CN104235505B CN201410472762.1A CN201410472762A CN104235505B CN 104235505 B CN104235505 B CN 104235505B CN 201410472762 A CN201410472762 A CN 201410472762A CN 104235505 B CN104235505 B CN 104235505B
Authority
CN
China
Prior art keywords
guang
support
splice
eye
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410472762.1A
Other languages
Chinese (zh)
Other versions
CN104235505A (en
Inventor
陈道华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhong Huayi Electrical Appliance Co., Ltd.
Original Assignee
Jiangsu Shilin Electrical Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Shilin Electrical Equipment Co Ltd filed Critical Jiangsu Shilin Electrical Equipment Co Ltd
Priority to CN201410472762.1A priority Critical patent/CN104235505B/en
Publication of CN104235505A publication Critical patent/CN104235505A/en
Application granted granted Critical
Publication of CN104235505B publication Critical patent/CN104235505B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/02Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing
    • F16L3/06Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing with supports for wires

Abstract

The invention provides a solderless folding cable support frame, which comprises an upright post, wherein a support cross beam is arranged on the upright post and is vertical to the upright post, the upright post and the support cross beam are connected into a whole through a connecting device, the connecting device comprises an inserting opening, a stress seat and an insertion buckle, the inserting opening is arranged on the upright post, the insertion buckle is arranged at one end of the support cross beam and is vertical to the support cross beam, the stress seat is fixedly arranged on the side surface of the upright post, the insertion opening is positioned at the upper end of the stress seat, during the installation, the insertion buckle passes through the insertion opening, buckling and supporting type stress nodes are formed among the support cross beam, the insertion buckle and the upright post, and the support cross beam is supported, so the cable installation is realized. The solderless folding cable support frame has the advantages that the stress is uniform, the carrying capability is high, the positioning is accurate, the installation is convenient, in addition, the support frame does not need to be welded, and the corrosion damage at the welding part can be avoided, so the service life of the solderless folding cable support frame is greatly prolonged.

Description

Exempt to weld collapsible cable bearer
Technical field
The present invention relates to support, particularly to a kind of for propping up that electrical network, power station, power industry high-density cable additionally arrange Frame, belongs to the technical field of power equipment.
Background technology
, to high-density cable region, majority is using traditional angle steel column and angle steel support for electrical network, power station, power industry at present Guang, coverlay welding, single or multiple lift support Guang support.This product in process of production, electrically welding account for overall 70% workload, High consumption human resourcess, high energy consumption, high pollution, impact production line employee's is healthy.And product surface is processed, such as hot dipping Zinc, electrostatic plastic spraying etc. are it is necessary to through chemical pickling technique.Angle steel column and angle steel support Guang, in coverlay welding crack, chemical soiling solution is difficult To remove, it is directed in the short time, chemical soiling solution is overflowed by crack.Corrosion shells, and surface layer is coarse, affects support service life. Especially national grid send power transformation multi-purpose project, and less than expected Replacement and Repair, loss is inestimable.Electrical network, power station, power industry, High-density cable region is all the confined space, especially cable duct, groove, only one meter about of width, bilateral or unilateral interval one Meter Yi Fu, multilamellar or monolayer support Guang support.Hundreds of meters, heavy caliber, cable additionally arrange workshop section, the vertical growth as job site, the sea of faces Team, heavy caliber cable is struggle with successively arranged in interval by ditch, groove, bottom and only has 20 cm, support base Guang and support Between Guang, welding support inconvenience folding, conversion, can not cross-operation, complicated in mistake that installation rate is slow, long in time limit, cable crosses, Machinery cannot operation, accident easily be sent out.Electrical network send power transformation multi-purpose project.General all long distance city remote region.Traditional angle steel weldering Connect support poor compatibility, transport and construction, workshop section's Cost for Coordination is expensive.
Content of the invention:
The main object of the present invention is to provide one kind to exempt to weld collapsible cable bearer, and this cable bracket structure is simple, carries Ability is strong, accurate positioning, easy for installation, and this support need not weld, it is to avoid weld corrosion and damage, therefore, substantially prolongs The service life of the present invention.
In order to solve above-mentioned technical problem, the present invention exempts to weld collapsible cable bearer, and including column, described column is provided with Support Guang, described support Guang is perpendicular with described column, and wherein, described column is linked into an integrated entity by attachment means with described support Guang; Socket that described attachment means include being arranged on described column, stress seat, eye-splice, described eye-splice is arranged on the one of described support Guang End, described in described eye-splice, support Guang is mutually perpendicular to;Described stress seat is fixedly installed on described column side, and described socket is located at institute State stress seat upper end, during installation, described eye-splice passes through described socket, and the vertical edge of eye-splice withstands on described column side, described is subject to The end face of power seat is supported on below the horizontal edge of described eye-splice, and the end face of described support Guang withstands on the lateral surface of described stress seat.Support Form button, support formula stress node between Guang, eye-splice and column, support Guang is supported, thus, realize the installation of cable, this Frame uniform force, bearing capacity is strong, accurate positioning, easy for installation, and this support need not weld, it is to avoid weld corrosion and damage, Therefore, substantially prolongs the service life of the present invention.
Above-mentioned exempt to weld collapsible cable bearer, wherein, between described support Guang and described column, be provided with positioner.Control Column is not offset with support Guang, thus, improve the reliability of this support.
Above-mentioned exempt to weld collapsible cable bearer, wherein, described positioner includes being arranged on the increasing of described support Guang one end Strong muscle, is arranged on mating holes on described column, and described mating holes is located on socket and is communicated with described socket, described increase muscle position Above described eye-splice, during installation, described enhancing muscle is matched with described mating holes.
Above-mentioned exempt to weld collapsible cable bearer, wherein, described positioner includes being arranged on the support of described support Guang one end Plate, is arranged on the recess on described stress seat end face, and described supporting plate is located at described eye-splice bottom surface, during installation, described supporting plate and institute State recess to match.
Above-mentioned exempt to weld collapsible cable bearer, wherein, described stress seat is c type component, and the bottom of described stress seat sets There is the supporting surface being supported on column side.
Above-mentioned exempt to weld collapsible cable bearer, wherein, described stress seat is ω type component, and the bottom of described stress seat sets There is the supporting surface being supported on column side.
Above-mentioned exempt to weld collapsible cable bearer, wherein, the section of described support Guang is in u-shaped.
Above-mentioned exempt to weld collapsible cable bearer, wherein, eye-splice is l type component, and described eye-splice is fixed by vertical edge and horizontal edge Integral and formed.
Beneficial effects of the present invention:
1st, moulded production of the present invention, do mechanization operation, low energy consumption, pollution-free, energy-efficient, element structure novelty, dress Join neat, system is suitable for flexibly with interchangeability.
2nd, there is good compatibility, make full use of transport, stack space, but transport and be able to good harmony.
3rd, stress reliability, shock resistance vibrations, support node has higher-strength.
4th, installation rate is fast, and installation rate is 5-6 times of traditional method, and installation cost reduces by 50%, and each professional workers can be handed over Fork operation improves work efficiency, reduction of erection time.
5th, surface galvanizing or electrostatic plastic spraying, smooth beautiful, service life is the double of traditional welding support.
Brief description
Fig. 1 the structural representation of present invention.
Fig. 2 column of the present invention is the structural representation of c type component.
Fig. 3 is the structural representation holding in the palm Guang in embodiment one.
Fig. 4 is the structural representation holding in the palm Guang in embodiment two.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings.
As illustrated, in order to solve above-mentioned technical problem, the present invention exempts to weld collapsible cable bearer, including column 1, described Column 1 is provided with support Guang 2, and described support Guang 2 is perpendicular with described column 1, and the quantity of support Guang 2 is unrestricted, can be wanted according to concrete Ask and be designed, can for one, two alternatively multiple, described column 1 connects into one with described support Guang 2 by attachment means Body;Described attachment means include socket 4, stress seat 5, eye-splice 7, and described eye-splice 7 is arranged on one end of described support Guang 2, described slotting Button 7 passes through to be integrally formed with described support Guang 2 or other modes link into an integrated entity;Described stress seat 5 passes through securing member or overall one-tenth The mode of type is arranged on described column 1 side, and socket 4 is located at stress seat 5 upper end, and during installation, described eye-splice 7 passes through described inserting Mouth 4, the vertical edge of eye-splice 7 withstands on the side of described column 1, and the end face of described stress seat 5 is supported under the horizontal edge of described eye-splice 7 Face, the end face of support Guang 2 withstands on the lateral surface of stress seat 5, and when installing cable, under cable gravity, support Guang 2 pushes, and withstands on vertical The vertical edge stress of the eye-splice 7 on post 1 side links closely column 1, thus realizing the effect that cable installed by support.Described stress seat 5 Shape is unrestricted, can be c type component, the bottom of described stress seat 5 is provided with the supporting surface 51 being supported on column 1 side; Described stress seat 5 is alternatively ω type component, and the bottom of described stress seat 5 is provided with the supporting surface 51 being supported on column 1 side;Insert Button 7 is l type component, and described eye-splice 7 is integrally fixed and is formed by vertical edge and horizontal edge.The section of described support Guang 2 is in u-shaped.In order to Be more firmly mounted, by bolt 9 or other securing members, eye-splice 7 can be linked together with column 1, hold in the palm Guang 2 be provided with for The installing hole 13 of cable is installed, this support install convenient, the reduction of erection time, energy-efficient, relatively simple for structure.
In order to avoid support produces displacement, positioner, positioning dress can be provided between described support Guang 2 and described column 1 The structure put is unrestricted, illustrates below taking two kinds of positioners as a example:
Embodiment one
Described positioner includes being arranged on the enhancing muscle 8 of described support Guang 1 one end, is arranged on mating holes on described column 1 6, described mating holes 6 is located at the upper end of socket 4 and is communicated with described socket 4, and described increase muscle 8 is located above described eye-splice 4, During installation, described enhancing muscle 8 is matched with described mating holes 6, to realize positioning action, it is to avoid support Guang 2 stress skew.
Embodiment two
Described positioner includes being arranged on the supporting plate 80 of described support Guang 1 one end, is arranged on described stress seat 5 end face Recess 60, described supporting plate 80 is located at described eye-splice 8 bottom surface, and during installation, described supporting plate 80 is matched with described recess 60, to realize Positioning action, it is to avoid support Guang 2 stress skew.
In sum, this support force component is accurate, compact conformation, install convenient, reduction of erection time, good compatibility, And it is energy-efficient.
The description of above example is more concrete, detailed, but therefore can not be interpreted as the restriction to this patent scope, It should be pointed out that for the person of ordinary skill of the art, without departing from the inventive concept of the premise, can also do Go out some deformation and improve, these broadly fall into protection scope of the present invention.

Claims (5)

1. exempt to weld collapsible cable bearer, including column, described column is provided with support Guang, and described support Guang is hung down with described column phase Directly it is characterised in that described column is linked into an integrated entity by attachment means with described support Guang;Described attachment means include being arranged on Socket on described column, stress seat, eye-splice, described eye-splice is arranged on one end of described support Guang, holds in the palm Guang phase described in described eye-splice Mutually vertical;Described stress seat is fixedly installed on described column side, and described socket is located at described stress seat upper end, during installation, Described eye-splice passes through described socket, and the vertical edge of eye-splice withstands on described column side, and the end face of described stress seat is supported on described Below the horizontal edge of eye-splice, the end face of described support Guang withstands on the lateral surface of described stress seat;Between described support Guang and described column It is provided with positioner;
The bottom of described stress seat is provided with the supporting surface being supported on column side, and described stress seat is c type component or ω type structure Part.
2. exempt from as claimed in claim 1 to weld collapsible cable bearer it is characterised in that described positioner include being arranged on described The enhancing muscle of support Guang one end, is arranged on mating holes on described column, and described mating holes is located on socket and is communicated with described socket, Described enhancing muscle is located above described eye-splice, and during installation, described enhancing muscle is matched with described mating holes.
3. exempting from as described in claim 1 welds collapsible cable bearer it is characterised in that described positioner includes being arranged on The supporting plate of described support Guang one end, is arranged on the recess on described stress seat end face, described supporting plate is located at described eye-splice bottom surface, installs When, described supporting plate is matched with described recess.
4. exempting from as described in claim 1 welds collapsible cable bearer it is characterised in that the section of described support Guang is in u type.
5. exempting from as described in claim 1 welds collapsible cable bearer it is characterised in that described eye-splice is l type component, described Eye-splice is integrally fixed and is formed by vertical edge and horizontal edge.
CN201410472762.1A 2014-09-16 2014-09-16 Solderless folding cable support frame Active CN104235505B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410472762.1A CN104235505B (en) 2014-09-16 2014-09-16 Solderless folding cable support frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410472762.1A CN104235505B (en) 2014-09-16 2014-09-16 Solderless folding cable support frame

Publications (2)

Publication Number Publication Date
CN104235505A CN104235505A (en) 2014-12-24
CN104235505B true CN104235505B (en) 2017-01-18

Family

ID=52224140

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410472762.1A Active CN104235505B (en) 2014-09-16 2014-09-16 Solderless folding cable support frame

Country Status (1)

Country Link
CN (1) CN104235505B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104810776A (en) * 2015-02-10 2015-07-29 江苏腾宇电能设备有限公司 Novel welding-free detachable bracket
CN107425484A (en) * 2017-09-22 2017-12-01 山东电力建设第工程公司 A kind of cable bearer fixed structure
EP3836323A1 (en) * 2019-12-13 2021-06-16 Lanz Oensingen AG Jib and fitting device with a jib
GB2616599A (en) * 2022-03-10 2023-09-20 Colin Ashford Mark Improvements in and relating to electric or fibre-optic cable installation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2234503A1 (en) * 1973-06-20 1975-01-17 Heer & Co
EP1804354A2 (en) * 2005-12-28 2007-07-04 OBO Bettermann GmbH & Co. KG. Adapter for connecting a side bracket for supporting a cable canal or cables to a mounting rail
CN200972010Y (en) * 2006-09-25 2007-11-07 上海飞中电器成套有限公司 Cable support
CN103807507A (en) * 2012-11-15 2014-05-21 宜昌市捷力输送机械有限公司 Combined composite cable support
CN204187129U (en) * 2014-09-16 2015-03-04 江苏士林电气设备有限公司 Exempt to weld collapsible cable bearer

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2234503A1 (en) * 1973-06-20 1975-01-17 Heer & Co
EP1804354A2 (en) * 2005-12-28 2007-07-04 OBO Bettermann GmbH & Co. KG. Adapter for connecting a side bracket for supporting a cable canal or cables to a mounting rail
CN200972010Y (en) * 2006-09-25 2007-11-07 上海飞中电器成套有限公司 Cable support
CN103807507A (en) * 2012-11-15 2014-05-21 宜昌市捷力输送机械有限公司 Combined composite cable support
CN204187129U (en) * 2014-09-16 2015-03-04 江苏士林电气设备有限公司 Exempt to weld collapsible cable bearer

Also Published As

Publication number Publication date
CN104235505A (en) 2014-12-24

Similar Documents

Publication Publication Date Title
CN104235505B (en) Solderless folding cable support frame
CN203640309U (en) Adjustable pipe carrier used on large-span steel structure roof primary truss general assembly jig frame
CN204187129U (en) Exempt to weld collapsible cable bearer
CN102619377B (en) Improved auxiliary holding pole fixing base
CN204212390U (en) A kind of Construction of Steel Structure Worker carrying basket
CN201702544U (en) Variable-paddle bearing installing walking table of wind power generator
CN201584692U (en) Fixing fixture for electric power engineering
CN203320420U (en) Temporary locking structure for corrugated steel webs of steel and concrete combined box girder
CN202976571U (en) Automobile body-in-white welding teaching system
CN203701393U (en) Light steel keel combination roof structure
CN203284886U (en) Connection node structure of rectangular steel pipe column and I-shaped steel beam
CN104810776A (en) Novel welding-free detachable bracket
CN205614518U (en) General support frock of large -scale permanent magnet wind power generator suit
CN206368682U (en) A kind of climbing instrument for overhauling power transmission tower pike pole Beam
CN205888420U (en) Steel bow member and connector plates welding position ware
CN204194731U (en) Equipment for supporting patient with burn
CN205129265U (en) Special frock of head inner wall welding
CN204947514U (en) A kind of substation secondary device room cable laying device
CN204139692U (en) A kind of steel tube tower
CN208107313U (en) A kind of pole bracket
CN209297854U (en) A kind of combined transformer box
CN203282351U (en) Belt conveyer support sandblast fixing device
CN202131971U (en) Connecting device for ladder stand
CN214399584U (en) Positioning structure of embedded sleeve of wall-attached embedded part of tower crane
CN203855309U (en) Assembly pipeline weld joint fitting-up hanging bracket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190624

Address after: 212211 No. 18 Xinba Village Port Southeast Road, Xinba Town, Yangzhong City, Jiangsu Province

Patentee after: Yangzhong Huayi Electrical Appliance Co., Ltd.

Address before: 212211 No. 18, Southeast Road, Xinba Town, Yangzhong City, Zhenjiang City, Jiangsu Province

Patentee before: Jiangsu Shilin Electrical Equipment Co., Ltd.