CN104253745A CN201310270236.2A CN201310270236A CN104253745A CN 104253745 A CN104253745 A CN 104253745A CN 201310270236 A CN201310270236 A CN 201310270236A CN 104253745 A CN104253745 A CN 104253745A
Authority
CN
China
Prior art keywords
network equipment
bfd
routing iinformation
module
bfd message
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310270236.2A
Other languages
Chinese (zh)
Other versions
CN104253745B (en
Inventor
杨佩林
杨平安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Shangge Intellectual Property Service Co ltd
Tongding Interconnection Information Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN201310270236.2A priority Critical patent/CN104253745B/en
Priority to PCT/CN2014/079902 priority patent/WO2014206207A1/en
Publication of CN104253745A publication Critical patent/CN104253745A/en
Application granted granted Critical
Publication of CN104253745B publication Critical patent/CN104253745B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • H04L45/28Routing or path finding of packets in data switching networks using route fault recovery
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • H04L45/02Topology update or discovery
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • H04L45/02Topology update or discovery
    • H04L45/023Delayed use of routing table updates
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications

Abstract

An embodiment of the invention provides a routing canceling method and routing canceling equipment. When the network equipment detects the link fault, between first network equipment with the same, or the fault of the first network equipment and packs routing information of the first network equipment into a BFD (bidirectional forwarding detection) message. The BDF message contains the routing information of the first network equipment. The network equipment sends the BDF message to second network equipment, thus the second network equipment cancels the routing from the second network equipment to the first network equipment. The routing which is sent to the first network equipment through the network equipment is directly canceled on the second network equipment, and meanwhile other normal link reception businesses are not affected.

Description

A kind of route withdraw method and the network equipment
Technical field
The present invention relates to communication technical field, particularly a kind of route withdraw method and the network equipment.
Background technology
Two-way converting detects (Bidirectional Forwarding Detection, BFD) agreement energy fast detecting is to the communication failure of a pair LA Management Room, so that the network equipment fault that can have according to fast detecting by flow switch to backup link to accelerate network convergence speed, can ensure that business proceeds, reduction equipment fault or link failure, on the impact of business, improve the availability of network.
Although the link that BFD agreement can detect between a pair network equipment detects, when the neighbouring device adopting BFD to detect breaks down, BFD cannot be realized and detect, as shown in Figure 1, can only by the interlock of two BFD sessions.The network equipment such as shown in Fig. 1, provider edge (Provider Edge, PE) the BFDx session between router PE n and PEm cannot detect the link failure between PE1 and PEn, can only by BFD2 session interlock BFDx session.
But, as shown in Figure 2, at multiple PE (such as PE1, PE2...PEi) and PEn sets up BFD session (BFD1, BFD2...BFDi) time, if one or several BFD sessions are delayed, the BFDx session that then can not link between PEn and PEm is delayed, because also have other link still normal, if BFDx session is delayed, then can affect other normal links can not receive business.
Summary of the invention
Receive business to not affect other normal links, the embodiment of the present invention provides a kind of route withdraw method and the network equipment.
First aspect, provides a kind of route withdraw method, comprising:
When the network equipment detects with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is packaged into two-way converting and detects BFD message by the described network equipment, and described BFD message comprises the routing iinformation of described first network equipment;
The described network equipment sends described BFD message to second network equipment, to make second network equipment described in described second network device revocation to the route of described first network equipment.
In conjunction with first aspect, in the implementation that the first is possible, when the network equipment detects with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is packaged into BFD message by the described network equipment, and the routing iinformation that described BFD message comprises described first network equipment specifically comprises:
When a BFD module of the described network equipment detects with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is informed to the 2nd BFD module of the described network equipment by a BFD module of the described network equipment;
The BFD message template that 2nd BFD module searches of the described network equipment is corresponding with described first network equipment, obtains the BFD message mated with the routing iinformation of described first network equipment.
In conjunction with first aspect, in the implementation that the second is possible, when the network equipment detects with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is packaged into BFD message by the described network equipment, and the routing iinformation that described BFD message comprises described first network equipment specifically comprises:
When a BFD module of the described network equipment detects with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is informed to the 2nd BFD module of the described network equipment by a BFD module of the described network equipment;
The routing iinformation of described first network equipment is packaged into BFD message by the 2nd BFD module of the described network equipment.
In conjunction with first aspect, the implementation possible with the first or the second of first aspect, in the implementation that the third is possible, described BFD message carries cancels route field, described route field of cancelling comprises routing information field, type the type field, described routing information field comprises the routing iinformation of described first network equipment, and described type the type field comprises the indication information of cancelling described routing iinformation.
In conjunction with first aspect, in the 4th kind of possible implementation, described method also comprises:
When the described network equipment detect recover with the link failure recovery of first network equipment room or first network equipment fault time, the routing iinformation of described fault recovery link or fault recovery first network equipment is packaged into BFD message by the described network equipment, and described BFD message comprises the routing iinformation of described fault recovery link or fault recovery first network equipment;
The described network equipment sends described BFD message to second network equipment, recovers the route of described second network equipment to described first network equipment to make described second network equipment.
In conjunction with first aspect, or in conjunction with any one possible implementation above-mentioned of first aspect, in the 5th kind of possible implementation, the described network equipment is specially and converges side gateway A SG, described first network equipment is specially base station side gateway CSG, and described second network equipment is specially wireless traffic side gateway RSG.
Second aspect, provides a kind of network equipment, comprising:
Package module, during for detecting when the described network equipment with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is packaged into two-way converting and detects BFD message, described BFD message comprises the routing iinformation of described first network equipment;
Sending module, for sending described BFD message to second network equipment, to make second network equipment described in described second network device revocation to the route of described first network equipment.
In conjunction with second aspect, in the implementation that the first is possible, described package module specifically comprises a BFD module and the 2nd BFD module,
A described BFD module, for detecting and the link failure of first network equipment room or first network equipment fault, and for when detecting with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is informed to described 2nd BFD module;
Described 2nd BFD module, for searching the BFD message template corresponding with described first network equipment, obtains the BFD message mated with the routing iinformation of described first network equipment.
In conjunction with second aspect, in the implementation that the second is possible, described package module specifically comprises a BFD module and the 2nd BFD module,
A described BFD module, for detecting and the link failure of first network equipment room or first network equipment fault, and for when detecting with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is informed to described 2nd BFD module;
Described 2nd BFD module, for being packaged into BFD message by the routing iinformation of described first network equipment.
In conjunction with second aspect, second aspect the second may or the third possible implementation, in the implementation that the third is possible, described BFD message carries cancels route field, described route field of cancelling comprises routing information field, type the type field, described routing information field comprises the routing iinformation of described first network equipment, and described type the type field comprises the indication information of cancelling described routing iinformation.
In conjunction with second aspect, in the 4th kind of possible implementation, package module, also for detect when the described network equipment recover with the link failure of first network equipment room or first network equipment fault time, the routing iinformation of described fault recovery link or fault recovery first network equipment is packaged into BFD message, and described BFD message comprises the routing iinformation of described fault recovery link or fault recovery first network equipment;
Sending module, for sending described BFD message to second network equipment, recovers the route of described second network equipment to described first network equipment to make described second network equipment.
In conjunction with second aspect, in the 5th kind of possible implementation, the described network equipment is specially and converges side gateway A SG.
The third aspect, provides a kind of network equipment, comprises processor, memory and transmitter, and described memory is used for program code stored, wherein:
Described processor, for calling the program code in described memory, performs following operation:
When the described network equipment detects with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is packaged into two-way converting and detects BFD message, described BFD message comprises the routing iinformation of described first network equipment;
Described transmitter, for sending described BFD message to second network equipment, to make second network equipment described in described second network device revocation to the route of described first network equipment.
Fourth aspect, provides a kind of route withdraw system, comprising: as second aspect or the third aspect arbitrary shown in the network equipment and second network equipment, described second network equipment, for cancelling the route of described second network equipment to first network equipment.
A kind of route withdraw method and apparatus that the embodiment of the present invention provides, when the network equipment detects with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is packaged into two-way converting and detects BFD message by the described network equipment, and described BFD message comprises the routing iinformation of described first network equipment; The described network equipment sends described BFD message to second network equipment, to make second network equipment described in described second network device revocation to the route of described first network equipment.Directly can delete through the route of the described network equipment to first network equipment on second network equipment, not affect other normal links and receive business.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme of the embodiment of the present invention, be briefly described to the accompanying drawing used required in the embodiment of the present invention below, apparently, accompanying drawing described is below only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the interconnected schematic block diagram of three network equipments of the embodiment of the present invention;
Fig. 2 be multiple network equipments of the embodiment of the present invention interconnected schematic block diagram;
Fig. 3 is the schematic flow diagram of the route withdraw method of the embodiment of the present invention;
Fig. 4 is the schematic diagram of the IP wireless access network of the embodiment of the present invention;
Fig. 5 is the schematic diagram of the BFD message format of the embodiment of the present invention;
Fig. 6 is the structural representation of the network equipment of the embodiment of the present invention;
Fig. 7 is the structural representation of the network equipment of another embodiment of the present invention;
Fig. 8 is the structural representation of the route withdraw system of the embodiment of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is a part of embodiment of the present invention, instead of whole embodiment.Based on the embodiment in the present invention, the every other embodiment that those of ordinary skill in the art obtain under the prerequisite not making creative work, all should belong to the scope of protection of the invention.
Below in conjunction with Figure of description, the embodiment of the present invention is described in further detail.
The embodiment of the present invention devises a kind of route withdraw method, and consult shown in Fig. 3, the method comprises the steps:
Step 301: when the network equipment detects with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is packaged into two-way converting and detects BFD message by the described network equipment, and described BFD message comprises the routing iinformation of described first network equipment;
Step 302: the described network equipment sends described BFD message to second network equipment, to make second network equipment described in described second network device revocation to the route of described first network equipment.
The route withdraw method of the embodiment of the present invention, directly can delete and delete through the route of the described network equipment to first network equipment through the described network equipment, not affect other normal links and receive business on second network equipment.
Preferably, can be, but not limited to realize step 301 by following manner.
Mode one: when a BFD module of the described network equipment detects with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is informed to the 2nd BFD module of the described network equipment by a BFD module of the described network equipment;
The BFD message template that 2nd BFD module searches of the described network equipment is corresponding with described first network equipment, obtains the BFD message mated with the routing iinformation of described first network equipment.Mode two: when a BFD module of the described network equipment detects with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is informed to the 2nd BFD module of the described network equipment by a BFD module of the described network equipment;
The routing iinformation of described first network equipment is packaged into BFD message by the 2nd BFD module of the described network equipment.
Preferably, described routing iinformation comprises route ID (Router ID) and the subnet mask (Network Mask) of described first network equipment.
Preferably, described BFD message carries cancels route field, described route field of cancelling comprises routing information field, type the type field, and described routing information field comprises the routing iinformation of described first network equipment, and described type the type field comprises the indication information of cancelling described routing iinformation.
Preferably, when the network equipment detects with the link failure of multiple first network equipment room or multiple first network equipment fault, can the routing iinformation of described multiple first network equipment be encapsulated in same BFD message, once can send all routes needing to cancel like this.
Preferably, a kind of route withdraw method of embodiment of the present invention design, also comprises:
When the described network equipment detect recover with the link failure recovery of first network equipment room or first network equipment fault time, the routing iinformation of described fault recovery link or fault recovery first network equipment is packaged into BFD message by the described network equipment, and described BFD message comprises the routing iinformation of described fault recovery link or fault recovery first network equipment;
The described network equipment sends described BFD message to second network equipment, recovers the route of described second network equipment to described first network equipment to make described second network equipment.
Preferably, the described network equipment is specially and converges side gateway A SG, and described first network equipment is specially base station side gateway CSG, and described second network equipment is specially wireless traffic side gateway RSG.
Below in conjunction with Fig. 4, the preferred embodiments of the present invention one are described.
The method of route that what the embodiment of the present invention provided cancel can be applied to metropolitan area network, also can be applied in IP wireless access network (IP Radio Access Network, IPRAN).
In the Layer2+Layer3 deployment scenario that current IP RAN disposes, usually BFD technology is adopted to carry out frequency converter as shown in Figure 4, base station side gateway (Cell Site Gateway, CSG) to converging side gateway (Aggregation Site Gateway, ASG) pseudo-line redundancy (Pseudowire Redundancy is disposed, PW Redundancy) protection, that is primary PW and PW for subsequent use is set up between CSG1 and main ASG and CSG1 and standby ASG, PW Redundancy redundancy protecting is set up between primary PW and PW for subsequent use, after primary PW link is abnormal, CSG1 is to the flow switch of main ASG to CSG1 to ASG for subsequent use, also set up PW Redundancy redundancy protecting between certain CSG2 and main ASG and CSG2 and standby ASG, between CSG3 and main ASG and CSG2 and standby ASG, also set up PW Redundancy redundancy protecting.At ASG to wireless traffic side gateway (Radio Service Gateway; RSG) VPN Quickly regroup (VPN Fast Reroute is disposed between; VPN FRR) and MPLS TE hot standby (MPLS TE Hot Standby, MPLS TE HSB) protection.
After active link PW fault CSG1, standby ASG can be switched to from the flow CSG1 to main ASG, flow from RNC to CSG1, still from main RSG to main ASG, if link is normal between main ASG and standby ASG, although primary PW link failure, the flow of RNC to CSG1 can pass through main ASG, through standby ASG, then get back to CSG1 by PW for subsequent use.If but when the link now between main ASG and standby ASG is also abnormal, after arriving main ASG from the flow of main RSG to CSG1, because link is all abnormal, route is interrupted, and the message from RNC to CSG1 can be lost.
When link between primary PW and main ASG and standby ASG is all abnormal, the flow from RSG to base station can be caused also to interrupt to standby ASG link is abnormal due to main ASG.In order to avoid flow interrupt, the method for the route withdraw that the embodiment of the present invention can be adopted to provide, comprising:
Step 1: when the main ASG of convergence side gateway detects the link (PW of base station side gateway CSG1 to the main ASG of described convergence side gateway, LSP, Tunnel, interface etc.) delay, the routing iinformation of this base station side gateway CSG1 is packaged into two-way converting and detects BFD message by the main ASG of described convergence side gateway, described routing iinformation comprises IP address and the subnet mask of this base station side gateway CSG1, as 100.1.1.0/24.
Described BFD message comprises the routing iinformation of this base station side gateway CSG1; Described BFD message also comprises the indication information of cancelling described routing iinformation.
As shown in Figure 5, the embodiment of the present invention carries the field cancelling route in the BFD protocol fields of RFC5880: 1, routing iinformation Data field, and described routing information field comprises the routing iinformation of described first network equipment, can be IPv4/IPv6 route; 2, type the type field, comprises the indication information of cancelling described routing iinformation.
Wherein, the main ASG of described convergence side gateway and standby ASG comprises a BFD module corresponding with described base station side gateway CSG1, CSG2, CSG3 respectively, the main ASG of described convergence side gateway and standby ASG also comprise respectively with the main RSG of described wireless traffic side gateway, the 2nd BFD module that standby RSG is corresponding
Wherein, can be, but not limited to realize step 1 by following manner,
Mode one: when the BFD module of the main ASG of described convergence side gateway detect and link failure between base station side gateway CSG1 time, the BFD module of the main ASG of described convergence side gateway by described base station side gateway CSG1 routing iinformation inform to the 2nd BFD module of the main ASG of described convergence side gateway; Concrete advice method can adopt broadcast or mode of unicast, and the embodiment of the present invention to limit, does not all belong to the protection range of the embodiment of the present invention.
The BFD message template corresponding with each base station side gateway CSG is preserved in the 2nd BFD module of the main ASG of described convergence side gateway, this BFD message template encapsulates complete BFD message according to the form shown in Fig. 5, and described BFD message comprises the routing iinformation of this base station side gateway CSG; Described BFD message also comprises the indication information of cancelling described routing iinformation.
The BFD message template that the 2nd BFD module searches of the main ASG of described convergence side gateway is corresponding with described base station side gateway CSG, obtains the BFD message mated with the routing iinformation of described base station side gateway CSG1.
The 2nd BFD module of the main ASG of described convergence side gateway does not need encapsulation, directly this has been encapsulated complete BFD message and has sent to the main RSG of wireless traffic side gateway, with the route making this wireless traffic side main RSG of gateway cancel this RSG to CSG1.Afterwards, this RSG can use the reserve link of CSG1 or reselect to the route of CSG1, and in the follow-up route having the flow to CSG1 to be switched to reserve link or to reselect.And because do not need encapsulation, this has directly been encapsulated complete BFD message and has sent to the main RSG of wireless traffic side gateway by Forwarding plane, the whole time of cancelling method for routing and needing can be reduced especially, made user can not perceive link abnormal, improve Consumer's Experience.
Mode two: when the BFD module of the main ASG of described convergence side gateway detect and link failure between base station side gateway CSG1 time, the BFD module of the main ASG of described convergence side gateway by described base station side gateway CSG1 routing iinformation inform to the 2nd BFD module of the main ASG of described convergence side gateway; Concrete advice method can adopt broadcast or mode of unicast, and the embodiment of the present invention to limit, does not all belong to the protection range of the embodiment of the present invention.
The routing iinformation of described base station side gateway CSG1 is packaged into BFD message by the 2nd BFD module of the main ASG of described convergence side gateway.This BFD message is the BFD message according to the form encapsulation shown in Fig. 5, and described BFD message comprises the routing iinformation of this base station side gateway CSG; Described BFD message also comprises the indication information of cancelling described routing iinformation.
Step 2: the main ASG of described convergence side gateway sends described BFD message to the main RSG of described wireless traffic side gateway, cancels the route of the main RSG of described wireless traffic side gateway to described base station side gateway CSG1 to make the main RSG of described wireless traffic side gateway.Afterwards, this RSG can use the reserve link of CSG1 or reselect to the route of CSG1, and in the follow-up route having the flow to CSG1 to be switched to reserve link or to reselect.Because this is cancelled method for routing and uses the transmission of BFD message, whole implementation procedure only needs the time in hundred milliseconds of ranks, makes user can not perceive link abnormal, improves Consumer's Experience.
When the link-recovery of base station side gateway CSG1 and the main ASG of convergence side gateway, the wireless traffic side main RSG of gateway of notice far-end can return to the route of base station side gateway CSG1, be specifically as follows: detect that base station side gateway CSG1 is to the link (PW converging the main ASG of side gateway when converging the main ASG of side gateway, LSP, Tunnel, interface etc.) link-recovery time, converge side gateway main ASG and the routing iinformation of described base station side gateway CSG1 is packaged into BFD message, described BFD message comprises the routing iinformation of described base station side gateway CSG1; Preferably, described BFD message also comprises the indication information of the routing iinformation recovering described base station side gateway CSG1.
The main ASG of described convergence side gateway sends described BFD message to the main RSG of wireless traffic side gateway, recovers the route of the main RSG of described wireless traffic side gateway to described base station side gateway CSG1 to make the main RSG of described wireless traffic side gateway.And have the flow to CSG1 to be switched to this route follow-up.
Based on same mentality of designing, the embodiment of the present invention additionally provides a kind of network equipment.Consult shown in Fig. 6, comprising:
Package module 601, during for detecting when the described network equipment with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is packaged into two-way converting and detects BFD message, described BFD message comprises the routing iinformation of described first network equipment; Sending module 602, for sending described BFD message to second network equipment, to make second network equipment described in described second network device revocation to the route of described first network equipment.
Preferably, described package module specifically comprises a BFD module and the 2nd BFD module,
A described BFD module, for detecting and the link failure of first network equipment room or first network equipment fault, and for when detecting with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is informed to described 2nd BFD module;
Described 2nd BFD module, for searching the BFD message template corresponding with described first network equipment, obtains the BFD message mated with the routing iinformation of described first network equipment.
Or preferably, described package module specifically comprises a BFD module and the 2nd BFD module, a described BFD module, for detecting and the link failure of first network equipment room or first network equipment fault, and for when detecting with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is informed to described 2nd BFD module;
Described 2nd BFD module, for being packaged into BFD message by the routing iinformation of described first network equipment.
Preferably, described BFD message carries cancels route field, described route field of cancelling comprises routing information field, type the type field, and described routing information field comprises the routing iinformation of described first network equipment, and described type the type field comprises the indication information of cancelling described routing iinformation.
Preferably, package module, also for detect when the described network equipment recover with the link failure of first network equipment room or first network equipment fault time, the routing iinformation of described fault recovery link or fault recovery first network equipment is packaged into BFD message, and described BFD message comprises the routing iinformation of described fault recovery link or fault recovery first network equipment;
Sending module, for sending described BFD message to second network equipment, recovers the route of described second network equipment to described first network equipment to make described second network equipment.
Preferably, the described network equipment is specially and converges side gateway A SG.
Embodiments of the invention also provide a kind of network equipment, comprise with reference to shown in Fig. 7: processor 701, memory 702, transmitter 703 and bus 704, this processor 701, memory 702 and transceiver 703, to be connected by bus 704 and to complete mutual communication, wherein:
This bus 704 can be industry standard architecture (Industry Standard Architecture, ISA) bus, peripheral component interconnect (Peripheral Component, PCI) bus or extended industry-standard architecture (Extended Industry Standard Architecture, EISA) bus etc.This bus 704 can be divided into address bus, data/address bus, control bus etc.For ease of representing, only representing with a line in Fig. 8, but not representing the bus only having a bus or a type.
Memory 702 is for program code stored, and this program code comprises operational order.Memory 702 may comprise high speed random asccess memory (random access memory, RAM), also may comprise nonvolatile memory (non-volatile memory), such as magnetic disc store.
Processor 701 may be a central processing unit (Central Processing Unit, CPU), or specific integrated circuit (Application Specific Integrated Circuit, or be configured to implement one or more integrated circuits of the embodiment of the present invention ASIC).
Transmitter 703, is mainly used in realizing the transmitting-receiving of communication data between the network equipment in the present embodiment and other network equipment.
Particularly, processor 701, for calling the program code in memory 702, in order to perform following operation:
When the described network equipment detects with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is packaged into two-way converting and detects BFD message, described BFD message comprises the routing iinformation of described first network equipment;
Transmitter 703 for sending described BFD message to second network equipment, to make second network equipment described in described second network device revocation to the route of described first network equipment.
Based on same mentality of designing, the embodiment of the present invention additionally provides a kind of route withdraw system, as shown in Figure 8, comprises the network equipment and the second network equipment of the embodiment of the present invention.As shown previously, second network equipment, for cancelling the route of described second network equipment to first network equipment for the network equipment.
In the embodiment of the present invention, when the network equipment detects with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is packaged into two-way converting and detects BFD message by the described network equipment, and described BFD message comprises the routing iinformation of described first network equipment; The described network equipment sends described BFD message to second network equipment, to make second network equipment described in described second network device revocation to the route of described first network equipment.Directly can delete through the route of the described network equipment to first network equipment on second network equipment, not affect other normal links and receive business.
Those of ordinary skill in the art can recognize, in conjunction with unit and the algorithm steps of each example of embodiment disclosed herein description, can realize with the combination of electronic hardware or computer software and electronic hardware.These functions perform with hardware or software mode actually, depend on application-specific and the design constraint of technical scheme.Professional and technical personnel can use distinct methods to realize described function to each specifically should being used for, but this realization should not thought and exceeds scope of the present invention.
Those skilled in the art can be well understood to, and for convenience and simplicity of description, the specific works process of the system of foregoing description, device and unit, with reference to the corresponding process in preceding method embodiment, can not repeat them here.
In several embodiments that the application provides, should be understood that disclosed system, apparatus and method can realize by another way.Such as, device embodiment described above is only schematic, such as, the division of described unit, be only a kind of logic function to divide, actual can have other dividing mode when realizing, such as multiple unit or assembly can in conjunction with or another system can be integrated into, or some features can be ignored, or do not perform.Another point, shown or discussed coupling each other or direct-coupling or communication connection can be by some interfaces, and the indirect coupling of device or unit or communication connection can be electrical, machinery or other form.
The described unit illustrated as separating component or can may not be and physically separates, and the parts as unit display can be or may not be physical location, namely can be positioned at a place, or also can be distributed in multiple network element.Some or all of unit wherein can be selected according to the actual needs to realize the object of the present embodiment scheme.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, also can be that the independent physics of unit exists, also can two or more unit in a unit integrated.
If described function using the form of SFU software functional unit realize and as independently production marketing or use time, can be stored in a computer read/write memory medium.Based on such understanding, the part of the part that technical scheme of the present invention contributes to prior art in essence in other words or this technical scheme can embody with the form of software product, this computer software product is stored in a storage medium, comprising some instructions in order to make a computer equipment (can be personal computer, server, or the network equipment etc.) perform all or part of step of method described in each embodiment of the present invention.And aforesaid storage medium comprises: USB flash disk, portable hard drive, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), magnetic disc or CD etc. various can be program code stored medium.
The above; be only the specific embodiment of the present invention, but protection scope of the present invention is not limited thereto, is anyly familiar with those skilled in the art in the technical scope that the present invention discloses; change can be expected easily or replace, all should be encompassed within protection scope of the present invention.Therefore, protection scope of the present invention should described be as the criterion with the protection range of claim.

Claims (14)

1. a route withdraw method, is characterized in that,
When the network equipment detects with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is packaged into two-way converting and detects BFD message by the described network equipment, and described BFD message comprises the routing iinformation of described first network equipment; The described network equipment sends described BFD message to second network equipment, to make second network equipment described in described second network device revocation to the route of described first network equipment.
2., according to described method according to claim 1, it is characterized in that,
When the network equipment detects with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is packaged into BFD message by the described network equipment, the routing iinformation that described BFD message comprises described first network equipment specifically comprises: when a BFD module of the described network equipment detects with the link failure of first network equipment room or first network equipment fault, and the routing iinformation of described first network equipment is informed to the 2nd BFD module of the described network equipment by a BFD module of the described network equipment;
The BFD message template that 2nd BFD module searches of the described network equipment is corresponding with described first network equipment, obtains the BFD message mated with the routing iinformation of described first network equipment.
3., according to described method according to claim 1, it is characterized in that,
When the network equipment detects with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is packaged into BFD message by the described network equipment, and the routing iinformation that described BFD message comprises described first network equipment specifically comprises:
When a BFD module of the described network equipment detects with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is informed to the 2nd BFD module of the described network equipment by a BFD module of the described network equipment;
The routing iinformation of described first network equipment is packaged into BFD message by the 2nd BFD module of the described network equipment.
4. the method according to described claim 1 or 2 or 3, is characterized in that,
Described BFD message carries cancels route field, described route field of cancelling comprises routing information field, type the type field, described routing information field comprises the routing iinformation of described first network equipment, and described type the type field comprises the indication information of cancelling described routing iinformation.
5. according to described method according to claim 1, it is characterized in that, described method also comprises: when the described network equipment detect recover with the link failure recovery of first network equipment room or first network equipment fault time, the routing iinformation of described fault recovery link or fault recovery first network equipment is packaged into BFD message by the described network equipment, and described BFD message comprises the routing iinformation of described fault recovery link or fault recovery first network equipment;
The described network equipment sends described BFD message to second network equipment, recovers the route of described second network equipment to described first network equipment to make described second network equipment.
6., according to the arbitrary described method of described claim 1-5, it is characterized in that,
The described network equipment is specially and converges side gateway A SG, and described first network equipment is specially base station side gateway CSG, and described second network equipment is specially wireless traffic side gateway RSG.
7. a network equipment, is characterized in that, comprising:
Package module, during for detecting when the described network equipment with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is packaged into two-way converting and detects BFD message, described BFD message comprises the routing iinformation of described first network equipment;
Sending module, for sending described BFD message to second network equipment, to make second network equipment described in described second network device revocation to the route of described first network equipment.
8., according to the described network equipment according to claim 7, it is characterized in that,
Described package module specifically comprises a BFD module and the 2nd BFD module,
A described BFD module, for detecting and the link failure of first network equipment room or first network equipment fault, and for when detecting with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is informed to described 2nd BFD module;
Described 2nd BFD module, for searching the BFD message template corresponding with described first network equipment, obtains the BFD message mated with the routing iinformation of described first network equipment.
9., according to the described network equipment according to claim 7, it is characterized in that,
Described package module specifically comprises a BFD module and the 2nd BFD module,
A described BFD module, for detecting and the link failure of first network equipment room or first network equipment fault, and for when detecting with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is informed to described 2nd BFD module;
Described 2nd BFD module, for being packaged into BFD message by the routing iinformation of described first network equipment.
10. the network equipment according to described claim 7 or 8 or 9, is characterized in that,
Described BFD message carries cancels route field, described route field of cancelling comprises routing information field, type the type field, described routing information field comprises the routing iinformation of described first network equipment, and described type the type field comprises the indication information of cancelling described routing iinformation.
11., according to the described network equipment according to claim 7, is characterized in that,
Package module, also for detect when the described network equipment recover with the link failure of first network equipment room or first network equipment fault time, the routing iinformation of described fault recovery link or fault recovery first network equipment is packaged into BFD message, and described BFD message comprises the routing iinformation of described fault recovery link or fault recovery first network equipment;
Sending module, for sending described BFD message to second network equipment, recovers the route of described second network equipment to described first network equipment to make described second network equipment.
12., according to the arbitrary described network equipment of described claim 7-11, is characterized in that,
The described network equipment is specially and converges side gateway A SG.
13. 1 kinds of network equipments, is characterized in that, comprise processor, memory and transmitter, and described memory is used for program code stored, wherein:
Described processor, for calling the program code in described memory, performs following operation:
When the described network equipment detects with the link failure of first network equipment room or first network equipment fault, the routing iinformation of described first network equipment is packaged into two-way converting and detects BFD message, described BFD message comprises the routing iinformation of described first network equipment;
Described transmitter, for sending described BFD message to second network equipment, to make second network equipment described in described second network device revocation to the route of described first network equipment.
14. 1 kinds of route withdraw systems, is characterized in that, comprising: the network equipment shown in as arbitrary in claim 7-13 and second network equipment, described second network equipment, for cancelling the route of described second network equipment to first network equipment.
CN201310270236.2A 2013-06-29 2013-06-29 A kind of route withdraw method and the network equipment Active CN104253745B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201310270236.2A CN104253745B (en) 2013-06-29 2013-06-29 A kind of route withdraw method and the network equipment
PCT/CN2014/079902 WO2014206207A1 (en) 2013-06-29 2014-06-16 Route withdrawal method and network device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310270236.2A CN104253745B (en) 2013-06-29 2013-06-29 A kind of route withdraw method and the network equipment

Publications (2)

Publication Number Publication Date
CN104253745A true CN104253745A (en) 2014-12-31
CN104253745B CN104253745B (en) 2018-05-29

Family

ID=52141025

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310270236.2A Active CN104253745B (en) 2013-06-29 2013-06-29 A kind of route withdraw method and the network equipment

Country Status (2)

Country Link
CN (1) CN104253745B (en)
WO (1) WO2014206207A1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016110248A1 (en) * 2015-01-05 2016-07-14 华为技术有限公司 Failure processing method and device for forwarding device, and controller
WO2016173195A1 (en) * 2015-04-29 2016-11-03 中兴通讯股份有限公司 Method for advertising route and withdrawing route and corresponding routing device
CN110740094A (en) * 2019-10-28 2020-01-31 新华三信息安全技术有限公司 network equipment, BFD message transmission method and device
CN110753002A (en) * 2019-09-29 2020-02-04 北京浪潮数据技术有限公司 Traffic scheduling method and device
CN113630314A (en) * 2020-05-09 2021-11-09 北京金山云网络技术有限公司 Disaster recovery method and device for hybrid cloud private line access network
CN115333994A (en) * 2022-08-01 2022-11-11 北京金山云网络技术有限公司 Method and device for realizing VPN route rapid convergence and electronic equipment
WO2024001359A1 (en) * 2022-06-30 2024-01-04 中兴通讯股份有限公司 Communication state switching method, port configuration method, and communication system and medium

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112367257B (en) * 2020-10-30 2022-10-21 新华三技术有限公司 Route notification method and device

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070207591A1 (en) * 2006-03-02 2007-09-06 Rahman Reshad A Technique for efficiently and dynamically maintaining bidirectional forwarding detection on a bundle of links
US20090010153A1 (en) * 2007-07-03 2009-01-08 Cisco Technology, Inc. Fast remote failure notification
US20090225652A1 (en) * 2008-03-07 2009-09-10 Jean-Philippe Vasseur Locating tunnel failure based on next-next hop connectivity in a computer network
CN101800676A (en) * 2010-02-20 2010-08-11 中兴通讯股份有限公司 Link detection method, device and system
CN101834773A (en) * 2010-03-30 2010-09-15 中兴通讯股份有限公司 Protection method and system of virtual private LAN (Local Area Network) service (VPLS)
CN101924654A (en) * 2010-08-23 2010-12-22 中兴通讯股份有限公司 Point-to-multipoint service-based path switching method and system
CN102195822A (en) * 2010-03-01 2011-09-21 杭州华三通信技术有限公司 Fault detection method and business provider edge (PE) equipment
CN102195861A (en) * 2010-03-19 2011-09-21 杭州华三通信技术有限公司 Method and device for establishing BFD (bidirectional forwarding detection) session in route switching process
US20110238843A1 (en) * 2010-03-25 2011-09-29 Verizon Patent And Licensing, Inc. Dampening interface flapping
CN102223241A (en) * 2010-04-15 2011-10-19 杭州华三通信技术有限公司 Method and equipment for informing network change
CN102255765A (en) * 2010-05-21 2011-11-23 华为技术有限公司 Bidirectional forwarding detection method and device
CN102316041A (en) * 2011-09-09 2012-01-11 福建星网锐捷网络有限公司 Router switching method and device
CN102611577A (en) * 2012-03-02 2012-07-25 中兴通讯股份有限公司 LDP (Label Distribution Protocol) conversation-based method, device and system for protecting PWs (Pseudo Wires)
CN102857399B (en) * 2012-08-20 2015-06-17 华为技术有限公司 MAC address deleting method, device and system of VPLS dual homing network

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101355486A (en) * 2007-07-23 2009-01-28 中国移动通信集团公司 Method, equipment and system for switching route
US7990852B1 (en) * 2008-08-14 2011-08-02 Tellabs San Jose, Inc. Methods and apparatus for improving network communication using BFD and VRRP tracking system
CN101431448B (en) * 2008-10-22 2011-12-28 华为技术有限公司 Method, equipment and system for positioning fault of IP bearing network
CN102164051B (en) * 2011-05-18 2013-11-06 西安交通大学 Service-oriented fault detection and positioning method

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070207591A1 (en) * 2006-03-02 2007-09-06 Rahman Reshad A Technique for efficiently and dynamically maintaining bidirectional forwarding detection on a bundle of links
US20090010153A1 (en) * 2007-07-03 2009-01-08 Cisco Technology, Inc. Fast remote failure notification
US20090225652A1 (en) * 2008-03-07 2009-09-10 Jean-Philippe Vasseur Locating tunnel failure based on next-next hop connectivity in a computer network
CN101800676A (en) * 2010-02-20 2010-08-11 中兴通讯股份有限公司 Link detection method, device and system
CN102195822A (en) * 2010-03-01 2011-09-21 杭州华三通信技术有限公司 Fault detection method and business provider edge (PE) equipment
CN102195861A (en) * 2010-03-19 2011-09-21 杭州华三通信技术有限公司 Method and device for establishing BFD (bidirectional forwarding detection) session in route switching process
US20110238843A1 (en) * 2010-03-25 2011-09-29 Verizon Patent And Licensing, Inc. Dampening interface flapping
CN101834773A (en) * 2010-03-30 2010-09-15 中兴通讯股份有限公司 Protection method and system of virtual private LAN (Local Area Network) service (VPLS)
CN102223241A (en) * 2010-04-15 2011-10-19 杭州华三通信技术有限公司 Method and equipment for informing network change
CN102255765A (en) * 2010-05-21 2011-11-23 华为技术有限公司 Bidirectional forwarding detection method and device
CN101924654A (en) * 2010-08-23 2010-12-22 中兴通讯股份有限公司 Point-to-multipoint service-based path switching method and system
CN102316041A (en) * 2011-09-09 2012-01-11 福建星网锐捷网络有限公司 Router switching method and device
CN102611577A (en) * 2012-03-02 2012-07-25 中兴通讯股份有限公司 LDP (Label Distribution Protocol) conversation-based method, device and system for protecting PWs (Pseudo Wires)
CN102857399B (en) * 2012-08-20 2015-06-17 华为技术有限公司 MAC address deleting method, device and system of VPLS dual homing network

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
D.KATZ;D.WARD: "Bidirectional Forwarding Detection(BFD)", 《REQUEST FOR COMMENTS:5880》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10756958B2 (en) 2015-01-05 2020-08-25 Huawei Technologies Co., Ltd. Method, device, and controller for processing forwarding device faults received from forwarding devices on a forwarding path
US11496355B2 (en) 2015-01-05 2022-11-08 Huawei Technologies Co., Ltd. Method for processing forwarding device fault, device, and controller
WO2016110248A1 (en) * 2015-01-05 2016-07-14 华为技术有限公司 Failure processing method and device for forwarding device, and controller
CN106209617B (en) * 2015-04-29 2020-12-11 中兴通讯股份有限公司 Method for announcing route and withdrawing route and corresponding routing equipment
CN106209617A (en) * 2015-04-29 2016-12-07 中兴通讯股份有限公司 A kind of notice route and cancels the method for route and corresponding routing device
WO2016173195A1 (en) * 2015-04-29 2016-11-03 中兴通讯股份有限公司 Method for advertising route and withdrawing route and corresponding routing device
CN110753002A (en) * 2019-09-29 2020-02-04 北京浪潮数据技术有限公司 Traffic scheduling method and device
CN110753002B (en) * 2019-09-29 2023-04-07 北京浪潮数据技术有限公司 Traffic scheduling method and device
CN110740094A (en) * 2019-10-28 2020-01-31 新华三信息安全技术有限公司 network equipment, BFD message transmission method and device
CN110740094B (en) * 2019-10-28 2021-09-21 新华三信息安全技术有限公司 Network equipment, BFD message transmission method and device
CN113630314A (en) * 2020-05-09 2021-11-09 北京金山云网络技术有限公司 Disaster recovery method and device for hybrid cloud private line access network
WO2024001359A1 (en) * 2022-06-30 2024-01-04 中兴通讯股份有限公司 Communication state switching method, port configuration method, and communication system and medium
CN115333994A (en) * 2022-08-01 2022-11-11 北京金山云网络技术有限公司 Method and device for realizing VPN route rapid convergence and electronic equipment

Also Published As

Publication number Publication date
CN104253745B (en) 2018-05-29
WO2014206207A1 (en) 2014-12-31

Similar Documents

Publication Publication Date Title
CN104253745A (en) Routing canceling method and network equipment
CN102571426B (en) Double-homing protection method and device
CN102088415B (en) Method and device for MAC (media access control) address withdrawal
CN103067277B (en) Set up and control the method for passage, forwarding unit and control equipment
CN107465613B (en) Link aggregation interface communication state switching method and device
CN102571492B (en) Method and device for detecting failure of routing equipment
CN102164085B (en) Based on tunnel group protection implementation method and the device of multi-protocol label switching network
CN104702480A (en) Method and device for establishing tunnel protection group in next generation multicast virtual private network
EP3039831A1 (en) Methods and apparatus
CN102769543A (en) BFD (Bidirectional Forwarding Detection) method and equipment based on LSP (Label Switching Path)
CN102857421B (en) A kind of VLL fault detection method and equipment
CN103634134A (en) Cross-domain protection intercommunication method and system
CN101192990A (en) A method and device and system for quick rerouting in MPLS network
CN102970172A (en) Communication link switching method, device and communication system
CN111447095A (en) Bidirectional forwarding detection switching method, bidirectional forwarding detection module and edge device
CN105591898A (en) Tunnel protection method and tunnel protection device based on shared tunnels
CN106161232B (en) tunnel protection switching method and device
CN101848159B (en) Three-layer VPN route resetting method and device
CN106788921B (en) Multi-CPE redundant link system and method
CN103036781A (en) Method and device for processing main path link failures
CN107819680A (en) A kind of method of service switchover, the network equipment
CN102255805B (en) Message transmission method, message forwarding method and devices
CN104717143A (en) Method and equipment for many-one reducibility scene multicast data transmission
CN105897451B (en) OTN dispatching system and fault processing method
CN103404050B (en) Pretection switch method, system and node

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201026

Address after: No.8, Xiaoping Avenue, Badu Economic Development Zone, Zhenze Town, Wujiang District, Suzhou City, Jiangsu Province

Patentee after: TONGDING INTERCONNECTION INFORMATION Co.,Ltd.

Address before: 625, room 269, Connaught platinum Plaza, No. 518101, Qianjin Road, Xin'an street, Shenzhen, Guangdong, Baoan District

Patentee before: SHENZHEN SHANGGE INTELLECTUAL PROPERTY SERVICE Co.,Ltd.

Effective date of registration: 20201026

Address after: 625, room 269, Connaught platinum Plaza, No. 518101, Qianjin Road, Xin'an street, Shenzhen, Guangdong, Baoan District

Patentee after: SHENZHEN SHANGGE INTELLECTUAL PROPERTY SERVICE Co.,Ltd.

Address before: 518129 Bantian HUAWEI headquarters office building, Longgang District, Guangdong, Shenzhen

Patentee before: HUAWEI TECHNOLOGIES Co.,Ltd.