CN104234205A - Nut locking anchor grouting straight sleeve connected precast concrete component, assembled concrete component and production method - Google Patents

Nut locking anchor grouting straight sleeve connected precast concrete component, assembled concrete component and production method Download PDF

Info

Publication number
CN104234205A
CN104234205A CN201410466603.0A CN201410466603A CN104234205A CN 104234205 A CN104234205 A CN 104234205A CN 201410466603 A CN201410466603 A CN 201410466603A CN 104234205 A CN104234205 A CN 104234205A
Authority
CN
China
Prior art keywords
sleeve
nut
reinforcing bar
concrete component
stifled ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410466603.0A
Other languages
Chinese (zh)
Inventor
蒋立红
邢民
杨兴民
刘程炜
李括
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China Construction Engineering Design Group Corp Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China Construction Engineering Design Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China Construction Engineering Design Group Corp Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201410466603.0A priority Critical patent/CN104234205A/en
Publication of CN104234205A publication Critical patent/CN104234205A/en
Pending legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a nut locking anchor grouting straight sleeve connected precast concrete component, an assembled concrete component and a production method and belongs to the technical field of assembled concrete structures of constructional engineering. According to the nut locking anchor grouting straight sleeve connected precast concrete component, the assembled concrete component and the production method, a nut locking anchor grouting straight sleeve connection method is adopted, a vertical reinforcement lower end nut (5) and a vertical reinforcement upper end nut (6) are installed at two ends of the reinforcement respectively, one end of a connection sleeve (7) is in a sleeve internal diameter which is smaller than the external diameter of the vertical reinforcement upper end nut (6) at the corresponding end, and the other end of the connection sleeve is provided with a blocking ring (10) with the internal diameter which is smaller than the external diameter of the vertical reinforcement lower end nut (5) at the corresponding end, so that the reinforcement utilizes locking anchor extrusion and bonding among the nuts, the blocking ring, the sleeve and slip casting materials for force transmitting, and a mode that reinforcement tensile force of the original grouting connected precast concrete component is mainly transmitted by bonding is changed. The precast concrete component is improved in connection safety and economy.

Description

Precast unit, assembling concrete component and the practice that nut break adrift grouting straight sleeve connects
Technical field
The present invention relates to a kind of bar connecting structure being applied to assembled type concrete prefabricated part, screw thread is processed at reinforcing bar two ends, cover upper cap nut, sleeve one end adopts the sleeve diameter less than the nut external diameter of respective end, this nut is pinned, the sleeve other end adopts the stifled ring that internal diameter is less than the nut external diameter of respective end, this nut is pinned, be in the milk by sleeve, make reinforcing bar utilize nut, stifled break adrift extruding between ring, sleeve and grouting material and bonding power transmission, change the mode of reinforcing bar pulling force mainly through the power transmission that bonds of the prefabricated units that former grouting connects.Adopt ater-casting prefabricated units are connected, thus make this novel precast unit be connected to safety and economy aspect increases, belong to construction work assembling concrete structure technique field.
Background technology
At present, the connection of precast unit mainly adopts sleeve, bellows to be connected with reserving hole grouting.These connected modes are all that the reinforcing bar that will connect pulls open a segment distance or overlap joint, then in hole, pour into high-strength grout; After sclerosis, reinforcing bar forms Unified Global together with the concrete strong bonded outside sleeve, bellows or hole.The pulling force of connecting reinforcement, then to be gone on grouting material and surrounding sleeve, bellows or concrete interface by Shear transfer to grouting material by Shear transfer, mainly relies on bonding power transmission, and reliability is not high; Because the pulling force of reinforcing bar mainly relies on bonding power transmission, the length of sleeve, bellows or hole and diameter all can be larger, and cause steel using amount very large, cost is high; Because the volume ratio of sleeve, bellows or hole is comparatively large, the special grouting material consumption therefore adopted is also comparatively large, and its durability is not fully verified, does not live through the test of the earthquake of actual generation; Space usually reserved between the prefabricated units of vertical connection is less, and there is the problem that grouting can not be full of space, cause bonding surface easy cracking destruction under horizontal loads, building continuous collapse can occur, and can cause serious life and property loss.
Summary of the invention
The object of the present invention is to provide one precast unit method of attachment very reliably, make prefabricated units connect safety and economy and convenient construction more.
The technical solution used in the present invention is as follows:
The precast unit that nut break adrift grouting straight sleeve connects, described precast unit side comprises the longitudinal reinforcement of band nut and the sleeve of attachment connection; Precast unit opposite side comprises the longitudinal reinforcement of band nut and stifled ring.
The assembling concrete component that described precast unit is formed, it is made up of described precast unit; Two precast units connect in work progress, and the reinforcing bar namely on a precast unit is connected with the sleeve on another precast unit by the stifled ring that it connects; The side of sleeve is provided with injected hole; Be cast-in-place band between two precast units, sleeve completes connection at cast-in-place band place.
Described sleeve is straight sleeve that external diameter is identical and internal diameter has difference vertically, and the one end open internal diameter being connected with stifled ring is comparatively large, and other end opening inside diameter is less; The hole of one end that sleeve openings internal diameter is larger is screwed hole; When described assembling concrete component for described cartridges sides when vertically connecting has an injected hole; When described assembling concrete component is level connection joint, cartridges sides is provided with an injected hole and a slurry outlet.
Outside stifled ring with the external screw thread matched with the bush whorl hole of another prefabricated units end during assembling, block up ring and be connected by screw thread with sleeve.
In described precast unit, described attachment is connected with the perforate less with the internal diameter of its link on the nut shape size of sleeve side reinforcing bar and the sleeve of attachment on it and matches, namely head diameter is greater than the open-ended internal diameter with the sleeve of its connection side, namely nut can be blocked by sleeve, even if when not being in the milk, reinforcing bar pulling force still can pass through reinforcing bar nut and sleeve transmission.
The head diameter that described prefabricated units do not adhere to the longitudinal reinforcement connecting sleeved side is greater than stifled ring internal diameter and is less than the internal diameter of the sleeve openings be connected with this side reinforcing bar, namely the nut ring that can be blocked blocks, even if when not being in the milk, pulling force still can by the pressure transmission between reinforcing bar nut and stifled ring.
Described assembling concrete component when vertically connecting and composing body of wall, when the sleeve side connecting stifled ring is in upper end, the shutoff pad of sealing when the opening part that sleeve is positioned at lower end is provided with for being in the milk; When the sleeve side connecting stifled ring is in lower end, the shutoff pad of sealing when the opening part of stifled ring lower end is provided with for being in the milk; Described assembling concrete component when level connection joint, when sleeve and stifled ring opening part are provided with for being in the milk sealing shutoff pad.
Before described precast unit arranges nut on reinforcing bar, sleeve is placed on the side of reinforcing bar, stifled ring is placed on not adhere to and connects sleeved side, and then screwing steel bars two ends arrange nut, and sleeve and stifled ring all can be blocked by each self-corresponding reinforcing bar nut.
When component is used for vertically connecting, in the lower end side reserved structure hole of the top precast unit of the cast-in-place band of described assembling concrete component, extends inside from component side and extend downward the bottom of place prefabricated units; When described component is used for level connection joint, without the need to arranging structure hole.
The practice of described assembling concrete component, is mainly undertaken by following three steps: a prefabricated units, and b component docks, c concreting.
When producing prefabricated units, arrange the reinforcing bar of two ends with nut, near unified for the sleeve that reinforcing bar the adheres to reinforcing bar nut pushing reinforcing bar side, the stifled ring unification that reinforcing bar adheres to is pushed near the reinforcing bar nut of opposite side; When precast unit is used for vertically connecting, be positioned at that the side of precast unit above bottom on top, ater-casting is pre-buried to be extended inside from the side and lead to the sleeve pipe of bottom, after concreting, form structure hole;
In sleeve on the reinforcing bar that during prefabricated units docking, precast unit extends with the reinforcing bar nut of stifled ring on another precast unit, in stifled ring screw-in sleeve, be then in the milk from injected hole, complete bar connecting.
After bar connecting, between precast unit, use template shutoff; When described component vertically connects, by the structure hole concreting of prefabricated units, form cast-in-place band; When described modular level connects, above sleeve, directly namely to form the position fluid concrete of cast-in-place band.
The present invention can obtain following beneficial effect:
Present invention employs the method that nut break adrift grouting straight sleeve connects, namely the reinforcing bar of two end band nuts is set, the sleeve matched and stifled ring, the band nut reinforcing bar of component one end extends in the sleeve of connecting elements one end, stifled ring is screwed in the larger one end of sleeve diameter, then from injected hole grouting, bar connecting is completed.
This prefabricated units sleeve connection, reinforcing bar two ends are with nut, and side sleeve diameter is less than the nut external diameter of respective end, and the internal diameter of the stifled ring of opposite side screw-in sleeve is less than the nut external diameter of respective end.Be in the milk by sleeve, make reinforcing bar, nut, stifled ring becomes as a whole with sleeve, because the internal diameter of stifled ring and opposite side sleeve is all less than corresponding nut external diameter, and the shearing ring area of reinforcing bar tension increases all greatly, and a part of reinforcement stresses can be passed to grouting material by extruding and passes to sleeve again, thus the length of sleeve can be shortened.When earthquake, even if due to construction or quality problems, after grouting material destroys, the pulling force of reinforcing bar also can by the pressure transmission of the stifled ring of reinforcing bar nut and the less socket end of internal diameter and the other end, avoid collapsing of building, save the Loss of Life and property of the people, also meet and improve engineering structures anti-seismic performance and the demand with multiple defence line.This prefabricated units sleeve connection, utilizes larger-diameter reinforcing bar nut, and when occurring to destroy, two ends nut can pin by less sleeve diameter and stifled ring, is unlikely to pull.Realize reinforcing bar pulling force by extruding and bonding power transmission, sleeve height can be reduced, namely decrease steel using amount and grouting amount, save material and cost, simultaneously can increase operating space, the sleeve reducing length is compared to the larger sleeve of original length, when making body of wall earthquake crack go out evenly, distributed areas are larger, greatly improve the anti-seismic performance of body of wall.
This prefabricated units sleeve is when for vertically connecting, and sleeve is placed on cast-in-place band position, when stifled ring end is in upside, only establishes a grout hole, and omits conduit, can reduce processing and manufacturing cost.
This prefabricated units sleeve connection, arranges higher cast-in-place band, can effectively avoid original sleeve connection technology to cause, during earthquake, the problems such as shearing slip occur because conjunction old and new concret face is comparatively near, perfusion leakiness etc. easily forms straight joint at element joints.
Accompanying drawing explanation
Fig. 1 monolithic precast shear wall schematic diagram
Fig. 2 is the precast concrete shear wall connection diagram that nut break adrift grout sleeve connects
Fig. 3 is upper strata precast wall body elevation
Fig. 4 is upper strata precast wall body ground plan
Tu5Shi lower floor precast wall body elevation
Tu6Shi lower floor precast wall body top plane view
Fig. 7 is the detail drawing at reinforcing bar nut and stifled ring B place
Fig. 8 is the detail drawing at reinforcing bar nut and sleeve A place
Fig. 9 is the detail drawing at sleeve connection C place
Figure 10-13 is 4 kinds of sleeve distribution schematic diagrams
Figure 14 is head diameter schematic diagram
The precast concrete beam that Figure 15-16 nut break adrift grout sleeve connects connects end face and side schematic view.In figure: 1-monolithic precast shear wall, 2-upper strata precast wall body, 3-lower floor precast wall body, 4-upper strata body of wall vertical reinforcement, 5-vertical reinforcement lower end nut, 6-vertical reinforcement upper end nut, 7-sleeve, 8-injected hole, 9-shutoff pad, 10-blocks up ring, and 11-constructs hole, the cast-in-place band of 12-, 13-lower floor body of wall vertical reinforcement, the reinforcing bar that 14-does not connect, the vertical reinforcement that 15-connects and sleeve, 16-internal thread, 17-external screw thread, 18-reinforcing bar lower end screw thread, 19-reinforcing bar threaded upper ends, 20-side precast beam, 21-opposite side precast beam.
Detailed description of the invention
Below for precast shear wall, in conjunction with the drawings and the specific embodiments in detail the present invention is described in detail:
Embodiment 1
Embodiment is used for for described precast unit the precast shear wall vertically connecting and composing assembling, is described in detail.
As shown in Fig. 1 to Figure 14, the precast unit that nut break adrift grouting straight sleeve connects, it is connected and composed by nut break adrift grouting straight sleeve at cast-in-place band by precast concrete shear wall; Prefabricated units described are herein upper strata body of wall and lower floor's body of wall.
The assembling concrete component that described nut break adrift grouting straight sleeve connects includes upper strata body of wall vertical reinforcement 4, lower floor's body of wall vertical reinforcement 13, and upper strata body of wall vertical reinforcement 4 and lower floor's body of wall vertical reinforcement 13 are connected to each other by sleeve 7; End, sleeve 7 upper end is provided with internal thread 16, and sleeve 7 side is provided with injected hole 8; The end of upper strata body of wall vertical reinforcement 4 and lower floor's body of wall vertical reinforcement 13 is respectively arranged with vertical reinforcement lower end nut 5 and vertical reinforcement upper end nut 6, and the diameter of nut 6 is greater than the internal diameter with the end of the sleeve of its connection side; The top cover of upper strata vertical reinforcement 4 has stifled ring 10, the internal diameter of stifled ring 10 is greater than the diameter of upper strata body of wall vertical reinforcement 4, but be less than the diameter of vertical reinforcement lower end nut 5 on reinforcing bar, the external diameter of stifled ring 10 is identical with the internal diameter of sleeve 7 upper end pipe, stifled ring 10 outer setting has external screw thread 17, and the external screw thread 17 that stifled ring 10 is arranged is engaged mutually with the internal thread 16 that end, sleeve 7 upper end is arranged; Sleeve 7 lower end is provided with shutoff pad 9.
The strength cement-based grouting material from the perfusion of described injected hole 8 is provided with, the upper strata body of wall vertical reinforcement 4 in grouting material branch sleeve 7 and lower floor's body of wall vertical reinforcement 13 in described sleeve 7.
In the lower end side reserved structure hole 11 of the top precast concrete shear wall 2 of the cast-in-place band 12 of described assembling concrete shear force wall, extend inside from the side of precast shear wall 2 and extend downward the bottom of place prefabricated units 2, for building cast-in-place band 12 between upper strata precast wall body 2 and lower floor's precast wall body 3.
Sleeve 7 upper end open internal diameter is comparatively large, and lower ending opening internal diameter is less.
The end of upper strata body of wall vertical reinforcement 4 and lower floor's body of wall vertical reinforcement 13 is respectively arranged with the larger vertical reinforcement lower end nut 5 of diameter and the less vertical reinforcement upper end nut 6 of diameter, and the diameter of the vertical reinforcement lower end nut 5 that diameter is larger is greater than the diameter of the less vertical reinforcement upper end nut 6 of diameter.
The making of precast shear wall that nut break adrift grouting straight sleeve connects, method of attachment and step are as follows:
S1, screwing steel bars and sleeve: sleeve 7 vertically internal diameter is different, one end internal diameter of beginning is comparatively large, and the internal diameter of the other end is less; Sleeve diameter compared with small end with airtight shutoff pad 9; One end inwall that sleeve diameter is larger is processed into internal thread 16, and cartridges sides has an injected hole 8; With the external screw thread 17 matched with the bush whorl hole being connected prefabricated units end during assembling outside stifled ring 10, stifled ring is connected by screw thread with sleeve.Be enclosed within straight reinforcing bar by sleeve 7 and stifled ring 10, nut 6 is installed by screw thread 19 in reinforced bar sleeve one end, and the other end installs nut 5 by screw thread 18.
S2, precast wall body: arrange the vertical reinforcement (it is 4 that vertical reinforcement is arranged in upper strata body of wall period division, and being arranged in lower floor's body of wall period division is 13) with nut 5 and nut 6; The stifled ring 10 adhered on it is pushed bottom, and sleeve pushes top; Component, with stifled ring one end side reserved structure hole 11, extends inside from component side and passes to bottom; Reserve thickness of concrete cover in shear wall both sides by spacer, then prop up the template of concreting, concreting.
S3, levels body of wall dock: lifting upper strata body of wall 2, bottom reinforcement bars 4 and its upper cap nut 5 are stretched in the sleeve 7 of lower floor's body of wall 3, carry out firmly with bearing diagonal, the external screw thread 17 of stifled ring 10 is tightened along upper cartridge internal thread 16, be in the milk by injected hole 8, the sleeve top surface until grouting material is emerged.
S4, concreting: cast-in-place band 12 place configuration template carries out shutoff, by structure hole 11 concrete perfusion of upper strata body of wall 2, fills up cast-in-place band, reaches stripping after some strength until concrete.
The distribution reinforcement of the sleeve connection of precast concrete panel can adopt double layout, single layout, and Z-shaped layout or mixed-arrangement can see Figure 10-13.
Embodiment 2
In the present embodiment, nut break adrift grouting straight sleeve connect precast concrete beam, assembling concrete beam and the practice all with embodiment 1 in similar, can with reference to figure 1-9.Described prefabricated units are precast concrete beam: side precast beam 20 and opposite side precast beam 21, connected by sleeve 7 between side precast beam 20 and opposite side precast beam 21.Difference does not all need to arrange structure hole in side precast beam 20 and opposite side precast beam 21, and concrete is the cast-in-place band 12 of perfusion formation between side precast beam 20 and opposite side precast beam 21 directly; Stifled ring end side is also with shutoff pad; An injected hole and a slurry outlet to be set on sleeve 7 top of horizontal positioned, be in the milk from injected hole, till emerging from slurry outlet.It is noted that the above description of this invention is illustrative, and nonrestrictive.For those skilled in the art, under the premise without departing from the principles of the invention, can also carry out some amendments, improvement and equivalence, these changes all fall within protection scope of the present invention, such as: 1. the shape changing sleeve.2., when connecting, sleeve two ends are inverted, diameter smallest end and stifled ring end and on the contrary of the present invention.3. the arrangement of branch sleeve.4. change the relative size of reinforcing bar nut shape or change two ends nut.Four examples are just enumerated above, and the actual amendment change falling into scope is not restricted to this, and each ingredient not clear and definite in the present embodiment all can use existing techniques in realizing.

Claims (13)

1. the precast unit of nut break adrift grouting straight sleeve connection, is characterized in that: described precast unit side comprises the longitudinal reinforcement of band nut and the sleeve of attachment connection; Precast unit opposite side comprises the longitudinal reinforcement of band nut and stifled ring.
2., with the assembling concrete component that precast unit according to claim 1 is formed, it is characterized in that: it is made up of precast unit according to claim 1; Two precast units connect in work progress, and the reinforcing bar namely on a precast unit is connected with the sleeve on another precast unit by the stifled ring that it connects; The side of sleeve is provided with injected hole; Be cast-in-place band between two precast units, sleeve completes connection at cast-in-place band place.
3. assembling concrete component according to claim 2, is characterized in that: described sleeve is the identical straight sleeve of external diameter and internal diameter has difference vertically, and the one end open internal diameter being connected with stifled ring is comparatively large, and other end opening inside diameter is less; The hole of one end that sleeve openings internal diameter is larger is screwed hole; When described assembling concrete component for described cartridges sides when vertically connecting has an injected hole; When described assembling concrete component is level connection joint, cartridges sides is provided with an injected hole and a slurry outlet.
4. assembling concrete component according to claim 2, is characterized in that: the external screw thread matched with the bush whorl hole of another prefabricated units end during stifled ring arranged outside assembling, and stifled ring is connected by screw thread with sleeve.
5. assembling concrete component according to claim 2, it is characterized in that: in described precast unit, described attachment is connected with the perforate less with the internal diameter of its link on the nut shape size of sleeve side reinforcing bar and the sleeve of attachment on it and matches, namely head diameter is greater than the open-ended internal diameter with the sleeve of its connection side, namely nut can be blocked by sleeve, even if when not being in the milk, reinforcing bar pulling force still can pass through reinforcing bar nut and sleeve transmission.
6. assembling concrete component according to claim 2, it is characterized in that: the nut maximum gauge that described prefabricated units do not adhere to the longitudinal reinforcement connecting sleeved side is greater than stifled ring internal diameter and is less than the internal diameter of the sleeve openings be connected with this side reinforcing bar, namely the nut ring that can be blocked blocks, even if when not being in the milk, pulling force still can by the pressure transmission between reinforcing bar nut and stifled ring.
7. assembling concrete component according to claim 2, it is characterized in that: described assembling concrete component is when vertically connecting,, when the sleeve side connecting stifled ring is in upper end, the shutoff pad of sealing when the opening part that sleeve is positioned at lower end is provided with for being in the milk; When the sleeve side connecting stifled ring is in lower end, the shutoff pad of sealing when the opening part of stifled ring lower end is provided with for being in the milk; Described assembling concrete component when level connection joint, when sleeve and stifled ring opening part are provided with for being in the milk sealing shutoff pad.
8. assembling concrete component according to claim 2, it is characterized in that: before described precast unit arranges nut on reinforcing bar, sleeve is placed on the side of reinforcing bar, stifled ring is placed on not adhere to and connects sleeved side, then screwing steel bars two ends arrange nut, and sleeve and stifled ring all can be blocked by each self-corresponding reinforcing bar nut.
9. assembling concrete component according to claim 2, it is characterized in that: when component is used for vertically connecting, in the lower end side reserved structure hole of the top precast unit of the cast-in-place band of described assembling concrete component, extend inside from component side and extend downward the bottom of place prefabricated units; When described component is used for level connection joint, without the need to arranging structure hole.
10. the practice of the assembling concrete component described in the arbitrary claim of claim 2 to 9, is mainly undertaken by following three steps: a prefabricated units, and b component docks, c concreting.
The practice of 11. assembling concrete components according to claim 10, it is characterized in that: when producing prefabricated units, arrange the reinforcing bar of two ends with nut, near unified for the sleeve that reinforcing bar the adheres to reinforcing bar nut pushing reinforcing bar side, the stifled ring unification that reinforcing bar adheres to is pushed near the reinforcing bar nut of opposite side; When precast unit is used for vertically connecting, be positioned at that the side of precast unit above bottom on cast-in-place band top is pre-buried to be extended inside from the side and lead to the sleeve pipe of bottom, after concreting, form structure hole;
The practice of 12. assembling concrete components according to claim 10, it is characterized in that: in the sleeve on the reinforcing bar that during prefabricated units docking, precast unit extends on another precast unit with the reinforcing bar nut of stifled ring, stifled ring is screwed in sleeve, then from injected hole grouting, bar connecting is completed.
The practice of 13. assembling concrete components according to claim 10, is characterized in that: after bar connecting, uses template shutoff between precast unit; When described component vertically connects, by the structure hole concreting of prefabricated units, form cast-in-place band; When described modular level connects, above sleeve, directly namely to form the position concreting of cast-in-place band.
CN201410466603.0A 2014-09-12 2014-09-12 Nut locking anchor grouting straight sleeve connected precast concrete component, assembled concrete component and production method Pending CN104234205A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410466603.0A CN104234205A (en) 2014-09-12 2014-09-12 Nut locking anchor grouting straight sleeve connected precast concrete component, assembled concrete component and production method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410466603.0A CN104234205A (en) 2014-09-12 2014-09-12 Nut locking anchor grouting straight sleeve connected precast concrete component, assembled concrete component and production method

Publications (1)

Publication Number Publication Date
CN104234205A true CN104234205A (en) 2014-12-24

Family

ID=52223034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410466603.0A Pending CN104234205A (en) 2014-09-12 2014-09-12 Nut locking anchor grouting straight sleeve connected precast concrete component, assembled concrete component and production method

Country Status (1)

Country Link
CN (1) CN104234205A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109930750A (en) * 2018-05-31 2019-06-25 华北理工大学 Reinforced bar sleeve slip casting attachment device and its application

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2375692Y (en) * 1999-07-02 2000-04-26 河北省电焊机股份有限公司 Upsetting steel bar connector
CN1407191A (en) * 2001-08-09 2003-04-02 胡锦标 Steel reinforce bar connecting device and use thereof
EP1830014A1 (en) * 2006-03-01 2007-09-05 Nicolás Moraleja Alonso Flooring system with removable magnetic flooring modules for constructing the raised floor of a computer room
CN102051964A (en) * 2010-10-27 2011-05-11 管乃彦 Composite sleeve type steel bar connecting device
CN102677779A (en) * 2012-04-05 2012-09-19 江苏金砼预制装配建筑发展有限公司 Assembled constructional reinforced concrete structural member
CN204225279U (en) * 2014-09-12 2015-03-25 中国中建设计集团有限公司 The precast unit that nut break adrift grouting straight sleeve connects, assembling concrete component

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2375692Y (en) * 1999-07-02 2000-04-26 河北省电焊机股份有限公司 Upsetting steel bar connector
CN1407191A (en) * 2001-08-09 2003-04-02 胡锦标 Steel reinforce bar connecting device and use thereof
EP1830014A1 (en) * 2006-03-01 2007-09-05 Nicolás Moraleja Alonso Flooring system with removable magnetic flooring modules for constructing the raised floor of a computer room
CN102051964A (en) * 2010-10-27 2011-05-11 管乃彦 Composite sleeve type steel bar connecting device
CN102677779A (en) * 2012-04-05 2012-09-19 江苏金砼预制装配建筑发展有限公司 Assembled constructional reinforced concrete structural member
CN204225279U (en) * 2014-09-12 2015-03-25 中国中建设计集团有限公司 The precast unit that nut break adrift grouting straight sleeve connects, assembling concrete component

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109930750A (en) * 2018-05-31 2019-06-25 华北理工大学 Reinforced bar sleeve slip casting attachment device and its application

Similar Documents

Publication Publication Date Title
CN204225367U (en) The precast unit that straight thread is connected with pier nose break adrift grout sleeve, assemble concrete component
CN104264909A (en) Precast concrete members connected by locking and anchoring pier heads and grouting variable diameter sleeve, prefabricated concrete member and manufacturing method of prefabricated concrete member
CN104234326A (en) Precast concrete member connected by straight thread and pier head lock anchor grouting sleeve, and method for assembling same
CN104264787A (en) Prefabricated concrete member, assembled concrete member and fabricating method through straight thread and nut locking anchor grouting sleeve connection
CN204225279U (en) The precast unit that nut break adrift grouting straight sleeve connects, assembling concrete component
CN203569582U (en) Connecting structure of concrete pipe pile and bearing platform
CN106284655B (en) Precast concrete beam stud connects connecting node and connection method
CN204225365U (en) Precast unit, the assembling concrete component of pier nose break adrift grouting reducing sleeve connection
CN205894313U (en) Prefabricated assembled steel pipe retrains frame node entirely
CN106592440B (en) A kind of construction method of prefabricated subsection type bridge pier
CN104113033B (en) Assembling type reinforced concrete cable trench
CN103590414B (en) A kind of attachment structure of concrete tubular pile and cushion cap
CN104264788A (en) Precast concrete component and assembly concrete component connected with pier head locking anchor grouting straight sleeve and production method thereof
CN103850363A (en) Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall
CN104264908A (en) Precast concrete members connected by locking and anchoring nuts and grouting variable diameter sleeve, prefabricated concrete member and manufacturing method of prefabricated concrete member
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
CN204225281U (en) The precast unit that straight thread is connected with nut break adrift grout sleeve, assemble concrete component
CN109056507A (en) The modularization precast hollow bridge pier segment being connected based on key teeth and connection method
CN108330806A (en) The steel-that compoiste adhering anchors shear connections knot mixes combined beam structure and production method
CN204691081U (en) Containing constraint bellows reinforcement lapping connection component with ribbing
CN107724427B (en) A kind of connection method of sinking tunnel section connector
CN204225366U (en) Precast unit, the assembling concrete component of nut break adrift grouting reducing sleeve connection
CN204225280U (en) The precast unit that pier nose break adrift grouting straight sleeve connects, assembling concrete component
CN204167845U (en) Novel assembled armored concrete cable trench
CN212248710U (en) Integral connection node of prefabricated floor slab and wallboard

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141224