CN104214955B - Control method for water supply system - Google Patents

Control method for water supply system Download PDF

Info

Publication number
CN104214955B
CN104214955B CN201410515071.5A CN201410515071A CN104214955B CN 104214955 B CN104214955 B CN 104214955B CN 201410515071 A CN201410515071 A CN 201410515071A CN 104214955 B CN104214955 B CN 104214955B
Authority
CN
China
Prior art keywords
water
flow
gas heater
storage tank
hot water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410515071.5A
Other languages
Chinese (zh)
Other versions
CN104214955A (en
Inventor
谢帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhu Midea Smart Kitchen Appliance Manufacturing Co Ltd
Original Assignee
Wuhu Midea Kitchen and Bath Appliances Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhu Midea Kitchen and Bath Appliances Manufacturing Co Ltd filed Critical Wuhu Midea Kitchen and Bath Appliances Manufacturing Co Ltd
Priority to CN201410515071.5A priority Critical patent/CN104214955B/en
Publication of CN104214955A publication Critical patent/CN104214955A/en
Application granted granted Critical
Publication of CN104214955B publication Critical patent/CN104214955B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

The invention discloses a control method for a water supply system. The control method for the water supply system comprises the steps of under a water use state, detecting total water discharging flow of a gas water heater and middle flow between the gas water heater and each water storage tank; judging water use points of a plurality of hot water discharging ends according to the total water discharging flow and the multiple pieces of middle flow; controlling the gas water heater and a plurality of electric heaters to be started or stopped according to positions of the water use points. The control method for the water supply system, which is disclosed by the embodiment of the invention, has the advantages that water discharging temperature can be kept constant, the hot water discharging speed is increased, cold water in a pipeline is eliminated, water is output to a plurality of water use points, the flow is high, the running mode can be adjusted according to the water use points and the like.

Description

The control method of water system
Technical field
The present invention relates to supply equipment technical field, in particular to a kind of control method of water system.
Background technology
Due to the equal Shortcomings of each energy-source water heater, as non-constant in gas heater leaving water temperature, electric heater hot water goes out Water speed is slow and leaving water temperature is uncontrollable, solar water heater larger, Teat pump boiler pipeline affected by environment has cold water.For This, some water systems adopt multi-energy source water heater to combine.But the confession water system of the multiple energy-source water heater compositions in correlation technique System can only export single use water spot and flow is less.
Content of the invention
It is contemplated that at least solving one of above-mentioned technical problem in correlation technique to a certain extent.For this reason, this A kind of control method of water system of bright proposition, the control method of this water system has and ensure that effluent temperature constancy, carries High hot water effluent's speed, eliminate pipeline inner cold water, to multiple exported with water spot and flow big, according to using water spot position adjustments The advantages of running status.
For achieving the above object, according to embodiments of the invention, a kind of control method of water system, described water supply are proposed System includes gas heater and multiple storage tank with electric heater, the water inlet of multiple described storage tanks respectively with described The delivery port of gas heater is connected, and the delivery port of the delivery port of described gas heater and multiple described storage tank connects respectively There is hot water effluent end, described control method includes:In the total water flow with water state, detecting described gas heater and Middle flow between described gas heater and each described storage tank;According to described total water flow and multiple described centre Flow judge in multiple described hot water effluent ends which be to use water spot;The heat of combustion gas described in position control according to described use water spot Hydrophone and the start and stop of multiple described electric heater.
The control method of water system according to embodiments of the present invention have ensure that effluent temperature constancy, improve hot water Go out water speed, eliminate pipeline inner cold water, exported with water spot and flow is big, run shape according to water spot position adjustments to multiple The advantages of state.
In addition, the control method of water system according to the above embodiment of the present invention can also have the technology added as follows Feature:
According to one embodiment of present invention, the position according to described use water spot, starts the independent work of described gas heater Solely mode of operation and described gas heater and described electricity add the electricity that the only mode of operation of combustion of work, described electric heater work independently One of combustion electricity complementary working mode that hot device works simultaneously.
According to one embodiment of present invention, when described total water flow is equal to one of multiple described middle flows When, judge the described hot water effluent end that the corresponding described storage tank of the described middle flow equal with described total water flow connects Use water spot for described;When described total water flow is equal to the several sum in multiple described middle flows, judge to be added Sum is equal to the described hot water effluent end that the corresponding described storage tank of several described middle flow of described total water flow connects Use water spot for described;When described total water flow is the arbitrary value of non-zero and multiple described middle flow is zero, judge institute Water spot is used for described in the described hot water effluent end stating gas heater connection;When described total water flow is more than multiple described centres When one of flow or several sum, judge sum be less than described total water flow one or several described in Between the described hot water that connects of the described hot water effluent end that connects of the corresponding described storage tank of flow and described gas heater go out Water end (W.E.) uses water spot for described.
According to one embodiment of present invention, when described total water flow is equal to one of multiple described middle flows When, start described electricity solely mode of operation or described combustion electricity complementary working mode;When described total water flow be equal to multiple described in Between several sum in flow when, start described electricity solely mode of operation or described combustion electricity complementary working mode;When described total Water flow is the arbitrary value of non-zero and when multiple described middle flow is zero, starts the only mode of operation of described combustion;When described When total water flow is more than one of multiple described middle flows or several sum, start described electricity solely mode of operation or Described combustion electricity complementary working mode.
According to one embodiment of present invention, when the hot water outlet temperature of described gas heater reaches overshoot temperature value When, start described electricity solely mode of operation.
According to one embodiment of present invention, show the hot water outlet temperature of each described storage tank.
According to one embodiment of present invention, adjust the pressure of the output hot water of described gas heater, make described combustion gas The heat outputting water of water heater enters multiple described storage tanks with constant pressure respectively.
According to one embodiment of present invention, the pressure in each described storage tank, the pressure in described storage tank are detected Power carries out pressure release to corresponding described storage tank when being more than predetermined safe pressure value.
According to one embodiment of present invention, the cold water before entering described gas heater is carried out at soft water and purification Reason.
According to one embodiment of present invention, control the chilled water flow direction entering before described gas heater, only fair The chilled water flow being permitted to enter before described gas heater flows towards described gas heater;Control described gas heater with Hot water direction between each described storage tank, only allows the heat between described gas heater and each described storage tank Water flows to described storage tank from described gas heater.
Brief description
Fig. 1 is the structural representation of water system according to embodiments of the present invention.
Fig. 2 is the flow chart of the control method of water system according to embodiments of the present invention.
Reference:Water system 1, gas heater 100, storage tank 400, hot water effluent end 610.
Specific embodiment
Embodiments of the invention are described below in detail, the example of described embodiment is shown in the drawings, wherein from start to finish The element that same or similar label represents same or similar element or has same or like function.Below with reference to attached The embodiment of figure description is exemplary it is intended to be used for explaining the present invention, and is not considered as limiting the invention.
Below with reference to the accompanying drawings the control method of water system 1 according to embodiments of the present invention is described.
As shown in figure 1, water system 1 according to embodiments of the present invention include gas heater 100 and multiple have electricity plus The storage tank 400 of hot device (not shown), the water inlet delivery port with gas heater 100 respectively of multiple storage tanks 400 It is connected, the delivery port of the delivery port of gas heater 100 and multiple storage tank 400 is connected to hot water effluent end 610.
As shown in Fig. 2 the control method of water system 1 according to embodiments of the present invention includes:
In total water flow and gas heater 100 and each water storage with water state, detecting gas heater 100 Middle flow between case 400;
Judge in multiple hot water effluent ends 610 according to described total water flow and multiple described middle flow which be use Water spot (uses the point of water);
Position control gas heater 100 according to described use water spot and the start and stop of multiple described electric heater.
The control method of water system 1 according to embodiments of the present invention, carries out the by controlling gas heater 100 to water Once heat, the hot water effluent speed of water system 1 because the efficiency of heating surface of gas heater 100 is higher, can be greatly improved, Realize instant-heating.
And, in pipeline between the hot water that gas heater 100 flows out and gas heater 100 and storage tank 400 Cold water enter hot water neutralization in storage tank 400, with storage tank 400, and be electrically heated device second and heat, control each water storage The start and stop of the electric heater in case 400, make to be heated to target temperature with the water temperature in the corresponding storage tank of water spot 400, profit Realize the complementary constant temperature of buffering with gas heater 100 and multiple storage tank 400 with electric heater, thus ensureing hot water effluent Temperature constant, no cold water in pipeline.
Additionally, by the start and stop controlling the electric heater in multiple storage tanks 400, using multiple storage tanks 400 and combustion gas Water heater 100 carries out hot water supply to multiple with water spot respectively, thus can realize multiplex water spot, big flow supplies water, and each use Water temperature balance between water spot does not interfere with each other.
In addition, by total water flow and gas heater 100 and each storage tank of detecting gas heater 100 Middle flow between 400, by the relation of relatively described total water flow and multiple described middle flow, can accurately judge Go out the position with water spot, thus according to electricity in the position control gas heater 100 of actual used water point and multiple storage tank 400 plus The start and stop of hot device, make water system 1 be adjusted to optimum state to supply hot water to water spot.
Therefore, the control method of water system 1 according to embodiments of the present invention has and ensure that effluent temperature constancy, carries High hot water effluent's speed, eliminate pipeline inner cold water, to multiple exported with water spot and flow big, according to using water spot position adjustments The advantages of running status.
Below with reference to the accompanying drawings the control method of the water system 1 according to the specific embodiment of the invention is described.
According to the position of described use water spot, start and fire only mode of operation, electricity solely mode of operation or the electric complementary working mode of combustion.
Start described combustion only mode of operation when, gas heater 100 work and multiple storage tank 400 in electric heater stop Only.When starting the only mode of operation of described electricity, the electric heater in storage tank 400 works and gas heater 100 stops.Start institute When stating the electric complementary working mode of combustion, the electric heater co-ordination in gas heater 100 and storage tank 400.
In some specific examples of the present invention, as depicted in figs. 1 and 2, when described total water flow is equal to multiple described During one of middle flow, judge the described middle flow equal with described total water flow as the water route being located with water spot, The hot water effluent end 610 that i.e. storage tank 400 corresponding with this middle flow connects is to use water spot, now starts described electricity and solely works Pattern or described combustion electricity complementary working mode.
When described total water flow is equal to the several sum in multiple described middle flows, judge described in these Middle flow is the water route being located with water spot, the hot water effluent that is, the corresponding storage tank 400 of these described middle flows connects End 610 is uses water spot, now starts described electricity solely mode of operation or described combustion electricity complementary working mode.
When described total water flow is the arbitrary value of non-zero and multiple described middle flow is zero, judge gas and hot water The hot water effluent end 610 that device 100 is directly connected to is described use water spot, now starts the only mode of operation of described combustion.
When described total water flow is more than one of multiple described middle flows or several sum, judge this The hot water effluent end 610 that the corresponding storage tank 400 of individual or several described middle flow connects is uses water spot, and and gas and hot water The hot water effluent end 610 that device 100 is joined directly together also is to use water spot, and solely mode of operation or described combustion electricity are complementary now to start described electricity Mode of operation.
By according to the position with water spot, controlling water system 1, to fire only mode of operation, electricity, solely mode of operation or combustion are electric mutually Mend mode of operation to run, such user can be according to domestic water number it is contemplated that the actual conditions such as water consumption voluntarily select.
In some specific embodiments of the present invention, when the hot water outlet temperature of gas heater 100 reaches overshoot temperature During value, start described electricity solely mode of operation.
Specifically, when tap water hydraulic of registering one's residence becomes suddenly big, gas heater 100 heats the unexpected overshoot of water temperature.Combustion gas heat When hydrophone 100 actual output temperature reaches overshoot temperature value, send closing gas heater 100 and instruct.Open with water spot pair The electric heater in storage tank 400 answered, to make up temperature drop when gas heater 100 cuts out.When the hydraulic pressure of water system 1 is extensive After multiple, recover original control logic.The fluctuation of hydraulic pressure and flow in main line thus can be eliminated.
Alternatively, with water state, showing the hot water outlet temperature of each storage tank 400, that is, each uses the water temperature of water spot. So not only facilitate the control to water system 1, and can realize visible with water spot water temperature.
In some specific examples of the present invention, the pressure of the output hot water of regulating gas water heater 100, make gas and hot water The heat outputting water of device 100 enters multiple storage tanks 400 with constant pressure respectively, thus using water spot constant temperature and pressure water outlet.
Further, in order to improve the safety and reliability of water system 1, detect the pressure in each storage tank 400, When the pressure in storage tank 400 is more than predetermined safe pressure value, pressure release is carried out to the storage tank 400 of superpressure.Wherein, described pre- Dingan County's total head force value can be arranged according to practical application and equipment requirement.
In some specific embodiments of the present invention, the cold water before entering gas heater 100 is carried out with soft water and net Change is processed.On the one hand cold water water outlet and the water quality of hot water effluent can be improved, on the other hand can improve gas heater 100 He Multiple storage tanks 400 and the service life of each pipeline.
Advantageously, control the chilled water flow direction entering before gas heater 100, only allow access into gas heater Chilled water flow before 100 flows towards gas heater 100.
Control the hot water direction between gas heater 100 and each storage tank 400, only allow gas heater Hot water between 100 and each storage tank 400 flows to described storage tank 400 from gas heater 100.So can ensure that water supply The correct flow direction in water route in system 1, prevents water route adverse current.
The concrete control method of the water system 1 according to embodiments of the present invention of citing description below.
Those skilled in the art it will be understood that in order to make it easy to understand, be described below taking two storage tanks 400 as a example (in order to distinguish label identical part, with the addition of small English alphabet after corresponding label), on this basis, only needs correspondingly Change volume, the rated load of gas heater 100 and the pipeline caliber of storage tank 400, you can according to practical application and requirement Any number of storage tank 400 is set.
As water system 1 is run under reservation use, the electric complementary duty of combustion, comfort mode.
When system uses hot water.If with water spot be only the first lavatory basin 1200, by gather first flow sensor 130, The data of second flow sensor 510 (b) and second flow sensor 510 (c) three is compared computing, and second flow senses The data of device 510 (b) and second flow sensor 510 (c) is zero, determines that only having the first lavatory basin 1200 uses water.Start combustion Solely working method.Water in water source 2 first hydraulic pressure automatic balancing arrangement 620 after gas heater 100 is heated to target flows Enter the first lavatory basin 1200 to use.Because pipeline is shorter, user's cold water stand-by period is only gas heater 100 heat time.
When system gondola water faucet 1400 (a) use hot water or the second lavatory basin 1300 (b) use hot water or gondola water faucet 1400 (a) and Second lavatory basin 1300 (b) is simultaneously using hot water.By gathering first flow sensor 130, second flow sensor 510 (b) It is compared computing, first flow sensor 130 and second flow sensing with the data of second flow sensor 510 (c) three The data of device 510 (b) is equal, determines that only having storage tank 400 (a) has hot water to export.Water in water source 2 is through gas heater 100 are heated to and flow into storage tank 400 (a) through the second hydraulic pressure automatic balancing arrangement 520 (b) after target temperature.From combustion gas heat Hydrophone 100 is to storage tank 400 (a) section system pipeline cold water and hot water neutralization in storage tank 400 (a).When in storage tank 400 (a) Because water temperature neutralization is less than target temperature, the electric heater in storage tank 400 (a) begins to warm up hot water temperature, until temperature reaches Stop to target temperature.From gas heater 100 output is target water temperature hot water, so electric heater will cut out quickly.And The hot water being target temperature that gondola water faucet 1400 (a), the second lavatory basin 1300 (b) are exported.Achieve system zero cold water with Instant-heating.By being wirelessly transferred, movable digital display controller 1500 (a) shows the output temperature of storage tank 400 (a), realizes system System terminal temperature shows.
When gondola water faucet 1400 (b) uses hot water or the second lavatory basin 1300 (c) to use hot water or gondola water faucet 1400 (b) and second Lavatory basin 1300 (c) is simultaneously using hot water.By gathering first flow sensor 130, second flow sensor 510 (b) and the The data of two flow sensor 510 (c) threes is compared computing, first flow sensor 130 and second flow sensor 510 C the data of () is equal, determine that only having storage tank 400 (b) has hot water to export.Water in water source 2 is added through gas heater 100 Heat flows into storage tank 400 (b) through the second hydraulic pressure automatic balancing arrangement 520 (c) to target temperature.From gas heater 100 To storage tank 400 (b) section system pipeline cold water and hot water neutralization in storage tank 400 (b).When the water temperature in storage tank 400 (b) because It is less than target temperature for water temperature neutralization, in storage tank 400 (b), electric heater begins to warm up, until temperature reaches target temperature and stops Only.From gas heater 100 output is target water temperature hot water, so electric heater will cut out quickly.And for gondola water faucet 1400 The b hot water being target temperature that () and the second lavatory basin 1300 (c) export.Achieve system zero cold water and instant-heating.Logical Cross and be wirelessly transferred, movable digital display controller 1500 (b) shows the output temperature of storage tank 400 (b), realize system end temperature and show Show.
When the first lavatory basin 1200 and gondola water faucet 1400 (a) are simultaneously using hot water or the first lavatory basin 1200 and the second washing Basin 1300 (b) is made with gondola water faucet 1400 (a) and the second lavatory basin 1300 (b) using hot water or the first lavatory basin 1200 simultaneously simultaneously Use hot water.By gathering first flow sensor 130, second flow sensor 510 (b) and second flow sensor 510 (c) three The data of person is compared computing, and the data of second flow sensor 510 (c) is zero and the number of second flow sensor 510 (b) According to the data less than first flow sensor 130, determine and above-mentioned use regimen condition.Because the first lavatory basin 1200 uses hot water. For safety, gas heater 100 is exported with target temperature constant temperature.Because gas heater 100 is supplied at two with water spot simultaneously, System total flow is split.Due to changes in flow rate and cold water variation in water pressure.First flow sensor 130 and second flow sensor 510 (b) automatic makes two EXIT POINT constant-temperature constant-current outputs.Because gondola water faucet 1400 (a) output flow is far longer than the first washing Basin 1200, when the hot water temperature in storage tank 400 (a) because water temperature neutralization be less than target temperature, storage tank 400a) in electricity add Hot device begins to warm up, until temperature reaches target temperature and stops.From gas heater 100 output is target water temperature hot water, institute To be closed quickly with electric heater.Ensure hot water flow, storage tank 400 (a) serves constant current effect in systems.
When the first lavatory basin 1200 and gondola water faucet 1400 (b) are simultaneously using hot water or the first lavatory basin 1200 and the second washing Basin 1300 (c) is made with gondola water faucet 1400 (b) and the second lavatory basin 1300 (c) using hot water or the second lavatory basin 1300 simultaneously simultaneously Use hot water.By gathering first flow sensor 130, second flow sensor 510 (b) and second flow sensor 510 (c) three The data of person is compared computing, and the data of second flow sensor 510 (b) is zero and the number of second flow sensor 510 (c) According to the data less than first flow sensor 130, determine and above-mentioned use regimen condition.Because the first lavatory basin 1200 uses hot water. For safety, gas heater 100 is exported with target temperature constant temperature.Because gas heater 100 is supplied at two with water spot simultaneously, System total flow is split.Due to changes in flow rate and cold water variation in water pressure.Second hydraulic pressure automatic balancing arrangement 520 and the first hydraulic pressure Automatic balancing arrangement 620 (c) automatic makes two EXIT POINT constant-temperature constant-current outputs.Due to gondola water faucet 1400 (b) output flow much More than the second lavatory basin 1300 (c), as the hot water temperature in storage tank 400 (b) accumulator tank because water temperature neutralization is less than mesh Mark temperature, the electric heater in storage tank 400 (b) begins to warm up, until temperature reaches target temperature and stops.From gas heater 100 outputs are target water temperature hot water, so electric heater will cut out quickly.Ensure hot water flow, storage tank 400 (b) is being Constant current effect is served in system.
When gondola water faucet 1400 (a) and gondola water faucet 1400 (b) are simultaneously using hot water or the second lavatory basin 1300 (b) and the second washing Basin 1300 (c) is simultaneously using hot water or gondola water faucet 1400 (a), gondola water faucet 1400 (b), the second lavatory basin 1300 (b) and the second lavatory basin 1300 (c) is simultaneously using hot water.By gathering first flow sensor 130, second flow sensor 510 (b) and second flow The data of sensor 510 (c) three is compared computing, second flow sensor 510 (c) and second flow sensor 510 (b) Data be equal to the data of first flow sensor 130, determine and above-mentioned use regimen condition.Gas heater 100 is permanent with target temperature Temperature output.Because gas heater 100 is supplied at two with water spot simultaneously, system total flow is split.Due to changes in flow rate and cold Water variation in water pressure.Second hydraulic pressure automatic balancing arrangement 520 (b) and the second hydraulic pressure automatic balancing arrangement 520 (c) automatic make two EXIT POINT constant-temperature constant-current exports.As the hot water temperature in storage tank 400 (a), storage tank 400 (b) because water temperature neutralization is less than it is The target temperature of system setting, the electric heater in storage tank 400 (a), storage tank 400 (b) begins to warm up, until temperature reaches mesh Mark temperature stops.From gas heater 100 output is target water temperature hot water, so electric heater will cut out quickly.Ensure heat Discharge, storage tank 400 (a), storage tank 400 (b) serve constant current effect in systems.
When the first lavatory basin 1200 with gondola water faucet 1400 (a), gondola water faucet 1400 (b) simultaneously using hot water or the first lavatory basin 1200 and second lavatory basin 1300 (b), the second lavatory basin 1300 (c) simultaneously using hot water or the first lavatory basin 1200 and gondola water faucet 1400 (a), gondola water faucet 1400 (b), the second lavatory basin 1300 (b), the second lavatory basin 1300 (c) are simultaneously using hot water.By collection The data of first flow sensor 130, second flow sensor 510 (b) and second flow sensor 510 (c) three is compared Compared with computing, the equal non-zero of data of second flow sensor 510 (b) and second flow sensor 510 (c) and both sums are less than the The data of one flow sensor 130, determines and above-mentioned uses regimen condition.Because the first lavatory basin 1200 uses hot water.For safety, Gas heater 100 is exported with target temperature constant temperature.Because gas heater 100 is supplied at three with water spot simultaneously, system always flows Amount is split.Due to changes in flow rate and cold water variation in water pressure.First hydraulic pressure automatic balancing arrangement 620, the second hydraulic pressure autobalance Device 520 (b), the second hydraulic pressure automatic balancing arrangement 520 (c) automatic make three EXIT POINT constant-temperature constant-current outputs.Due to gondola water faucet 1400 (a), gondola water faucet 1400 (b) output flow are far longer than the first lavatory basin 1200, when storage tank 400 (a), storage tank 400 (b) Interior hot water temperature is because water temperature neutralization is less than target temperature, storage tank 400a), the electric heater in storage tank 400 (b) starts Heating, until temperature reaches target temperature and stops.From gas heater 100 output is target water temperature hot water, so electrical heating Device will cut out quickly.Ensure hot water flow, storage tank 400 (a), storage tank 400 (b) serve constant current effect in systems.
As water system 1 is run under reservation use, the electric complementary duty of combustion, comfort mode.
When system uses hot water.First flow sensor 130 gathered data sends to.If being only the first lavatory basin with water spot 1200, by gathering first flow sensor 130, second flow sensor 510 (b) and second flow sensor 510 (c) three Data be compared computing, the data of second flow sensor 510 (b) and second flow sensor 510 (c) is zero, really Surely only have the first lavatory basin 1200 and use water.Start and fire only working method.Water in water source 2 is heated to through gas heater 100 After target, the first hydraulic pressure automatic balancing arrangement 620 flows into the first lavatory basin 1200 and uses.Because pipeline is shorter, user's cold water waits Time is only gas heater 100 heat time.
When system gondola water faucet 1400 (a) use hot water or the second lavatory basin 1300 (b) use hot water or gondola water faucet 1400 (a) and Second lavatory basin 1300 (b) is simultaneously using hot water.By gathering first flow sensor 130, second flow sensor 510 (b) It is compared computing, first flow sensor 130 and second flow sensing with the data of second flow sensor 510 (c) three The data of device 510 (b) is equal, determines that only having storage tank 400 (a) has hot water to export.Gas heater 100 starts, according to water storage Temperature in case 400 (a), enters row operation, allows gas heater 100 with target temperature to gas-fired equipment maximum temperature Variable power formula Heating.Become warm water's the second hydraulic pressure automatic balancing arrangement 520 (b) and flow into storage tank 400 (a).From gas heater 100 to water storage Case 400 (a) section system pipeline cold water and hot water neutralization in storage tank 400 (a).When in storage tank 400 (a) hot water temperature because water Middle benefit gas and be less than target temperature, the electric heater in storage tank 400 (a) begins to warm up, until temperature reaches target temperature and stops. And the hot water being target temperature that gondola water faucet 1400 (a), the second lavatory basin 1300 (b) are exported.Achieve system zero cold water With instant-heating.By being wirelessly transferred, movable digital display controller 1500 (a) shows the output temperature of storage tank 400 (a), realizes System end temperature shows.
When gondola water faucet 1400 (b) uses hot water or the second lavatory basin 1300 (c) to use hot water or gondola water faucet 1400 (b) and second Lavatory basin 1300 (c) is simultaneously using hot water.By gathering first flow sensor 130, second flow sensor 510 (b) and the The data of two flow sensor 510 (c) threes is compared computing, first flow sensor 130 and second flow sensor 510 C the data of () is equal, determine that only having storage tank 400 (b) has hot water to export.Gas heater 100 starts, according to storage tank 400 B the temperature in (), enters row operation, allow gas heater 100 to heat with target temperature to gas-fired equipment maximum temperature Variable power formula. Become warm water and flow into storage tank 400 (b) through the second hydraulic pressure automatic balancing arrangement 520 (c).From gas heater 100 output It is target water temperature hot water, so electric heater will cut out quickly.And it is defeated for gondola water faucet 1400 (b) and the second lavatory basin 1300 (c) The hot water being target temperature going out.Achieve system zero cold water and instant-heating.By being wirelessly transferred, movable digital display controller 1500 (b) shows the output temperature of storage tank 400 (b), realizes system end temperature and shows.
When the first lavatory basin 1200 and gondola water faucet 1400 (a) are simultaneously using hot water or the first lavatory basin 1200 and the second washing Basin 1300 (b) is made with gondola water faucet 1400 (a) and the second lavatory basin 1300 (b) using hot water or the first lavatory basin 1200 simultaneously simultaneously Use hot water.By gathering first flow sensor 130, second flow sensor 510 (b) and second flow sensor 510 (c) three The data of person is compared computing, and the data of second flow sensor 510 (c) is zero and the number of second flow sensor 510 (b) According to the data less than first flow sensor 130, determine and above-mentioned use regimen condition.Because the first lavatory basin 1200 uses hot water. For safety, gas heater 100 is exported with target temperature constant temperature.Because gas heater 100 is supplied at two with water spot simultaneously, System total flow is split.Due to changes in flow rate and cold water variation in water pressure.First flow sensor 130 and second flow sensor 510 (b) automatic makes two EXIT POINT constant-temperature constant-current outputs.Because gondola water faucet 1400 (a) output flow is far longer than the first washing Basin 1200, when the hot water temperature in storage tank 400 (a) because water temperature neutralization be less than target temperature, storage tank 400a) in electricity add Hot device begins to warm up, until temperature reaches target temperature and stops.From gas heater 100 output is target water temperature hot water, institute To be closed quickly with electric heater.Ensure hot water flow, storage tank 400 (a) serves constant current effect in systems.
When the first lavatory basin 1200 and gondola water faucet 1400 (b) are simultaneously using hot water or the first lavatory basin 1200 and the second washing Basin 1300 (c) is made with gondola water faucet 1400 (b) and the second lavatory basin 1300 (c) using hot water or the second lavatory basin 1300 simultaneously simultaneously Use hot water.By gathering first flow sensor 130, second flow sensor 510 (b) and second flow sensor 510 (c) three The data of person is compared computing, and the data of second flow sensor 510 (b) is zero and the number of second flow sensor 510 (c) According to the data less than first flow sensor 130, determine and above-mentioned use regimen condition.Because the first lavatory basin 1200 uses hot water. For safety, gas heater 100 is exported with target temperature constant temperature.Because gas heater 100 is supplied at two with water spot simultaneously, System total flow is split.Due to changes in flow rate and cold water variation in water pressure.Second hydraulic pressure automatic balancing arrangement 520 and the first hydraulic pressure Automatic balancing arrangement 620 (c) automatic makes two EXIT POINT constant-temperature constant-current outputs.Due to gondola water faucet 1400 (b) output flow much More than the second lavatory basin 1300 (c), as the hot water temperature in storage tank 400 (b) accumulator tank because water temperature neutralization is less than mesh Mark temperature, the electric heater in storage tank 400 (b) begins to warm up, until temperature reaches target temperature and stops.From gas heater 100 outputs are target water temperature hot water, so electric heater will cut out quickly.Ensure hot water flow, storage tank 400 (b) is being Constant current effect is served in system.
When gondola water faucet 1400 (a) and gondola water faucet 1400 (b) are simultaneously using hot water or the second lavatory basin 1300 (b) and the second washing Basin 1300 (c) is simultaneously using hot water or gondola water faucet 1400 (a), gondola water faucet 1400 (b), the second lavatory basin 1300 (b) and the second lavatory basin 1300 (c) is simultaneously using hot water.By gathering first flow sensor 130, second flow sensor 510 (b) and second flow The data of sensor 510 (c) three is compared computing, second flow sensor 510 (c) and second flow sensor 510 (b) Data be equal to the data of first flow sensor 130, determine and above-mentioned use regimen condition.Gas heater 100 starts, according to water storage Temperature in case 400 (a) and storage tank 400 (b), enters row operation, allows gas heater 100 with target temperature to gas-fired equipment High-temperature Variable power formula heats.Become warm water's the second hydraulic pressure automatic balancing arrangement 520 (b), the second hydraulic pressure automatic balancing arrangement 520 C () automatic makes two EXIT POINT constant-temperature constant-current outputs.As the hot water temperature in storage tank 400 (a), storage tank 400 (b) because Water temperature neutralization begins to warm up less than the target temperature of system setting, the electric heater in storage tank 400 (a), storage tank 400 (b), Until temperature reaches target temperature and stops.From gas heater 100 output is target water temperature hot water, so electric heater will very Fast closing.Ensure hot water flow, storage tank 400 (a), storage tank 400 (b) serve constant current effect in systems.
When the first lavatory basin 1200 with gondola water faucet 1400 (a), gondola water faucet 1400 (b) simultaneously using hot water or the first lavatory basin 1200 and second lavatory basin 1300 (b), the second lavatory basin 1300 (c) simultaneously using hot water or the first lavatory basin 1200 and gondola water faucet 1400 (a), gondola water faucet 1400 (b), the second lavatory basin 1300 (b), the second lavatory basin 1300 (c) are simultaneously using hot water.By collection The data of first flow sensor 130, second flow sensor 510 (b) and second flow sensor 510 (c) three is compared Compared with computing, the equal non-zero of data of second flow sensor 510 (b) and second flow sensor 510 (c) and both sums are less than the The data of one flow sensor 130, determines and above-mentioned uses regimen condition.Because the first lavatory basin 1200 uses hot water.For safety, Gas heater 100 is exported with target temperature constant temperature.Because gas heater 100 is supplied at three with water spot simultaneously, system always flows Amount is split.Due to changes in flow rate and cold water variation in water pressure.First hydraulic pressure automatic balancing arrangement 620, the second hydraulic pressure autobalance Device 520 (b), the second hydraulic pressure automatic balancing arrangement 520 (c) automatic make three EXIT POINT constant-temperature constant-current outputs.Due to gondola water faucet 1400 (a), gondola water faucet 1400 (b) output flow are far longer than the first lavatory basin 1200, when storage tank 400 (a), storage tank 400 (b) Interior hot water temperature is because water temperature neutralization is less than target temperature, storage tank 400a), the electric heater in storage tank 400 (b) starts Heating, until temperature reaches target temperature and stops.From gas heater 100 output is target water temperature hot water, so electrical heating Device will cut out quickly.Ensure hot water flow, storage tank 400 (a), storage tank 400 (b) serve constant current effect in systems.
In describing the invention it is to be understood that term " " center ", " longitudinal ", " horizontal ", " length ", " width ", " thickness ", " on ", D score, "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom " " interior ", " outward ", " up time The orientation of instruction such as pin ", " counterclockwise " or position relationship are based on orientation shown in the drawings or position relationship, are for only for ease of The description present invention and simplification describe, rather than the device of instruction or hint indication or element must have specific orientation, Yi Te Fixed azimuth configuration and operation, are therefore not considered as limiting the invention.
Additionally, term " first ", " second " are only used for describing purpose, and it is not intended that indicating or hint relative importance Or the implicit quantity indicating indicated technical characteristic.Thus, define " first ", the feature of " second " can express or Implicitly include one or more this feature.In describing the invention, " multiple " are meant that at least two, such as two Individual, three etc., unless otherwise expressly limited specifically.
In the present invention, unless otherwise clearly defined and limited, term " installation ", " being connected ", " connection ", " fixation " etc. Term should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or integral;Can be that machinery connects Connect or electrically connect;Can be to be joined directly together it is also possible to be indirectly connected to by intermediary, can be in two elements The connection in portion or the interaction relationship of two elements.For the ordinary skill in the art, can be according to concrete feelings Condition understands above-mentioned term concrete meaning in the present invention.
In the present invention, unless otherwise clearly defined and limited, fisrt feature second feature it " on " or D score The first and second feature directly contacts can be included not to be directly contact but passes through it is also possible to include the first and second features Between other characterisation contact.And, fisrt feature second feature " on ", that " top " and " above " include first is special Levy directly over second feature and oblique upper, or be merely representative of fisrt feature level height higher than second feature.Fisrt feature exists Second feature " under ", " lower section " and " below " include fisrt feature immediately below second feature and obliquely downward, or be merely representative of Fisrt feature level height is less than second feature.
In the description of this specification, reference term " embodiment ", " some embodiments ", " example ", " specifically show The description of example " or " some examples " etc. means specific features, structure, material or the spy describing with reference to this embodiment or example Point is contained at least one embodiment or the example of the present invention.In this manual, to the schematic representation of above-mentioned term not Identical embodiment or example must be directed to.And, the specific features of description, structure, material or feature can be in office What combine in an appropriate manner in one or more embodiments or example.Additionally, this can be said by those skilled in the art Different embodiments described in bright book or example are engaged and are combined.
Although embodiments of the invention have been shown and described above it is to be understood that above-described embodiment is example Property it is impossible to be interpreted as limitation of the present invention, those of ordinary skill in the art within the scope of the invention can be to above-mentioned Embodiment is changed, changes, replacing and modification.

Claims (7)

1. a kind of control method of water system is it is characterised in that described water system includes gas heater and multiple has The storage tank of electric heater, the water inlet of multiple described storage tanks is connected with the delivery port of described gas heater respectively, described The delivery port of the delivery port of gas heater and multiple described storage tank is connected to hot water effluent end, described control method bag Include:
In total water flow and described gas heater and each described storage with water state, detecting described gas heater Middle flow between water tank;
Judge in multiple described hot water effluent ends according to described total water flow and multiple described middle flow which be to use water Point;
Gas heater described in position control according to described use water spot and the start and stop of multiple described electric heater, according to described use The position of water spot, starts the electricity that combustion only mode of operation, the described electric heater that described gas heater works independently works independently One of combustion electricity complementary working mode that solely mode of operation and described gas heater and described electric heater work simultaneously, when When described total water flow is equal to one of multiple described middle flows, judge equal with described total water flow described in Between the described hot water effluent end that connects of the corresponding described storage tank of flow be described to use water spot;
When described total water flow is equal to the several sum in multiple described middle flows, judge that sum is equal to institute Water is used for described in the described hot water effluent end stating the corresponding described storage tank connection of several described middle flow of total water flow Point;
When described total water flow is the arbitrary value of non-zero and multiple described middle flow is zero, judge described gas and hot water Water spot is used for described in the described hot water effluent end that device connects;
When described total water flow is more than one of multiple described middle flows or several sum, judge sum The described hot water effluent that described storage tank corresponding less than the one or several described middle flow of described total water flow connects The described hot water effluent end of end and the connection of described gas heater is described use water spot, when described total water flow is equal to multiple During one of described middle flow, start described electricity solely mode of operation or described combustion electricity complementary working mode;
When described total water flow is equal to the several sum in multiple described middle flows, start described electricity solely Working mould Formula or described combustion electricity complementary working mode;
When described total water flow is the arbitrary value of non-zero and multiple described middle flow is zero, starts described combustion and solely work Pattern;
When described total water flow is more than one of multiple described middle flows or several sum, start described electricity solely Mode of operation or described combustion electricity complementary working mode.
2. the control method of water system according to claim 1 is it is characterised in that work as the hot water of described gas heater When output temperature reaches overshoot temperature value, start described electricity solely mode of operation.
3. the control method of water system according to claim 1 is it is characterised in that show the heat of each described storage tank Water output temperature.
4. the control method of water system according to claim 1 is it is characterised in that adjust the defeated of described gas heater Go out the pressure of hot water, make the heat outputting water of described gas heater enter multiple described storage tanks with constant pressure respectively.
5. the control method of water system according to claim 1 is it is characterised in that detect in each described storage tank Pressure, carries out pressure release when the pressure in described storage tank is more than predetermined safe pressure value to corresponding described storage tank.
6. water system according to claim 1 control method it is characterised in that to enter described gas heater it Front cold water carries out soft water and purified treatment.
7. the control method of water system according to claim 1 enters described gas heater it is characterised in that controlling Chilled water flow direction before, only allows access into chilled water flow before described gas heater towards described gas heater stream Dynamic;
Control the hot water direction between described gas heater and each described storage tank, only allow described gas heater Hot water and each described storage tank between flows to described storage tank from described gas heater.
CN201410515071.5A 2014-09-29 2014-09-29 Control method for water supply system Active CN104214955B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410515071.5A CN104214955B (en) 2014-09-29 2014-09-29 Control method for water supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410515071.5A CN104214955B (en) 2014-09-29 2014-09-29 Control method for water supply system

Publications (2)

Publication Number Publication Date
CN104214955A CN104214955A (en) 2014-12-17
CN104214955B true CN104214955B (en) 2017-02-15

Family

ID=52096709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410515071.5A Active CN104214955B (en) 2014-09-29 2014-09-29 Control method for water supply system

Country Status (1)

Country Link
CN (1) CN104214955B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104535349A (en) * 2014-12-29 2015-04-22 北京建筑大学 Test method and device aiming at water output system
CN104676729B (en) * 2015-02-10 2017-09-29 芜湖美的厨卫电器制造有限公司 The electric complementary hot-water system of combustion and its control method
CN106895585A (en) * 2015-12-21 2017-06-27 北京奇虎科技有限公司 Gas heater control method and device
CN112113343B (en) * 2016-12-23 2021-07-30 芜湖美的厨卫电器制造有限公司 Control system and control method of water heater
CN113537564B (en) * 2021-06-15 2024-05-10 顺德职业技术学院 Daily water quantity adjusting method based on quarterly change

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201037690Y (en) * 2007-03-12 2008-03-19 广东万和集团有限公司 Online device for gas water heater
CN101280933A (en) * 2007-04-02 2008-10-08 杨瑞宁 Combined use method of different water heaters
CN102213489A (en) * 2011-03-31 2011-10-12 广东万家乐燃气具有限公司 Method and system for parallel connection of multiple gas heaters
CN102759197A (en) * 2011-04-28 2012-10-31 朱利和 Control method of hot water supply system
CN203824042U (en) * 2014-04-28 2014-09-10 芜湖美的厨卫电器制造有限公司 Hot water system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63273757A (en) * 1987-05-01 1988-11-10 Noritsu Co Ltd Large capacity hot water maker of parallel type
US8768154B2 (en) * 2011-06-21 2014-07-01 Daichi L Nakagawa Fixed and selectively fixed bypass pumpless instantaneous / storage water heater system
JP5811053B2 (en) * 2012-07-09 2015-11-11 三菱電機株式会社 Heat exchanger and operation method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201037690Y (en) * 2007-03-12 2008-03-19 广东万和集团有限公司 Online device for gas water heater
CN101280933A (en) * 2007-04-02 2008-10-08 杨瑞宁 Combined use method of different water heaters
CN102213489A (en) * 2011-03-31 2011-10-12 广东万家乐燃气具有限公司 Method and system for parallel connection of multiple gas heaters
CN102759197A (en) * 2011-04-28 2012-10-31 朱利和 Control method of hot water supply system
CN203824042U (en) * 2014-04-28 2014-09-10 芜湖美的厨卫电器制造有限公司 Hot water system

Also Published As

Publication number Publication date
CN104214955A (en) 2014-12-17

Similar Documents

Publication Publication Date Title
CN104214961B (en) Control method for water supply system
CN104214955B (en) Control method for water supply system
US10066841B2 (en) Circulating hot water system and or appliance
CN104236102B (en) Water system
CN104214960B (en) High-temperature sterilizing method of water supplying system
CN106369807B (en) Zero cold water gas heater of one kind and its system
CN205102377U (en) Fire electric heat water system
CN101946130A (en) Water heating system and method for operating thereof
CN104676879A (en) Electric water heater, ignition point complementation water heating system and control method thereof
CN104236112B (en) The control method of water system
CN105091329B (en) The control method of heat pump hot-water system and heat pump hot-water system
EP2664858A2 (en) Gas water heater attachable with an adapter to realize central heating function
CN202419891U (en) Foot bath barrel capable of preserving water temperature
CN104676703B (en) The hybrid power hot-water heating system of gas heating pump
CN206113076U (en) Adopt warm water installation and adopt warm water system
CN104791991A (en) Gas water heater and control method thereof
CN104236113A (en) Method for controlling water supply system
CN105193275A (en) Water heating device, control method thereof and water dispenser
CN203785252U (en) Circulation type heat-pump water heater
CN203987654U (en) Water heating device and water dispenser with same
CN104654440B (en) Hot water supply system
CN103363667A (en) Application method of constant-temperature gas water heater
CN203771666U (en) Water heater
CN104676892A (en) Electric water heater, ignition point complementation water heating system and control method thereof
CN204153982U (en) Water system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220729

Address after: 241000 west side of 3 / F, No.5 office building, new energy and new materials gathering area, Fuzhou Road, Jiangbei District, Wuhu City, Anhui Province

Patentee after: Wuhu Midea intelligent kitchen electricity Manufacturing Co.,Ltd.

Address before: 241009 Wan Chun East Road, East Wuhu economic and Technological Development Zone, Wuhu, Anhui

Patentee before: WUHU MIDEA KITCHEN AND BATH APPLIANCES MFG. Co.,Ltd.