CN104234218A - Waterproof structure and waterproofing treatment construction method of wall butt-joint seam node - Google Patents

Waterproof structure and waterproofing treatment construction method of wall butt-joint seam node Download PDF

Info

Publication number
CN104234218A
CN104234218A CN201410498670.0A CN201410498670A CN104234218A CN 104234218 A CN104234218 A CN 104234218A CN 201410498670 A CN201410498670 A CN 201410498670A CN 104234218 A CN104234218 A CN 104234218A
Authority
CN
China
Prior art keywords
butt joint
wall
wallboard
collision mat
metope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410498670.0A
Other languages
Chinese (zh)
Other versions
CN104234218B (en
Inventor
王晓华
苗晓玲
代秦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Duowei Union Group Co Ltd
Original Assignee
Duowei Union Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Duowei Union Group Co Ltd filed Critical Duowei Union Group Co Ltd
Priority to CN201410498670.0A priority Critical patent/CN104234218B/en
Publication of CN104234218A publication Critical patent/CN104234218A/en
Application granted granted Critical
Publication of CN104234218B publication Critical patent/CN104234218B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a waterproof structure and a waterproofing treatment construction method of a wall butt-joint seam node. The method comprises the steps: arranging a waterproof pad between a wall purlin and two wall bodies; filling a butt-joint seam of the end faces of the two wall bodies with a sealant, and plugging a sealing plug, so as to block the butt-joint seam. According to the waterproof structure and the construction method of the wall butt-joint seam node, the problem of the traditional wall butt-joint seam node waterproof structures that rainwater leakage easily occurs is solved; in long-term use of the waterproof structure disclosed by the invention, the phenomenon of rainwater leakage cannot occur, and meanwhile, the service life of a building is prolonged to some extent.

