CN104218546B - A kind of self-healing recovery control method of intelligent distribution network - Google Patents

A kind of self-healing recovery control method of intelligent distribution network Download PDF

Info

Publication number
CN104218546B
CN104218546B CN201410484757.2A CN201410484757A CN104218546B CN 104218546 B CN104218546 B CN 104218546B CN 201410484757 A CN201410484757 A CN 201410484757A CN 104218546 B CN104218546 B CN 104218546B
Authority
CN
China
Prior art keywords
distribution network
reconstruct
voltage
network
self
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410484757.2A
Other languages
Chinese (zh)
Other versions
CN104218546A (en
Inventor
邓立华
费峻涛
班崔仁
蔡昌春
张秀平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Campus of Hohai University
Original Assignee
Changzhou Campus of Hohai University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Campus of Hohai University filed Critical Changzhou Campus of Hohai University
Priority to CN201410484757.2A priority Critical patent/CN104218546B/en
Publication of CN104218546A publication Critical patent/CN104218546A/en
Application granted granted Critical
Publication of CN104218546B publication Critical patent/CN104218546B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of self-healing recovery control method of intelligent distribution network, belong to field of power system control, using loss minimization as the Optimization goal of reconstruct, distribution power system load flow calculation is carried out using the forward-backward sweep method of nodal hierarchy according to the radial design feature of power distribution network.New solution is used for the closed-loop case being likely to occur in restructuring procedure, to avoid the generation of a large amount of infeasible solutions, the calculating dimension in optimization algorithm is reduced.If the master switch number opened in radial distribution networks is equal to interconnection switch number and system is without isolated island, the result that can ensure reconstruct is individual without closed network, and wherein isolated island judgement can be by Load flow calculation, without another programming.The method is simple and effective, reduces computing dimension, it is easy to program, it is adaptable to the power distribution network self-healing recovery control of real-time.

Description

A kind of self-healing recovery control method of intelligent distribution network
Technical field
Patent of the present invention is related to a kind of self-healing recovery control method of intelligent distribution network, more particularly to a kind of intelligent distribution network The method of reconfiguration of electric networks, belongs to technical field of electric power system control after breaking down.
Background technology
Intelligent distribution network is the important component of intelligent grid, and it is mainly characterized by with complete self-healing function, energy Farthest reduce influence of the electric network fault to user.Power distribution network is typically closed loop design, open loop and radially runs.When When power distribution network breaks down, by changing the state of block switch and interconnection switch, supply network is reconfigured, recover load and supply Electricity., it is necessary to consider reduction system losses, improve quality of voltage, realize bearing during self-healing recovery is reconstructed after a failure Lotus balance etc. many contents, therefore power distribution network reconfiguration be a multiple target, many dimensions, multiple constraint, multi-period nonlinear group State optimization problem.Therefore globally optimal solution is not only found when power distribution network reconfiguration is carried out, and it is high to solving speed requirement.
The main method of current power distribution network reconfiguration can be divided into three kinds:Mathematics Optimization Method, heuristic search, Yi Jiren Work intelligent method., because there is complete strict mathematical theory basis, algorithm stability is good, but there is amount of calculation for Mathematics Optimization Method Greatly, the problem of overlong time is calculated.Heuristic search and artificial intelligence approach are to be applied to heuristic or intelligent method It is the hot issue of Recent study in fault recovery reconstruction strategy.But heuristic search and artificial intelligence approach are received The original state influence of system is big, and the stability of algorithm is not strong, and computational efficiency is not high.
So the reconfiguration of electric networks for how fast and effectively carrying out power distribution network after failure is the control of intelligent distribution network self-healing recovery Key issue.
The content of the invention
It is an object of the invention to overcome drawbacks described above, there is provided a kind of optimizing has certainty, while improving calculating again The self-healing recovery control method of the intelligent distribution network of speed so that self-healing recovery control has stability and rapidity.
In order to solve the above problems, the technical scheme that apparatus of the present invention are used for:A kind of self-healing of intelligent distribution network is extensive Multiple control method, it is characterised in that using search reconfiguration scheme, comprise the following steps:
Step S1, initialisation switch sequence, every initial value is all 1;
Step S2, the switch number that input is broken down, the switch value of this is set to 0;
Step S3, in addition to the switch of failure, produces one group of new on off sequence;
Step S4, judges whether the master switch number opened is equal to interconnection switch number, if equal entrance S5, otherwise returns to step Rapid S3;
Step S5, calls Load flow calculation module, returning result to take each node voltage, on off sequence, iterations, total network loss With each branch power value;
Step S6, judges to meet whether the total node number that magnitude of voltage is 1 is equal to feeder line number and node voltage and line simultaneously Road performance number is less than maximum permissible value, if satisfaction enters S7, otherwise returns to step S3;
Step S7, is sequentially output each node voltage value, correspondence on off sequence, iterations, total network loss;
Step S8, chooses the on off sequence of loss minimization as reconstruct optimal solution.
The self-healing recovery control method of foregoing a kind of intelligent distribution network, if the master switch opened in radial distribution networks Number is equal to interconnection switch number and system is without isolated island, then the result for ensureing reconstruct is individual without closed network, and wherein isolated island judges to borrow Help Load flow calculation module.
A kind of self-healing recovery control method of foregoing intelligent distribution network, using loss minimization as the Optimization goal of reconstruct, Distribution power system load flow calculation is carried out using the forward-backward sweep method of nodal hierarchy according to the radial design feature of power distribution network.
A kind of self-healing recovery control method of foregoing intelligent distribution network, can also be reconstructed except obtaining reconstruct optimal solution Suboptimal solution.
The self-healing recovery control method of foregoing a kind of intelligent distribution network, using loss minimization as the Optimization goal of reconstruct Reconstruction model is:
I is node number in formula, and n is network total node number, and I is the branch current before node i, and r is branch impedance;
Constraints is in restructuring procedure:
Load flow calculation is constrained:Whenever Load flow calculation will be re-started after structure change;
Capacity of trunk is constrained:Si≤Smax
Node voltage is constrained:Vmin≤Vi≤Vmax
Network topology is constrained:Power distribution network or tree after reconstruct, are not allow for the generation of looped network and isolated island;
Wherein, SiAnd SmaxThe respectively maximum permissible value of the overpowering calculated value of i line flows and capacity of trunk, VminWith VmaxIt is the lower limit and higher limit of node voltage, ViIt is the magnitude of voltage of node i.
A kind of self-healing recovery control method of foregoing intelligent distribution network, in step s 6, magnitude of voltage refers to magnitude of voltage for 1 Equal to rated voltage.
The present invention carries out eliminating the reconstruct of isolated island using Load flow calculation.In preceding pushing back for Load flow calculation, due to isolated island Node is not connected directly or indirectly with feeder line, causes, when down back substitution calculates voltage step by step from feeder line, not traverse orphan Island node.When isolated island node is not involved in Load flow calculation, the magnitude of voltage of isolated island node can be the initial voltage of Load flow calculation.Therefore without orphan The necessary and sufficient condition on island is reduced to the nodes that magnitude of voltage after Load flow calculation is 1 and is necessarily equal to feeder line number.The elimination closed loop and isolated island Method, advantage just directly by Load flow calculation just can judge whether this reconfiguration scheme forms closed loop or isolated island, be not required to separately The subprogram called and judge closed loop and isolated island is write outward, algorithm is optimized, the arithmetic speed of reconstruct is accelerated.
Brief description of the drawings
Fig. 1 is the power distribution network reconfiguration flow chart based on optimal network loss;
Fig. 2 is search reconfiguration scheme flow chart;
Fig. 3 is IEEE16 node primitive network structure charts;
Fig. 4 is network structure after the failure reconfiguration of Line 1 road;
Symbol description KG in wherein Fig. 2 represents switch combination.
Specific embodiment
For technical scheme, technical characteristic, reached purpose and effect for making present invention realization are easy to understand, with reference to Specific embodiments and the drawings, are expanded on further the present invention.
The present invention proposes a kind of new reconstructing method to solve the problems, such as algorithm stability and rapidity.Its main think of Think as follows:Distribution network is structurally characterized in that radial power supply, and typically N bars feeder line is designed with N number of interconnection switch.Propose to work as and beat The master switch number opened is equal to interconnection switch number, and system is without isolated island, then the result for ensuring that reconstruct is individual without closed loop Effective scheme.The optimum organization search for improving the method for exhaustion is so carried out during reconfiguration scheme is searched for, closed loop, orphan is eliminated Island and the solution of trend constraint condition is unsatisfactory for, finally chooses optimal network loss side in all feasible reconfiguration scheme after having searched for Case.This reconstructing method belongs to the category of Mathematics Optimization Method, and optimizing has certainty, while improve calculate asking for dimension again Topic, calculating speed is fast.
