CN104237486B - 一种封闭钻孔采动破坏模拟试验装置 - Google Patents

一种封闭钻孔采动破坏模拟试验装置 Download PDF

Info

Publication number
CN104237486B
CN104237486B CN201410529036.9A CN201410529036A CN104237486B CN 104237486 B CN104237486 B CN 104237486B CN 201410529036 A CN201410529036 A CN 201410529036A CN 104237486 B CN104237486 B CN 104237486B
Authority
CN
China
Prior art keywords
boring
stress
data acquisition
plate
mining failure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410529036.9A
Other languages
English (en)
Other versions
CN104237486A (zh
Inventor
魏久传
肖乐乐
牛超
尹会永
郭建斌
谢道雷
张伟杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201410529036.9A priority Critical patent/CN104237486B/zh
Publication of CN104237486A publication Critical patent/CN104237486A/zh
Application granted granted Critical
Publication of CN104237486B publication Critical patent/CN104237486B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明属于封闭钻孔采动破坏模拟试验设备技术领域,涉及一种封闭钻孔采动破坏模拟试验装置,模型架上竖向设置有侧向加载装置,每个侧向加载装置均与液压动力控制系统连通;模型架的内侧设置有独立加压隔板,整个装置的中间钻孔内设置有钻孔监视传感器,钻孔的顶部孔口侧壁上设有顶部套管,钻孔的内侧壁上安装制有测量电极应力应变传感片,整个装置的顶部对称设有加压板,加压板的上端安装制有顶部加载装置,整个装置内部制有多个应力监测点,计算机控制处理系统分别与超高密度电法测量系统、应力数据采集板、成像数据采集板和液压动力控制系统电连接;其结构简单,便于维护和安装,原理科学,操作方便,采集的数据精确。

Description

一种封闭钻孔采动破坏模拟试验装置
技术领域:
本发明属于封闭钻孔采动破坏模拟试验设备技术领域,涉及一种封闭钻孔采动破坏模拟试验装置,对封闭钻孔在采动响应下的破坏机理进行研究。
背景技术:
随着煤矿开采深度不断加大,开采方式的变化,煤矿水害产生的条件以及水害产生的方式都发生着较大的变化,其中,封闭不良钻孔是诱发煤矿水害发生的一个重要因素,是威胁煤矿安全生产的隐患。结合国内外研究现状,目前并没有对钻孔封闭机理和封闭钻孔在采动影响下破坏失稳造成次生导水通道等问题进行进一步研究。因此,寻求一种封闭钻孔采动破坏模拟试验装置,用以观测钻孔采动破坏失稳裂隙发育,并对钻孔封闭使用相似材料模拟进行岩石力学测试,结合数值模拟研究封闭钻孔采动破坏失稳机理具有创新意义,并对煤矿生产中遇到的封闭钻孔突水问题具有指导意义。
发明内容:
本发明的目的在于克服现有技术存在的缺点,寻求设计提供一种封闭钻孔采动破坏模拟试验装置,开发钻孔封闭注浆试验平台、封闭钻孔在采动响应下的破坏机理研究的模拟试验平台。
为了实现上述目的,本发明的主体结构包括独立加压隔板、加压板、钻孔顶板套管、顶部加载装置、侧向加载装置、钻孔成像检测传感器、测量电极应力应变传感器、应力监测点、液压管路、超高密度电法测量系统、应力数据采集板、成像数据采集板、液压动力控制系统、计算机控制处理系统和模型架;封闭钻孔采动破坏模拟试验装置的左右两侧对称设有模型架,模型架为固定模型,在对模型加载侧向和垂直压力时起到支撑作用;模型架上竖向分布设置有3-7个侧向加载装置,侧向加载装置工作时作为模拟横向上的构造应力和地应力的分量对钻孔挤压;每个侧向加载装置均通过液压管路与液压动力控制系统连通,液压动力控制系统为侧向加载装置提供动力源;模型架的内侧设置有独立加压隔板,独立加压隔壁模拟不同地层所受的构造应力;整个装置的中间钻孔内设置有钻孔监视传感器,钻孔监视传感器由微型摄像头和超声波探测装置相见组成,将钻孔破坏造成的裂隙发育情况用摄影成像的方式观测,微裂隙则使用超声波探测,将钻孔破坏裂隙形成和发育进行综合监测;钻孔的顶部孔口侧壁上设有加固孔口的顶部套管,防治在早期试验阶段钻孔坍塌,顶部套管的长度为5~10cm;钻孔的内侧壁上竖向安装制有间距为10cm的10~12个测量电极应力应变传感片,电极应力应变传感片作为电极利用超高密度电法测量系统探测钻孔围岩在采动破坏过程中的电性特征分布,同时测量钻孔壁应力分布和监测钻孔壁应变;测量电极应力应变传感片通过钻孔监视传感器分别与应力数据采集板、成像数据采集板和超高密度电法测量系统电信息连接;应力数据采集板采集应力数据,成像数据采集板为钻孔监视传感器采集到的摄像及超声波数据,超高密度电法测量系统采集钻孔壁的电阻率数据;封闭钻孔采动破坏模拟试验装置的顶部对称设有加压板,加压板的上端安装制有顶部加载装置,顶部加载装置模拟垂直地应力,垂直地应力的大小与地层埋深有关;封闭钻孔采动破坏模拟试验装置内部同一深度水平方向上均匀分布制有多个应力监测点,采集不同深度地层上的应力分布特征;每个应力监测点均与由应力数据采集板和成像数据采集板组合构成的数据采集系统连接;计算机控制处理系统分别与超高密度电法测量系统、应力数据采集板、成像数据采集板和液压动力控制系统电连接。
本发明与现有技术相比,通过封闭钻孔采动破坏模拟试验装置,对封闭钻孔在采动条件下的破坏失稳水害问题进行深入的研究,解决矿井目前遇到的封闭钻孔煤柱留设、封闭不良钻孔突水、封闭钻孔采动破坏突水等难题,解放受封闭钻孔水害威胁的煤炭资源储量并对优化布置采掘系统等做出指导;其结构简单,便于维护和安装,原理科学,操作方便,采集的数据精确,对煤矿生产中遇到的封闭钻孔突水问题具有指导意义。
附图说明:
图1为本发明的主体结构原理示意图。
具体实施方式:
下面通过实施例并结合附图对本发明作进一步说明。
实施例:
本实施例的主体结构包括独立加压隔板1、加压板2、钻孔顶板套管3、顶部加载装置4、侧向加载装置5、钻孔成像检测传感器6、测量电极应力应变传感器7、应力监测点8、液压管路9、超高密度电法测量系统10、应力数据采集板11、成像数据采集板12、液压动力控制系统13、计算机控制处理系统14和模型架15;封闭钻孔采动破坏模拟试验装置的左右两侧对称设有模型架15,模型架15为固定模型,在对模型加载侧向和垂直压力时起到支撑作用;模型架15上竖向分布设置有3-7个侧向加载装置5,侧向加载装置5工作时作为模拟横向上的构造应力和地应力的分量对钻孔挤压;每个侧向加载装置5均通过液压管路9与液压动力控制系统13连通,液压动力控制系统13为侧向加载装置5提供动力源;模型架15的内侧设置有独立加压隔板1,独立加压隔壁1模拟不同地层所受的构造应力;整个装置的中间钻孔内设置有钻孔监视传感器6,钻孔监视传感器6由微型摄像头和超声波探测装置相见组成,将钻孔破坏造成的裂隙发育情况用摄影成像的方式观测,微裂隙则使用超声波探测,将钻孔破坏裂隙形成和发育进行综合监测;钻孔的顶部孔口侧壁上设有加固孔口的顶部套管3,防治在早期试验阶段钻孔坍塌,顶部套管3的长度为5~10cm;钻孔的内侧壁上竖向安装制有间距为10cm的10~12个测量电极应力应变传感片7,电极应力应变传感片7作为电极利用超高密度电法测量系统10探测钻孔围岩在采动破坏过程中的电性特征分布,同时测量钻孔壁应力分布和监测钻孔壁应变;测量电极应力应变传感片7通过钻孔监视传感器6分别与应力数据采集板11、成像数据采集板12和超高密度电法测量系统10电信息连接,应力数据采集板11采集应力数据,成像数据采集板12为钻孔监视传感器6采集到的摄像及超声波数据,超高密度电法测量系统10采集钻孔壁的电阻率数据;封闭钻孔采动破坏模拟试验装置的顶部对称设有加压板2,加压板2的上端安装制有顶部加载装置4,顶部加载装置4模拟垂直地应力,垂直地应力的大小与地层埋深有关;封闭钻孔采动破坏模拟试验装置内部同一深度水平方向上均匀分布制有多个应力监测点8,采集不同深度地层上的应力分布特征;每个应力监测点8均与由应力数据采集板11和成像数据采集板12组合构成的数据采集系统连接;计算机控制处理系统14分别与超高密度电法测量系统10、应力数据采集板11、成像数据采集板12和液压动力控制系统13电连接。

Claims (1)

1.一种封闭钻孔采动破坏模拟试验装置,其特征在于主体结构包括独立加压隔板、加压板、钻孔顶板套管、顶部加载装置、侧向加载装置、钻孔成像检测传感器、测量电极应力应变传感器、应力监测点、液压管路、超高密度电法测量系统、应力数据采集板、成像数据采集板、液压动力控制系统、计算机控制处理系统和模型架;封闭钻孔采动破坏模拟试验装置的左右两侧对称设有模型架,模型架为固定模型,在对模型加载侧向和垂直压力时起到支撑作用;模型架上竖向分布设置有3-7个侧向加载装置,侧向加载装置工作时作为模拟横向上的构造应力和地应力的分量对钻孔挤压;每个侧向加载装置均通过液压管路与液压动力控制系统连通,液压动力控制系统为侧向加载装置提供动力源;模型架的内侧设置有独立加压隔板,独立加压隔板模拟不同地层所受的构造应力;整个装置的中间钻孔内设置有钻孔监视传感器,钻孔监视传感器由微型摄像头和超声波探测装置相见组成,将钻孔破坏造成的裂隙发育情况用摄影成像的方式观测,微裂隙则使用超声波探测,将钻孔破坏裂隙形成和发育进行综合监测;钻孔的顶部孔口侧壁上设有加固孔口的钻孔顶板套管,钻孔顶板套管的长度为5~10cm;钻孔的内侧壁上竖向安装制有间距为10cm的10~12个测量电极应力应变传感器,测量电极应力应变传感器作为电极利用超高密度电法测量系统探测钻孔围岩在采动破坏过程中的电性特征分布,同时测量钻孔壁应力分布和监测钻孔壁应变;测量电极应力应变传感器通过钻孔监视传感器分别与应力数据采集板、成像数据采集板和超高密度电法测量系统电信息连接,应力数据采集板采集应力数据,成像数据采集板采集钻孔监视传感器采集到的摄像及超声波数据,超高密度电法测量系统采集钻孔壁的电阻率数据;封闭钻孔采动破坏模拟试验装置的顶部对称设有加压板,加压板的上端安装制有顶部加载装置,顶部加载装置模拟垂直地应力,垂直地应力的大小与地层埋深有关;封闭钻孔采动破坏模拟试验装置内部同一深度水平方向上均匀分布制有多个应力监测点,采集不同深度地层上的应力分布特征;每个应力监测点均与由应力数据采集板和成像数据采集板组合构成的数据采集系统连接;计算机控制处理系统分别与超高密度电法测量系统、应力数据采集板、成像数据采集板和液压动力控制系统电连接。
CN201410529036.9A 2014-10-10 2014-10-10 一种封闭钻孔采动破坏模拟试验装置 Expired - Fee Related CN104237486B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410529036.9A CN104237486B (zh) 2014-10-10 2014-10-10 一种封闭钻孔采动破坏模拟试验装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410529036.9A CN104237486B (zh) 2014-10-10 2014-10-10 一种封闭钻孔采动破坏模拟试验装置

Publications (2)

Publication Number Publication Date
CN104237486A CN104237486A (zh) 2014-12-24
CN104237486B true CN104237486B (zh) 2016-08-17

Family

ID=52225977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410529036.9A Expired - Fee Related CN104237486B (zh) 2014-10-10 2014-10-10 一种封闭钻孔采动破坏模拟试验装置

Country Status (1)

Country Link
CN (1) CN104237486B (zh)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104729915B (zh) * 2015-01-26 2017-06-30 北京市市政工程研究院 一种城市地铁区间道路松散及脱空精细探查的装置及方法
CN104730585B (zh) * 2015-03-26 2016-08-24 山东科技大学 一种采动工作面底板破坏深度实时监测方法
CN104792616B (zh) * 2015-04-03 2017-08-25 河南理工大学 一种瓦斯抽采钻孔孔径变化规律模拟装置及模拟方法
CN106154350B (zh) * 2016-06-16 2018-01-19 山东大学 基于孔中摄像与单孔声波的工程综合测孔系统与方法
CN108625772A (zh) * 2017-03-24 2018-10-09 河南理工大学 一种煤矿巷道底板锚固孔钻进模拟实验方法
CN109882183B (zh) * 2019-02-28 2020-12-04 西安科技大学 一种富水松散破碎煤岩体注浆固结实验装置及效果评价方法
CN110878691A (zh) * 2019-11-13 2020-03-13 中国海洋石油集团有限公司 一种海洋完井产气管柱力学性能实验装置及实验方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101509852A (zh) * 2009-03-18 2009-08-19 中国矿业大学 一种获取厚壁圆筒试样环形断裂的试验方法
CN102353762A (zh) * 2011-09-05 2012-02-15 武汉大学 一种节理岩体开挖瞬态卸荷松动模拟系统
CN102866241A (zh) * 2012-09-29 2013-01-09 重庆大学 三向加载大型三维相似模拟试验方法
CN103017822A (zh) * 2012-11-29 2013-04-03 长江水利委员会长江科学院 高地应力区地下厂房围岩变形破裂演化测试方法及结构
CN103033565A (zh) * 2012-12-07 2013-04-10 山东大学 岩样破裂过程的声发射与电阻率联合监测装置及监测方法
CN103399139A (zh) * 2013-08-02 2013-11-20 中国地质大学(武汉) 一种露天转地下开采模型试验方法及其试验系统

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8952829B2 (en) * 2010-10-20 2015-02-10 Baker Hughes Incorporated System and method for generation of alerts and advice from automatically detected borehole breakouts

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101509852A (zh) * 2009-03-18 2009-08-19 中国矿业大学 一种获取厚壁圆筒试样环形断裂的试验方法
CN102353762A (zh) * 2011-09-05 2012-02-15 武汉大学 一种节理岩体开挖瞬态卸荷松动模拟系统
CN102866241A (zh) * 2012-09-29 2013-01-09 重庆大学 三向加载大型三维相似模拟试验方法
CN103017822A (zh) * 2012-11-29 2013-04-03 长江水利委员会长江科学院 高地应力区地下厂房围岩变形破裂演化测试方法及结构
CN103033565A (zh) * 2012-12-07 2013-04-10 山东大学 岩样破裂过程的声发射与电阻率联合监测装置及监测方法
CN103399139A (zh) * 2013-08-02 2013-11-20 中国地质大学(武汉) 一种露天转地下开采模型试验方法及其试验系统

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
封闭不良钻孔可视化探测及效果分析;许延春;《中国高新技术企业》;20101231(第25期);27-29 *
钻孔摄像技术的发展与现状;王川婴;《岩石力学与工程学报》;20051031;第24卷(第19期);3441-3448 *

Also Published As

Publication number Publication date
CN104237486A (zh) 2014-12-24

Similar Documents

Publication Publication Date Title
CN104237486B (zh) 一种封闭钻孔采动破坏模拟试验装置
CN104237025B (zh) 一种封闭钻孔采动破坏模拟试验方法
CN105806697B (zh) 一种模拟隧道开挖对周边管线影响的试验装置及其方法
Zhao et al. Experimental and numerical investigation of the effect of blast-induced vibration from adjacent tunnel on existing tunnel
CN107861157B (zh) 一种地下水封洞库运营期微震监测方法
CN204964308U (zh) 高温岩石锚杆拉拔试验监测系统
Zhou et al. Dynamic monitoring the deformation and failure of extra-thick coal seam floor in deep mining
CN101576458A (zh) 矿井突水规律地质力学试验平台
CN104181611A (zh) 一种矿井工作面顶底板采动破坏裂隙发育动态监测方法
CN103076128A (zh) 一种隧道三维应力场模拟装置
CN104089822B (zh) 深部开采采动应力场演变过程试验方法
CN103529488A (zh) 矿井顶底板突水监测预报系统及方法
CN203705252U (zh) 一种海洋深水钻井导管承载能力室内模拟试验装置
CN105092815B (zh) 一种模拟储层条件的岩石声学和电学参数联合测试装置
CN104266913A (zh) 一种矿井工作面底板采动破坏模拟试验装置
Song et al. Evaluation of coal seam hydraulic fracturing using the direct current method
CN202994353U (zh) 隧道三维应力场模拟系统
CN105954499A (zh) 湿陷黄土场地进行劈裂注浆加固后湿陷场地评测方法及装置
CN103061774A (zh) 一种盾构隧道施工环境模拟装置
Qiu et al. Determination of hydraulic flushing impact range by DC resistivity test method
CN102621593A (zh) 一种模拟多夹层盐岩地质条件的造腔模型试验装置
CN108398325A (zh) 测试岩石用的声学响应试验装置
CN103790582A (zh) 地应力测量设备及方法
Guo et al. Using the Schwarz alternating method to identify critical water-resistant thickness between tunnel and concealed cavity
Serdyukov et al. Laboratory installation simulating a hydraulic fracturing of fractured rock mass

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20171010