Description

The waterproof construction of metope butt joint node and Construction for waterproofing treatment method
Technical field
The present invention relates to building waterproof process field, be specifically related to a kind of waterproof construction and Construction for waterproofing treatment method of metope butt joint node.
Background technology
Constructure waterproofing engineering is as an important link in building engineering construction, and the quality of its construction quality, directly has influence on the use after building completion.The good application life that can increase building to a certain extent that the quality of waterproofing is done; In the bad application life that may affect building that the quality of waterproofing is done, What is more, needs again to do over again or rectify and improve, and not only affects the use of building but also can increase building costs.
Body of wall waterproofing is as a part for constructure waterproofing engineering, and it has certain difficulty in construction, and the particularly waterproofing etc. of non-cast-in-place, the non-masonry panel such as precast plate body of wall, sandwiched plate body of wall, difficulty of construction is larger.Precast plate body of wall or sandwiched plate body of wall, when constructing, can form pair of seams between plate and plate, the keypoint part that this butt joint leaks often.
Traditional precast plate body of wall or sandwiched plate body of wall are when constructing, and in outdoor butt joint, often sealing joint strip established by plug; Usually first can paste sealing adhesive tape at butt joint place in indoor, and then body of wall and metope purlin be nailed, wherein, butt joint is in the middle part of metope purlin, and metope purlin is fixed on through body of wall in the both sides of nail separation butt joint.
Because sealing joint strip and sealing adhesive tape are in use easily oxidized, cause its shrinkage strain, affect the effect of its waterproof, when causing rainwater to be called on, butt joint there will be Seepage.
Summary of the invention
Technical problem to be solved by this invention is the waterproof construction and the Construction for waterproofing treatment method that provide a kind of metope butt joint node, by the setting of waterproof cushion block, fluid sealant and seal plug, thus solve the problem that rain leakage phenomenon easily appears in butt joint place.
In order to solve the problem, present invention is disclosed a kind of Construction for waterproofing treatment method of metope butt joint node, it comprises the following steps: lay the side that waterproof is padded on metope purlin; Two pieces of bodies of wall are set on collision mat, and form pair of seams between two pieces of bodies of wall;
Two pieces of bodies of wall are fixed on metope purlin together with collision mat; Fluid sealant is stamped by beating the side of glue process near collision mat in butt joint; And seal plug is filled in butt joint, block butt joint.
Further, in the Construction for waterproofing treatment method of above-mentioned metope butt joint node, the operation that two blocks of wallboards are fixed on metope purlin together with collision mat is also comprised: the first wallboard in the polylith wallboard of each body of wall is resisted against on collision mat; Be fixed on metope purlin by fixture by the first wallboard and collision mat, wherein one end of fixture is suppressed on the first wallboard, and the other end sequentially through wallboard and collision mat, and is fixed on metope purlin; And the second wallboard in polylith wallboard is engaged in the one end the first wallboard being provided with fixture, wherein relative two ends of each wallboard are respectively arranged with the concaveconvex structure matched, first wallboard and the second wallboard are interconnected by concaveconvex structure, and form an enclosure space in junction, fixture is suppressed and is placed in enclosure space in one end of the first wallboard.
Further, the Construction for waterproofing treatment method of above-mentioned metope butt joint node also comprises: in the edge of collision mat and the gap that formed between metope purlin and two pieces of bodies of wall, stamp fluid sealant by playing glue process.
Further, in the Construction for waterproofing treatment method of above-mentioned metope butt joint node, collision mat is provided with multiple dividing plate and multiple guide channel towards the one side of two pieces of bodies of wall, and each guide channel is formed between two adjacent dividing plates, and wherein a guide channel corresponds to butt joint.
Further, in the Construction for waterproofing treatment method of above-mentioned metope butt joint node, the height self waterproofing pad of multiple dividing plate is cumulative towards the side away from butt joint near the side of butt joint.
Further, in the Construction for waterproofing treatment method of above-mentioned metope butt joint node, the width corresponding to the guide channel of butt joint is matched with the width of butt joint, and is greater than the width of all the other guide channels.
The present invention also discloses a kind of waterproof construction of metope butt joint node, comprise metope purlin, collision mat, two pieces of bodies of wall, fluid sealant and seal plugs, wherein collision mat is layed in a side of metope purlin, two pieces of bodies of wall are arranged at intervals at the another side of the relative metope purlin of collision mat, and form pair of seams between two pieces of bodies of wall.Fluid sealant is arranged at the side near collision mat in butt joint, and seal plug is arranged in butt joint, and clogging butt joint.
Further, in the waterproof construction of above-mentioned metope butt joint node, collision mat surface is provided with multiple dividing plate and multiple guide channel, and each guide channel is formed between two adjacent dividing plates, and wherein a guide channel corresponds to butt joint.
Further, in the waterproof construction of above-mentioned metope butt joint node, the height self waterproofing pad of multiple dividing plate is cumulative towards the side away from butt joint near the side of butt joint.
Further, in the waterproof construction of above-mentioned metope butt joint node, the width corresponding to the guide channel of butt joint is matched with the width of butt joint, and is greater than the width of all the other guide channels.
Further, in the waterproof construction of above-mentioned metope butt joint node, at relative two ends of collision mat and be formed with gap between metope purlin and two pieces of bodies of wall, and be provided with fluid sealant in gap.
Further, the waterproof construction of the metope butt joint node of the invention described above also comprises multiple fixture, and one end of fixture is suppressed on the body of wall of correspondence, and the other end through body of wall and collision mat, and is fixed on and is arranged on metope purlin.
Further, in the waterproof construction of above-mentioned metope butt joint node, each body of wall comprises multiple wallboard, relative two ends of each wallboard are respectively arranged with the concaveconvex structure matched, the first wallboard in multiple wallboard and the second wallboard are interconnected by concaveconvex structure, and form an enclosure space in junction, one end of fixture is suppressed on described first wallboard, and is placed in enclosure space.
Compared with prior art, the present invention can obtain and comprise following technique effect:
The collision mat structure newly increased and do in butt joint and play fluid sealant process, can make the waterproof construction of metope butt joint node of the present invention better compared with the waterproof effect of existing structure, can Long-Time Service and waterproof effect can not change.The structure of wallboard butt joint place of the present invention fixture and Construction for waterproofing treatment method, not only can promote the aesthetics of body of wall, and easily there is the problem of Seepage in the fixture place solving existing metope butt joint node in addition.
Accompanying drawing explanation
Accompanying drawing described herein is used to provide a further understanding of the present invention, forms a part of the present invention, and schematic description and description of the present invention, for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the floor map of the waterproof construction of the metope butt joint node of the embodiment of the present invention;
Fig. 2 is the schematic side view of the collision mat of the embodiment of the present invention;
Fig. 3 is the schematic side view of the waterproof construction deadlight connected node of the embodiment of the present invention;
Fig. 4 is the flow chart of the Construction for waterproofing treatment method of the metope butt joint node of the present invention first embodiment of the method;
Fig. 5 is the flow chart of the Construction for waterproofing treatment method of the metope butt joint node of the present invention second embodiment of the method.
Detailed description of the invention
Describe cooperation drawings and Examples in detail embodiments of the present invention below, by this to the present invention how application technology means solve technical problem and the implementation procedure reaching technology effect can fully understand and implement according to this.
As employed some vocabulary to censure specific components in the middle of manual and claim.Those skilled in the art should understand, and hardware manufacturer may call same assembly with different noun.This specification and claims are not used as with the difference of title the mode distinguishing assembly, but are used as the criterion of differentiation with assembly difference functionally." comprising " as mentioned in the middle of manual and claim is in the whole text an open language, therefore should be construed to " comprise but be not limited to "." roughly " refer to that in receivable error range, those skilled in the art can solve the technical problem within the scope of certain error, reach described technique effect substantially.In addition, " couple " or " electric connection " one word comprise directly any and indirectly electric property coupling means at this.Therefore, if describe a first device in literary composition to be coupled to one second device, then represent described first device and directly can be electrically coupled to described second device, or be indirectly electrically coupled to described second device by other device or the means that couple.Manual subsequent descriptions is for implementing better embodiment of the present invention, and right described description is to illustrate for the purpose of rule of the present invention, and is not used to limit scope of the present invention.Protection scope of the present invention is when being as the criterion depending on the claims person of defining.
Also it should be noted that, term " comprises ", " comprising " or its other variant any are intended to contain comprising of nonexcludability, thus make to comprise the process of a series of key element, method, commodity or system and not only comprise those key elements, but also comprise other key element clearly do not listed, or also comprise by the intrinsic key element of this process, method, commodity or system.When not more restrictions, the key element limited by statement " comprising ... ", and be not precluded within process, method, commodity or the system comprising described key element and also there is other identical element.
As shown in Figure 1, for the floor map of the waterproof construction of the metope butt joint node of the embodiment of the present invention, the waterproof construction of the metope butt joint node disclosed by the embodiment of the present invention comprises metope purlin 10, collision mat 20, fluid sealant 30, seal plug 40 and two pieces of bodies of wall 50.Wherein collision mat 20 is layed in a side of metope purlin 10; Two pieces of bodies of wall 50 are arranged at intervals at the another side of the relative metope purlin 10 of collision mat 20, and form pair of seams 530 between two pieces of bodies of wall 50; Fluid sealant 30 is arranged at the side near collision mat 20 in butt joint 530; Seal plug 40 is arranged in butt joint 530, and clogging butt joint 530.
Wherein, collision mat 20 is located between metope purlin 10 and body of wall 50, on the one hand because the material that collision mat 30 is special can make the connection of metope purlin 10 and two pieces of bodies of wall 50 more closely knit, makes it not easily Seepage occur when rainwater is called on; Building is very high to the requirement of cold-prevention bridge now on the other hand, body of wall generally all can have cold-prevention bridge measure, but because butt joint directly can contact with the metope purlin of indoor, material is thus formed natural cold bridge band, therefore, the collision mat 20 that the local sandwiched directly contacted at butt joint and metope purlin has a cold-prevention bridge material effectively can prevent the generation of cold bridge phenomenon.In addition, side close with collision mat 20 in butt joint 530 of the present invention is provided with fluid sealant 30, this not only can play make the connection of collision mat 20 and two pieces of bodies of wall 50 more closely knit effect outside, and fill in butt joint 530 for ease of seal plug 40 under normal conditions, the general ovalize structure of leading portion of seal plug 40, can by controlling the thickness of fluid sealant 30 when making it contact with collision mat 20 in butt joint 530, seal plug 40 can be extruded fluid sealant 30, it is made to expand to both sides, thus fill the gap be formed between the two, make the waterproof construction in whole butt joint 530 more closely knit, can the generation of effective pre-rainwater leakage prevention phenomenon.
Please refer to shown in Fig. 1 and Fig. 2, in the preferred embodiment of the waterproof construction of metope butt joint node of the present invention, collision mat 20 can be but be not limited to the rubber cushion blocks made by elastomeric material, and multiple dividing plate 210 and multiple guide channel 220 is provided with on the surface of collision mat 20, wherein multiple dividing plate 210 is spaced the surface in collision mat, and namely the spacing between adjacent two dividing plates 210 forms guide channel 220, and in waterproof construction, one of them guide channel 230 of collision mat 20 corresponds to the butt joint 530 formed between two pieces of bodies of wall just.
Wherein, on waterproof action, dividing plate 210 can block the rainwater leaked out by seal plug 40, makes it pass through corresponding guide channel 220 and is guided by rainwater, discharges.Because multiple dividing plate 210 and multiple guide channel 220 can play the effect of multi-overlapped and guiding to rainwater, thus allow the collision mat 20 of this special construction can play efficient waterproof action.
In addition, in above-mentioned collision mat 20 structure, preferably dividing plate 210 configuration mode is that the height self waterproofing pad 20 of multiple dividing plate 210 is cumulative towards the side away from butt joint 530 near the side of butt joint 530.
The relation that the height of this collision mat 20 structure median septum 210 is cumulative, if can make the distance nearlyer side of butt joint 530 the rainwater of guide channel 220 when filling, dividing plate 210 pair rainwater higher by adjacent both sides height stop, thus avoid rainwater towards the relative two side diffusions of collision mat 20, and, because the height of the dividing plate 210 of the distance nearlyer side of butt joint 530 is lower than the height of dividing plate 210 of distance butt joint 530 side far away, rainwater can be made to reflux to the guide channel 220 close to butt joint 530 side, and then by butt joint 530, the rainwater of overflow is discharged.This have concurrently to block reflux and then collision mat 20 structure of draining with guiding, effectively can prevent the generation of Seepage.
In addition, in some embodiments of the invention, in the configuration of the guide channel of collision mat, the width of the guide channel 230 corresponding to butt joint 530 can also be set to the width being matched with butt joint 530, and be greater than the width of all the other guide channels 220.By this Pei Catching-rabbits relation, the both sides dividing plate 210 of the guide channel 230 corresponding to butt joint 530 can be made just in time to correspond to the edge of two pieces of bodies of wall 50, namely the both sides dividing plate 210 of approaching channel 230 and the end face of two pieces of bodies of wall 50 in the same plane, thus first safeguard procedures are provided, make its rainwater leakage prevention effect better.In addition, can also make in butt joint 530 to play glue process more smooth and easy, also make the fluid sealant 30 squeezed into more sufficient, and then when making seal plug 40 fill in butt joint 530, contact between each structure is filled more closely knit, strengthens the dynamics preventing rain leakage.Moreover, the set-up mode of the width of all the other guide channels 220 is greater than by the width of the guide channel 230 corresponding to butt joint 530, collision mat 20 can also be made when width is certain, increase the quantity of dividing plate 210 as much as possible, and then allow the quantity of guide channel also increase thereupon, so just can play the effect of multiple waterproof, thus make the waterproof effect of collision mat 20 better.
As shown in Figure 1, in the waterproof construction of the metope butt joint node disclosed by the embodiment of the present invention, width due to collision mat may be slightly less than the width of metope purlin, in the case, in order to promote waterproof effect further, can in relative two ends of collision mat 20 and the gap formed between metope purlin 10 and two pieces of bodies of wall 50 filling with sealant 30, so, can effectively preventing when there is rain leakage in butt joint 530 and collision mat 20, stop that the rainwater of seepage further leaks out to indoor; Moreover due to the corner of metope purlin 10 be circular arc mostly, its position contacted with two pieces of bodies of wall 50 can leave certain gap, by playing glue process, can also fill this gap, makes its interior wall wall also beautiful and clean.
Please refer to Fig. 1 and Fig. 3, the waterproof construction of the metope butt joint node disclosed by the embodiment of the present invention in the fixed form of collision mat 20 and body of wall 50, can be paste, chimeric or sealed mode is fixed on metope purlin 10.In the present embodiment, be fixed on the mode of metope purlin 10 as an example with the fixture such as screw or bolt, but not as limit.Wherein, one end of multiple fixture 60 is suppressed on the body of wall 50 of correspondence, and the other end sequentially through body of wall 50 and collision mat 20, and is fixed on metope purlin 10.Preferably fixture 60 is self threading pin, and its simple to operate and intensity is large, has very strong fastening ability, can make body of wall 50, collision mat 20 and metope purlin 10 three combination more closely knit, further prevent the generation of rain leakage phenomenon.Certainly, the fixture 60 playing fastening effect also has a lot, and self threading pin is that wherein a kind of preferred embodiment is not construed as limiting the invention.
In addition, infiltrate in waterproof construction in order to avoid rainwater from fixture 60 through the hole of body of wall 50 or collision mat 20, in embodiments of the present invention, each body of wall 50 comprises multiple wallboard, the first wallboard 510 and the second wallboard 520 that such as structural form is identical, and relative two ends of each wallboard are respectively arranged with the concaveconvex structure matched, thus the first wallboard 510 in multiple wallboard and the second wallboard 520 can be interconnected by this concaveconvex structure, such as the 2nd Wall plate 520 leads to one end that Over Let is equipped with convex Like Knot Agencies and embeds Let on what the one Wall plate 510 and be equipped with one end of recessed Like Knot Agencies, one Wall plate With the 2nd Wall plate is bonded with each other the whole Body of As mono-, and a spacing of being separated by between the bottom in the top and groove structure of convex cylinder, thus form an enclosure space 540 in the junction of the first wallboard 510 and the second wallboard 520, one end in order to allow fixture 60 suppress on the first wallboard 510 is placed in enclosure space 540.
Be understandable that, the concaveconvex structure that embodiments of the invention provide is the one of numerous connected structure, and other connected modes belonging to inventive concept category also belong to protection scope of the present invention.By the setting of concaveconvex structure, allowing fixture 60 suppress can be placed in enclosure space 540 in one end of the first wallboard 510, allow fixture 60 can not be exposed to outside wallboard 50, make the vestige that the wall face of building be can't see fixture 60, exposed compared with the fixture of conventional art more attractive in appearance on the whole; The fixture 60 be hidden in addition in enclosure space 540 also avoids the invasion of rainwater, reduces to a certain extent and is occurred that by the hole of fixture 60 phenomenon of rain leakage occurs.
In addition, first wallboard 510 and the second wallboard 520 are interconnected by concaveconvex structure, this simple and practical connected mode, not only make installation and removal more simple, can play and need not can operate by any aid, and more traditional mode of being undertaken connecting by connector greatly reduces the possibility of rain leakage.
Be further described below by way of the construction method of certain methods embodiment to the waterproof construction of metope butt joint node of the present invention.
As shown in Figure 4, be the flow chart of the Construction for waterproofing treatment method of the metope butt joint node of the present invention first embodiment of the method.The Construction for waterproofing treatment method of the metope butt joint node disclosed by this method embodiment comprises the following steps:
Step S101, lays the side that waterproof is padded on metope purlin;
Step S102, arranges two pieces of bodies of wall on collision mat, and form pair of seams between two pieces of body of wall;
Two pieces of bodies of wall are fixed on metope purlin together with collision mat by step S103;
Step S104, stamps fluid sealant by beating the side of glue process near collision mat in butt joint;
Step S105, fills in seal plug in butt joint, blocks butt joint.
Structure chart below in conjunction with the waterproof construction of metope butt joint node of the present invention is described in detail above-mentioned steps.
Please refer to Fig. 1 and Fig. 4, first, collision mat 20 is layed in a side of metope purlin 10, wherein collision mat 20 can be bonding method, but be not limited to the method, this step just plays and temporary transient for collision mat 20 is fixed on metope purlin 10, makes waterproof cushion block 20 with metope purlin 10, relative displacement (S101) can not occur in subsequent steps.Then, two pieces of bodies of wall 50 are arranged at intervals on collision mat 20, allow collision mat 20 be fixed between two pieces of bodies of wall 50 and metope purlin 10 by clipping and form sandwich structure, and between the end face that two pieces of bodies of wall 50 are relative, form a butt joint 530 (S102), the size of this butt joint 530 is stayed according to construction needs and is established, particular determination is not done at this, wherein the position of butt joint 530 corresponds to one of them guide channel 220 on collision mat 20 just, such as, correspond to the guide channel 220 that on collision mat 20, width is maximum.Then, two pieces of bodies of wall 50 are fixed on (S103) on metope purlin 10 together with collision mat 20, wherein fixed form can be but be not limited to and be fixed by the fixture such as rivet or self threading pin, be preferably self threading pin, good fixed effect and easier installation and removal method can be had.Then, fluid sealant 30 (S104) is stamped in the side near collision mat 20 in butt joint 530, and the method for this dozen of glue process can make the connection of collision mat 20 and two pieces of bodies of wall 50 more closely knit.Finally, seal plug 40 is filled in butt joint 530, butt joint 530 is got clogged (S105), thus allow the stop being subject to seal plug 40 from the rainwater in the external world or aqueous vapor, and avoid these rainwater or aqueous vapor to enter in butt joint 530.
Wherein, butt joint 530 is filled in acting as of seal plug 40, prevents rain leakage.Preferably the composition material of seal plug 40 is EPDM.As everyone knows, the exterior wall of building is usually exposed in air, expose to the weather for a long time, cause and be filled in the very easily oxidation by air and lose the function of plugging watertight of seal plug 40 in butt joint 530, but the seal plug in the present embodiment 40 is made up of EPDM material, it has stronger non-oxidizability, can ensure its Long-Time Service when exposing to the weather.
Based on above-mentioned, the Construction for waterproofing treatment method of the metope butt joint node that the embodiment of the present invention discloses, by the setting of water cushion 30, make the connection of metope purlin 10 and two pieces of bodies of wall 50 more closely knit, except not easily occurring except Seepage when rainwater is called on, the effect preventing cold bridge phenomenon from occurring in the position that butt joint 530 is corresponding with metope purlin 10 can also be played.In addition, by playing glue process, the connection of collision mat 20 and two pieces of bodies of wall 50 not only can be made more closely knit; Moreover, can also be extruded by seal plug 40 pairs of fluid sealants 30, and be fully filled in seal plug and sealing avenge between the gap that formed, can the generation of effective rainwater leakage prevention phenomenon in advance.
As shown in Figure 5, be the flow chart of the Construction for waterproofing treatment method of the metope butt joint node of the present invention second embodiment of the method.The second embodiment of the method disclosed by the present invention is roughly the same in operating process with the first embodiment of the method, and difference is between the two, two pieces of bodies of wall are being fixed on together with collision mat in the operation on metope purlin by this method embodiment, comprise the following steps:
Step S201, is resisted against on collision mat by the first wallboard in the polylith wallboard of each body of wall;
Step S202, is fixed on metope purlin by fixture by the first wallboard and collision mat;
Step S203, is engaged in the second wallboard in polylith body of wall the one end the first wallboard being provided with fixture.
Structure chart below in conjunction with the waterproof construction of metope butt joint node of the present invention is described in detail above-mentioned steps.Please refer to Fig. 1, Fig. 2 and Fig. 5, in this method embodiment, each body of wall 50 is spliced by multiple wallboard, such as be bonded with each other by multiple first wallboard 510 and multiple second wallboard 520 and form, and relative two ends of each wallboard are provided with the concaveconvex structure cooperatively interacted, allowing the second wallboard 520 can cross groove structure is sleeved on the convex cylinder of the first wallboard 510, allow the first wallboard 510 and the second wallboard 520 are bonded with each other by concaveconvex structure, and form enclosure space 540 in the position be bonded with each other.Therefore, operationally, first the first wallboard 510 in the wallboard of two pieces of bodies of wall 50 is resisted against on collision mat 20 respectively, and forms butt joint 530 between the first adjacent wallboard 510.Then, sequentially passed adjacent to the side of convex cylinder and collision mat 60 on the first wallboard 510 by one end of the fixture such as screw or self threading pin 60, and be fixed on metope purlin 10, until the other end of fixture 60 is suppressed on the first wallboard 510.Afterwards, the side second wallboard 520 being provided with groove structure is engaged in the one end the first wallboard 510 being provided with fixture 60, namely be sleeved on convex cylinder that the first wallboard 510 matches with it, the first wallboard 510 and the second wallboard 520 is allowed to be bonded with each other by concaveconvex structure, now, fixture 60 is suppressed in the enclosure space 540 that namely one end of the first wallboard 510 is placed in the formation of concaveconvex structure junction.
By this configuration mode, the effect that can't see fixture 60 vestige on the wall face of building can be played, exposed compared with the fixture of conventional art more attractive in appearance on the whole; In addition, because fixture 60 is hidden in enclosure space 540, the invasion of rainwater from the external world or aqueous vapor can be avoided, thus the phenomenon reducing hole that rainwater or aqueous vapor formed by fixture 60 on body of wall or collision mat and infiltrate waterproof construction occurs.
In addition, in order to promote water proof effect further, in the Construction for waterproofing treatment method of the metope butt joint node disclosed by each embodiment of the method above-mentioned, can also optionally by playing glue process, in the edge of collision mat 20 and the gap that formed between metope purlin 10 and two pieces of bodies of wall 50, stamp fluid sealant 30.
This operation first can effectively preventing when there is rain leakage in butt joint 530 and collision mat 20, seepage rainwater further leaks out to indoor phenomenon and occurs; Moreover due to the corner of metope purlin 10 be circular arc mostly, its position contacted with two pieces of bodies of wall 50 can leave certain gap, by playing glue process, allowing fluid sealant 30 fill this gap, making interior wall wall also beautiful and clean.
Above-mentioned explanation illustrate and describes some preferred embodiments of the present invention, but as previously mentioned, be to be understood that the present invention is not limited to the form disclosed by this paper, should not regard the eliminating to other embodiments as, and can be used for other combinations various, amendment and environment, and can in invention contemplated scope described herein, changed by the technology of above-mentioned instruction or association area or knowledge.And the change that those skilled in the art carry out and change do not depart from the spirit and scope of the present invention, then all should in the protection domain of claims of the present invention.

Claims (13)

1. a Construction for waterproofing treatment method for metope butt joint node, is characterized in that, comprising:
Lay the side that waterproof is padded on metope purlin;
Two pieces of bodies of wall are set on described collision mat, and form pair of seams between described two pieces of bodies of wall;
Described two pieces of bodies of wall are fixed on described metope purlin together with described collision mat;
Fluid sealant is stamped by beating the side of glue process near described collision mat in described butt joint; And
Seal plug is filled in described butt joint, block residence and state butt joint.
2. the Construction for waterproofing treatment method of metope butt joint node as claimed in claim 1, is characterized in that, the operation that described two pieces of bodies of wall are fixed on described metope purlin together with described collision mat also comprised:
The first wallboard in the polylith wallboard of body of wall described in each is resisted against on described collision mat;
Be fixed on described metope purlin by fixture by described first wallboard and described collision mat, one end of wherein said fixture is suppressed on described first wallboard, and the other end sequentially through described wallboard and described collision mat, and is fixed on described metope purlin; And
The second wallboard in described polylith body of wall is engaged in the one end described first wallboard being provided with described fixture, wherein relative two ends of wallboard described in each are respectively arranged with the concaveconvex structure matched, described first wallboard and described second wallboard are interconnected by described concaveconvex structure, and form an enclosure space in junction, described fixture is suppressed and is placed in described enclosure space in one end of described first wallboard.
3. the Construction for waterproofing treatment method of metope butt joint node as claimed in claim 1, is characterized in that, also comprise: in the edge of described collision mat and the gap that formed between described metope purlin and described two pieces of bodies of wall, stamp fluid sealant by playing glue process.
4. the Construction for waterproofing treatment method of metope butt joint node as claimed in claim 1, it is characterized in that, described collision mat is provided with multiple dividing plate and multiple guide channel towards the one side of described two pieces of bodies of wall, guide channel described in each is formed between two adjacent described dividing plates, and wherein guide channel described in corresponds to described butt joint.
5. the Construction for waterproofing treatment method of metope butt joint node as claimed in claim 4, it is characterized in that, the height of described multiple dividing plate is cumulative towards the side away from described butt joint near the side of described butt joint from described collision mat.
6. the Construction for waterproofing treatment method of metope butt joint node as claimed in claim 4, it is characterized in that, the width corresponding to the described guide channel of described butt joint is matched with the width of described butt joint, and is greater than the width of all the other guide channels.
7. a waterproof construction for metope butt joint node, is characterized in that, comprising:
Metope purlin;
Collision mat, is layed in a side of described metope purlin;
Two pieces of bodies of wall, are arranged at intervals at the another side of the relatively described metope purlin of described collision mat, and form pair of seams between described two pieces of bodies of wall;
Fluid sealant, is arranged at the side near described collision mat in described butt joint; And
Seal plug, is arranged in described butt joint, and clogging described butt joint.
8. the waterproof construction of body of wall butt joint node as claimed in claim 7, it is characterized in that, described collision mat surface is provided with multiple dividing plate and multiple guide channel, and guide channel described in each is formed between two adjacent described dividing plates, and wherein guide channel described in corresponds to described butt joint.
9. the waterproof construction of body of wall butt joint node as claimed in claim 8, it is characterized in that, the height of described multiple dividing plate is cumulative towards the side away from described butt joint near the side of described butt joint from described collision mat.
10. the waterproof construction of body of wall butt joint node as claimed in claim 8, it is characterized in that, the width corresponding to the described guide channel of described butt joint is matched with the width of described butt joint, and is greater than the width of all the other guide channels.
The waterproof construction of 11. body of wall butt joint nodes as claimed in claim 7, is characterized in that, at relative two ends of described collision mat and be formed with gap between described metope purlin and described two pieces of bodies of wall, and is provided with described fluid sealant in described gap.
The waterproof construction of 12. body of wall butt joint nodes as claimed in claim 7, it is characterized in that, also comprise multiple fixture, one end of described fixture is suppressed on the described body of wall of correspondence, the other end through described body of wall and described collision mat, and is arranged at described in being fixed on described metope purlin.
The waterproof construction of 13. body of wall butt joint nodes as claimed in claim 12, it is characterized in that, each body of wall comprises multiple wallboard, relative two ends of wallboard described in each are respectively arranged with the concaveconvex structure matched, the first wallboard in described multiple wallboard and the second wallboard are interconnected by described concaveconvex structure, and form an enclosure space in junction, one end of described fixture is suppressed on described first wallboard, and is placed in described enclosure space.
CN201410498670.0A 2014-09-25 2014-09-25 Waterproof structure and waterproofing treatment construction method of wall butt-joint seam node Active CN104234218B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410498670.0A CN104234218B (en) 2014-09-25 2014-09-25 Waterproof structure and waterproofing treatment construction method of wall butt-joint seam node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410498670.0A CN104234218B (en) 2014-09-25 2014-09-25 Waterproof structure and waterproofing treatment construction method of wall butt-joint seam node

Publications (2)

Publication Number Publication Date
CN104234218A true CN104234218A (en) 2014-12-24
CN104234218B CN104234218B (en) 2017-03-22

Family

ID=52223045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410498670.0A Active CN104234218B (en) 2014-09-25 2014-09-25 Waterproof structure and waterproofing treatment construction method of wall butt-joint seam node

Country Status (1)

Country Link
CN (1) CN104234218B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0932106A (en) * 1995-07-21 1997-02-04 Nichiha Corp Drain structure of overhang part of building
CN201169832Y (en) * 2008-03-19 2008-12-24 新疆光正钢结构工程技术有限责任公司 H type steel purline and apron plate connecting structure
CN201722798U (en) * 2009-12-17 2011-01-26 深圳市卓宝科技股份有限公司 Structure of outer wall core board
CN102251629A (en) * 2011-04-13 2011-11-23 北京东方诚国际钢结构工程有限公司 Overall rigid waterproof system of building
CN102704578A (en) * 2012-06-13 2012-10-03 美联钢结构建筑系统(上海)股份有限公司 Telescopic seam connecting method for transverse paving single-layer metal wall surface plate
CN204081098U (en) * 2014-09-25 2015-01-07 多维联合集团有限公司 The waterproof construction of metope butt joint node

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0932106A (en) * 1995-07-21 1997-02-04 Nichiha Corp Drain structure of overhang part of building
CN201169832Y (en) * 2008-03-19 2008-12-24 新疆光正钢结构工程技术有限责任公司 H type steel purline and apron plate connecting structure
CN201722798U (en) * 2009-12-17 2011-01-26 深圳市卓宝科技股份有限公司 Structure of outer wall core board
CN102251629A (en) * 2011-04-13 2011-11-23 北京东方诚国际钢结构工程有限公司 Overall rigid waterproof system of building
CN102704578A (en) * 2012-06-13 2012-10-03 美联钢结构建筑系统(上海)股份有限公司 Telescopic seam connecting method for transverse paving single-layer metal wall surface plate
CN204081098U (en) * 2014-09-25 2015-01-07 多维联合集团有限公司 The waterproof construction of metope butt joint node

Also Published As

Publication number Publication date
CN104234218B (en) 2017-03-22

Similar Documents

Publication Publication Date Title
CN112726871A (en) Waterproof structure of prefabricated external wall panel
CN204081098U (en) The waterproof construction of metope butt joint node
JP2018053669A (en) Waterproof structure of exterior wall, exterior wall panel, and waterproof construction method of exterior wall panel
CN105227107A (en) Solar photovoltaic assembly bridging type splicing hermetically-sealed construction
CN204081152U (en) A kind of waterproof construction of metope inner corner trim node
CN105604219A (en) Fireproof plugging construction method and device for joint of partition and roof
CN104234218A (en) Waterproof structure and waterproofing treatment construction method of wall butt-joint seam node
CN103225283A (en) Connection structure of barrage foundation diaphragm wall and gate dam building
CN103422595B (en) Concordant cell cube system and manufacture craft thereof after sideslip formula
CN210032136U (en) Waterproof sheet structure for house building construction
CN104264869A (en) Water-proof structure and water-proof treatment construction method of wall surface internal corner joints
CN110725573B (en) Bathroom bottom plate
CN106545136A (en) A kind of wood moulding wall, shoe plate
CN209603340U (en) A kind of high leakproofness type unitized curtain wall system
CN111764520A (en) Fiber cement external wall panel lap joint seal structure
CN209874278U (en) Waterproof roof of assembled integrated house
CN205297602U (en) Be applied to waterproof construction in underground cable tunnel
CN202706236U (en) Composite waterproof structure for deformation joint of basement
CN219306563U (en) Connection structure of dry area chassis and wet area chassis and double-spliced chassis
CN210439557U (en) Sandwich plate structure of prefabricated house and prefabricated house
CN213086873U (en) Basement movement joint stable structure
JP5681322B1 (en) Portable dyke prop and portable levee
CN211973946U (en) Prefabricated waterproof coincide component and have its coincide wall
CN204456512U (en) A kind of parcel post docking node structure
CN210238857U (en) Green wall body insulation construction of assembly type structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant