the 6th shaft coupling 1310 with first reducing motors 139, first reducing motors 139 It is arranged on the 5th base 137 with the 9th controller 138, first reducing motors 139 pass through wire and the phase of the 9th controller 138 Even, the control of the 9th controller 138 forward or reverse of first reducing motors 139, the first screw jack 1311 is mechanic jacks, By the screw pair gear transmission inside the first screw jack 1311, first reducing motors 139 drive the first screw jack 1311 Internal screw rod rotation, the jacking sleeve 604 of the first screw jack of screw rod rotation forces 1311 rises or falls, so that weight Rise or fall, the forward or reverse of first reducing motors 139 rises or falls the first screw jack 1311, and then change the Angle between one rock-climbing face 135 and ground, Bearing gear 133 is arranged on upper end, Bearing gear 133 in the first rock-climbing face 135 Structure be provided with gear for the outer ring of bearing 119, Bearing gear 133 passes through the 8th shaft coupling 1318 and the phase of the 3rd reducing motor 1319 Even, the 3rd reducing motor 1319 is arranged on the 5th motor cabinet 1320, and the 5th motor cabinet 1320 is arranged on the first rock-climbing side of face 135 Face, the 3rd reducing motor 1319 is connected by wire with the 9th controller 138;The right-hand member of 132 and second rock-climbing face of tooth bar 131 is stretched into To in the first rock-climbing face 135, tooth bar 132 is arranged on the second rock-climbing outer bottom of face 131, and tooth bar 132 is arranged on Bearing gear 133 On, tooth bar 132 can mutually coincide with the gear of the outer ring of Bearing gear 133, and the 9th controller 138 controls the 3rd reducing motor 1319 Forward or reverse, makes the forward or reverse of Bearing gear 133, makes tooth bar 132 with the second rock-climbing face 131 in the first rock-climbing face 135 Inside extend into or out, make the rock-climbing partial-length of the obstacle wall adjustable, the 3rd support frame 1312 is arranged on the second rock-climbing face 131 Under, the 3rd support frame 1312 is located at the left side of tooth bar 132, and the second screw jack 1316 is reverse mounted in the 3rd support frame 1312 Under, the 3rd support frame 1312 makes the second screw jack 1316 to be horizontally mounted, and position top is lifted on the top of the second screw jack 1316 On the 5th base 137, the top of the second screw jack 1316 is lifted position and is not mutually permanently connected with the 5th base 137, the second spiral shell Rotation jack 1316 is connected by the 7th shaft coupling 1315 with second reducing motors 1314, and second reducing motors 1314 are installed in the Under four motor cabinets 1313, the 4th motor cabinet 1313 is arranged on the side of the 3rd support frame 1312, and second reducing motors 1314 are by leading Line is connected with the 9th controller 138, the control forward or reverse of second reducing motors 1314 of the 9th controller 138, the second spiral thousand Jin top 1316 is mechanic jacks, by the screw pair gear transmission inside the second screw jack 1316, second reducing motors 1314 The screw rod inside the second screw jack 1316 is driven to rotate, the jacking sleeve of the second screw jack of screw rod rotation forces 1316 604 rise or fall, so that position is lifted on the top of the second screw jack 1316 leaves the 5th base 137 or the second screw jack Lift position and withstand on the 5th base 137 in 1316 tops;Plane Installation multiple steps on pin on first rock-climbing face 135 and the second rock-climbing face 131 Point 1317, the person of participating in training can climb up the first rock-climbing face 135 and the second rock-climbing face 131 by pin point 1317 is stepped on.
Application method of the invention:Netting equipment 1 is passed through in regulation, by the first controller 1013 for passing through netting equipment 1 After controlling the first motor 106 to invert and loosen the first rope 105, the first controller 1013 controls the second motor 101 to rotate forward or instead Turn, the forward or reverse of ball-screw 1011 is driven, so that ball nut 1012 is moved to the left or moves right with timber 103 To adjust the distance between timber 103 and timber 103, then the control of the first controller 1,013 first motor 106 is rotated forward and makes first Rope 105 is tensed, and realizes that the crossover sites size between the first rope 105 and the first rope 105 is adjustable, will be travelling through netting equipment 1 regulation is arrived and is adapted to state;The swaying platform 2 for physical training is adjusted, by second of the swaying platform 2 for physical training Controller 2010 control the forward or reverse of the 3rd motor 209, the forward or reverse of the 3rd motor 209 drive the axis of rolling 203 rotate forward or Reversion, makes wheel 206 to the left or be rotated backward on slideway 205, makes circular arc platform 201 as wheel 206 is in first base 202 On alternately waving to the left and to the right;Regulation is multi-functional to swing wooden bridge 3, by multi-functional the 3rd controller for swinging wooden bridge 3 The energization and power-off of 3017 the first magnetic valves 307 of control move reciprocatingly come the piston for controlling the first cylinder 3011, make the second post Son 303 or waving forward or backward or to the left or to the right, first crossbeam 301 and second cross beam 302 rely on the first flake bearing 304 can together wave with the second pillar 303, and increase riding boogie board 3014 waves degree;Fish shape equipment 6 is passed through in regulation, is unscrewed The bolt 602 of fish shape equipment 6 is passed through, is made sleeve 604 on cylinder 603 or up or down is slided, move semicircular ring 605 or up or down It is dynamic to cover the surrounding of circular hole 607, or circular hole 607 is kept complete, making the different fat or thin persons of participating in training that are sized for of circular hole 607 makes With tightening bolt 602;The distance between circular hole 607 and ground are adjusted by electric lifting rod 608, makes circular hole 607 and ground Between height be adapted to the person of participating in training of different heights and use, control the 3rd motor 209 to rotate forward or instead by the 4th controller 6015 Turn, make the forward or reverse of first rotating shaft 6013, make main board 601 turn forward or tilt backwards adjust main board 601 with ground Angle between face;Regulation tyre type sports equipment 7, is clipped in by the tongue piece eye hook 7010 for adjusting tyre type sports equipment 7 Tire 7012 is adjusted and is adapted to the person of participating in training and makes by the diverse location of iron chains 709 to adjust the height between tire 7012 and ground Height, controls linear electric motors 704 to drive movable block 703 or left or right to move by the 5th controller 702, makes tire 7012 Energy or left or right are rocked;Regulation is gone through the veil of time tunnel sports equipment 9, and the 3rd of tunnel sports equipment 9 is gone through the veil of time by changing The length that rope 907 knots adjusts the height between iron ring 906 and ground;Regulation climbing mast ladder 10, by climbing mast The control forward or reverse of the 5th motor 1117 of 6th controller 1119 of ladder 10, the 5th motor 1117 is driving the second rotating shaft 1114 just Turn or invert, the second rotating shaft 1114 rotarily drives the forward or reverse of rotating disk 1110, makes the first ladder 1111 with connecting shaft 1112 Slide to the left or slide to the right, and three the 5th motors 1117 are controlled with different rotating speeds by the 6th controller 1119, Make the first ladder 1111 on three rotation masts 111 that there is different rotary speeies;Regulation final spurt platform 12, the 8th control Device 1220 controls the energization and power-off of the second magnetic valve 1223, and the energization of the second magnetic valve 1223 and power-off control the second cylinder 1211 piston does stretching motion, moves downward two connecting rods 128 of the front end of pedal 121, two connecting rods of the rear end of pedal 121 128 motions upwards, and then rotate pedal 121, change the angle between pedal 121 and connecting rod 128, make pedal 121 by Horizontality becomes inclined state, and pedal 121 is adjusted into suitable position;6th motor is controlled by the 7th controller 1218 1221 forward or reverse, the 6th motor 1221 drive the forward or reverse of leading screw 1216, make screw 1215 on leading screw 1216 to the left Movement moves right, and drives support base 1214 to be moved to the left or move right, and realizes that the angle between connecting rod 128 and ground can Adjust, and then make the tilt adjustable in the spurt face of the spurt platform, by the spurt face regulation of the spurt platform to suitable position;Regulation Adjustable obstacle wall 13, the control forward or reverse of first reducing motors 139 of the 9th controller 138, first reducing motors 139 are rotated forward Or reversion rises or falls the first screw jack 1311, and then change the first angle climbed rocks between face 135 and ground, root According to the person's of participating in training height and age, the first rock-climbing face 135 is adjusted into suitable position, the control of the 9th controller 138 the 3rd is slowed down electric The forward or reverse of machine 1319, makes the forward or reverse of Bearing gear 133, makes tooth bar 132 with the second rock-climbing face 131 in the first rock-climbing Extended into or out in face 135, make the rock-climbing partial-length of the obstacle wall adjustable, according to the person's of participating in training height and age, second climbed Suitable position is arrived in the regulation of scar 131, and the control forward or reverse of second reducing motors 1314 of the 9th controller 138 makes the second spiral Jack 1316 stretches withstand the 5th base 137 downwards.
The person of participating in training pass through the training of netting equipment 1, and the person of participating in training passes through the first base plate 109 to cross over or jump form Region, during any position of body must not touch the first rope 105 and timber 103, from the one end of the first base plate 109 cross over or jump Jump to the other end of the first base plate 109 and complete to pass through the training of netting equipment 1;The person of participating in training carries out flat for waving for physical training The training of platform 2, the person of participating in training walks zigzag on circular arc platform 201, and the another of circular arc platform 201 is gone to from one end of circular arc platform 201 One end is the training for completing the swaying platform 2 for physical training;The person of participating in training carries out the multi-functional training for swinging wooden bridge 3, the person of participating in training The second rope 306, pin riding boogie board 3014, by switching while grasping balance are grabbed in the multi-functional one end hand of wooden bridge 3 that swings The mode of riding boogie board 3014 moves forward arrival terminal and completes the multi-functional training for swinging wooden bridge 3;The person of participating in training is from one end of quincuncial pile 4 The other end is crossed, that is, completes the training of quincuncial pile 4;The person of participating in training completes height garden wood railing 5 across height garden wood railing 5 Training;The person of participating in training facing away from and pass through fish shape equipment 6, and lean back drill-through completes to pass through fish shape equipment 6 through circular hole 607 Training;The person of participating in training grabs iron chains 709, pin treading wheel tire 7012, while grasping balance in the right-hand member hand of tyre type sports equipment 7 Arrival fishing net 701 is moved to the left by way of switching tire 7012, swashing from fishing net 701 completes tyre type physical culture device The training of material 7;The person's of participating in training hand grabs the top for rocking horizontal ladder 8, and the right side for rocking horizontal ladder 8 is moved to from the left side for rocking horizontal ladder 8 i.e. The training of horizontal ladder 8 is rocked in completion;The person of participating in training climbs into the string bag 908, one from the iron ring 906 in the left side of tunnel sports equipment 9 that goes through the veil of time Directly creeped forward along the string bag 908, climbed out of from last string bag 908 and complete the training of tunnel sports equipment 9 of going through the veil of time; The person of participating in training catches or steps on different the first ladder 1111 or the second ladders in the lower section of climbing mast ladder 10 by both hands and both feet Son 1115, rotation mast 111 from below is climbed rocks onto platform 117 always, then down slides into ground by the first rope 114 On, that is, complete the training of climbing mast ladder 10;The participate in training one end in Zhe CongVXing roads 11 moves to the other end in V-type road 11 and completes V The training in type road 11;The person of participating in training pulls the foot pedal 121 of the second rope 124 of final spurt platform 12, and plateau 126 is climbed to always On, then down gone on ground from convenient ladder 127, that is, complete the training of final spurt platform 12;The person of participating in training is in adjustable obstacle wall 13 lower section, the first rock-climbing face 135 and the second rock-climbing face 131 are climbed up and climb down by pin point 1317 is stepped on, that is, complete this into being arranged Standby whole training.

Claims (5)

1. a kind of body-building gallery complete set of equipments, including pass through netting equipment(1), for the swaying platform of physical training(2), many work( Wooden bridge can be swung(3), quincuncial pile(4), height garden wood railing(5), pass through fish shape equipment(6), tyre type sports equipment(7), rock Horizontal ladder(8), go through the veil of time tunnel sports equipment(9), climbing mast ladder(10), V-type road(11), final spurt platform(12)With it is adjustable Section obstacle wall(13), it is characterized in that:The swaying platform for physical training(2)Installed in passing through netting equipment(1)The right side Side, it is multi-functional to swing wooden bridge(3)Installed in the swaying platform for physical training(2)Right side, quincuncial pile(4)Installed in multi-functional Swing wooden bridge(3)Right side, height garden wood railing(5)Installed in quincuncial pile(4)Right side, pass through fish shape equipment(6)Installed in height Low garden wood railing(5)Right side, tyre type sports equipment(7)Installed in passing through fish shape equipment(6)Right side, rock horizontal ladder(8) Installed in tyre type sports equipment(7)Right side, go through the veil of time tunnel sports equipment(9)It is horizontal terraced installed in rocking(8)Right side, Climbing mast ladder(10)Installed in the tunnel sports equipment that goes through the veil of time(9)Right side, V-type road(11)Installed in climbing mast ladder (10)Right side, final spurt platform(12)Installed in V-type road(11)Right side, can adjust obstacle wall(13)Installed in final spurt Platform(12)Right side, pass through netting equipment(1), for the swaying platform of physical training(2), multi-functional swing wooden bridge(3), quincuncial pile (4), height garden wood railing(5), pass through fish shape equipment(6), tyre type sports equipment(7), rock horizontal ladder(8), go through the veil of time tunnel Road sports equipment(9), climbing mast ladder(10), V-type road(11), final spurt platform(12)With adjustable obstacle wall(13)Mutually according to Minor sort constitutes a complete body-building equipment, passes through netting equipment(1), including the second motor(101), first shaft coupling (102), timber(103), bobbin winoler(104), the first rope(105), the first motor(106), the first motor cabinet(107), frame (108), the first base plate(109), first bearing seat(1010), ball-screw(1011), ball nut(1012), the first controller (1013), first support(1014)And groove(1015), first base plate(109)The left and right sides is symmetrically installed frame(108), Frame(108)Five the second motors of upper installation(101), the second motor(101)By first shaft coupling(102)With ball-screw (1011)It is connected, ball-screw(1011)Installed in two first bearing seats(1010)On, first bearing seat(1010)It is arranged on Frame(108)On, ball nut(1012)Installed in ball-screw(1011)On, first support(1014)Installed in ball nut (1012)Under, first support(1014)Installed in groove(1015)On, groove(1015)It is arranged on frame(108)It is interior, groove (1015)Positioned at ball-screw(1011)Under, timber(103)Installed in ball nut(1012)On, ball nut(1012)Appearance Face is square, bobbin winoler(104)Installed in timber(103)On, the first motor(106)Installed in the first motor cabinet(107)On, the One motor cabinet(107)Installed in frame(108)Right-hand member, the first controller(1013)Installed in frame(108)On, the first controller (1013)By wire respectively with the first motor(106)With the second motor(101)It is connected;First rope(105)Successively from left side First bobbin winoler(104)It is wound into opposite frame(108)On second bobbin winoler(104), same to side frame(108)On 3rd bobbin winoler(104), opposite frame(108)On the 4th bobbin winoler(104), same to side frame(108)On the 5th Bobbin winoler(104), same to side frame(108)Upper first motor(106)Output shaft on, for the swaying platform of physical training(2), Including circular arc platform(201), first base(202), the axis of rolling(203), second bearing seat(204), slideway(205), wheel (206), second shaft coupling(207), the second motor cabinet(208), the 3rd motor(209), second controller(2010), first support Frame(2011)With the first pillar(2012), first pillar(2012)Installed in circular arc platform(201)On, nine the first pillars (2012)Mutually installed in zigzag, circular arc platform(201)Positioned at first base(202)On, circular arc platform(201)Upper plane is Plane, circular arc platform(201)Lower plane is outer convex, first base(202)Upper plane is indent arc, first base (202)Lower plane is plane, circular arc platform(201)Lower plane and first base(202)Upper plane is mutually agreed with, circular arc platform (201)Upper berth is set up defences skidding, circular arc platform(201)Bottom surface is symmetrically installed four second bearing seats(204), each two second bearing Seat(204)Between respectively install an axis of rolling(203), the axis of rolling(203)Two ends each pass through second bearing seat(204), wheel (206)Installed in the axis of rolling(203)On, the axis of rolling(203)One end passes through second shaft coupling(207)With the 3rd motor(209)Phase Even, the 3rd motor(209)Installed in the second motor cabinet(208)On, the second motor cabinet(208)Installed in second bearing seat(204) Side, second controller(2010)Installed in the first support frame(2011)On, the 3rd motor(209)Controlled by wire and second Device(2010)It is connected, the first support frame(2011)Installed in circular arc platform(201)Bottom surface, first base(202)It is upper to install two Slideway(205), wheel(206)It is arranged on slideway(205)It is interior, pass through fish shape equipment(6), including main board(601), bolt (602), cylinder(603), sleeve(604), semicircular ring(605), handle(606), circular hole(607), electric lifting rod(608), side Set(609), the second base plate(6010), the 4th motor(6011), the 3rd shaft coupling(6012), first rotating shaft(6013), flange seat (6014)With the 4th controller(6015), the main board(601)It is shaped as fish shape, main board(601)It is provided with two circular holes (607), circular hole(607)A diameter of 55cm, circular hole(607)Upper and lower ends respectively install cylinder(603), sleeve(604)Pacify one end Mounted in semicircular ring(605)On, sleeve(604)It is enclosed within cylinder(603)Outward, sleeve(604)It is externally provided with bolt(602), sleeve(604) Use bolt(602)It is fixed on cylinder(603)On, the semicircular ring of top(605)The back side is provided with two handles(606), main board (601)Installed in two electric lifting rods(608)On, electric lifting rod(608)Installed in square set(609)On, square set(609)Set In first rotating shaft(6013)Outward, first rotating shaft(6013)Two ends are respectively arranged on flange seat(6014)On, flange seat(6014)Install In the second base plate(6010)On, first rotating shaft(6013)By the 3rd shaft coupling(6012)With the 4th motor(6011)It is connected, the Four motors(6011)With the 4th controller(6015)Installed in the second base plate(6010)On, tyre type sports equipment(7), including fishing Net(701), the 5th controller(702), movable block(703), linear electric motors(704), the 3rd crossbeam(705), stretch cord(706)、 3rd pillar(707), the 4th crossbeam(708), iron chains(709), tongue piece eye hook(7010), the first iron hoop(7011)And tire (7012), the 3rd crossbeam(705)Left and right two ends are respectively installed by the 3rd pillar(707), be connected two the 3rd pillars(707)Between 4th crossbeam is installed(708), fishing net(701)Installed in the 4th crossbeam in left side(708)With two the 3rd pillars in left side(707) Between, fishing net(701)The 4th crossbeam on the left of the connection of upper end(708), fishing net(701)Left and right two ends respectively connect the 3rd pillar (707), the 5th controller(702)Installed in the 3rd crossbeam(705)On, the 3rd crossbeam(705)Four linear electric motors of upper installation (704), linear electric motors(704)By wire and the 5th controller(702)It is connected, movable block(703)Installed in linear electric motors (704)On, stretch cord(706)Installed in movable block(703)Under, stretch cord(706)Turned left from the right side and gradually shorten, iron chains(709) One end connects stretch cord(706), iron chains(709)Other end connection tongue loop eye hook(7010), iron chains(709)Turned left gradually from the right side Shorten, tongue piece eye hook(7010)Through the first iron hoop(7011)It is clipped in iron chains(709)On, the first iron hoop(7011)Installed in wheel Tire(7012)On, go through the veil of time tunnel sports equipment(9), including doorframe(901), the 4th pillar(902), the 5th crossbeam(903)、 Second iron hoop(904), the 3rd iron hoop(905), iron ring(906), the 3rd rope(907), the string bag(908)With the 6th crossbeam(909), Two the 4th pillars(902)Between install two the 5th crossbeams(903), the 5th crossbeam(903)The second iron hoop of upper installation (904), the 4th pillar(902)Second iron hoop is installed(904), iron ring(906)Surrounding respectively installs the 3rd iron hoop(905), the 3rd rope Rope(907)One end connects the second iron hoop(904), the 3rd rope(907)The other end connects the 3rd iron hoop(905), the 4th pillar (902), the 5th crossbeam(903), the second iron hoop(904), the 3rd iron hoop(905), iron ring(906)With the 3rd rope(907)Constitute Doorframe(901), doorframe(901)It is provided with six, doorframe(901)Install successively from left to right, two neighboring doorframe(901)Between between Away from being 140cm, two neighboring doorframe(901)Between the 6th crossbeam is each side installed(909), the string bag(908)Installed in iron Circle(906)On, the string bag(908)All it is that the braiding of two strands is formed using warp and parallel.
2. a kind of body-building gallery complete set of equipments according to claim 1, it is characterized in that:It is described multi-functional to swing wooden bridge(3), bag Include first crossbeam(301), second cross beam(302), the second pillar(303), the first flake bearing(304), the first spring(305)、 Second rope(306), the first magnetic valve(307), first flange(308), second support(309), the first fairlead(3010), One cylinder(3011), the first cylinder block(3012), second base(3013), riding boogie board(3014), cross groove(3015), second Spring(3016), the 3rd controller(3017)With the second flake bearing(3018), the first crossbeam(301)Respectively install the in two ends One flake bearing(304), two second cross beams(302)Two ends are respectively installed by the first flake bearing(304), the first flake bearing (304)Installed in four the second pillars(303)On, second cross beam(302)Four the first springs of lower installation(305), the second rope (306)One end is arranged on the first spring(305)Under, the second rope(306)The other end is arranged on riding boogie board(3014)On, first flange (308)Installed in the second pillar(303)On, first flange(308)On be symmetrically installed four the second flake bearings(3018), second Flake bearing(3018)With first flange(308)In 45 ° of installations, second support(309)One end is arranged on the second flake bearing (3018)On, second support(309)The other end is arranged on the first fairlead(3010)On, the first fairlead(3010)Installed in One cylinder(3011)On, the first cylinder(3011)Installed in the first cylinder block(3012)On, the second pillar(303)Lower end is arranged on Second base(3013)It is interior, second base(3013)Four the first magnetic valves are installed on the wall of side(307), the first magnetic valve(307) By tracheae and the first cylinder(3011)It is connected, the 3rd controller(3017)Installed in the second pillar(303)On, the 3rd controller (3017)By wire and the first magnetic valve(307)It is connected, second base(3013)Lower end is provided with cross groove(3015), the Two pillars(303)Lower end is arranged on cross groove(3015)Center, four second springs(3016)One end is symmetrically mounted on ten Font groove(3015)It is interior, four second springs(3016)The other end connects the second pillar(303)Lower end.
3. a kind of body-building gallery complete set of equipments according to claim 1, it is characterized in that:The climbing mast ladder(10), bag Include rotation mast(111), the second support frame(112), cylinder(113), the first rope(114), the 7th crossbeam(115), the 5th Pillar(116), platform(117), the first dividing plate(118), bearing(119), rotating disk(1110), the first ladder(1111), connecting shaft (1112), chute(1113), the second rotating shaft(1114), the second ladder(1115), the 4th shaft coupling(1116), the 5th motor (1117), second partition(1118), the 6th controller(1119)With the 3rd base(1120), the rotation mast(111)From upper Down interfix successively, underlying rotation mast(111)Installed in the 3rd base(1120)On, platform(117)Install In rotation mast above(111)On, the 6th controller(1119)It is mounted on the rotation mast of centre(111)It is interior, Platform(117)Two the 5th pillars of upper installation(116), the 7th crossbeam(115)Installed in two the 5th pillars(116)On, first Rope(114)Installed in the 7th crossbeam(115)On;Rotation mast(111)Including the second support frame(112), cylinder(113)、 First dividing plate(118), bearing(119), rotating disk(1110), the first ladder(1111), connecting shaft(1112), chute(1113), Two rotating shafts(1114), the second ladder(1115), the 4th shaft coupling(1116), the 5th motor(1117)And second partition(1118), First dividing plate(118)Installed in cylinder(113)On, second partition(1118)Installed in cylinder(113)Under, second partition (1118)The 5th motor of upper installation(1117), the second rotating shaft(1114)Lower end passes through the 4th shaft coupling(1116)With the 5th motor (1117)It is connected, the second rotating shaft(1114)Upper end is arranged on bearing(119)On, bearing(119)Installed in the first dividing plate(118) Under, the 4th shaft coupling(1116)Installed in the second support frame(112)On, the second support frame(112)Installed in second partition (1118)On, the second rotating shaft(1114)Two rotating disks of upper installation(1110), cylinder(113)The upper left and right sides is respectively provided with two cunnings Groove(1113), chute(1113)It is ring-shaped, chute(1113)Length is cylinder(113)The a quarter of diameter, connecting shaft (1112)One end connects the first ladder(1111), connecting shaft(1112)The other end passes through chute(1113)Stretch into cylinder(113) Interior and rotating disk(1110)It is connected, cylinder(113)Lower end side is symmetrically installed the second ladder(1115), the second ladder(1115)Position In two chutes(1113)Lower section.
4. a kind of body-building gallery complete set of equipments according to claim 1, it is characterized in that:The final spurt platform(12), bag Include pedal(121), connecting plate(122), the 8th crossbeam(123), the second rope(124), the 6th pillar(125), plateau(126)、 Convenient ladder(127), connecting rod(128), bearing pin(129), the second fairlead(1210), the second cylinder(1211), slide rail(1212), it is sliding Block(1213), support base(1214), screw(1215), leading screw(1216), the 4th base(1217), the 7th controller(1218)、 3rd bearing seat(1219), the 8th controller(1220), the 6th motor(1221), the 3rd motor cabinet(1222), the second magnetic valve (1223)With the 5th shaft coupling(1224), the plateau(126)Two the 6th pillars of upper installation(125), the 8th crossbeam(123)Peace Mounted in two the 6th pillars(125)On, the 8th crossbeam(123)Two the second ropes of upper installation(124), plateau(126)Pacify side The convenient ladder of dress(127), plateau(126)Lower end is installed by two the 4th bases(1217), the 4th base(1217)On each side Slide rail is installed(1212), slide rail(1212)Two sliding blocks of upper installation(1213), the 4th base(1217)Two the 3rd axles of upper installation Bearing(1219), 3rd bearing seat(1219)Positioned at two slide rails(1212)Between, leading screw(1216)Installed in two the 3rd axles Bearing(1219)On, screw(1215)It is enclosed within leading screw(1216)Outward, leading screw(1216)Left end passes through the 5th shaft coupling(1224)With 6th motor(1221)It is connected, the 6th motor(1221)Installed in the 3rd motor cabinet(1222)On, the 3rd motor cabinet(1222)Peace Mounted in the 4th base(1217)Front end, the 4th base(1217)Front end is installed by the 7th controller(1218), the 7th controller (1218)By wire and the 6th motor(1221)It is connected, another the 4th base(1217)Front end is installed by the 8th controller (1220), support base(1214)Installed in four sliding blocks(1213)On, support base(1214)Bottom surface and screw(1215)It is connected, Support base(1214)Two the second magnetic valves of upper installation(1223)With two the second cylinders(1211), the 8th controller(1220)It is logical Cross wire and the second magnetic valve(1223)It is connected, the second magnetic valve(1223)By pipeline and the second cylinder(1211)It is connected, the Two fairleads(1210)Installed in the second cylinder(1211)On, connecting rod(128)Installed in the second fairlead(1210)On;Ten are stepped on Plate(121)It is arranged in order from top to bottom, pedal(121)With pedal(121)The distance between be equal to pedal(121)Width, step on Plate(121)Left and right side is respectively provided with two bearing pins(129), connecting rod(128)By bearing pin(129)It is hinged on ten pedals(121) Side, first pedal(121)It is hinged on connecting plate(122)Left end, connecting plate(122)It is hinged on plateau(126)On.
5. a kind of body-building gallery complete set of equipments according to claim 1, it is characterized in that:The adjustable obstacle wall(13), Including the second rock-climbing face(131), tooth bar(132), Bearing gear(133), top cap(134), first rock-climbing face(135), flange shaft Hold(136), the 5th base(137), the 9th controller(138), first reducing motors(139), the 6th shaft coupling(1310), first Screw jack(1311), the 3rd support frame(1312), the 4th motor cabinet(1313), second reducing motors(1314), the 7th Axle device(1315), the second screw jack(1316), step on pin point(1317), the 8th shaft coupling(1318), the 3rd reducing motor (1319)With the 5th motor cabinet(1320), the first rock-climbing face(135)Installed in two flange bearings(136)On, flange shaft Hold(136)Installed in the 5th base(137)On, flange bearing(136)It is inner ring flange bearing long(136), the first rock-climbing face (135)Two top caps of lower installation(134), the first screw jack(1311)Upper end and top cap(134)It is connected, the first spiral is very heavy Top(1311)Lower end is arranged on the 5th base(137)On, the first screw jack(1311)By the 6th shaft coupling(1310)With First reducing motors(139)It is connected, first reducing motors(139)With the 9th controller(138)Installed in the 5th base(137) On, first reducing motors(139)By wire and the 9th controller(138)It is connected, Bearing gear(133)Installed in the first rock-climbing Face(135)Interior upper end, Bearing gear(133)By the 8th shaft coupling(1318)With the 3rd reducing motor(1319)It is connected, the 3rd Reducing motor(1319)Installed in the 5th motor cabinet(1320)On, the 5th motor cabinet(1320)Installed in the first rock-climbing face(135) Side, the 3rd reducing motor(1319)By wire and the 9th controller(138)It is connected;Tooth bar(132)With the second rock-climbing face (131)Right-hand member extend into the first rock-climbing face(135)It is interior, tooth bar(132)Installed in the second rock-climbing face(131)Outer bottom, tooth bar (132)Installed in Bearing gear(133)On, tooth bar(132)With Bearing gear(133)Can mutually coincide, the 3rd support frame (1312)Installed in the second rock-climbing face(131)Under, the 3rd support frame(1312)Positioned at tooth bar(132)The left side, the second spiral thousand Jin top(1316)It is reverse mounted in the 3rd support frame(1312)Under, the second screw jack(1316)Lift position and withstand on the 5th bottom in top Seat(137)On, the second screw jack(1316)By the 7th shaft coupling(1315)With second reducing motors(1314)It is connected, the Two reducing motors(1314)Installed in the 4th motor cabinet(1313)Under, the 4th motor cabinet(1313)Installed in the 3rd support frame (1312)Side, second reducing motors(1314)By wire and the 9th controller(138)It is connected;First rock-climbing face(135)With Second rock-climbing face(131)Upper Plane Installation multiple steps on pin point(1317).
CN201410363890.2A 2014-07-29 2014-07-29 A kind of body-building gallery complete set of equipments Active CN104258542B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410363890.2A CN104258542B (en) 2014-07-29 2014-07-29 A kind of body-building gallery complete set of equipments

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410363890.2A CN104258542B (en) 2014-07-29 2014-07-29 A kind of body-building gallery complete set of equipments

Publications (2)

Publication Number Publication Date
CN104258542A CN104258542A (en) 2015-01-07
CN104258542B true CN104258542B (en) 2017-06-16

Family

ID=52150191

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410363890.2A Active CN104258542B (en) 2014-07-29 2014-07-29 A kind of body-building gallery complete set of equipments

Country Status (1)

Country Link
CN (1) CN104258542B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109559588B (en) * 2018-12-27 2020-09-04 重庆电子工程职业学院 A experience machine that stumbles in slip for teaching
CN110259104B (en) * 2019-07-31 2023-08-08 中冶建工集团有限公司 Scaffold bottom fixing device and scaffold structure comprising same
CN112587879B (en) * 2020-12-10 2022-09-16 安徽晨风游乐设备集团有限公司 Multifunctional outdoor expansion equipment
CN112891849A (en) * 2021-01-19 2021-06-04 王成 Body-building apparatus

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08126727A (en) * 1994-11-01 1996-05-21 Space Design:Kk Artificial canoe facility
CN2607166Y (en) * 2003-02-15 2004-03-24 中国人民解放军桂林陆军学院 Rockinkg platform
CN101088582A (en) * 2006-06-14 2007-12-19 解立新 Closed gallery type sports system
CN201299924Y (en) * 2008-09-28 2009-09-02 武汉昊康健身器材有限公司 A long-corridor type physical training system
CN204121678U (en) * 2014-07-29 2015-01-28 浙江海洋学院 A kind of body-building gallery complete set of equipments

Also Published As

Publication number Publication date
CN104258542A (en) 2015-01-07

Similar Documents

Publication Publication Date Title
CN104258542B (en) A kind of body-building gallery complete set of equipments
CN105920799B (en) A kind of Multifunctional bodybuilding furniture
CN110681138B (en) Annular rock climbing training equipment
CN1149119C (en) Multi-bay bungee-core acrobatic suspension and trampoline structure
CN107875608A (en) A kind of shuttlecock beginner high clear action exercise device
KR101376703B1 (en) Structure of tower type for extreme leisure sports
CN204121678U (en) A kind of body-building gallery complete set of equipments
CN202410135U (en) Children's slide toy
CN202822595U (en) Indoor multifunctional fitness and entertainment combined appliance for children
CN105854223A (en) Pedaled fitness equipment
LU101381B1 (en) Comprehensive training device for lion head action in lion dance
CN202028179U (en) Turret recreation device with soaring warehouses arranged as circumference matrix
CN107754317B (en) Multi-degree-of-freedom overturning device and application method
CN207575772U (en) Multi-function swinging fluctuating orbit platform amusement device
CN204106979U (en) A kind of novel climbing mast ladder
CN212235776U (en) Sports over-and-under type climbing trainer
CN108261715A (en) Athletic training high jump training equipment
CN102160933B (en) Rotary-tower game device with flight chambers arranged in circular matrix
CN2605044Y (en) Bunge-jump whirlwind amusement apparatus
CN2624976Y (en) Climbing equipment for body-building sports
CN207356458U (en) Circulation, which is climbed, swings locomotory apparatus
CN108434662B (en) Women's volleyball physical strength training device
CN208356099U (en) Mostly rotatable elastic snowfield roller-coaster
CN218392017U (en) Pile hoisting equipment
CN219167650U (en) Adjustable combined body-building equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant