CN104240033A - Power grid maintenance schedule graph layout method and system - Google Patents

Power grid maintenance schedule graph layout method and system Download PDF

Info

Publication number
CN104240033A
CN104240033A CN201410487135.5A CN201410487135A CN104240033A CN 104240033 A CN104240033 A CN 104240033A CN 201410487135 A CN201410487135 A CN 201410487135A CN 104240033 A CN104240033 A CN 104240033A
Authority
CN
China
Prior art keywords
rectangular block
time
arbitrary
plan
chronomere
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410487135.5A
Other languages
Chinese (zh)
Inventor
方李兵
马伟哲
邓琨
刘典安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Power Supply Bureau Co Ltd
Shenzhen Comtop Information Technology Co Ltd
Original Assignee
Shenzhen Power Supply Bureau Co Ltd
Shenzhen Comtop Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Power Supply Bureau Co Ltd, Shenzhen Comtop Information Technology Co Ltd filed Critical Shenzhen Power Supply Bureau Co Ltd
Priority to CN201410487135.5A priority Critical patent/CN104240033A/en
Publication of CN104240033A publication Critical patent/CN104240033A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a power grid maintenance schedule graph layout method. The method includes the steps that the current time ranges of maintenance schedules are displayed, wherein the units of the time ranges are a year, a quarter and a month; within the current time ranges, corresponding rectangular blocks formed by the current time value of each maintenance schedule and the fixed construction period of each maintenance schedule are obtained, a response to a dragging command sent by a user to any rectangular block is made, any rectangular block is dragged, and the time value acquired after each rectangular block is dragged is determined, wherein each time value comprises start time and stop time, and each fixed construction period is the difference between the end time and the start time; according to the time value acquired after each rectangular block is dragged, the maintenance schedules are rearranged in a time mode and displayed. By the implementation of the method, the maintenance schedules can be reasonably arranged, the risks of arrangement errors of the maintenance schedules are reduced, the labor intensity of schedule arrangement staff can be relieved, work efficiency is improved, and time and labor can be saved.

Description

A kind of method and system of maintenance scheduling for power systems presentation graphics
Technical field
The present invention relates to technical field of power systems, particularly relate to a kind of method and system of maintenance scheduling for power systems presentation graphics.
Background technology
Maintenance scheduling for power systems is a complexity in electric system and very important vocational work, and its main task is the repair time arranging to determine each power equipment in planning cycle.Therefore, plan layout personnel need when arranging turnaround plan to consider several factors, such as ensure that safe, the minimizing equipment of system and equipment repeat the workload, reduction equipment centralized operation etc. of power failure, equilibrium operating department, these factors mutually restrict and influence each other, and make to arrange the working experience that a reasonably turnaround plan needs dependence plan layout personnel to enrich.
The flow process of maintenance scheduling for power systems layout is generally service work content and the turnaround plan time of first being submitted to respective administrative equipment by different operation departments (as power transformation, transmission of electricity etc.), then gathers the turnaround plan of all submissions by plan layout personnel and carries out unifying to arrange.At present, the information system of grid company construction can help plan layout personnel to collect all turnaround plans, plan layout personnel complete unified arrangement the time again by revising a rule plan in collected turnaround plan, its shortcoming is: the amendment of planned time is generally the mode adopting option date on time control, every bar plan approximately needs 6, the mouse action of 7 times, its trivial operations brings huge workload to plan layout personnel and work efficiency is lower, simultaneously when carrying out one by one plan, whether plan layout personnel can only only go the arrangement of time judging this plan reasonable with brain, whether have with the plan arranged above and conflict, often attend to one thing and lose sight of another, thus there is the risk that turnaround plan arrangement mistake causes large area blackout.
Along with the expansion of electric system scale, electric network composition is day by day complicated, the quantity of repair apparatus is on the increase, the difficulty of maintenance scheduling for power systems layout is also increasing year by year, adopt the work efficiency of tradition plan method of combination lower, cause the labour intensity planning layout personnel very large, be difficult to the requirement adapting to modern power network service work.
Summary of the invention
Embodiment of the present invention technical matters to be solved is, a kind of method and system of maintenance scheduling for power systems presentation graphics is provided, can reasonable arrangement turnaround plan, reduce the risk that turnaround plan arranges mistake, alleviate the labour intensity of plan layout personnel simultaneously and increase work efficiency, realizing time saving and energy saving object.
In order to solve the problems of the technologies described above, embodiments provide a kind of method of maintenance scheduling for power systems presentation graphics, described method comprises:
The current time frame of the required layout turnaround plan of display, wherein, described time range comprise with 1 year be chronomere, with the first quarter be chronomere and with January for chronomere;
In the current time frame of described display, obtain the corresponding rectangular block formed by the current time value of each turnaround plan and fixing duration thereof, and response user pulls instruction to the rectangular block obtained described in arbitrary, and the rectangular block obtained described in arbitrary is pulled, determine each rectangular block pull after time value; Wherein, described time value comprises initial time and end time, and the described fixing duration is the difference between described end time and described initial time;
Time value after pulling according to described each rectangular block determined, temporally mode is resequenced each turnaround plan content showing.
Wherein, described method comprises further:
Show multiple decision-making assistant information figures that arbitrary rectangular block pulls rear correspondence, when detect the time value after a rectangular block pulls exceed preset plan rules of arrangement time, then show collision alert information between described multiple decision-making assistant information figure.
Wherein, described method comprises further:
Using described exceed preset plan rules of arrangement rectangular block as current rectangle block, further response user pulls instruction to described current rectangle block, and described current rectangle block is pulled, until determine described current rectangle block pull after time value do not exceed described default plan rules of arrangement.
Wherein, described temporally mode resequence each turnaround plan and display step be specially:
With the initial time positive sequence of turnaround plan in described time value or each turnaround plan of inverted order mode sequencing display.
Wherein, described method comprises further:
In the current time frame of described display, response user to other assigned operation instruction of the rectangular block obtained described in arbitrary, and carries out other assigned operation command operating described to the rectangular block obtained described in arbitrary; Wherein, other operational order described comprise pin Ctrl simultaneously mouse to bottom roller operation and pin Ctrl simultaneously mouse operate to upper roller.
Wherein, described in the current time frame of described display, response user to other assigned operation instruction of the rectangular block obtained described in arbitrary, and is specially the step that the rectangular block obtained described in arbitrary carries out other assigned operation command operating described:
When described current time frame with the first quarter be chronomere show time, response user to the rectangular block obtained described in arbitrary pin Ctrl simultaneously mouse to bottom roller operational order, and to the rectangular block obtained described in arbitrary pin Ctrl simultaneously mouse operate to bottom roller, then described current time frame is that chronomere shows with January, and shows the turnaround plan of current month and the rectangular block of correspondence thereof; Or
Response user to the rectangular block obtained described in arbitrary pin Ctrl simultaneously mouse to upper roller operational order, and to the rectangular block obtained described in arbitrary pin Ctrl simultaneously mouse operate to upper roller, then described current time frame with 1 year for chronomere's display, and the display turnaround plan of current year and the rectangular block of correspondence thereof.
Wherein, described in the current time frame of described display, response user to other assigned operation instruction of the rectangular block obtained described in arbitrary, and is specially the step that the rectangular block obtained described in arbitrary carries out other assigned operation command operating described:
When described current time frame showed for chronomere with 1 year, response user to the rectangular block obtained described in arbitrary pin Ctrl simultaneously mouse to bottom roller operational order, and to the rectangular block obtained described in arbitrary pin Ctrl simultaneously mouse operate to bottom roller, then described current time frame is that chronomere shows with January, and shows the turnaround plan of current month and the rectangular block of correspondence thereof.
Wherein, described in the current time frame of described display, response user to other assigned operation instruction of the rectangular block obtained described in arbitrary, and is specially the step that the rectangular block obtained described in arbitrary carries out other assigned operation command operating described:
When described current time frame with January be chronomere show time, response user to the rectangular block obtained described in arbitrary pin Ctrl simultaneously mouse to upper roller operational order, and to the rectangular block obtained described in arbitrary pin Ctrl simultaneously mouse operate to upper roller, then described current time frame is that chronomere shows with the first quarter, and shows the turnaround plan in current season and the rectangular block of correspondence thereof.
The embodiment of the present invention additionally provides a kind of system of maintenance scheduling for power systems presentation graphics, and described system comprises turnaround plan content displaying district, programming time viewing area and presentation graphics operational zone; Wherein,
Described programming time viewing area, for showing the current time frame of required layout turnaround plan, wherein, described time range comprise with 1 year be chronomere, with the first quarter be chronomere and with January for chronomere;
Described presentation graphics operational zone, for in the current time frame of described display, obtain the corresponding rectangular block formed by the current time value of each turnaround plan and fixing duration thereof, and response user pulls instruction to the rectangular block obtained described in arbitrary, and the rectangular block obtained described in arbitrary is pulled, determine each rectangular block pull after time value; Wherein, described time value comprises initial time and end time, and the described fixing duration is the difference between described end time and described initial time;
Described turnaround plan content displaying district, for the time value after pulling according to described each rectangular block determined, temporally mode is resequenced each turnaround plan content showing.
Wherein, described system also comprises multiple decision-making assistant information figure show area, described multiple decision-making assistant information figure show area pulls multiple decision-making assistant information figures of rear correspondence for showing arbitrary rectangular block, when detect the time value after a rectangular block pulls exceed preset plan rules of arrangement time, then show collision alert information between described multiple decision-making assistant information figure.
Implement the embodiment of the present invention, there is following beneficial effect:
1, in embodiments of the present invention, layout process due to whole turnaround plan all adopts graphical operation and carries out graphical representation, rectangular block is used to substitute each turnaround plan, will automatic editing turnaround plan time and display as long as pull rectangular block easily, and adopt Ctrl to add the mode of operation of mouse roller at rectangular block place, realize year, the switching of turnaround plan and display between season and the moon, thus the labour intensity of plan layout personnel can be alleviated and increase work efficiency, realize time saving and energy saving object;
2, in embodiments of the present invention, all automatically can detect under default plan rules of arrangement owing to often pulling a rectangular block, until the rectangular block pulled meets preset plan rules of arrangement, thus can reasonable arrangement turnaround plan, reduce the risk that turnaround plan arranges mistake.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, the accompanying drawing obtaining other according to these accompanying drawings still belongs to category of the present invention.
The process flow diagram of the method for the maintenance scheduling for power systems presentation graphics that Fig. 1 provides for the embodiment of the present invention;
The structural representation of the system of the maintenance scheduling for power systems presentation graphics that Fig. 2 provides for the embodiment of the present invention;
In the systematic difference scene of the maintenance scheduling for power systems presentation graphics that Fig. 3 a provides for the embodiment of the present invention rectangular block pull before structural representation;
Fig. 3 b be in Fig. 3 a rectangular block pull after structural representation.
Embodiment
For making the object, technical solutions and advantages of the present invention clearly, below in conjunction with accompanying drawing, the present invention is described in further detail.
As shown in Figure 1, be the method for a kind of maintenance scheduling for power systems presentation graphics that the embodiment of the present invention provides, described method comprises:
The current time frame of step S101, the required layout turnaround plan of display, wherein, described time range comprise with 1 year be chronomere, with the first quarter be chronomere and with January for chronomere;
In the embodiment of the present invention, turnaround plan layout work has very strong business characteristic: one, plan the period ratio of layout more fixing, such as once does 1 year, the plan in a season or month; Two, the duration of turnaround plan is determined by service work content, and plan layout personnel can revise initial time and the end time of plan together when revising planned time, and generally can not revise the duration of plan, and therefore the duration of each turnaround plan is fixing; Three, plan layout personnel when arrangement one is planned, need to consider this plan and other relations of planning simultaneously, and this plan impact on corporate plan, plan rules of arrangement therefore can be preset before layout.
Step S102, in the current time frame of described display, obtain the corresponding rectangular block formed by the current time value of each turnaround plan and fixing duration thereof, and response user pulls instruction to the rectangular block obtained described in arbitrary, and the rectangular block obtained described in arbitrary is pulled, determine each rectangular block pull after time value; Wherein, described time value comprises initial time and end time, and the described fixing duration is the difference between described end time and described initial time;
Be specially, in current time frame, as the first quarter, in this season, each turnaround plan all can a corresponding rectangular block, therefore corresponding J the rectangular block of J bar turnaround plan, each rectangular block is before pulling, its left margin corresponds to the current initial time of corresponding turnaround plan, right margin corresponds to the current end time of corresponding turnaround plan, length corresponds to the fixing duration of corresponding turnaround plan, plan layout personnel can pass through pulling mode, because the duration is fixed, making pulling rectangular block in process is that the position at right boundary place changes, namely after pulling, the initial time of this rectangular block and end time change, when pulling after position determines, obtain initial time and the end time of this rectangular block after pulling.As an example, L article of corresponding L the rectangular block of turnaround plan, the initial time obtaining M article of turnaround plan is a1 day in March, end time is a2 day in March, after pulling, obtaining the initial time after pulling is a3 day in March, and the end time is a4 day in March; Difference wherein between a2 and a1 equals the difference between a4 and a3, and namely the duration is fixed.
Step S103, pull according to described each rectangular block determined after time value, temporally mode is resequenced each turnaround plan content showing.
Detailed process is, with the initial time positive sequence of turnaround plan in time value or each turnaround plan of inverted order mode sequencing display.As an example, aforesaid L article of turnaround plan, after pulling, because initial time is a3 day in March by a1 diurnal variation in March, therefore according to the positive sequential mode of initial time, aforesaid M article of turnaround plan may layout be L+K article of turnaround plan.
Be understandable that, compared to the mode adopting Conventional temporal control amendment planned time, the mouse clicking operation more than 7 times can be reduced to 1 mouse drag operation by this method.
For the ease of management and decision, each rectangular block is pulling after position determines, multiple decision-making assistant informations of capital its correspondence of patterned Dynamic Announce, and when after rectangular block pulls, the turnaround plan time value of its correspondence exceeds default plan rules of arrangement, collision alert information is shown between multiple decision-making assistant information figure, this turnaround plan of prompting plan layout personnel violates plan rules of arrangement, therefore, described method comprises further: show multiple decision-making assistant information figures that arbitrary rectangular block pulls rear correspondence, when detect the time value after a rectangular block pulls exceed preset plan rules of arrangement time, then show collision alert information between multiple decision-making assistant information figure.Certainly, for exceeding the rectangular block presetting plan rules of arrangement, it can be used as current rectangle block, further response user pulls instruction to current rectangle block, and current rectangle block is pulled, until determine current rectangle block pull after time value do not exceed preset plan rules of arrangement, complete the turnaround plan layout corresponding to this rectangular block.
Except changing the turnaround plan time by pulling of mouse, can also be matched with keyboard by mouse, realize the change of turnaround plan layout actual range, therefore, in the current time frame of display, user is to other assigned operation instruction of arbitrary rectangular block in response, and carries out other assigned operation command operating to arbitrary rectangular block; Wherein, other operational order comprise pin Ctrl simultaneously mouse to bottom roller operation and pin Ctrl simultaneously mouse operate to upper roller.
Comprise with 1 year for chronomere according to time range, take the first quarter as chronomere and take January as three kinds of modes of chronomere's display, therefore the situation realizing the change of turnaround plan layout actual range is specially: first kind of way, current time frame is that chronomere is when showing with the first quarter, response user to arbitrary rectangular block pin Ctrl simultaneously mouse to bottom roller operational order, and to arbitrary rectangular block pin Ctrl simultaneously mouse operate to bottom roller, then current time frame is that chronomere shows with January, and show the turnaround plan of current month and the rectangular block of correspondence thereof, or
Response user to arbitrary rectangular block pin Ctrl simultaneously mouse to upper roller operational order, and to arbitrary rectangular block pin Ctrl simultaneously mouse operate to upper roller, then current time frame with 1 year for chronomere's display, and the display turnaround plan of current year and the rectangular block of correspondence thereof.
The second way, current time frame with 1 year for chronomere show time, response user to arbitrary rectangular block pin Ctrl simultaneously mouse to bottom roller operational order, and to arbitrary rectangular block pin Ctrl simultaneously mouse operate to bottom roller, then current time frame is that chronomere shows with January, and shows the turnaround plan of current month and the rectangular block of correspondence thereof.
The third mode, current time frame are that chronomere is when showing with January, response user to arbitrary rectangular block pin Ctrl simultaneously mouse to upper roller operational order, and to arbitrary rectangular block pin Ctrl simultaneously mouse operate to upper roller, then current time frame is that chronomere shows with the first quarter, and shows the turnaround plan in current season and the rectangular block of correspondence thereof.
Should be noted that, by the method that mouse matches with keyboard, the amendment of turnaround plan programming time scope only needs 1 mouse roller operation, and tradition carrys out the mode of select planning programming time scope by time control, needs the mouse clicking operation being no less than 5 times.
As shown in Figure 2, the embodiment of the present invention also provides a kind of system of maintenance scheduling for power systems presentation graphics, and described system comprises turnaround plan content displaying district 210, programming time viewing area 220 and presentation graphics operational zone 230; Wherein,
Described programming time viewing area 210, for showing the current time frame of required layout turnaround plan, wherein, described time range comprise with 1 year be chronomere, with the first quarter be chronomere and with January for chronomere;
Described presentation graphics operational zone 220, for in the current time frame of described display, obtain the corresponding rectangular block formed by the current time value of each turnaround plan and fixing duration thereof, and response user pulls instruction to the rectangular block obtained described in arbitrary, and the rectangular block obtained described in arbitrary is pulled, determine each rectangular block pull after time value; Wherein, described time value comprises initial time and end time, and the described fixing duration is the difference between described end time and described initial time;
Described turnaround plan content displaying district 230, for the time value after pulling according to described each rectangular block determined, temporally mode is resequenced each turnaround plan content showing.
Wherein, this system also comprises multiple decision-making assistant information figure show area 240, described multiple decision-making assistant information figure show area 240 pulls multiple decision-making assistant information figures of rear correspondence for showing arbitrary rectangular block, when detect the time value after a rectangular block pulls exceed preset plan rules of arrangement time, then show collision alert information between described multiple decision-making assistant information figure.
As best shown in figures 3 a and 3b, the systematic difference scene of the maintenance scheduling for power systems presentation graphics of the embodiment of the present invention is further illustrated:
The first step, open presentation graphics instrument, the same screen of display device shows turnaround plan content displaying district A, programming time viewing area B1, presentation graphics operational zone B2 and multiple decision-making assistant information figure show area C1 to Cn;
Second step, suppose that the next year turnaround plan needing layout has N bar, then B1 district time range is 1 year (the 1-12 month), and A district is corresponding lists N bar turnaround plan content, and in B2 district, correspondence lists N number of rectangular block.The position of rectangular block and length were determined with the application end time by the application start time of turnaround plan, namely the time of rectangular block left margin corresponding to B2 district is the application start time of this turnaround plan, and the time of rectangular block right margin corresponding to B2 district is application end time of turnaround plan;
The turnaround plan (supposing there is M article) of the 3rd step, if desired first consideration layout first quarter, then mouse pointer can be placed on the position of the B2 district 1-3 month, (should be noted that, realize judging that now mouse pointer is placed on the position of the B2 district 1-3 month by the arbitrary rectangular block in the 1-3 month), operated to upper roller by Ctrl+ mouse, then the time range in B1 district is changed to 3 months of the first quarter, A district is corresponding lists M bar turnaround plan content, and B2 district correspondence lists M rectangular block (not shown).The position of rectangular block changes along with the change of B1 district time value, and the length of rectangular block also can increase along with the refinement of B1 district time scale, and namely all rectangular blocks realize the convergent-divergent of equal proportion on full-sized basis.In like manner, when needing the turnaround plan of the layout turnaround plan of month or a year, only need to be operated by Ctrl+ mouse roller, the content in A, B1, B2 district can change accordingly.
4th step, when needing the application time adjusting certain turnaround plan, then available mouse pulls should the rectangular block xxxxx turnaround plan of B2 district grey rectangle block and corresponding A 1 district (in as Fig. 3 a) of turnaround plan in B2 district, drag it to suitable position, change into time corresponding to reposition (the xxxxx turnaround plan as B2 district grey rectangle block and corresponding A 1 district in Fig. 3 b) by start time of this turnaround plan and end time.After rectangular block is dragged to new position, the decision-making assistant information figure of right side C1-Cn can upgrade at once.Violate a plan rules of arrangement after such as certain turnaround plan being dragged to reposition, then the figure of this rule of right side reflection will show collision alert immediately, and this turnaround plan of prompting plan layout personnel violates plan rules of arrangement.
5th step, so repeatedly second step are to the 4th step, and all turnaround plans are all dragged to suitable position by plan layout personnel in presentation graphics instrument of the present invention, namely complete turnaround plan layout work.
Implement the embodiment of the present invention, there is following beneficial effect:
1, in embodiments of the present invention, layout process due to whole turnaround plan all adopts graphical operation and carries out graphical representation, rectangular block is used to substitute each turnaround plan, will automatic editing turnaround plan time and display as long as pull rectangular block easily, and adopt Ctrl to add the mode of operation of mouse roller at rectangular block place, realize year, the switching of turnaround plan and display between season and the moon, thus the labour intensity of plan layout personnel can be alleviated and increase work efficiency, realize time saving and energy saving object;
2, in embodiments of the present invention, all automatically can detect under default plan rules of arrangement owing to often pulling a rectangular block, until the rectangular block pulled meets preset plan rules of arrangement, thus can reasonable arrangement turnaround plan, reduce the risk that turnaround plan arranges mistake.
It should be noted that in said system embodiment, each included system unit is carry out dividing according to function logic, but is not limited to above-mentioned division, as long as can realize corresponding function; In addition, the concrete title of each functional unit, also just for the ease of mutual differentiation, is not limited to protection scope of the present invention.
One of ordinary skill in the art will appreciate that all or part of step realized in above-described embodiment method is that the hardware that can carry out instruction relevant by program has come, described program can be stored in a computer read/write memory medium, described storage medium, as ROM/RAM, disk, CD etc.
Above disclosedly be only a kind of preferred embodiment of the present invention, certainly can not limit the interest field of the present invention with this, therefore according to the equivalent variations that the claims in the present invention are done, still belong to the scope that the present invention is contained.

Claims (10)

1. a method for maintenance scheduling for power systems presentation graphics, is characterized in that, described method comprises:
The current time frame of the required layout turnaround plan of display, wherein, described time range comprise with 1 year be chronomere, with the first quarter be chronomere and with January for chronomere;
In the current time frame of described display, obtain the corresponding rectangular block formed by the current time value of each turnaround plan and fixing duration thereof, and response user pulls instruction to the rectangular block obtained described in arbitrary, and the rectangular block obtained described in arbitrary is pulled, determine each rectangular block pull after time value; Wherein, described time value comprises initial time and end time, and the described fixing duration is the difference between described end time and described initial time;
Time value after pulling according to described each rectangular block determined, temporally mode is resequenced each turnaround plan showing.
2. the method for claim 1, is characterized in that, described method comprises further:
Show multiple decision-making assistant information figures that arbitrary rectangular block pulls rear correspondence, when detect the time value after a rectangular block pulls exceed preset plan rules of arrangement time, then show collision alert information between described multiple decision-making assistant information figure.
3. method as claimed in claim 2, it is characterized in that, described method comprises further:
Using described exceed preset plan rules of arrangement rectangular block as current rectangle block, further response user pulls instruction to described current rectangle block, and described current rectangle block is pulled, until determine described current rectangle block pull after time value do not exceed described default plan rules of arrangement.
4. the method for claim 1, is characterized in that, described temporally mode resequence each turnaround plan and display step be specially:
With the initial time positive sequence of turnaround plan in described time value or each turnaround plan of inverted order mode sequencing display.
5. the method for claim 1, is characterized in that, described method comprises further:
In the current time frame of described display, response user to other assigned operation instruction of the rectangular block obtained described in arbitrary, and carries out other assigned operation command operating described to the rectangular block obtained described in arbitrary; Wherein, other operational order described comprise pin Ctrl simultaneously mouse to bottom roller operation and pin Ctrl simultaneously mouse operate to upper roller.
6. method as claimed in claim 5, it is characterized in that, described in the current time frame of described display, response user to other assigned operation instruction of the rectangular block obtained described in arbitrary, and is specially the step that the rectangular block obtained described in arbitrary carries out other assigned operation command operating described:
When described current time frame with the first quarter be chronomere show time, response user to the rectangular block obtained described in arbitrary pin Ctrl simultaneously mouse to bottom roller operational order, and to the rectangular block obtained described in arbitrary pin Ctrl simultaneously mouse operate to bottom roller, then described current time frame is that chronomere shows with January, and shows the turnaround plan of current month and the rectangular block of correspondence thereof; Or
Response user to the rectangular block obtained described in arbitrary pin Ctrl simultaneously mouse to upper roller operational order, and to the rectangular block obtained described in arbitrary pin Ctrl simultaneously mouse operate to upper roller, then described current time frame with 1 year for chronomere's display, and the display turnaround plan of current year and the rectangular block of correspondence thereof.
7. method as claimed in claim 5, it is characterized in that, described in the current time frame of described display, response user to other assigned operation instruction of the rectangular block obtained described in arbitrary, and is specially the step that the rectangular block obtained described in arbitrary carries out other assigned operation command operating described:
When described current time frame showed for chronomere with 1 year, response user to the rectangular block obtained described in arbitrary pin Ctrl simultaneously mouse to bottom roller operational order, and to the rectangular block obtained described in arbitrary pin Ctrl simultaneously mouse operate to bottom roller, then described current time frame is that chronomere shows with January, and shows the turnaround plan of current month and the rectangular block of correspondence thereof.
8. method as claimed in claim 5, it is characterized in that, described in the current time frame of described display, response user to other assigned operation instruction of the rectangular block obtained described in arbitrary, and is specially the step that the rectangular block obtained described in arbitrary carries out other assigned operation command operating described:
When described current time frame with January be chronomere show time, response user to the rectangular block obtained described in arbitrary pin Ctrl simultaneously mouse to upper roller operational order, and to the rectangular block obtained described in arbitrary pin Ctrl simultaneously mouse operate to upper roller, then described current time frame is that chronomere shows with the first quarter, and shows the turnaround plan in current season and the rectangular block of correspondence thereof.
9. a system for maintenance scheduling for power systems presentation graphics, is characterized in that, described system comprises turnaround plan content displaying district, programming time viewing area and presentation graphics operational zone; Wherein,
Described programming time viewing area, for showing the current time frame of required layout turnaround plan, wherein, described time range comprise with 1 year be chronomere, with the first quarter be chronomere and with January for chronomere;
Described presentation graphics operational zone, for in the current time frame of described display, obtain the corresponding rectangular block formed by the current time value of each turnaround plan and fixing duration thereof, and response user pulls instruction to the rectangular block obtained described in arbitrary, and the rectangular block obtained described in arbitrary is pulled, determine each rectangular block pull after time value; Wherein, described time value comprises initial time and end time, and the described fixing duration is the difference between described end time and described initial time;
Described turnaround plan content displaying district, for the time value after pulling according to described each rectangular block determined, temporally mode is resequenced each turnaround plan content showing.
10. system as claimed in claim 9, it is characterized in that, described system also comprises multiple decision-making assistant information figure show area, described multiple decision-making assistant information figure show area pulls multiple decision-making assistant information figures of rear correspondence for showing arbitrary rectangular block, when detect the time value after a rectangular block pulls exceed preset plan rules of arrangement time, then show collision alert information between described multiple decision-making assistant information figure.
CN201410487135.5A 2014-09-23 2014-09-23 Power grid maintenance schedule graph layout method and system Pending CN104240033A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410487135.5A CN104240033A (en) 2014-09-23 2014-09-23 Power grid maintenance schedule graph layout method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410487135.5A CN104240033A (en) 2014-09-23 2014-09-23 Power grid maintenance schedule graph layout method and system

Publications (1)

Publication Number Publication Date
CN104240033A true CN104240033A (en) 2014-12-24

Family

ID=52228054

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410487135.5A Pending CN104240033A (en) 2014-09-23 2014-09-23 Power grid maintenance schedule graph layout method and system

Country Status (1)

Country Link
CN (1) CN104240033A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105069516A (en) * 2015-06-19 2015-11-18 国家电网公司 Electric transmission and transformation equipment monthly maintenance schedule coordination method based on integrated risk
CN107887006A (en) * 2017-10-27 2018-04-06 上海京颐科技股份有限公司 Rehabilitation programme based reminding method and device, storage medium, server
CN109902891A (en) * 2017-12-07 2019-06-18 英业达科技有限公司 The school timetable of immediate feedback adjusts system and method
CN112149948A (en) * 2020-07-30 2020-12-29 中国南方电网有限责任公司 Integrated management method and equipment for whole-network maintenance
CN112788386A (en) * 2019-11-06 2021-05-11 西安诺瓦星云科技股份有限公司 Program scheduling generation method and device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101813936A (en) * 2009-02-25 2010-08-25 西门子公司 Be used to dispatch the method and system of manufacture process
CN102479359A (en) * 2010-11-27 2012-05-30 甘肃省电力公司兰州供电公司 Power grid overhauling plan compilation method based on graphic operations
CN103065273A (en) * 2012-12-21 2013-04-24 苏州海客科技有限公司 Travel itinerary displaying method based on time level
US20140156114A1 (en) * 2012-11-30 2014-06-05 Thales Method for displaying an aeronautical flight plan comprising a step of flight data configuration

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101813936A (en) * 2009-02-25 2010-08-25 西门子公司 Be used to dispatch the method and system of manufacture process
CN102479359A (en) * 2010-11-27 2012-05-30 甘肃省电力公司兰州供电公司 Power grid overhauling plan compilation method based on graphic operations
US20140156114A1 (en) * 2012-11-30 2014-06-05 Thales Method for displaying an aeronautical flight plan comprising a step of flight data configuration
CN103065273A (en) * 2012-12-21 2013-04-24 苏州海客科技有限公司 Travel itinerary displaying method based on time level

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105069516A (en) * 2015-06-19 2015-11-18 国家电网公司 Electric transmission and transformation equipment monthly maintenance schedule coordination method based on integrated risk
CN105069516B (en) * 2015-06-19 2018-09-14 国家电网公司 The monthly repair schedule coordination approach of power transmission and transforming equipment based on integrated risk
CN107887006A (en) * 2017-10-27 2018-04-06 上海京颐科技股份有限公司 Rehabilitation programme based reminding method and device, storage medium, server
CN109902891A (en) * 2017-12-07 2019-06-18 英业达科技有限公司 The school timetable of immediate feedback adjusts system and method
CN112788386A (en) * 2019-11-06 2021-05-11 西安诺瓦星云科技股份有限公司 Program scheduling generation method and device
CN112788386B (en) * 2019-11-06 2023-12-05 西安诺瓦星云科技股份有限公司 Program schedule generation method and device
CN112149948A (en) * 2020-07-30 2020-12-29 中国南方电网有限责任公司 Integrated management method and equipment for whole-network maintenance

Similar Documents

Publication Publication Date Title
US11422687B2 (en) Building system with a building graph
US10527306B2 (en) Building energy management system with energy analytics
CN104240033A (en) Power grid maintenance schedule graph layout method and system
US11268996B2 (en) Building energy management system with virtual audit metrics
US11770020B2 (en) Building system with timeseries synchronization
CN103020421B (en) energy dashboard
WO2017127373A1 (en) Building energy management system with energy analytics and ad hoc dashboard
Chou et al. Early-warning application for real-time detection of energy consumption anomalies in buildings
Pardo-García et al. Sustainable and Resource Efficient Cities platform–SureCity holistic simulation and optimization for smart cities
CN113076101A (en) Management platform based on visual programming and use method
US20140143724A1 (en) Manipulating Timelines
Mastelic et al. Energy management in a public building: A case study co-designing the building energy management system
US11947785B2 (en) Building system with a building graph
CN108279962A (en) A kind of method and device creating visualization data display interface
Bernardo et al. Resource-efficient nondomestic buildings: Intertwining behaviour and technology
CN112785249A (en) Schedule management method and system based on VBA
JP7194753B2 (en) HEAT SOURCE SYSTEM MANAGEMENT DEVICE, HEAT SOURCE SYSTEM MANAGEMENT METHOD
Evins et al. Visual data exploration in sustainable building design
Sahann et al. OCP-Operational Curricular Planning: A visual decision support system for planning teaching resources at universities
Alblooshi Visualization & Automation of Shams Dubai Report
Jaffery Envisioning a building information model (BIM) integrated building performance visualization (iPViz) interface
KR20120133421A (en) Total exhibit operating system
Dicken From hard desk to soft desk-the changing operator interface
Mangisi Signed this. day of 2014.
KR20090022849A (en) Control device for an air conditioning device and the method for controlling the air conditioning device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20141224