CN104222348B - A kind of simple and easy green tea production line - Google Patents

A kind of simple and easy green tea production line Download PDF

Info

Publication number
CN104222348B
CN104222348B CN201410547640.4A CN201410547640A CN104222348B CN 104222348 B CN104222348 B CN 104222348B CN 201410547640 A CN201410547640 A CN 201410547640A CN 104222348 B CN104222348 B CN 104222348B
Authority
CN
China
Prior art keywords
idler machining
bellows
air
drying plant
inverted cone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410547640.4A
Other languages
Chinese (zh)
Other versions
CN104222348A (en
Inventor
周晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou University
Original Assignee
Wenzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou University filed Critical Wenzhou University
Priority to CN201410547640.4A priority Critical patent/CN104222348B/en
Publication of CN104222348A publication Critical patent/CN104222348A/en
Application granted granted Critical
Publication of CN104222348B publication Critical patent/CN104222348B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tea And Coffee (AREA)

Abstract

The invention discloses a kind of simple and easy green tea production line, including stand green grass or young crops equipment (1) being sequentially connected with, pneumatic separator (2), rub equipment (3), the first drying plant (4), the second drying plant (5), the 3rd drying plant (6) and packaging facilities (7); Connect each through lifting device (8) between each neighbouring device. The present invention can replace traditional artificial tea frying completely, it is achieved fully-automatic production green tea, has the advantage that production efficiency is high and automaticity is high.

Description

一种简易绿茶生产线A simple green tea production line

技术领域 technical field

本发明涉及一种生产线,特别是一种简易绿茶生产线,属于机械设备领域。 The invention relates to a production line, in particular to a simple green tea production line, which belongs to the field of mechanical equipment.

背景技术 Background technique

我国饮茶的历史已有4700多年,茶与可可、咖啡并称当今世界的三大无酒精饮料。随着社会的进步,茶已经冲出国门走向世界,深受外国人的喜爱。绿茶是中国的主要茶类之一,是指采取茶树新叶或芽,未经发酵,经杀青、或者整形、烘干等典型工艺制作而成的产品。其制成品的色泽,冲泡后茶汤较多的保存了鲜茶叶的绿色主调。常饮绿茶能防癌,降血脂和减肥。随着茶叶需求量的增加,传统的手工制茶方法已经逐渐无法满足需求,为了提高绿茶的产量人们发明了各种辅助炒茶的设备,如摊青机、揉捻机、微波烘烤机和提香机等,但是现有的绿茶生产技术仍需要人机共同完成,生产效率仍需提高,急需研发一条能够完全取代人工自动加工绿茶的生产线。 my country has a history of drinking tea for more than 4,700 years. Tea, cocoa and coffee are also known as the three major non-alcoholic beverages in the world today. With the progress of society, tea has rushed out of the country to the world, and is deeply loved by foreigners. Green tea is one of the main teas in China. It refers to the products made from the new leaves or buds of tea trees, without fermentation, and processed by typical processes such as greening, shaping, and drying. The color of its finished product, after brewing, the tea soup retains more of the green main tone of fresh tea leaves. Drinking green tea regularly can prevent cancer, lower blood fat and lose weight. With the increase of demand for tea, the traditional hand-made tea method has gradually been unable to meet the demand. In order to increase the output of green tea, people have invented various auxiliary tea-frying equipment, such as greening machine, kneading machine, microwave roasting machine and extraction machine. Fragrance machines, etc., but the existing green tea production technology still needs to be completed by man and machine, and the production efficiency still needs to be improved. It is urgent to develop a production line that can completely replace manual and automatic green tea processing.

发明内容 Contents of the invention

本发明的目的在于,提供一种简易绿茶生产线,它能够完全取代传统的人工炒茶,实现全自动生产绿茶,具有生产效率高和自动化程度高的优点。 The object of the present invention is to provide a simple green tea production line, which can completely replace the traditional artificial tea frying, realize automatic production of green tea, and has the advantages of high production efficiency and high degree of automation.

本发明的技术方案:一种简易绿茶生产线,包括依次连接的摊青设备、风选设备、揉搓设备、第一烘干设备、第二烘干设备、第三烘干设备和包装设备;各相邻设备之间均通过提升装置连接。 The technical scheme of the present invention: a simple green tea production line, comprising green spreading equipment, winnowing equipment, kneading equipment, first drying equipment, second drying equipment, third drying equipment and packaging equipment connected in sequence; Neighboring equipment is connected through lifting devices.

前述的简易绿茶生产线中,所述摊青设备包括摊青架体、送料架体、第一传送带、第二传送带和第三传送带,送料架体倾斜设置,送料架体的一端与摊青架体的顶部固定连接,摊青架体上由下至上依次设有第一托辊组、第二托辊组和第三托辊组,送料架体上安装有送料托辊组,第一传送带缠绕在第一托辊组上,第二传送带缠绕在第二托辊组上,第三传送带缠绕在第三托辊组和送料托辊组上;第一托辊组与第三托辊组通过链条连接,摊青架体的底部设有第一驱动电机和第二驱动电机,第一驱动电机通过链条与第二托辊组连接,第二驱动电机通过链条与第一托辊组连接;第一传送带的下方设有转运胶带机,转运胶带机的输出端与提升装置连接,提升装置与杀青设备连接;摊青架体的一侧设有鼓风装置,第一托辊组与第二托辊组之间、第二托辊组与第三托辊组之间均设有送风装置,鼓风装置与送风装置连通。通过设置鼓风装置和送风装置可以加速茶叶的风干。 In the aforesaid simple green tea production line, the green tea spreading equipment includes a spreading green frame, a feeding frame, a first conveyor belt, a second conveyor belt and a third conveyor belt, the feeding frame is inclined, and one end of the feeding frame is connected to the greening frame The top of the stand is fixedly connected. The first idler group, the second idler group and the third idler group are arranged on the stand body from bottom to top, and the feeding idler group is installed on the feeding frame body. The first conveyor belt is wound on On the first roller group, the second conveyor belt is wound on the second roller group, and the third conveyor belt is wound on the third roller group and the feeding roller group; the first roller group and the third roller group are connected by a chain , the bottom of the stand body is provided with a first drive motor and a second drive motor, the first drive motor is connected with the second roller group through a chain, and the second drive motor is connected with the first roller group through a chain; the first conveyor belt There is a transfer belt machine under the bottom of the transfer belt machine. The output end of the transfer belt machine is connected with the lifting device, and the lifting device is connected with the greening equipment; one side of the stand is equipped with a blower device, and the first roller group and the second roller group An air supply device is provided between the second idler roller group and the third idler roller group, and the air blast device communicates with the air supply device. The air-drying of tea leaves can be accelerated by arranging an air blast device and an air supply device.

前述的简易绿茶生产线中,所述鼓风装置包括第一鼓风机和集风箱,集风箱为下大上小的锥形,集风箱的底部与第一鼓风机连通;送风装置包括送风箱和送风孔,送风孔均匀布置在送风箱的顶面和底面,两个送风箱均与集风箱的侧面连通,集风箱内设有两块导流板,导流板分别位于两个送风箱与集风箱的连接口处;所述第一传送带、第二传送带和第三传送带的结构相同,均由金属纱网和S形弹簧杆构成,S形弹簧杆均布在两层金属纱网之间,且S形弹簧杆之间等间距设有加固杆;第一托辊组、第二托辊组和第三托辊组上的托辊之间均通过联动链条连接,加固杆的两端与联动链条固定连接。通过设置导流板可以将第一鼓风机送出的风集中引导进入2个送风箱内,不会让风积聚在集风箱内,高效利用第一鼓风机送出的风。通过采用金属纱网和S形弹簧杆制作传送带,既可以保证传送带耐磨耐用,又可以使其透气、通风。 In the aforementioned simple green tea production line, the air blowing device includes a first air blower and an air collecting box, the air collecting box is in the shape of a cone with a large bottom and a small top, and the bottom of the air collecting box communicates with the first air blower; the air supply device includes an air supply box and an air supply box. The air holes and the air supply holes are evenly arranged on the top and bottom of the air supply box, and the two air supply boxes are connected with the sides of the air collection box. At the connection port between the bellows and the air collecting box; the first conveyor belt, the second conveyor belt and the third conveyor belt have the same structure, all of which are made of metal gauze and S-shaped spring rods, and the S-shaped spring rods are evenly distributed on two layers of metal gauze There are reinforcing rods between the nets and S-shaped spring rods at equal intervals; the rollers on the first idler group, the second idler group and the third idler group are all connected by linkage chains, and the reinforcement rods The two ends are fixedly connected with the linkage chain. By setting the deflector, the wind sent by the first blower can be concentrated and guided into the two air supply boxes, so that the wind will not be accumulated in the air collection box, and the wind sent by the first blower can be efficiently utilized. By using metal gauze and S-shaped spring bars to make the conveyor belt, it can not only ensure the wear resistance and durability of the conveyor belt, but also make it breathable and ventilated.

前述的简易绿茶生产线中,所述第一烘干设备、第二烘干设备和第三烘干设备的结构相同,均包括烘干设备架体、保温外壳、旋转滚筒、导向叶片、蒸汽发生器、喷火嘴和中心转轴,保温外壳固定在烘干设备架体上,旋转滚筒插接在保温外壳内,旋转滚筒的两端分别固定安装有滚轮,烘干设备架体上设置有2组承载滚轮,承载滚轮设置在滚轮的下方且与滚轮滚动连接,烘干设备架体上还设有滚轮驱动电机,滚轮驱动电机通过减速机与其中一个承载滚轮的转轴连接;导向叶片焊接在旋转滚筒的内壁上,导向叶片呈螺旋状设置,保温外壳与旋转滚筒之间的区域设有喷火嘴,喷火嘴用于加热旋转滚筒,中心转轴固定在旋转滚筒的轴线上,中心转轴为空心结构,中心转轴上均布有蒸汽喷射孔,中心转轴的一端通过连接气管与设置在烘干设备架体上的蒸汽发生器连接;旋转滚筒的出口端设有离心风机,离心风机的底部设有茶叶出口。 In the aforementioned simple green tea production line, the first drying equipment, the second drying equipment and the third drying equipment have the same structure, and all include a drying equipment frame, a thermal insulation shell, a rotating drum, guide vanes, and a steam generator. , flame nozzle and central rotating shaft, the heat preservation shell is fixed on the drying equipment frame, the rotating drum is plugged into the heat preservation shell, the two ends of the rotating drum are respectively fixed with rollers, and the drying equipment frame is equipped with 2 sets of bearings. Roller, the bearing roller is arranged under the roller and is connected with the roller in a rolling manner. The drying equipment frame is also equipped with a roller driving motor, which is connected to the rotating shaft of one of the bearing rollers through a reducer; the guide vane is welded on the rotating drum On the inner wall, the guide vanes are arranged in a spiral shape, and the area between the heat preservation shell and the rotating drum is provided with a flame nozzle, which is used to heat the rotating drum, and the central rotating shaft is fixed on the axis of the rotating drum, and the central rotating shaft is a hollow structure. Steam injection holes are evenly distributed on the central shaft, and one end of the central shaft is connected to the steam generator installed on the drying equipment frame through a connecting air pipe; the outlet end of the rotating drum is provided with a centrifugal fan, and the bottom of the centrifugal fan is provided with a tea outlet .

前述的简易绿茶生产线中,所述风选设备包括进料口、第二鼓风机、第一倒锥形风箱、第二倒锥形风箱、过渡风箱、茶叶出口和输送胶带机,第一倒锥形风箱和第二倒锥形风箱并列设置,过渡风箱的底部与第一倒锥形风箱和第二倒锥形风箱的顶部连通,进料口设于过渡风箱的侧面,进料口与第一倒锥形风箱连通,第一倒锥形风箱的底部设有第二鼓风机和茶叶出口;输送胶带机设置在第二倒锥形风箱的下方,过渡风箱内部设有弧形导流板。 In the aforementioned simple green tea production line, the winnowing equipment includes a feed inlet, a second air blower, a first inverted cone bellows, a second inverted cone bellows, a transitional bellows, a tea outlet and a conveyor belt machine, and the first inverted cone bellows The bellows and the second inverted cone bellows are arranged side by side, the bottom of the transition bellows communicates with the top of the first inverted cone bellows and the second inverted cone bellows, the feed inlet is set on the side of the transition bellows, and the feed inlet is connected to the first inverted cone bellows. The conical bellows are connected, and the bottom of the first inverted conical bellows is provided with a second air blower and tea outlet; the conveyor belt conveyor is arranged under the second inverted conical bellows, and the interior of the transitional bellows is provided with an arc deflector.

前述的简易绿茶生产线中,所述第二鼓风机的出风口设有倾斜面,且出风口的倾斜面上设有纱网;进料口的底面为斜面。 In the aforementioned simple green tea production line, the air outlet of the second blower is provided with an inclined surface, and the inclined surface of the air outlet is provided with gauze; the bottom surface of the feed inlet is an inclined surface.

与现有技术相比,本发明通过设置摊青设备取代传统的摊青工艺,通过设置第一传送带、第二传送带和第三传送带以及鼓风装置和送风装置,可以快速完成摊青工作。通过本案特殊设计的传送带不但能够保证摊青设备的使用寿命,而且还能够提高杀青的效果。通过设置复合式的烘干设备,既采用火焰烘烤又采用蒸汽烘烤可以使烘干后的茶叶色泽更好。通过风选设备,可以有效且快速的去除茶叶中的坏茶和茶叶末,保证茶叶的质量。另外,通过提升装置连接各设备取代了传统的人工传送,通过揉捻机取代传统的人工揉捻,通过包装机可以自动将生产好的茶叶包装成袋,实现了全程无需人工操作,完全自动化生产。 Compared with the prior art, the present invention replaces the traditional greening process by arranging greening equipment, and can quickly complete the greening work by setting the first conveyor belt, the second conveyor belt, the third conveyor belt, the air blast device and the air supply device. The conveyor belt specially designed in this case can not only ensure the service life of the greening equipment, but also improve the effect of greening. By setting up composite drying equipment, both flame roasting and steam roasting can make the color of the dried tea leaves better. Through winnowing equipment, the bad tea and tea powder in the tea can be effectively and quickly removed to ensure the quality of the tea. In addition, the lifting device is used to connect the equipment to replace the traditional manual transmission, the kneading machine is used to replace the traditional manual kneading, and the packaging machine can automatically pack the produced tea into bags, which realizes the whole process without manual operation and fully automated production.

附图说明 Description of drawings

图1是本发明的整体结构示意图; Fig. 1 is the overall structural representation of the present invention;

图2是摊青设备的结构示意图; Fig. 2 is the structural representation of spreading green equipment;

图3是鼓风装置和送风装置的结构示意图; Fig. 3 is the structural representation of blower device and air supply device;

图4是传送带的结构示意图; Fig. 4 is the structural representation of conveyor belt;

图5是烘干设备的结构示意图; Fig. 5 is the structural representation of drying equipment;

图6是烘干设备局部剖开后的结构示意图; Fig. 6 is a schematic diagram of the structure of the drying equipment after being partially cut away;

图7是风选设备的结构示意图; Fig. 7 is the structural representation of winnowing equipment;

图8是风选设备的内部结构示意图。 Fig. 8 is a schematic diagram of the internal structure of the winnowing equipment.

附图中的标记为:1-摊青设备,2-风选设备,3-揉搓设备,4-第一烘干设备,5-第二烘干设备,6-第三烘干设备,7-包装设备,8-提升装置,9-输送胶带机,10-弧形导流板,11-烘干设备架体,12-茶叶出口,13-摊青架体,14-送料架体,15-第一传送带,16-第二传送带,17-第三传送带,18-第一托辊组,19-第二托辊组,20-第三托辊组,21-送料托辊组,22-第一驱动电机,23-第二驱动电机,24-转运胶带机,25-鼓风装置,26-送风装置,27-第一鼓风机,28-集风箱,29-送风箱,30-送风孔,31-导流板,32-金属纱网,33-S形弹簧杆,34-加固杆,35-联动链条,36-保温外壳,37-旋转滚筒,38-导向叶片,39-蒸汽发生器,40-喷火嘴,41-中心转轴,42-滚轮,43-承载滚轮,44-离心风机,45-减速机,46-蒸汽喷射孔,47-滚轮驱动电机,48-进料口,49-第二鼓风机,50-第一倒锥形风箱,51-第二倒锥形风箱,52-过渡风箱。 The marks in the accompanying drawings are: 1-greening equipment, 2-air separation equipment, 3-kneading equipment, 4-first drying equipment, 5-second drying equipment, 6-third drying equipment, 7- Packaging equipment, 8-lifting device, 9-conveyor belt machine, 10-curved deflector, 11-drying equipment frame, 12-tea outlet, 13-greening frame, 14-feeding frame, 15- The first conveyor belt, 16-the second conveyor belt, 17-the third conveyor belt, 18-the first roller group, 19-the second roller group, 20-the third roller group, 21-feed roller group, 22-the first 1 drive motor, 23-second drive motor, 24-transfer tape machine, 25-air blower, 26-air supply device, 27-first blower, 28-air collection box, 29-air supply box, 30-air supply Hole, 31-deflector, 32-metal gauze, 33-S-shaped spring rod, 34-reinforcing rod, 35-linkage chain, 36-insulation shell, 37-rotating drum, 38-guide vane, 39-steam generation Device, 40-flame nozzle, 41-central shaft, 42-roller, 43-loading roller, 44-centrifugal fan, 45-reducer, 46-steam injection hole, 47-roller drive motor, 48-feed inlet, 49-the second blower, 50-the first inverted cone bellows, 51-the second inverted cone bellows, 52-transitional bellows.

具体实施方式 detailed description

下面结合附图和实施例对本发明作进一步的说明,但并不作为对本发明限制的依据。 The present invention will be further described below in conjunction with the accompanying drawings and embodiments, but not as a basis for limiting the present invention.

本发明的实施例:如图1所示,一种简易绿茶生产线,包括依次连接的摊青设备1、风选设备2、揉搓设备3、第一烘干设备4、第二烘干设备5、第三烘干设备6和包装设备7;各相邻设备之间均通过提升装置8连接。 Embodiments of the present invention: as shown in Figure 1, a kind of simple and easy green tea production line, comprises successively connected stand green equipment 1, winnowing equipment 2, kneading equipment 3, the first drying equipment 4, the second drying equipment 5, The third drying equipment 6 and the packaging equipment 7; each adjacent equipment is connected by a lifting device 8.

如图2所示,摊青设备1包括摊青架体13、送料架体14、第一传送带15、第二传送带16和第三传送带17,送料架体14倾斜设置,送料架体14的一端与摊青架体13的顶部固定连接,摊青架体13上由下至上依次设有第一托辊组18、第二托辊组19和第三托辊组20,送料架体14上安装有送料托辊组21,第一传送带15缠绕在第一托辊组18上,第二传送带16缠绕在第二托辊组19上,第三传送带17缠绕在第三托辊组20和送料托辊组21上;第一托辊组18与第三托辊组20通过链条连接,摊青架体13的底部设有第一驱动电机22和第二驱动电机23,第一驱动电机22通过链条与第二托辊组19连接,第二驱动电机23通过链条与第一托辊组18连接;第一传送带15的下方设有转运胶带机24,转运胶带机24的输出端与提升装置8连接,提升装置8与杀青设备2连接;摊青架体13的一侧设有鼓风装置25,第一托辊组18与第二托辊组19之间、第二托辊组19与第三托辊组20之间均设有送风装置26,鼓风装置25与送风装置26连通。 As shown in Figure 2, the greening equipment 1 includes a greening frame body 13, a feeding frame body 14, a first conveyor belt 15, a second conveyor belt 16 and a third conveyor belt 17, the feeding frame body 14 is inclined, and one end of the feeding frame body 14 It is fixedly connected with the top of the spreading frame body 13, and the spreading green frame body 13 is provided with the first idler group 18, the second idler group 19 and the third idler group 20 in sequence from bottom to top, and the feeding frame body 14 is installed There is a feeding roller group 21, the first conveyor belt 15 is wound on the first roller group 18, the second conveyor belt 16 is wound on the second roller group 19, and the third conveyor belt 17 is wound on the third roller group 20 and the feeding tray On the roller group 21; the first roller group 18 and the third roller group 20 are connected by a chain, and the bottom of the stand body 13 is provided with a first drive motor 22 and a second drive motor 23, and the first drive motor 22 is connected by a chain It is connected with the second idler roller group 19, and the second drive motor 23 is connected with the first idler roller group 18 through a chain; a transfer belt machine 24 is provided under the first conveyor belt 15, and the output end of the transfer belt machine 24 is connected with the lifting device 8 , the lifting device 8 is connected with the greening equipment 2; one side of the stand body 13 is provided with a blower device 25, between the first roller group 18 and the second roller group 19, between the second roller group 19 and the third roller group An air supply device 26 is provided between the roller groups 20 , and the air blower device 25 communicates with the air supply device 26 .

如图3和图4所示,鼓风装置25包括第一鼓风机27和集风箱28,集风箱28为下大上小的锥形,集风箱28的底部与第一鼓风机27连通;送风装置26包括送风箱29和送风孔30,送风孔30均匀布置在送风箱29的顶面和底面,两个送风箱29均与集风箱28的侧面连通,集风箱28内设有两块导流板31,导流板31分别位于两个送风箱29与集风箱28的连接口处;所述第一传送带15、第二传送带16和第三传送带17的结构相同,均由金属纱网32和S形弹簧杆33构成,S形弹簧杆33均布在两层金属纱网32之间,且S形弹簧杆33之间等间距设有加固杆34;第一托辊组18、第二托辊组19和第三托辊组20上的托辊之间均通过联动链条35连接,加固杆34的两端与联动链条35固定连接。 As shown in Fig. 3 and Fig. 4, the blower device 25 comprises the first blower 27 and the wind collection box 28, the wind collection box 28 is a tapered shape with a large bottom and a small top, and the bottom of the wind collection box 28 communicates with the first blower 27; 26 comprises air supply box 29 and air supply hole 30, and air supply hole 30 is evenly arranged on the top surface and the bottom surface of air supply box 29, and two air supply boxes 29 all communicate with the side of wind collection box 28, and wind collection box 28 is provided with Two deflectors 31, deflectors 31 are respectively positioned at the joints of two air supply boxes 29 and the wind collection box 28; the structures of the first conveyor belt 15, the second conveyor belt 16 and the third conveyor belt 17 are the same, all made of Metal gauze 32 and S-shaped spring rods 33 are formed, and S-shaped spring rods 33 are evenly distributed between two layers of metal gauze 32, and reinforcing rods 34 are arranged at equal intervals between S-shaped spring rods 33; the first roller group 18. The idlers on the second roller set 19 and the third idler roller set 20 are all connected by linkage chains 35 , and both ends of the reinforcing rod 34 are fixedly connected with the linkage chains 35 .

如图5和图6所示,第一烘干设备4、第二烘干设备5和第三烘干设备6的结构相同,均包括烘干设备架体11、保温外壳36、旋转滚筒37、导向叶片38、蒸汽发生器39、喷火嘴40和中心转轴41,保温外壳36固定在烘干设备架体11上,旋转滚筒37插接在保温外壳36内,旋转滚筒37的两端分别固定安装有滚轮42,烘干设备架体11上设置有2组承载滚轮43,承载滚轮43设置在滚轮42的下方且与滚轮42滚动连接,烘干设备架体11上还设有滚轮驱动电机47,滚轮驱动电机47通过减速机45与其中一个承载滚轮43的转轴连接;导向叶片38焊接在旋转滚筒37的内壁上,导向叶片38呈螺旋状设置,保温外壳36与旋转滚筒37之间的区域设有喷火嘴40,喷火嘴40用于加热旋转滚筒37,中心转轴41固定在旋转滚筒37的轴线上,中心转轴41为空心结构,中心转轴41上均布有蒸汽喷射孔46,中心转轴41的一端通过连接气管与设置在烘干设备架体11上的蒸汽发生器39连接;旋转滚筒37的出口端设有离心风机44,离心风机44的底部设有茶叶出口。 As shown in Fig. 5 and Fig. 6, the first drying equipment 4, the second drying equipment 5 and the third drying equipment 6 have the same structure, and all include a drying equipment frame body 11, a thermal insulation shell 36, a rotating drum 37, Guide vane 38, steam generator 39, flame nozzle 40 and central rotating shaft 41, heat preservation shell 36 are fixed on the drying equipment frame body 11, rotating drum 37 is inserted in the heat preservation shell 36, and the two ends of rotating drum 37 are respectively fixed Rollers 42 are installed, and two sets of bearing rollers 43 are arranged on the drying equipment frame body 11. The bearing rollers 43 are arranged below the rollers 42 and are rollingly connected with the rollers 42. The drying equipment frame body 11 is also provided with a roller driving motor 47. , the roller drive motor 47 is connected with the rotating shaft of one of the bearing rollers 43 through the reducer 45; the guide vane 38 is welded on the inner wall of the rotating drum 37, and the guide vane 38 is arranged in a spiral shape, and the area between the heat preservation shell 36 and the rotating drum 37 A flame nozzle 40 is provided, and the flame nozzle 40 is used for heating the rotating drum 37. The central rotating shaft 41 is fixed on the axis of the rotating drum 37. The central rotating shaft 41 is a hollow structure, and the central rotating shaft 41 is evenly distributed with steam injection holes 46. One end of rotating shaft 41 is connected with the steam generator 39 that is arranged on the drying equipment frame body 11 through connecting air pipe;

如图7和图8所示,风选设备2包括进料口48、第二鼓风机49、第一倒锥形风箱50、第二倒锥形风箱51、过渡风箱52、茶叶出口12和输送胶带机9,第一倒锥形风箱50和第二倒锥形风箱51并列设置,过渡风箱52的底部与第一倒锥形风箱50和第二倒锥形风箱51的顶部连通,进料口48设于过渡风箱52的侧面,进料口48与第一倒锥形风箱50连通,第一倒锥形风箱50的底部设有第二鼓风机49和茶叶出口12;输送胶带机9设置在第二倒锥形风箱51的下方,过渡风箱52内部设有弧形导流板10。第二鼓风机49的出风口设有倾斜面,且出风口的倾斜面上设有纱网;进料口48的底面为斜面。 As shown in Fig. 7 and Fig. 8, winnowing equipment 2 comprises feed inlet 48, second air blower 49, first inverted conical bellows 50, second inverted conical bellows 51, transitional bellows 52, tea outlet 12 and conveyor belt Machine 9, the first inverted cone bellows 50 and the second inverted cone bellows 51 are arranged side by side, the bottom of the transition bellows 52 communicates with the tops of the first inverted cone bellows 50 and the second inverted cone bellows 51, and the feed port 48 Located on the side of the transition bellows 52, the feed port 48 communicates with the first inverted cone bellows 50, and the bottom of the first inverted cone bellows 50 is provided with a second blower 49 and a tea outlet 12; the belt conveyor 9 is arranged on the second Below the inverted cone air box 51 , an arc-shaped deflector 10 is arranged inside the transition air box 52 . The air outlet of the second blower 49 is provided with an inclined surface, and the inclined surface of the air outlet is provided with gauze; the bottom surface of the feeding port 48 is an inclined surface.

本发明的工作原理:将茶叶倒入第三传送带17上,通过送料托辊组21和第三托辊组20的作用将茶叶传送至第三传送带17的边缘,茶叶落入第二传送带16,然后再由第二传送带16落入第一传送带15,茶叶在传送带上运输的过程中通过第一鼓风机27为送风装置26送风,风通过送风孔30喷出,同时吹上层传送带上茶叶的底部和下层传送带上茶叶的顶部,这样就能保证茶叶的上下两面同时被风吹到,茶叶最终通过第一传送带15运至转运胶带机24,转运胶带机24将完成摊青工作的茶叶通过提升装置8送至风选设备3的进料口48,茶叶顺着进料口48倾斜的底面滑入第一倒锥形风箱50,通过第一倒锥形风箱50底部第二鼓风机49的作用,质量较差的茶叶和茶叶末会被风吹起,并顺着弧形导流板10进入第二倒锥形风箱51,最终通过第二倒锥形风箱51底部的输送胶带机9运走,而优质的茶叶顺着第二鼓风机49顶部的斜面金属网落入茶叶出口12,通过提升装置8运至揉搓设备3,揉搓好的茶叶通过提升装置8送入依次送入第一烘干设备4、第二烘干设备5和第三烘干设备6进行烘干,具体的烘干原理为,茶叶进入旋转滚筒37内,旋转滚筒37在滚轮驱动电机47的带动下旋转,茶叶顺着旋转滚筒37内的导向叶片38翻滚并输送到旋转滚筒37的另一端,在旋转滚筒37转动的同时,喷火嘴40喷火烘烤旋转滚筒37,蒸汽发生器39将蒸汽通过气管送入中心转轴41,再由中心转轴41上的蒸汽喷射孔46喷出,用于烘烤茶叶,采用这种结构的设备可以使杀青后的茶叶色泽鲜美,杀青后的茶叶从离心风机44的底部排出,最后茶叶通过提升装置8进入包装设备7进行打包。 Working principle of the present invention: pour the tea leaves onto the third conveyor belt 17, and the tea leaves will be transported to the edge of the third conveyor belt 17 by the action of the feeding roller group 21 and the third roller group 20, and the tea leaves will fall into the second conveyor belt 16, Then fall into the first conveyor belt 15 by the second conveyor belt 16, and the tea leaves are blown by the first air blower 27 for the air supply device 26 in the process of transportation on the conveyor belt, and the wind is ejected through the air supply holes 30, and the tea leaves on the upper conveyor belt are blown simultaneously. The bottom of the bottom and the top of the tea leaves on the lower conveyor belt, so as to ensure that the upper and lower sides of the tea leaves are blown by the wind at the same time, and the tea leaves are finally transported to the transfer tape machine 24 through the first conveyor belt 15, and the transfer tape machine 24 passes the tea leaves that have finished the green work through the first conveyor belt 15. The lifting device 8 is sent to the feed inlet 48 of the winnowing equipment 3, and the tea leaves slide into the first inverted conical bellows 50 along the inclined bottom surface of the feed inlet 48, and the tea leaves are driven by the second blower 49 at the bottom of the first inverted cone bellows 50 , poor quality tea and tea dust will be blown up by the wind, and enter the second inverted conical bellows 51 along the arc-shaped deflector 10, and finally be transported away by the conveyor belt machine 9 at the bottom of the second inverted cone bellows 51 , and the high-quality tea leaves fall into the tea outlet 12 along the inclined metal mesh on the top of the second blower 49, and are transported to the kneading equipment 3 through the lifting device 8, and the kneaded tea leaves are sent to the first drying equipment in turn through the lifting device 8 4. The second drying equipment 5 and the third drying equipment 6 perform drying. The specific drying principle is that the tea leaves enter the rotating drum 37, and the rotating drum 37 rotates under the drive of the roller drive motor 47, and the tea leaves rotate along the The guide blades 38 in the drum 37 roll over and are transported to the other end of the rotating drum 37. While the rotating drum 37 is rotating, the flame nozzle 40 sprays fire to bake the rotating drum 37, and the steam generator 39 sends the steam into the central shaft through the air pipe. 41, and then sprayed out from the steam injection hole 46 on the central rotating shaft 41 for roasting tea leaves. The equipment with this structure can make the finished tea leaves have a delicious color, and the finished tea leaves are discharged from the bottom of the centrifugal fan 44, and finally The tea leaves enter the packaging equipment 7 through the lifting device 8 for packaging.

Claims (2)

1. a simple and easy green tea production line, it is characterised in that: stand green grass or young crops equipment (1), the pneumatic separator (2) that include being sequentially connected with, rub equipment (3), the first drying plant (4), the second drying plant (5), the 3rd drying plant (6) and packaging facilities (7), connect each through lifting device (8) between each neighbouring device, the blue or green equipment (1) in described stand includes frame for spreading fresh tea leaf body (13), feeding support body (14), first conveyer belt (15), second conveyer belt (16) and the 3rd conveyer belt (17), feeding support body (14) is obliquely installed, one end of feeding support body (14) is fixing with the top of frame for spreading fresh tea leaf body (13) to be connected, frame for spreading fresh tea leaf body (13) is sequentially provided with the first idler machining (18) from the bottom to top, second idler machining (19) and the 3rd idler machining (20), feeding support body (14) is provided with feeding idler machining (21), first conveyer belt (15) is wrapped on the first idler machining (18), second conveyer belt (16) is wrapped on the second idler machining (19), 3rd conveyer belt (17) is wrapped on the 3rd idler machining (20) and feeding idler machining (21), first idler machining (18) is connected by chain with the 3rd idler machining (20), the bottom of frame for spreading fresh tea leaf body (13) is provided with the first drive motor (22) and the second drive motor (23), first drive motor (22) is connected by chain and the second idler machining (19), and the second drive motor (23) is connected by chain and the first idler machining (18),First conveyer belt (15) be connected with transhipment sealing-tape machine (24), the outfan of transhipment sealing-tape machine (24) is connected with lifting device (8), and lifting device (8) is connected with pneumatic separator (2), the side of frame for spreading fresh tea leaf body (13) is provided with air-blast device (25), between first idler machining (18) and the second idler machining (19), being equipped with air-supply arrangement (26) between the second idler machining (19) and the 3rd idler machining (20), air-blast device (25) connects with air-supply arrangement (26), described air-blast device (25) includes the first aerator (27) and air collecting box (28), air collecting box (28) is lower big little taper, and the bottom of air collecting box (28) connects with the first aerator (27), air-supply arrangement (26) includes wind pushing box (29) and wind pushing hole (30), wind pushing hole (30) is evenly arranged in end face and the bottom surface of wind pushing box (29), two wind pushing box (29) all connect with the side of air collecting box (28), being provided with two pieces of deflectors (31) in air collecting box (28), deflector (31) lays respectively at the connector place of two wind pushing box (29) and air collecting box (28), described first conveyer belt (15), the second conveyer belt (16) are identical with the structure of the 3rd conveyer belt (17), constitute by metal gauze (32) and S shape spring lever (33), S shape spring lever (33) is distributed between double layer of metal gauze (32), and is equidistantly provided with reinforcing bar (34) between S shape spring lever (33), connecting each through linkage chain (35) between carrying roller on first idler machining (18), the second idler machining (19) and the 3rd idler machining (20), the two ends of reinforcing bar (34) are fixing with linkage chain (35) to be connected, described first drying plant (4), second drying plant (5) is identical with the structure of the 3rd drying plant (6), all include drying plant support body (11), lagging casing (36), rotate cylinder (37), guide vane (38), steam generator (39), bocca (40) and central rotating shaft (41), lagging casing (36) is fixed on drying plant support body (11), rotate cylinder (37) and be plugged in lagging casing (36), the two ends rotating cylinder (37) are installed with roller (42) respectively, drying plant support body (11) is provided with 2 groups of carryings roller (43), carrying roller (43) is arranged on the lower section of roller (42) and is connected with roller (42) rolling, drying plant support body (11) is additionally provided with roller drive motor (47), roller drive motor (47) is connected by the rotating shaft of reductor (45) with one of them carrying roller (43), guide vane (38) is welded on the inwall rotating cylinder (37), guide vane (38) is arranged in the shape of a spiral, lagging casing (36) and the region rotated between cylinder (37) are provided with bocca (40), bocca (40) is used for heating rotation cylinder (37), central rotating shaft (41) is fixed on the axis rotating cylinder (37), central rotating shaft (41) is hollow-core construction, central rotating shaft (41) is evenly equipped with steam jetting hole (46), one end of central rotating shaft (41) is connected with the steam generator (39) being arranged on drying plant support body (11) by connecting trachea, the port of export rotating cylinder (37) is provided with centrifugal blower (44), and the bottom of centrifugal blower (44) is provided with tea export, described pneumatic separator (2) includes charging aperture (48), second aerator (49), first inverted cone bellows (50), second inverted cone bellows (51), transition bellows (52), tea export (12) and adhesive tape conveying machine (9), first inverted cone bellows (50) and the second inverted cone bellows (51) are set up in parallel, the bottom of transition bellows (52) connects with the top of the first inverted cone bellows (50) and the second inverted cone bellows (51), charging aperture (48) is located at the side of transition bellows (52), charging aperture (48) connects with the first inverted cone bellows (50), the bottom of the first inverted cone bellows (50) is provided with the second aerator (49) and tea export (12),Adhesive tape conveying machine (9) is arranged on the lower section of the second inverted cone bellows (51), and transition bellows (52) are internal is provided with arc deflector (10).
2. the simple and easy green tea production line of one according to claim 1, it is characterised in that: the air outlet of described second aerator (49) is provided with inclined plane, and the inclined plane of air outlet is provided with gauze; The bottom surface of charging aperture (48) is inclined-plane.
CN201410547640.4A 2014-10-16 2014-10-16 A kind of simple and easy green tea production line Expired - Fee Related CN104222348B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410547640.4A CN104222348B (en) 2014-10-16 2014-10-16 A kind of simple and easy green tea production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410547640.4A CN104222348B (en) 2014-10-16 2014-10-16 A kind of simple and easy green tea production line

Publications (2)

Publication Number Publication Date
CN104222348A CN104222348A (en) 2014-12-24
CN104222348B true CN104222348B (en) 2016-06-15

Family

ID=52211960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410547640.4A Expired - Fee Related CN104222348B (en) 2014-10-16 2014-10-16 A kind of simple and easy green tea production line

Country Status (1)

Country Link
CN (1) CN104222348B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107771975B (en) * 2017-11-04 2020-08-28 来安县半塔茶场 Green tea leaf drying and impurity removing cylinder
CN112273470A (en) * 2020-11-25 2021-01-29 湖南省千秋界茶业有限公司 Tea fixing, kneading, rolling and steaming combination machine

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202800040U (en) * 2012-09-11 2013-03-20 湖北汉家刘氏茶叶有限公司 Automatic production line for green tea
CN203233973U (en) * 2012-09-19 2013-10-16 长沙湘丰茶叶机械制造有限公司 Black tea and green tea compatible automatic tea processing production line
CN203040586U (en) * 2012-10-29 2013-07-10 四川绿昌茗茶业有限公司 Tea production system
CN102972540B (en) * 2012-12-11 2014-06-25 贵州龙原都匀毛尖茶业有限公司 Preparing and processing process for green tea
CN204104696U (en) * 2014-10-16 2015-01-21 郑良 A kind of simple and easy green tea production line

Also Published As

Publication number Publication date
CN104222348A (en) 2014-12-24

Similar Documents

Publication Publication Date Title
CN115736030B (en) Continuous production line of small-tank Tieguanyin tea
CN203575545U (en) Black tea production equipment
CN105318673A (en) Sectional type tea drying equipment
CN104286234B (en) A kind of full-automatic green tea production line
CN101455295B (en) A dry three-stage maturing rice noodle unit
CN104222348B (en) A kind of simple and easy green tea production line
CN207487327U (en) A kind of dried orange peel dryer
CN107772514A (en) A kind of efficiently capsicum annum fasciculatum dries pulverizing all-in-one
CN107152857A (en) A kind of foodstuff drying device
CN104255968B (en) A kind of automatic tea tea leaf tedder
CN105318702A (en) Drying device used for tea drying
CN203913257U (en) The hot tea water-removing machine of a kind of oil
CN204104696U (en) A kind of simple and easy green tea production line
CN203884584U (en) Tea drying machine
CN204104698U (en) A kind of full-automatic green tea production line
CN203776031U (en) Automatic dough cover baking machine set
CN208972546U (en) A kind of instant bean vermicelli drying device
CN217429157U (en) Fermented tea preparation production line
CN206576195U (en) A kind of tea leaf water-removing device
CN201491684U (en) Sesame Roasting Screening System
CN203985898U (en) The automatic fermenting and producing equipment of a kind of improved tealeaves
CN217117407U (en) Continuous machine of completing of damp and hot wind preheating-type cylinder
CN116869178A (en) Preparation process of chilli sauce
CN205597082U (en) Hot pepper parch device
CN113575715A (en) Fermented tea preparation production line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Zhou Chen

Inventor before: Zheng Liang

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160504

Address after: 325035 Zhejiang Economic Development Zone, Ouhai, South East Road, No. 38, Wenzhou National University Science Park Incubator

Applicant after: Wenzhou University

Address before: The old village hall Zhili town Wuxing District Museum Road 313008 in Zhejiang province Huzhou City No. 19

Applicant before: Zheng Liang

C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20141224

Assignee: Pingyang Intelligent Manufacturing Research Institute of Wenzhou University

Assignor: Wenzhou University

Contract record no.: X2020330000096

Denomination of invention: A simple green tea production line

Granted publication date: 20160615

License type: Common License

Record date: 20201122

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160615

Termination date: 20211016