A kind of intelligent distribution network of the present invention break down after reconfiguration of electric networks method, its content is by power distribution network reconfiguration mould Type, distribution power system load flow calculation and the part of algorithm for distribution network reconfiguration three composition.As shown in Figure 1, Figure 2, Figure 3, Figure 4, the present invention is preferable The method of embodiment is specific as follows:
(1) power distribution network reconfiguration model
The final Optimization goal of power distribution network reconfiguration of the present invention is loss minimization.Its model is as follows:
I is node number in formula, and n is network total node number, and I is the branch current before node i, and r is branch impedance.
Constraints is in restructuring procedure:
Load flow calculation is constrained:Whenever Load flow calculation will be re-started after structure change.
Capacity of trunk is constrained:Si≤Smax
Node voltage is constrained:Vmin≤Vi≤Vmax
Network topology is constrained:Power distribution network or tree after reconstruct, are not allow for the generation of looped network and isolated island.
Wherein, SiAnd SmaxThe respectively maximum permissible value of the overpowering calculated value of i line flows and capacity of trunk, VminWith VmaxIt is the lower limit and higher limit of node voltage, ViIt is the magnitude of voltage of node i.
(2) Load flow calculation of power distribution network
Compared with grid, the structure of power distribution network, the method for operation, device type and component parameters etc. are all different, Its power flow algorithm also should be different.Power distribution network mostly has cyclic structure, but due to fault location and relay protection setting The need for and open loop operation.Distribution network line length is short compared with power transmission network, and power distribution network circuit of the circuit section than power transmission network Section is small.The particularly use of power cable, causes the r/x of power distribution network larger, some circuits r>Even, this is often caused often x Rule trend does not restrain.Because power distribution network is in configuration aspects and the obvious difference of power transmission network, have very much to power transmission network Load flow calculation The traditional algorithm of effect.Such as the inferior method of the pressgang of newton one and PQ decomposition methods not necessarily reach satisfied meter in distribution power system load flow calculation Effect is calculated, the situation for morbid state often occur, Load flow calculation is difficult to restrain.
Forward-backward sweep method is to solve for one of optimal algorithm of radial distribution networks Power Flow Problem.The present invention is using based on node The forward-backward sweep method of layering carries out Load flow calculation.Forward-backward sweep method is each node load of known network, it is assumed that node voltage is volume Determine voltage, each branch power is calculated from network end-point to head end;Then since the root node according to each branch power step-by-step calculation Voltage.The purpose of nodal hierarchy essence is exactly to look for corresponding node during generation calculating voltage x current is preceding pushed back.
(3) algorithm for distribution network reconfiguration based on optimal network loss
The present invention uses binary coding, i.e., with 0 and 1 two character come the disconnection of representation switch and open mode.To net Each branch road finishes sequence number in network, and a string of binary codes are to represent a reconfiguration scheme.Which which position of binary code corresponds to Number branch switch.The length of binary code is then equal to total circuitry number of distribution network.Power distribution network is typically N bars feeder line with N Individual interconnection switch design, makes total system open loop operation, so it is to ensure to have in network after reconstruct and can only have N number of switch opening The necessary condition of network open loop.By this point present invention improves over exhaustive search algorithm, for distribution network, only search wherein contains The binary system sequence of N 1.Do so can not only accomplish, from global optimizing, a feasible program not being missed, and in certain journey Program operation speed is accelerated on degree.
For distribution network of the N bars feeder line with N number of interconnection switch, the master switch number opened after reconstruct is ensured is equal to contact On the premise of switch number N, if being occurred in that in certain feeder line, two are opened switch, not only necessarily occur isolated island section in this feeder line Point, and due to having used two to open switch, being only left N-2 opening switch will be assigned in remaining N-1 bars feeder line Go, i.e., a closed loop necessarily occurs.I.e. on the premise of the master switch number opened after ensureing reconstruct is equal to interconnection switch number, have Isolated island must then have closed loop, then must be without closed loop without isolated island.Network of the N bars feeder line with N number of interconnection switch eliminates filling for closed loop and wants accordingly The master switch number that condition is opening is equal to interconnection switch number and without isolated island.
The present invention carries out eliminating the reconstruct of isolated island using Load flow calculation.In preceding pushing back for Load flow calculation, due to isolated island Node is not connected directly or indirectly with feeder line, causes, when down back substitution calculates voltage step by step from feeder line, not traverse orphan Island node.When isolated island node is not involved in Load flow calculation, the magnitude of voltage of isolated island node can be the initial voltage of Load flow calculation.Therefore without orphan The necessary and sufficient condition on island is reduced to the nodes that magnitude of voltage after Load flow calculation is 1 and is necessarily equal to feeder line number.The elimination closed loop and isolated island Method, advantage just directly by Load flow calculation just can judge whether this reconfiguration scheme forms closed loop or isolated island, be not required to separately The subprogram called and judge closed loop and isolated island is write outward, algorithm is optimized, the arithmetic speed of reconstruct is accelerated.
Embodiment chooses IEEE16 nodes distribution network model (shown in Fig. 3) and is reconstructed algorithm simulating test.One KG sequence A reconfiguration scheme is represented, search reconfiguration scheme flow chart is as shown in Figure 2.
If Line 1 road is broken down, No. 1 downstream node is dead electricity region.If the method for exhaustion generates initial reconstitution scheme, meeting Produce 216 i.e. 65536 kinds of schemes.And restructing algorithm proposed by the present invention, it is only necessary to consider that wherein 3 is 0, it is remaining to be all 1 Situation, hasKind.In fact, after failure occurs, because the switch of isolated fault point have to be off, illustrating this position It is 0, number of combinations is further reduced toKind.The necessary and sufficient condition of isolated island is finally eliminated after cooperation Load flow calculation, i.e., is only allowed The voltage of feeder line is initial voltage, and the reconfiguration scheme quantity for being met requirement is 13 groups.It is defeated according to the ascending arrangement of network loss Go out preceding 4 groups of data, as shown in table 1.Optimal network loss reconfiguration scheme is understood to disconnect switch 1,5,15, network structure after failure reconfiguration It is topological as shown in Figure 4.
The reconstruction result table of table 1
The the first prescription case for opening switch 1,5,15 as shown in Figure 4 is can successfully to recover the power supply in dead electricity area, is also The reconfiguration scheme of optimal network loss.This algorithm can also obtain remaining scheme in addition, that is, the suboptimal solution for reconstructing.
General principle of the invention, principal character and advantages of the present invention has been shown and described above.The technology of the industry Personnel it should be appreciated that the present invention is not limited to the above embodiments, simply explanation described in above-described embodiment and specification this The principle of invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appending claims and its Equivalent thereof.

Claims (3)

1. the self-healing recovery control method of a kind of intelligent distribution network, it is characterised in that using search reconfiguration scheme, including following step Suddenly:
Step S1, initialisation switch sequence, every initial value is all 1;
Step S2, the switch number that input is broken down, the switch value of this is set to 0;
Step S3, in addition to the switch of failure, produces one group of new on off sequence;
Step S4, judges whether the master switch number opened is equal to interconnection switch number, if equal entrance S5, otherwise returns to step S3;
Step S5, calls Load flow calculation module, and returning result takes each node voltage, on off sequence, iterations, total network loss and each Branch power value;Using loss minimization as the Optimization goal of reconstruct, according to the radial design feature of power distribution network using node point The forward-backward sweep method of layer carries out distribution power system load flow calculation;
Step S6, judges to meet whether the total node number that magnitude of voltage is 1 is equal to feeder line number and node voltage and circuit work(simultaneously Rate value is less than maximum permissible value, if satisfaction enters S7, otherwise returns to step S3;Magnitude of voltage for 1 refer to magnitude of voltage be equal to it is specified Voltage;
Step S7, is sequentially output each node voltage value, correspondence on off sequence, iterations, total network loss;
Step S8, chooses the on off sequence of loss minimization as reconstruct optimal solution.
2. the self-healing recovery control method of a kind of intelligent distribution network according to claim 1, it is characterised in that radial If the master switch number opened in power distribution network is equal to interconnection switch number and system is without isolated island, the result for ensureing reconstruct is that a nothing is closed Loop network, wherein isolated island are judged by Load flow calculation module.
3. the self-healing recovery control method of a kind of intelligent distribution network according to claim 1, it is characterised in that except obtaining Reconstruct optimal solution can also obtain the suboptimal solution of reconstruct.
CN201410484757.2A 2014-09-19 2014-09-19 A kind of self-healing recovery control method of intelligent distribution network Active CN104218546B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410484757.2A CN104218546B (en) 2014-09-19 2014-09-19 A kind of self-healing recovery control method of intelligent distribution network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410484757.2A CN104218546B (en) 2014-09-19 2014-09-19 A kind of self-healing recovery control method of intelligent distribution network

Publications (2)

Publication Number Publication Date
CN104218546A CN104218546A (en) 2014-12-17
CN104218546B true CN104218546B (en) 2017-06-06

Family

ID=52099789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410484757.2A Active CN104218546B (en) 2014-09-19 2014-09-19 A kind of self-healing recovery control method of intelligent distribution network

Country Status (1)

Country Link
CN (1) CN104218546B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107872058B (en) * 2017-11-22 2021-07-02 深圳供电局有限公司 Distribution network integrated protection method fusing self-healing of line
CN112436506A (en) * 2020-10-26 2021-03-02 国网浙江省电力有限公司杭州供电公司 Power distribution network topology reconstruction method based on genetic algorithm

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103001216A (en) * 2012-03-28 2013-03-27 河海大学 Method for quickly restoring power supply of power distribution network containing distributed power source
CN103036234A (en) * 2013-01-10 2013-04-10 南京软核科技有限公司 Power distribution network anti-error optimization method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050125104A1 (en) * 2003-12-05 2005-06-09 Wilson Thomas L. Electrical power distribution control systems and processes

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103001216A (en) * 2012-03-28 2013-03-27 河海大学 Method for quickly restoring power supply of power distribution network containing distributed power source
CN103036234A (en) * 2013-01-10 2013-04-10 南京软核科技有限公司 Power distribution network anti-error optimization method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
含有微网的配电网络故障恢复重构研究;刘国栋;《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》;20120215;全文 *
基于N-1准则的配电网重构分区评估分析;方芹等;《电网技术》;20130430;第37卷(第4期);第1090-1094页 *
基于Zbus和前推回代法的配电网潮流计算;张勤等;《电力系统及其自动化学报》;20121231;第24卷(第6期);第73-77页 *

Also Published As

Publication number Publication date
CN104218546A (en) 2014-12-17

Similar Documents

Publication Publication Date Title
CN104410066B (en) A kind of mine high voltage supply system automatic short-circuit computational methods based on incidence matrix
CN105141464B (en) The grid structure planing method that a kind of power transmission and distribution are coordinated
CN105069704B (en) A kind of quick traversal reconstruction method of power distribution network improving distributed generation resource permeability
CN107017622A (en) The multiple faults multiple target of distribution containing DG combined optimization repairing recovery policy is asked for
CN111861030B (en) Urban power distribution network multi-stage planning method and system
CN108092284B (en) Three-phase unbalanced intelligent power distribution network reconstruction method based on linear model
CN103199510A (en) Ordered binary decision diagram modeling method for distribution network fault recovery
CN106684906A (en) Power system parallel recovery method used after blackouts
CN114665479B (en) Power distribution network power supply recovery method and system considering network reconfiguration
CN102403718A (en) Generating method for power grid topological relationship based on Arcgis
CN104868465A (en) Power system grid structure reconfiguration and optimization method based on fuzzy chance constraint
CN108388688A (en) A kind of active distribution network reliability estimation method
CN108616124B (en) Power distribution network reconstruction calculation method based on ordered binary decision diagram
CN109033507A (en) A kind of Model in Reliability Evaluation of Power Systems method considering the failure of information system function for monitoring
CN104143161A (en) BFS-based searching method for distribution network loops
CN107808200B (en) Short-time maintenance plan optimization method and device for power distribution network
CN104218546B (en) A kind of self-healing recovery control method of intelligent distribution network
CN113300367A (en) Online rapid identification method for key section of power grid and power transmission quota making method and device
CN114050573B (en) Fault recovery control method, device, equipment and medium for active power distribution network
CN109768543B (en) Elastic bottom-preserving net rack search modeling method based on mixed integer linear programming
CN108768748B (en) Fault diagnosis method and device for power communication service and storage medium
Zhou et al. Robustness analysis of power system dynamic process and repair strategy
CN104578055A (en) Power system transient stability simulation method based on network node numbering optimization
Han et al. Improved percolation theory incorporating power flow analysis to model cascading failures in cyber-physical power system
CN107196307A (en) A kind of method that electric network active trend is quickly estimated after transformer fault

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant