CN104219128B - MSAP and its implementation - Google Patents
MSAP and its implementation Download PDFInfo
- Publication number
- CN104219128B CN104219128B CN201410439932.6A CN201410439932A CN104219128B CN 104219128 B CN104219128 B CN 104219128B CN 201410439932 A CN201410439932 A CN 201410439932A CN 104219128 B CN104219128 B CN 104219128B
- Authority
- CN
- China
- Prior art keywords
- realizes
- support
- msap
- road
- function
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
A kind of MSAP of the invention and its implementation belong to internet device and intelligent management platform technical field.The MSAP includes: 19 inches of 7U subracks, and subrack is equipped with 16 plug-in card slot positions;LVDS is equipped in subrack without clock cabling backboard, SDH and GE independent bus line structure;The road ShuanSDHQun disk is additionally provided in subrack, Dual-Ethernet core converges disk, double network management disks and dual power supply dish structure.The invention also includes the implementation methods of above-mentioned MSAP, specifically comprise the following steps: S1, realize SDH groups of road business;S2 realizes that Ethernet core exchanges business;S3 realizes a variety of branch services;S4 realizes equipment timing function;S5 realizes equipment Management Function.MSAP and its implementation of the invention has the function of to support multiple network topological structure, the Integrated services access that can really realize high reliability and output, can be applicable in the application demand of complex network and have the features such as comprehensive, intelligent management.
Description
Technical field
The present invention relates to internet device and intelligent management platform technical field more particularly to a kind of MSAP and its realization sides
Method.
Background technique
Currently, MSAP (access multiservice platform) is widely answered as internet device and intelligent management platform
With.MSAP (Muti-Services Access Platform) uses traditional SDH technology, based on SDH technology, uses
Advanced GFP, VCAT and LCAS technology merges ethernet switch technology and ATM switching technology, realizes TDM business, Ethernet industry
The comprehensive transmission of business and ATM business, furthermore MSAP can also provide the Nx64k special line of low rate, and Ethernet extends business
(EoXDSL) etc..
But present MSAP technology be not also it is very complete, there are many technologies to need to improve: for example, can not support a variety of
Network topology structure does not adapt to the application demand of complex network, can not really realize the integrated service of high reliability completely
Access and transmission.
Summary of the invention
In order to solve the above-mentioned technical problem, the object of the present invention is to provide one kind can support multiple network topological structure, energy
Enough Integrated services access for really realizing high reliability and output, the application demand that complex network can be applicable in, have comprehensively, intelligence
The MSAP and its implementation of energy management function.
The purpose of the present invention is what is be achieved through the following technical solutions:
A kind of MSAP includes: 19 inches of 7U subracks, and subrack is equipped with 16 plug-in card slot positions;LVDS is equipped in subrack without clock
Cabling backboard, SDH and GE independent bus line structure;The road ShuanSDHQun disk is additionally provided in subrack, Dual-Ethernet core converges disk, double nets
Pipe dish and dual power supply dish structure.
The invention also includes the implementation methods of above-mentioned MSAP, specifically comprise the following steps: S1, realize SDH groups of road business;
S2 realizes that Ethernet core exchanges business;S3 realizes a variety of branch services;S4 realizes equipment timing function;S5 realizes equipment
Management function.
By the technical solution of aforementioned present invention, MSAP of the invention and its implementation have support multiple network topology
Structure, the Integrated services access that can really realize high reliability and output, the application demand that complex network can be applicable in and tool
It is standby comprehensively, intelligent management function the features such as.
Detailed description of the invention
Fig. 1 is the flow diagram of the implementation method of MSAP of the invention.
Specific embodiment
Detailed description of the preferred embodiments with reference to the accompanying drawing:
A kind of MSAP, comprising: 19 inches of 7U subracks, subrack are equipped with 16 plug-in card slot positions;Be equipped in subrack LVDS without when
Clock cabling backboard, SDH and GE independent bus line structure;The road ShuanSDHQun disk is additionally provided in subrack, Dual-Ethernet core converges disk, double
Network management disk and dual power supply dish structure.The MSAP is safer, more reliable.
As shown in Figure 1, the implementation method of above-mentioned MSAP, includes the following steps:
S1 realizes SDH groups of road business, including the following function of setting:
It provides and is no less than 4 STM-4 or STM-1 groups of road optical interfaces;4 STM-4 or STM-1 groups of road light are at most provided to connect
Mouthful;
Group's road optical port uses LC type SFP optical transceiver module, can support hot plug;
Maximum crossing is 32VC4 × 32VC4,96TU-3 × 96TU-3,2016VC12 × 2016VC12;
It supports 1+1 groups of road plate card protections, realizes the warm back-up on group road, intersection and clock module;
Support mono-/bis-end 1+1 linear multiplex section protection and SNCP protection;Support the topology knot such as point-to-point, link network and looped network
Structure.
S2 realizes that Ethernet core exchanges business, including the following function of setting:
It supports to be no less than 4 gigabit optical ports and 4 gigabit power ports, that is, could support up 4 gigabit optical ports and 4 gigabit electricity
Mouthful;
Each disc can independently converge 9 gigabit ethernet port data from backboard.
S3 realizes a variety of branch services, including the following function of setting:
It supports downlink SDH optical branch, supports E1, the access and convergence of a variety of branch services such as EOS, EOP;
The interconnection with products such as distal end ethernet optical fiber transceiver, protocol converter, SDH optical transmitter and receivers can be achieved;
Support 1+1 path protection;
Support built-in E1 Error Detector test function.
S4 realizes equipment timing function, including the following function of setting:
Traceable group road optical port timing source, outer synchronization timing source and branch timing source;
Outer synchronization timing source output is provided;
It supports automatic or forces selection timing source;
Four kinds of timing modes are freely shaken, track, lock and keep in support.
S5 realizes equipment Management Function, including the following function of setting:
Equipment frame top alarm output is provided;
Support DCC management passage and built-in DCN network management path;
Support SNMP_V1 and SNMP_V2 agreement;
Support the RayView network management platform of C/S framework, it can be achieved that the software of local device board and remote equipment exists
Line upgrade function.
MSAP and its implementation of the invention has the following beneficial effects:
The MSAP is open Integrated Service Access Platform.Wherein, SDH groups of road optical port rates support STM-1, STM-4
Grade, can smooth upgrade to STM-16 grade.It has SDH/MSTP transmission net and the two-way bearing capacity of IP Metropolitan Area Network (MAN), supports
SDH, Ethernet independent bus line framework, can really realize Integrated services access and the transmission of high reliability.
The MSAP also there is powerful time-slot cross and IP data exchange capability, it can be achieved that various businesses flexible dispatching,
Tradition E1 business, optical branch business, the access and convergence of the multiple business such as EOS/EOP business are realized in perfection;Complete industry is provided
Business protective capability, stable transmission line is provided to client;It supports multiple network topological structure, adapts to the application of complex network
Demand;Has comprehensive, intelligent management platform, it can be achieved that business is monitored and managed end to end.The MSAP is in big customer's special line
Access, base station interconnection and field of video monitoring, which have, to be widely applied.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto,
In the technical scope disclosed by the present invention, any changes or substitutions that can be easily thought of by anyone skilled in the art,
It should be covered by the protection scope of the present invention.Therefore, protection scope of the present invention should be with the protection model of claims
Subject to enclosing.
Claims (1)
1. a kind of MSAP characterized by comprising 19 inches of 7U subracks, subrack are equipped with 16 plug-in card slot positions;It is equipped in subrack
LVDS is without clock cabling backboard, SDH and GE independent bus line structure;The road ShuanSDHQun disk is additionally provided in subrack, Dual-Ethernet core is converged
Poly- disk, double network management disks and dual power supply dish structure;
The implementation method of the MSAP, includes the following steps:
S1 realizes SDH groups of road business, including the following function of setting:
It provides and is no less than 4 STM-4 or STM-1 groups of road optical interfaces;
Group's road optical port uses LC type SFP optical transceiver module, can support hot plug;
Maximum crossing is 32VC4 × 32VC4,96TU-3 × 96TU-3,2016VC12 × 2016VC12;
It supports 1+1 groups of road plate card protections, realizes the warm back-up on group road, intersection and clock module;
Support mono-/bis-end 1+1 linear multiplex section protection and SNCP protection;
Support the topological structure of point-to-point, link network and looped network;
S2 realizes that Ethernet core exchanges business, including the following function of setting:
It supports to be no less than 4 gigabit optical ports and 4 gigabit power ports;
Each disc can independently converge 9 gigabit ethernet port data from backboard;
S3 realizes a variety of branch services, including the following function of setting:
It supports downlink SDH optical branch, supports E1, EOS, the access and convergence of EOP branch service;
The interconnection with distal end ethernet optical fiber transceiver, protocol converter, SDH optical transmitter and receiver can be achieved;
Support 1+1 path protection;
Support built-in E1 Error Detector test function;
S4 realizes equipment timing function, including the following function of setting:
Traceable group road optical port timing source, outer synchronization timing source and branch timing source;
Outer synchronization timing source output is provided;
It supports automatic or forces selection timing source;
Four kinds of timing modes are freely shaken, track, lock and keep in support;
S5 realizes equipment Management Function, including the following function of setting:
Equipment frame top alarm output is provided;
Support DCC management passage and built-in DCN network management path;
Support SNMP_V1 and SNMP_V2 agreement;
Support the RayView network management platform of C/S framework, it can be achieved that the software of local device board and remote equipment rises online
Grade function.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410439932.6A CN104219128B (en) | 2014-08-28 | 2014-08-28 | MSAP and its implementation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410439932.6A CN104219128B (en) | 2014-08-28 | 2014-08-28 | MSAP and its implementation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104219128A CN104219128A (en) | 2014-12-17 |
CN104219128B true CN104219128B (en) | 2019-01-01 |
Family
ID=52100280
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410439932.6A Expired - Fee Related CN104219128B (en) | 2014-08-28 | 2014-08-28 | MSAP and its implementation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104219128B (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101145836A (en) * | 2006-09-12 | 2008-03-19 | 北京正有网络通信技术股份有限公司 | A multi-service integrated access device |
CN101447828A (en) * | 2008-12-16 | 2009-06-03 | 北京华环电子股份有限公司 | Multi-service access SDH optical transmission device |
CN201854293U (en) * | 2010-05-25 | 2011-06-01 | 珠海高凌信息科技有限公司 | Multi-service communication platform |
-
2014
- 2014-08-28 CN CN201410439932.6A patent/CN104219128B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101145836A (en) * | 2006-09-12 | 2008-03-19 | 北京正有网络通信技术股份有限公司 | A multi-service integrated access device |
CN101447828A (en) * | 2008-12-16 | 2009-06-03 | 北京华环电子股份有限公司 | Multi-service access SDH optical transmission device |
CN201854293U (en) * | 2010-05-25 | 2011-06-01 | 珠海高凌信息科技有限公司 | Multi-service communication platform |
Also Published As
Publication number | Publication date |
---|---|
CN104219128A (en) | 2014-12-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10237634B2 (en) | Method of processing traffic in a node in a transport network with a network controller | |
KR101690853B1 (en) | Optical line terminal device and implementation method thereof | |
CN102291631B (en) | Hybrid access and transmission method and device of packet switching and optical transport network service | |
CN107005325B (en) | Framer, light transmitting device and framing method | |
US9825696B2 (en) | Ethernet link state signaling for packet flows mapped into optical transport network with generic framing procedure | |
CN206559565U (en) | Terminal communication access network EPON ring-shaped network structures | |
WO2013033998A1 (en) | Method and device for realizing ptn function on otn platform | |
CN104393914A (en) | A multiplex route recovering method for an optical fiber differential protection device | |
CN104080019A (en) | Novel power automatic information transmission platform | |
CN108449660A (en) | A kind of PON system | |
CN106788856B (en) | A kind of full granularity of multi-service based on SDH and MSTP technology intersects intelligent cut-in method and system | |
CN104734913A (en) | Multi-service integrated device and intelligent service matching testing method thereof | |
KR101357646B1 (en) | Total PON MAC apparatus and total PON OLT System using the same | |
CN202385092U (en) | Power communication platform integrating packet transport network (PTN) and Ethernet passive optical network (EPON) | |
CN203632693U (en) | Multi-service access and wavelength division transmission system | |
CN105871453B (en) | A kind of method that data service protection is realized under OTN equipment | |
CN202998130U (en) | ITN dedicated line terminal and system realizing dedicated access based on PTN | |
CN104219128B (en) | MSAP and its implementation | |
CN106452565A (en) | Double-PON double-MAC protection power collection device and working method thereof | |
CN204761436U (en) | Electric power collection system of two MAC protections of two PON | |
CN205430244U (en) | Automatic protection system of power communication network | |
CN204481838U (en) | A kind of multi-service integrating device | |
CN202906946U (en) | Multinode communication system of seabed observatory network | |
CN201994942U (en) | Multi-service access and transmission device | |
EP2466767B1 (en) | Adapting equipment and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190101 Termination date: 20190828 |
|