CN104217307B - A kind of informatization overall process achievement structured management and quality control method - Google Patents
A kind of informatization overall process achievement structured management and quality control method Download PDFInfo
- Publication number
- CN104217307B CN104217307B CN201410489267.1A CN201410489267A CN104217307B CN 104217307 B CN104217307 B CN 104217307B CN 201410489267 A CN201410489267 A CN 201410489267A CN 104217307 B CN104217307 B CN 104217307B
- Authority
- CN
- China
- Prior art keywords
- achievement
- function
- design
- service
- interface
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A kind of informatization overall process achievement structured management and quality control method, the steps include: step one: achievement structuring, the achievement in stage each in Information-based Item process of construction carried out structuring as requested; Step 2: achievement is monitored, the achievement in monitor message project construction process after each stage structures.Present invention achieves the standardization unified management of informatization achievement, and assets can be formed manage; Make result's management more transparent, project management is standardized more, guarantee that system is finally paid and realize being consistent not departing from original demands.
Description
Technical field
The invention belongs to informatization management-control method technical field.
Background technology
Informatization process is an organic whole, achievement directly has certain ideational, there is the value of outwardness, in process of construction, outcomes are output objects of correlated activation, in order to the quality of Safeguard Informatization Establishment better, can revise again according to the suggestion of the associated specialist from service layer, technological layer, make all kinds of achievements in informatization process really can meet business demand, reach re-set target.
The management system adopted in current Information-based Item construction mainly contains the China Project managerial knowledge system (C-PMBOK) of CMMI, PMBOK, Princes2 and domestic issue.The process management of project that what this few class management system stressed is all, perfect not to the result's management in process of construction, the management of the incidence relation between being especially short of achievement.The front and back which results in project construction disconnect, and real demand is with finally paying realization exists deviation; In project management, also have that achievement is opaque, the difficult control of progress, quality owe situation about ensureing, bring audit risk, managing risk thus.
Summary of the invention
The present invention is in order to solve an above-mentioned difficult problem: the shortcoming of incidence relation management between the weakness of result's management in Information-based Item construction and achievement.Propose a kind of informatization overall process achievement structured management and quality control method.
The present invention adopts following technical scheme to realize:
Step one: achievement structuring, the achievement in stage each in Information-based Item process of construction is carried out structuring as requested, specifically comprises:
1. business model achievement structuring: business model achievement key element comprises: operation flow, flow nodes, flow nodes is made up of " business object, business form, service management and risk point ";
2. demand analysis achievement structuring: demand analysis achievement key element comprises: function items, function subitem; Function items comprises function coding, function title and functional description, and the relation that is associated with operation flow; Function subitem comprises coding, title, description, rule-based algorithm, business object and function use-case, and the relation that is associated with flow nodes;
3. Outline Design achievement structuring: Outline Design achievement key element comprises: one-level application function, secondary application function, comprise coding, title and functional description respectively, and set up administrative relationships with appellative function subitem;
4. detailed design achievement structuring: detailed design achievement key element comprises: interface, Service Design, data modeling; Interface comprises interfacing code, interface title, interface type, source, interface, reference interface, interface element and service call relation; Service Design comprises Services Code, service code, service name, service describing, performance expectation, design constraint, the I/O entity comprised, flow process/algorithm logic, and sets up component call relation, entity associated relation and interface element incidence relation; Data modeling comprises entity code, entity title, entity description and field information, and the relation that is associated with the service related to;
5. development structuring: development key element comprises: front-end code, backstage code, database file, respectively include file title, file size, code annex, and the incidence relation of foundation and application;
Step 2: achievement is monitored, and the achievement in monitor message project construction process after each stage structures, specifically comprises:
1. monitor function items in demand analysis achievement to the undertaking of operation flow in business model achievement, function subitem to the undertaking situation of flow nodes;
2. monitor one-level application function, secondary application function in Outline Design and, to the undertaking of function subitem in demand analysis achievement, ensure the degree of conformity of design phase achievement for demand achievement;
3. monitor detailed design achievement median surface, service and data modeling to the undertaking of Outline Design;
4. monitoring structure result of design is in the situation of landing of development phase, comprising: client realizes situation for the realization of Service Design and database table for data modeling for the realization of interface, background service program.
The present invention has following technique effect:
1. realize the standardization unified management of informatization achievement, and assets can be formed manage;
2. result's management is more transparent, and project management is standardized more, and then ensures progress monitoring and quality control;
3., by the incidence relation between achievement, monitoring business demand building the undertaking situation in life cycle between a stage, guarantees that system finally pays that realizing is consistent with original demands does not depart from.
Embodiment
A kind of informatization overall process achievement structured management and quality control method, the present invention adopts following technical scheme to realize:
Step one: achievement structuring, the achievement in stage each in Information-based Item process of construction is carried out structuring as requested, specifically comprises:
1. business model achievement structuring: business model achievement key element comprises: operation flow, flow nodes, flow nodes is made up of " business object, business form, service management and risk point ";
2. demand analysis achievement structuring: demand analysis achievement key element comprises: function items, function subitem.Function items comprises function coding, function title and functional description, and the relation that is associated with operation flow; Function subitem comprises coding, title, description, rule-based algorithm, business object and function use-case, and the relation that is associated with flow nodes;
3. Outline Design achievement structuring: Outline Design achievement key element comprises: one-level application function, secondary application function.Comprise coding, title and functional description respectively, and set up administrative relationships with appellative function subitem;
4. detailed design achievement structuring: detailed design achievement key element comprises: interface, Service Design, data modeling; Interface comprises interfacing code, interface title, interface type, source, interface, reference interface, interface element and service call relation; Service Design comprises Services Code, service code, service name, service describing, performance expectation, design constraint, the I/O entity comprised, flow process/algorithm logic, and sets up component call relation, entity associated relation and interface element incidence relation; Data modeling comprises entity code, entity title, entity description and field information, and the relation that is associated with the service related to;
5. development structuring: development key element comprises: front-end code, backstage code, database file.Include file title, file size, code annex respectively, and the incidence relation of foundation and application;
Step 2: achievement is monitored, and the achievement in monitor message project construction process after each stage structures, specifically comprises:
1. monitor function items in demand analysis achievement to the undertaking of operation flow in business model achievement, function subitem to the undertaking situation of flow nodes;
2. monitor one-level application function, secondary application function in Outline Design and, to the undertaking of function subitem in demand analysis achievement, ensure the degree of conformity of design phase achievement for demand achievement;
3. monitor detailed design achievement median surface, service and data modeling to the undertaking of Outline Design;
4. monitoring structure result of design is in the situation of landing of development phase, comprising: client realizes situation for the realization of Service Design and database table for data modeling for the realization of interface, background service program.
Claims (1)
1. informatization overall process achievement structured management and a quality control method, is characterized in that, step is:
Step one: achievement structuring, the achievement in stage each in Information-based Item process of construction is carried out structuring as requested, comprising:
1) business model achievement structuring: business model achievement key element comprises, operation flow, flow nodes, flow nodes is made up of " business object, business form, service management and risk point ";
2) demand analysis achievement structuring: demand analysis achievement key element comprises: function items, function subitem; Function items comprises function coding, function title and functional description, and the relation that is associated with operation flow; Function subitem comprises coding, title, description, rule-based algorithm, business object and function use-case, and the relation that is associated with flow nodes;
3) Outline Design achievement structuring: Outline Design achievement key element comprises: one-level application function, secondary application function, comprise coding, title and functional description respectively, and set up administrative relationships with appellative function subitem;
4) detailed design achievement structuring: detailed design achievement key element comprises: interface, Service Design, data modeling; Interface comprises interfacing code, interface title, interface type, source, interface, reference interface, interface element and service call relation; Service Design comprises Services Code, service code, service name, service describing, performance expectation, design constraint, the I/O entity comprised, flow process/algorithm logic, and sets up component call relation, entity associated relation and interface element incidence relation; Data modeling comprises entity code, entity title, entity description and field information, and the relation that is associated with the service related to;
5) development structuring: development key element comprises: front-end code, backstage code, database file; Front-end code, backstage code, database file be include file title, file size, code annex respectively, and the incidence relation of foundation and application;
Step 2: achievement is monitored, and the achievement in monitor message project construction process after each stage structures, comprising:
1) function items in demand analysis achievement is monitored to the undertaking of operation flow in business model achievement, function subitem to the undertaking situation of flow nodes;
2) monitor one-level application function, secondary application function in Outline Design and, to the undertaking of function subitem in demand analysis achievement, ensure the degree of conformity of design phase achievement for demand achievement;
3) detailed design achievement median surface, service and data modeling is monitored to the undertaking of Outline Design;
4) monitoring structure result of design is in the situation of landing of development phase, comprising: client realizes situation for the realization of Service Design and database table for data modeling for the realization of interface, background service program.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410489267.1A CN104217307B (en) | 2014-09-23 | 2014-09-23 | A kind of informatization overall process achievement structured management and quality control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410489267.1A CN104217307B (en) | 2014-09-23 | 2014-09-23 | A kind of informatization overall process achievement structured management and quality control method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104217307A CN104217307A (en) | 2014-12-17 |
CN104217307B true CN104217307B (en) | 2016-04-13 |
Family
ID=52098766
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410489267.1A Active CN104217307B (en) | 2014-09-23 | 2014-09-23 | A kind of informatization overall process achievement structured management and quality control method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104217307B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107480188B (en) * | 2017-07-11 | 2020-12-04 | 中国建设银行股份有限公司 | Audit service data processing method and computer equipment |
CN107423920A (en) * | 2017-09-18 | 2017-12-01 | 安徽蓝杰鑫信息科技有限公司 | A kind of method of Power Project process management and the analysis of stage degree of conformity |
CN109858792B (en) * | 2019-01-23 | 2021-06-25 | 中广核工程有限公司 | Nuclear power station debugging test task management method and system based on test steps |
CN113254423B (en) * | 2021-06-09 | 2022-02-11 | 中航机载系统共性技术有限公司 | System file generation method, device, equipment and medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101551882A (en) * | 2008-12-31 | 2009-10-07 | 东莞市天新企业管理咨询有限公司 | Engineering management monitoring system and method |
CN102254251A (en) * | 2011-07-18 | 2011-11-23 | 广东省电力设计研究院 | Power grid three-dimensional design result data management system and digital management method thereof |
CN103279832A (en) * | 2013-06-04 | 2013-09-04 | 国家电网公司 | Transformer substation engineering construction quality supervision analysis system |
CN103400226A (en) * | 2013-07-31 | 2013-11-20 | 湖南省烟草公司永州市公司 | Integrated tobacco industry information security, operation and maintenance application platform system |
-
2014
- 2014-09-23 CN CN201410489267.1A patent/CN104217307B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101551882A (en) * | 2008-12-31 | 2009-10-07 | 东莞市天新企业管理咨询有限公司 | Engineering management monitoring system and method |
CN102254251A (en) * | 2011-07-18 | 2011-11-23 | 广东省电力设计研究院 | Power grid three-dimensional design result data management system and digital management method thereof |
CN103279832A (en) * | 2013-06-04 | 2013-09-04 | 国家电网公司 | Transformer substation engineering construction quality supervision analysis system |
CN103400226A (en) * | 2013-07-31 | 2013-11-20 | 湖南省烟草公司永州市公司 | Integrated tobacco industry information security, operation and maintenance application platform system |
Non-Patent Citations (1)
Title |
---|
企业级非结构化数据管理平台研究及实践;程志华等;《ELECTRIC POWER IT》;20121031;第10卷(第3期);第12-20页 * |
Also Published As
Publication number | Publication date |
---|---|
CN104217307A (en) | 2014-12-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104217307B (en) | A kind of informatization overall process achievement structured management and quality control method | |
Kakarontzas et al. | A conceptual enterprise architecture framework for smart cities: A survey based approach | |
CN102609813B (en) | based on the master data management architecture of cloud | |
WO2015023872A1 (en) | Model-based approach to intelligent automation in a computing domain | |
CN105164660A (en) | Cloud based service design inheritance | |
SG10201702888XA (en) | Platform for the integration of operational bim, operational intelligence, and user journeys for the simplified and unified management of smart cities | |
CN103051714A (en) | Implementation method of water conservation cloud platform | |
CN101873334A (en) | State-driven executable service flow execution method | |
CN105574135A (en) | Universal access method and universal access system for supporting heterogeneous services | |
Fukui | A systems approach to big data technology applied to supply chain | |
CN103729742B (en) | A kind of Data Resources Management System based on SOA framework and executing model drive structure | |
US20170075333A1 (en) | Planning for manufacturing environments | |
CN108108986A (en) | A kind of design method of CRM system, device and electronic equipment | |
US20120102075A1 (en) | Management of configuration data structures in multi-layer data models | |
CN105573774A (en) | Application parameter managing and configuring method | |
TW202020760A (en) | Ontologically-driven business model system and method | |
CN109981792A (en) | A kind of method and device for business processing based on cloud platform | |
US20190318282A1 (en) | Enterprise framework for efficient and adaptable workflow application data distribution | |
CN104901998A (en) | Integrated cloud service monitoring method | |
CN102571789B (en) | Degraded service replacement validating method for enhancing survivability of service oriented architecture (SOA) | |
CN101751618A (en) | Method, device and system for realizing rail traffic construction management collaborative application platform | |
Herger et al. | Breaking down the barriers for moving an enterprise to cloud | |
CA2956400A1 (en) | Circle layer system construction method and apparatus | |
Rosen | BPM and SOA | |
CN105590133B (en) | For the knowledge management method of IT system operation maintenance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |