CN104211182B - Reflux vertical wet land sewage treating process and device and application - Google Patents

Reflux vertical wet land sewage treating process and device and application Download PDF

Info

Publication number
CN104211182B
CN104211182B CN201410434090.5A CN201410434090A CN104211182B CN 104211182 B CN104211182 B CN 104211182B CN 201410434090 A CN201410434090 A CN 201410434090A CN 104211182 B CN104211182 B CN 104211182B
Authority
CN
China
Prior art keywords
sewage
water
wetland
wet land
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410434090.5A
Other languages
Chinese (zh)
Other versions
CN104211182A (en
Inventor
杨扬
陈沛君
陶然
郑哲
唐小燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan University
Original Assignee
Jinan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan University filed Critical Jinan University
Priority to CN201410434090.5A priority Critical patent/CN104211182B/en
Publication of CN104211182A publication Critical patent/CN104211182A/en
Application granted granted Critical
Publication of CN104211182B publication Critical patent/CN104211182B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Landscapes

  • Purification Treatments By Anaerobic Or Anaerobic And Aerobic Bacteria Or Animals (AREA)
  • Biological Treatment Of Waste Water (AREA)

Abstract

The invention discloses the vertical wet land sewage treating process of a kind of backflow and device and application.The present invention is from top to bottom vertical current constructed wetland, horizontal drowned flow artificial wet land and tank to be combined into vertical structure, by laying water monitor to control the operating condition of circulating pump, realize the circular treatment of sewage, and relay of arranging in pairs or groups is to control to adjust every batch sewage load and process time.The present invention, compared with traditional artificial swamp, has that floor space is little, hydraulic load big, a low energy consumption, easily operation and quickly remove the advantage of pollutant, its conventional water quality effluent index CODCr、SS、TN、NH4 +~the concentration threshold (GB18918 2002) that N is limited far below municipal sewage treatment one-level A standard, water outlet pesticide concentration meets standards for drinking water quality (GB5749 2006), and water outlet content of beary metal reaches surface water II class water quality standard (GB3838 2002).The invention also achieves the automatic business processing of artificial swamp class sewage, solve dirty Organic substance in water and the problem of nitrogen pollutant once-through artificial swamp poor removal effect.

Description

Reflux vertical wet land sewage treating process and device and application
Technical field
The present invention relates to environmental project technical field of sewage, more particularly, to the one vertical wetland sewage of backflow Process technique and device.
Background technology
Artificial swamp can divide surface stream and the big class of current wetland two.It is low that surface current artificial wetland builds operating cost, can have Effect relaxes the impact of waterpower pollutional load, but floor space is big, and designed breeding is inaccurate.Drowned flow artificial wet land divides again level to dive Stream and vertical subsurface flow, its expenditure of construction relatively surface current artificial wetland is high, but can make full use of Wetland Space play plant, matrix and Synergy between the key elements such as microorganism, improves the ability removing removal organic polluter, wherein vertical current constructed wetland reoxygenation energy Power is relatively strong, and nitrification is good, and horizontal drowned flow artificial wet land is due to sewage bottom horizontal flow sheet under matrix, and reoxygenation ability is poor, easily Being formed based on anaerobe or the environment of amphimicrobe, its denitrification is preferable.
The artificial swamp of single type is often unable to reach water treatment requirement, the most domestic has engendered various combination Type artificial swamp, to reducing floor space and improving contaminant removal efficiency.The China of Application No. 200303157161.1 Patent application discloses the system and method that the hybrid constructed wetland of a kind of sewage processes, Application No. 200310111813.X Chinese patent application discloses a kind of municipal sewage combined artificial wetland denitrification and dephosphorization method, Application No. 200620022790.4 Chinese patent application disclose a kind of combined artificial wetland, the Chinese patent application of Application No. 200710015966.3 is open A kind of undercurrent-surface current composite artificial marshland, the Chinese patent application of Application No. 200710164456.1 discloses a kind of use In the stereo artificial wetland system of sewage disposal, the Chinese patent application of Application No. 200810197811.X discloses compound Vertical current artificial wetland oxygenation system, the Chinese patent application of Application No. 201110091785.4 discloses multistage composite lotus root connection Artificial wet land system and application thereof, it is wet that the Chinese patent application of Application No. 201310721638.X discloses a kind of combinatorial artificial Ground system and sewage water treatment method thereof, the Chinese patent application of Application No. 201320152135.0 discloses multi-functional compound people Work wet land system, the Chinese patent application of Application No. 201410013794.5 discloses combined wastewater treatment system System etc..But system disclosed in above-mentioned document is limited only on horizontal structure different types of artificial swamp is combined string Connection, the problem that actual solution wetland floor space is big, and all it is unable to reach the purpose quickly removing pollutant, its waterpower The time of staying, often beyond more than 1d, greatly reduces the treatment effeciency of sewage, even too much due to the wetland configuration of series connection, leads Cause difficult management, labor management is required higher.
Artificial swamp is preferable to the removal effect of ammoniacal nitrogen pollutant, but the most very manages the removal effect of nitrate nitrogen contaminants Thinking, even in negative removal efficiency, the removal efficiency ultimately resulting in total nitrogen is low.The Chinese patent Shen of Publication No. 101423297 Please disclose a kind of composite vertical current artificial wetland oxygenation system, the method is by arranging emptying bottom vertical current constructed wetland Pipe carries out intermittent aerating, creates the aerobic and environmental condition of anaerobism alternately change, but this system needs manual adjustment air pressure The ratio aeration rate of contracting machine and manual start-stop, regular job is relatively complicated and plant running parameter is difficult to regulation.How to ensure While high denitrification effect, it is achieved the automatic operating of device and the easy problem of management be technical barrier that this area is to be solved and The important directions of research.
Artificial wetland effluent backflow can be effectively improved the removal efficiency of pollutant, in Application No. 200310111813.X State's patent application discloses municipal sewage combined artificial wetland denitrification and dephosphorization method, the China of Application No. 201120098642.1 Patent application discloses artificial wetland outflow water backflow device, and the Chinese patent application of Application No. 201410013794.5 discloses Combined artificial marsh sewage treatment system etc..But above-mentioned relate to artificial wetland effluent backflow wet land technique be all to follow Ring pump is placed in and constantly runs the operating mode drawn water, and its electric energy loss is more, and the service life of circulating pump is the longest, how to control reflux pump Service condition to reduce energy consumption cost, and to reach optimal removal effect be another technical barrier that this area is to be solved.
Additionally, along with the detection in water body environment such as trace toxic pollutant such as agricultural chemicals, medicine and incretion interferent Frequency and concentrations constantly raise, and cause poisonous effect and enrichment that this pollutant is had by people, and Highest attention to aquatic ecosystem 26S Proteasome Structure and Function stabilizing influence.Artificial swamp is as a kind of novel ecological sewage treatment Technology, is used widely in the water of China processes, but compared with external progress, domestic artificial still in research Wetland removes efficiency and the mechanism stage of Conventional pollution, removes the artificial swamp work of trace toxic pollutant about artificial swamp Skill not yet has been reported that.
Summary of the invention
Present invention aims to the deficiencies in the prior art, it is provided that one can automatic operating, can directly process former Sanitary sewage, and can quickly remove COD, total nitrogen and trace toxic pollutant, save floor space and reduce returning of energy consumption Flow vertical wet field facilities for treating sewage, while ensureing high denitrification effect, it is achieved the automatic operating of device and easy management.
The object of the invention is achieved by the following technical programs:
The one vertical wet land sewage treating process of backflow is provided, comprises the following steps:
The most from top to bottom vertical current constructed wetland, horizontal drowned flow artificial wet land and tank are combined at vertical sewage Reason system;Vertical current constructed wetland, horizontal drowned flow artificial wet land and tank are connected by collector pipe and water distributor;
Described vertical current constructed wetland bottom arranges filler, filling surface planting plants;Described horizontal drowned flow artificial wet land Filler is set;
S2. sewage is drawn water by circulating pump from tank, realizes the oxygenation to sewage, sewage by single during being drawn water Plant absorption in vertical current constructed wetland, the nutriment in absorption effluent after extraction, and by photosynthetic oxygen evolution to water Body carries out oxygenation, reduces the organic loading of sewage, and the filler in vertical current constructed wetland retains, suspended particulate in absorption effluent Heavy metal in thing and sewage and difficult degradation class material, NH4 +~N is converted into NO2 -~N and NO3 -~N;Then, sewage is through level The further suction-operated of drowned flow artificial wet land, the NO in sewage2 -~N and NO3 -~N changes into nitrogen;
S3. sewage iterates through described vertical sewage disposal system and finally realizes the up to standard of effluent quality;
Wherein, described vertical sewage disposal system is Automated condtrol, and the implementation method of described Automated condtrol is: pass through Monitoring water level controls startup and the closedown of circulating pump, it is achieved the circular treatment of sewage, dirty by the single batch of Control regulation Water treating capacity and the time of process.
Preferably, described in S1, vertical current constructed wetland bottom arranges filler, and filling-material structure is gravel and two kinds of fillers of haydite, Its cobble-stone upper, haydite under.It is further preferred that the filling height ratio of the two filler is 1:1.Further preferably Ground, the filling of the two filler is highly 20cm.
Preferably, described gravel specification ε=0.4~0.5, described haydite specification ε=0.5~0.6.
Preferably, plant described in S1 is emergent aquactic plant, and the density of plantation emergent aquactic plant is 12 strains/m2.It is further preferred that Described emergent aquactic plant selects cyperus alternifolius.
Preferably, horizontal drowned flow artificial wet land described in S1 arranges filler is gravel.It is further preferred that the dress of described gravel Raising degree is 40cm.Preferably, described gravel specification ε=0.4~0.5.
The present invention provides a kind of optional Automated condtrol implementation method to be: lay water monitor in tank, if Determine high level (such as 40cm) and low water level (such as 10cm).When by relay, the work of tank outlet pipeline relay is set Between t1, time t1The sewage processed in ensureing tank can be emitted at the minimum level of outlet pipe, arranges inlet pipeline and continues Electrical work time t2, time t2Ensure at the high level that amount of inlet water reaches to arrange;T is set1And t2Interval time be t3, Time t3The time of circular treatment is entered for sewage;
Manual unlocking switchs, and the relay on outlet pipeline takes the lead in work, runs time t1After end, system is automatically switched off Relay on outlet pipeline, automatically opens up the relay on inlet pipeline simultaneously, when running between t2After end, device will not Intaking, circulating pump starts intermittent operation automatically again, and sewage enters the state of circular treatment until running time t3Terminate, single batch Secondary sewage disposal time t=t1 +t2 +t3
Preferably, described time t3It is 300~360min.It is further preferred that described time t3For 330min.
Present invention simultaneously provides the device of a kind of vertical wet land sewage treating process of described backflow, wet including perpendicular flow artificial Ground, horizontal drowned flow artificial wet land, tank, circulating pump and electromechanical box, utilize support from top to bottom by vertical current constructed wetland, water Flat drowned flow artificial wet land and tank are combined into vertical structure;
Described vertical current constructed wetland internal filling gravel and haydite, gravel upper, haydite under, gravel surface grafting wind Car grass, vertical current constructed wetland is provided with water distributor, and one end of water distributor connects circulating pump, and circulating pump connects tank, vertical current Laying collector pipe bottom artificial swamp, the delivery port of vertical current constructed wetland is located at bottom wetland, and the side of delivery port connects collection Water pipe, opposite side connects a threeway;The side connecting valve of threeway, the opposite side (bottom) of threeway connects horizontal drowned flow artificial The water distributor of wetland;
Described horizontal drowned flow artificial wet land internal filling gravel, horizontal drowned flow artificial wet land laying water distributor, water distributor is even Connect described vertical current constructed wetland collector pipe, lay collector pipe bottom horizontal subsurface flow wetland, delivery port, water outlet are set bottom wetland Mouth side connection collector pipe, opposite side one threeway of connection, one valve of threeway side connection, the top connecting water pipe of threeway, Water pipe arranges valve, and is connected with tank;
Described tank one side bottom is provided with outlet pipeline, outlet pipeline connecting tee, and threeway side connects circulating pump, separately Side connects outlet pipe;The opposite side of tank lays inlet pipeline;Water monitor, described water inlet is laid in described tank Laying relay on pipeline and outlet pipeline, relay is by electromechanical box control.
Preferably, described vertical current constructed wetland underdrain pipe is " matrix pattern ", and collector pipe two bottom sides is symmetrical 45° angle perforate, position of opening interval 5cm, aperture is 0.5cm;The delivery port of vertical current constructed wetland is located at wetland and water distributor Enter the wetland lower center position of wetland one end opposite side;
The water distributor of described horizontal drowned flow artificial wet land is laid in the delivery port with vertical current constructed wetland and is positioned at same The surface of the horizontal drowned flow artificial wet land of side, the medium position of water distributor connects the water outlet of upper vertical artificial wetland collector pipe Pipe, the symmetrical 45° angle perforate of water distributor two bottom sides, pitch of holes is 5cm, and aperture is 0.5cm, horizontal subsurface flow wetland and its cloth Laying collector pipe, the symmetrical 45° angle perforate of collector pipe two bottom sides bottom the wetland of water pipe opposite side, pitch of holes is 5cm, Aperture is 0.5cm, delivery port be arranged at the wetland bottom center of collector pipe the same side at.
It is further preferred that the length and width of the length and width of described vertical current constructed wetland, horizontal drowned flow artificial wet land and tank Identical, the present invention provides a kind of typical specifications design to be: the length and width of described vertical current constructed wetland, horizontal drowned flow artificial wet land It is respectively 80cm and 60cm with the length and width of tank, but the aspect ratio horizontal drowned flow artificial wet land of vertical current constructed wetland and water storage Pond height 15cm, for 65cm, this is to better assure that sewage will not overflow after being quickly evacuated to vertical current constructed wetland by circulating pump Go out.
Preferably the water distributor design of vertical current constructed wetland be at the water pipe connecting circulating pump, connect a threeway after again Connect two curved logical, when the water level in tank arrives at high level, and circulating pump is started working, and is taken out by sewage in 2~3 minutes To low liquid level, make the water level within vertical current constructed wetland beyond stromal surface 10~20cm, regulate vertical current constructed wetland Outlet pipe valve, sewage quickly descends bleed-through to cross collector pipe and flow to horizontal drowned flow artificial wet land surface.Described perpendicular flow artificial is wet Matrix top layer, ground plantation emergent aquactic plant, such as cyperus alternifolius, planting density is 12 strains/m2
The vertical wet field facilities for treating sewage of backflow of the present invention uses haydite and gravel as filler, and two kinds of fillers are the most honest and the cleanest Valency is easy to get.Filling kind commonly used in the art is more, and the present invention combines great many of experiments contrast by carefully analyzing research, adopts With haydite and two kinds of fillers of gravel as combination, effectively play the two complementation and synergistic effect, it is thus achieved that beyond thought well Effect.Play the big feature of haydite specific surface area, it is ensured that the effect of microorganism colonization, it is possible to COD in fast degradation sewage, BOD5、NH4 +~N and organic matter, and can the hydrophobic organic matter of strong adsorption, and due to haydite light weight, by its with gravel to fill out The ratio filling height 1:1 is pressed on gravel bottom;SS in gravel layer effectively catching sewage, the growth for plant provides fixed strip Part, will carry out quick Ammonia Nitrification effect and organic matter degradation process inside vertical current constructed wetland.The present invention is in level Around the collector pipe of drowned flow artificial wet land, select the gravel that particle diameter is bigger to prevent inside the blocking of collector pipe, beneficially wetland Form the environment based on amphimicrobe, improve device to NO3 -~the removal ability of N, sewage is flowing through the mistake of device Journey will alternately enter the environment of aerobic microbiological and amphimicrobe.
Backflow of the present invention vertical wetland sewage disposal processing means has higher hydraulic load, can effectively prevent wet Ground is internal to be blocked.
Sewage flow velocity in the vertical wet field facilities for treating sewage of reverse-flow type can be by regulation vertical current constructed wetland water outlet The valve of pipe and the valve of horizontal drowned flow artificial wet land outlet pipe are controlled, and coutroi velocity ensures that pollutant is the most fully degraded Effluent cycle number of times with necessary, finally ensures removal effect.
The removal process of pollutant is mainly included by the vertical wet field facilities for treating sewage of reverse-flow type, and circulating pump draws water at single During realize the oxygenation to sewage, improve the biodegradability of sewage;Plant absorption in vertical current constructed wetland, absorption dirt Nutriment in water, and by photosynthetic oxygen evolution, water body is carried out oxygenation, reduce the organic loading of sewage;Top layer gravel matrix is cut Stay the suspended particulate substance in sewage;Owing to haydite specific surface area is relatively big, beneficially growth of microorganism, when oozing under sewage to haydite layer, Ammonia nitrogen class material in sewage and organic matter generation Quick Oxidation effect, NH4 +~N is to NO2 -~N and NO3 -~N converts, organic matter Oxidation forms carbon dioxide;Additionally, due to gravel and the suction-operated of haydite, heavy metal and difficult degradation class material in sewage are equal Can effectively remove, at horizontal drowned flow artificial wet land, these pollutants will occur further suction-operated;At perpendicular flow artificial The NO converted in wetland2 -~N and NO3 -~N horizontal drowned flow artificial wet land based on amphimicrobe in the environment of Denitrification is occurred to change into nitrogen;Sewage iterates through the vertical wet field facilities for treating sewage of reverse-flow type thus finally realizes out Water water quality up to standard.
Use the inventive method, summed up by the attenuation change monitoring each pollutant and show that every batch sewage disposal time is About 6h i.e. can reach the optimal removal effect of pollutant, apparatus of the present invention continuously-running, can process 4 batch sewage every day.
The beneficial effect that the present invention produces:
The vertical marsh sewage treatment system of ingehious design of the present invention, and can scientifically organically combine with autocontrol method, Use single batch sewage disposal and the method for operation of intermittent circulating reflux sewage, thus efficiently and effectively decrease accounting for of wetland Ground area, and solve the problem of sewage once-through wet land system poor processing effect, the speed of its denitrogenation and degradation of organic substances and Efficiency will be better than domestic combined artificial swamp, and the advantage of its maximum is can thoroughly to realize automation after bed rearrangement device completes Run, automatically control the turnover discharge of sewage, utilize water monitor to realize circulating pump simultaneously and automatically turn on by phased manner and close Closing, whole sewage disposal process, without manual operation, thoroughly realizes automation and intellectuality runs, and effectively reduce energy consumption, can Run continuously, in addition to early stage runs debugging, daily without labor management.
Present invention process design is simple and clear, and operational management is simple, utilizes the switch of electromechanical box manipulation relay, automatically controls dirt The turnover discharge of water, utilizes water monitor to realize circulating pump simultaneously and opens and closes automatically by phased manner, whole sewage disposal Process, without manual operation, thoroughly realizes automation and intellectuality runs, and effectively reduce energy consumption, continuously-running.
Compared with the combined artificial wet land system of Present Domestic, the present invention is creatively by vertical current constructed wetland, water Flat drowned flow artificial wet land and tank are connected on vertical space, efficiently and effectively decrease the floor space of wetland, reduce energy Consumption, and solve the problem of sewage once-through wet land system poor processing effect, its denitrogenation and the speed of degradation of organic substances and efficiency Will be better than domestic combined artificial swamp, the ability that apparatus of the present invention remove pollutant is relatively strong, and its simple structure, can be by It is used for disperseing to process raw sewage, is suitable for popularization and application in the community in city and rural area, and this device can also effectively remove depollution Trace toxic pollutant in water body, such as agricultural chemicals, medicine, incretion interferent and heavy metal etc..
Accompanying drawing explanation
Fig. 1 is the reverse-flow type vertical wet field facilities for treating sewage structural representation of invention.
Fig. 2 is horizontal drowned flow artificial wet land left view.
Detailed description of the invention
The invention will be further described with embodiment below in conjunction with the accompanying drawings, and unless stated otherwise, it is former that the present invention uses Material and equipment are raw material and the equipment of the art routine.
Embodiment 1
The present embodiment provide one reflux vertical wet land sewage treating process in order to process sanitary sewage (derive from rural area and The sewage that town dweller discharges every day), comprise the following steps:
The most from top to bottom vertical current constructed wetland, horizontal drowned flow artificial wet land and tank are combined at vertical sewage Reason system;Vertical current constructed wetland, horizontal drowned flow artificial wet land and tank are connected by collector pipe and water distributor;
Described vertical current constructed wetland bottom arranges filler, filling surface planting plants;Described horizontal drowned flow artificial wet land Filler is set;
S2. sewage is drawn water by circulating pump from tank, realizes the oxygenation to sewage, sewage by single during being drawn water Plant absorption in vertical current constructed wetland, the nutriment in absorption effluent after extraction, and by photosynthetic oxygen evolution to water Body carries out oxygenation, reduces the organic loading of sewage, and the filler in vertical current constructed wetland retains, suspended particulate in absorption effluent Heavy metal in thing and sewage and difficult degradation class material, NH4 +~N is converted into NO2 -~N and NO3 -~N;Then, sewage is through level The further suction-operated of drowned flow artificial wet land, the NO in sewage2 -~N and NO3 -~N changes into nitrogen;
S3. sewage iterates through described vertical sewage disposal system and finally realizes the up to standard of effluent quality;
Wherein, described vertical sewage disposal system is Automated condtrol, and the implementation method of described Automated condtrol is: pass through Monitoring water level controls startup and the closedown of circulating pump, it is achieved the circular treatment of sewage, dirty by the single batch of Control regulation Water treating capacity and the time of process.
Using the inventive method, the process flow direction of sewage is: the wastewater level in tank reaches the height of water monitor Liquid level end, connects the power supply of circulating pump, and sewage is quickly pumped down to vertical current constructed wetland from tank, the sewage water in tank Potential drop, to the low liquid level end of water monitor, disconnects circulating pump power supply, oozes, pass through under the sewage gravity in vertical current constructed wetland The collector pipe of vertical current constructed wetland enters the water distributor of horizontal drowned flow artificial wet land, arrives horizontal drowned flow artificial wet land, sewage Ooze from the water distributor of horizontal drowned flow artificial wet land, be gradually filled with horizontal drowned flow artificial wet land from bottom to top, when the dirt that it is internal Water liquid level is up to the standard undercurrent outlet pipe position, and the sewage that sewage oozes under continuing at extruding horizontal drowned flow artificial wet land collector pipe leads to Cross outlet pipe and enter tank.Circulation is carried out.
Preferably, described in S1, vertical current constructed wetland bottom arranges filler, and filling-material structure is gravel and two kinds of fillers of haydite, Its cobble-stone upper, haydite under.It is further preferred that the filling height ratio of the two filler is 1:1.Further preferably Ground, the filling of the two filler is highly 20cm.
Preferably, described gravel specification ε=0.4~0.5, described haydite specification ε=0.5~0.6.
Preferably, plant described in S1 is emergent aquactic plant, and the density of plantation emergent aquactic plant is 12 strains/m2.It is further preferred that Described emergent aquactic plant selects cyperus alternifolius.
Preferably, horizontal drowned flow artificial wet land described in S1 arranges filler is gravel.It is further preferred that the dress of described gravel Raising degree is 40cm.Preferably, described gravel specification ε=0.4~0.5.
Automated condtrol process is arranged:
S1 arranges outlet pipeline relay working time t on electromechanical box1=22 min, (time t1Tank need to be ensured The sewage inside processed can be emitted at the minimum level of outlet pipe 11);Inlet pipeline relay working time t is set2= 8 Min, (time t2Need to ensure that amount of inlet water can reach at high level, the present embodiment lays water monitor in tank, if Determining high level is 40cm, and low water level is 10cm);The interval time arranging relay two task is t3=330 min, (time t3 According to the time point that pollutant removal is best);
S2 manual unlocking electromechanical box switchs, and the relay on outlet pipeline takes the lead in work, runs time t1After end, system The relay being automatically switched off on outlet pipeline, automatically opens up the relay on inlet pipeline simultaneously, when running between t2After end, Device will no longer be intake, and circulating pump 4 starts intermittent operation automatically, and sewage enters the state of circular treatment until running time t3 Terminate.
Single batch sewage disposal time t=t1 +t2 +t3= 360 min。
t3During=330min, reverse-flow type vertical wet land sewage treating process Inlet and outlet water water quality and elimination capacity are recorded in table 1.
Table 1 reverse-flow type vertical wet land sewage treating process Inlet and outlet water water quality and elimination capacity
Note: n=14, every batch processed sewage 250L, the process time is 6h, can process 4 batch sewage every day.
The present embodiment can effectively control the service condition of reflux pump, reduces energy consumption cost, and reaches optimal removal effect, Conventional water quality effluent index CODCr、SS、TN、NH4 +~the concentration threshold that N is limited far below municipal sewage treatment one-level A standard (GB18918-2002).
Embodiment 2
The present embodiment provides a kind of vertical wet land sewage treating process that refluxes to process and (is derived from agriculture by the sewage of pollution by pesticides Industry pollution of area source), comprise the following steps:
The most from top to bottom vertical current constructed wetland, horizontal drowned flow artificial wet land and tank are combined at vertical sewage Reason system;Vertical current constructed wetland, horizontal drowned flow artificial wet land and tank are connected by collector pipe and water distributor;
Described vertical current constructed wetland bottom arranges filler, filling surface planting plants;Described horizontal drowned flow artificial wet land Filler is set;
S2. sewage is drawn water by circulating pump from tank, realizes the oxygenation to sewage, sewage by single during being drawn water Plant absorption in vertical current constructed wetland, the nutriment in absorption effluent after extraction, and by photosynthetic oxygen evolution to water Body carries out oxygenation, reduces the organic loading of sewage, and the filler in vertical current constructed wetland retains, suspended particulate in absorption effluent Heavy metal in thing and sewage and difficult degradation class material, NH4 +~N is converted into NO2 -~N and NO3 -~N;Then, sewage is through level The further suction-operated of drowned flow artificial wet land, the NO in sewage2 -~N and NO3 -~N changes into nitrogen;
S3. sewage iterates through described vertical sewage disposal system and finally realizes the up to standard of effluent quality;
Wherein, described vertical sewage disposal system is Automated condtrol, and the implementation method of described Automated condtrol is: pass through Monitoring water level controls startup and the closedown of circulating pump, it is achieved the circular treatment of sewage, dirty by the single batch of Control regulation Water treating capacity and the time of process.
Using the inventive method, the process flow direction of sewage is: the wastewater level in tank reaches the height of water monitor Liquid level end, connects the power supply of circulating pump, and sewage is quickly pumped down to vertical current constructed wetland from tank, the sewage water in tank Potential drop, to the low liquid level end of water monitor, disconnects circulating pump power supply, oozes, pass through under the sewage gravity in vertical current constructed wetland The collector pipe of vertical current constructed wetland enters the water distributor of horizontal drowned flow artificial wet land, arrives horizontal drowned flow artificial wet land, sewage Ooze from the water distributor of horizontal drowned flow artificial wet land, be gradually filled with horizontal drowned flow artificial wet land from bottom to top, when the dirt that it is internal Water liquid level is up to the standard undercurrent outlet pipe position, and the sewage that sewage oozes under continuing at extruding horizontal drowned flow artificial wet land collector pipe leads to Cross outlet pipe and enter tank.Circulation is carried out.
Preferably, described in S1, vertical current constructed wetland bottom arranges filler, and filling-material structure is gravel and two kinds of fillers of haydite, Its cobble-stone upper, haydite under.It is further preferred that the filling height ratio of the two filler is 1:1.Further preferably Ground, the filling of the two filler is highly 20cm.
Preferably, described gravel specification ε=0.4~0.5, described haydite specification ε=0.5~0.6.
Preferably, plant described in S1 is emergent aquactic plant, and the density of plantation emergent aquactic plant is 12 strains/m2.It is further preferred that Described emergent aquactic plant selects cyperus alternifolius.
Preferably, horizontal drowned flow artificial wet land described in S1 arranges filler is gravel.It is further preferred that the dress of described gravel Raising degree is 40cm.Preferably, described gravel specification ε=0.4~0.5.
Automated condtrol process is arranged:
S1 arranges outlet pipeline relay working time t on electromechanical box1=22 min, (time t1Tank need to be ensured The sewage inside processed can be emitted at the minimum level of outlet pipe 11);Inlet pipeline relay working time t is set2= 8 Min, (time t2Need to ensure that, at the high level that amount of inlet water can reach to arrange, the present embodiment lays water level prison in tank Control device, sets high level as 40cm, and low water level is 10cm);The interval time arranging relay two task is t3= 330 Min, (time t3According to the time point that pollutant removal is best);
S2 manual unlocking electromechanical box switchs, and the relay on outlet pipeline takes the lead in work, runs time t1After end, system The relay being automatically switched off on outlet pipeline, automatically opens up the relay on inlet pipeline simultaneously, when running between t2After end, Device will no longer be intake, and circulating pump starts intermittent operation automatically, and sewage enters the state of circular treatment until running time t3 Terminate.
Single batch sewage disposal time t=t1 +t2 +t3= 360 min。
t3During=330 min, reverse-flow type vertical wet land sewage treating process Inlet and outlet water water quality and elimination capacity are recorded in table 2.
Table 2 reverse-flow type vertical wet land sewage treating process Inlet and outlet water water quality and elimination capacity
Note: n=14, every batch processed sewage 250L, the process time is 6h, can process 4 batch sewage every day.
The present embodiment routine water quality effluent index CODCr、TN、NH4 +~N is far below municipal sewage treatment one-level A standard institute The concentration threshold (GB18918-2002) limited, water outlet pesticide concentration meets standards for drinking water quality (GB5749-2006).
Embodiment 3
The present embodiment provides a kind of vertical wet land sewage treating process that refluxes to process and (is derived from by the sewage of heavy metal pollution Industrial wastewater discharge), comprise the following steps:
The most from top to bottom vertical current constructed wetland, horizontal drowned flow artificial wet land and tank are combined at vertical sewage Reason system;Vertical current constructed wetland, horizontal drowned flow artificial wet land and tank are connected by collector pipe and water distributor;
Described vertical current constructed wetland bottom arranges filler, filling surface planting plants;Described horizontal drowned flow artificial wet land Filler is set;
S2. sewage is drawn water by circulating pump from tank, realizes the oxygenation to sewage, sewage by single during being drawn water Plant absorption in vertical current constructed wetland, the nutriment in absorption effluent after extraction, and by photosynthetic oxygen evolution to water Body carries out oxygenation, reduces the organic loading of sewage, and the filler in vertical current constructed wetland retains, suspended particulate in absorption effluent Heavy metal in thing and sewage and difficult degradation class material, NH4 +~N is converted into NO2 -~N and NO3 -~N;Then, sewage is through level The further suction-operated of drowned flow artificial wet land, the NO in sewage2 -~N and NO3 -~N changes into nitrogen;
S3. sewage iterates through described vertical sewage disposal system and finally realizes the up to standard of effluent quality;
Wherein, described vertical sewage disposal system is Automated condtrol, and the implementation method of described Automated condtrol is: pass through Monitoring water level controls startup and the closedown of circulating pump, it is achieved the circular treatment of sewage, dirty by the single batch of Control regulation Water treating capacity and the time of process.
Using the inventive method, the process flow direction of sewage is: the wastewater level in tank reaches the height of water monitor Liquid level end, connects the power supply of circulating pump, and sewage is quickly pumped down to vertical current constructed wetland from tank, the sewage water in tank Potential drop, to the low liquid level end of water monitor, disconnects circulating pump power supply, oozes, pass through under the sewage gravity in vertical current constructed wetland The collector pipe of vertical current constructed wetland enters the water distributor of horizontal drowned flow artificial wet land, arrives horizontal drowned flow artificial wet land, sewage Ooze from the water distributor of horizontal drowned flow artificial wet land, be gradually filled with horizontal drowned flow artificial wet land from bottom to top, when the dirt that it is internal Water liquid level is up to the standard undercurrent outlet pipe position, and the sewage that sewage oozes under continuing at extruding horizontal drowned flow artificial wet land collector pipe leads to Cross outlet pipe and enter tank.Circulation is carried out.
Preferably, described in S1, vertical current constructed wetland bottom arranges filler, and filling-material structure is gravel and two kinds of fillers of haydite, Its cobble-stone upper, haydite under.It is further preferred that the filling height ratio of the two filler is 1:1.Further preferably Ground, the filling of the two filler is highly 20cm.
Preferably, described gravel specification ε=0.4~0.5, described haydite specification ε=0.5~0.6.
Preferably, plant described in S1 is emergent aquactic plant, and the density of plantation emergent aquactic plant is 12 strains/m2.It is further preferred that Described emergent aquactic plant selects canna.
Preferably, horizontal drowned flow artificial wet land described in S1 arranges filler is gravel.It is further preferred that the dress of described gravel Raising degree is 40cm.Preferably, described gravel specification ε=0.4~0.5.
Automated condtrol process is arranged:
S1 arranges outlet pipeline relay working time t on electromechanical box1=22 min, (time t1Tank need to be ensured The sewage inside processed can be emitted at the minimum level of outlet pipe 11);Inlet pipeline relay working time t is set2= 8 Min, (time t2Need to ensure that amount of inlet water can reach at high level, the present embodiment lays water monitor in tank, if Determining high level is 40cm, and low water level is 10cm);The interval time arranging relay two task is t3=330 min, (time t3 According to the time point that pollutant removal is best);
S2 manual unlocking electromechanical box switchs, and the relay on outlet pipeline takes the lead in work, runs time t1After end, system The relay being automatically switched off on outlet pipeline, automatically opens up the relay 15 on inlet pipeline simultaneously, when running between t2Terminate After, device will no longer be intake, and circulating pump 4 starts intermittent automatically operation, when sewage enters the state of circular treatment until running Between t3Terminate.
Single batch sewage disposal time t=t1 +t2 +t3= 360 min。
t3During=330min, reverse-flow type vertical wet land sewage treating process Inlet and outlet water water quality and elimination capacity are recorded in table 3.
Table 3 reverse-flow type vertical wet land sewage treating process Inlet and outlet water water quality and elimination capacity
Note: n=14, every batch processed sewage 250L, the process time is 6h, can process 4 batch sewage every day.
The present embodiment effectively controls the service condition of reflux pump, reduces energy consumption cost, and reaches optimal removal effect, often Rule water quality effluent index CODCr、SS、TN、NH4 +~the concentration threshold that N is limited far below municipal sewage treatment one-level A standard (GB18918-2002), water outlet content of beary metal reaches surface water II class water quality standard (GB3838-2002).
Embodiment 4
The present embodiment provides the apparatus system of a kind of optimization, in order to more efficiently to realize present invention process.
Reflux described in the present embodiment vertical wet field facilities for treating sewage structural representation as shown in Figure 1, including upper strata hang down Direct current artificial swamp 3, intermediate layer horizontal drowned flow artificial are wet 2, bottom tank 1, circulating pump 4 and electromechanical box 12, utilize support 18 From top to bottom vertical current constructed wetland 3, horizontal drowned flow artificial wet land 2 and tank 1 are combined into vertical structure.
The inside filling gravel 7 and haydite 8 of described vertical current constructed wetland 3, gravel 7 upper, haydite 8 under, gravel 7 table Face plantation cyperus alternifolius 6, vertical current constructed wetland 3 is provided with water distributor 9, and one end of water distributor 9 connects circulating pump 4, and circulating pump 4 connects Tank 1, lays collector pipe 10 bottom vertical current constructed wetland 3, the delivery port of vertical current constructed wetland is located at bottom wetland, is gone out The side at the mouth of a river connects collector pipe 10, and opposite side connects a threeway;The side connecting valve of threeway, the bottom of threeway connects water The water distributor 12 of flat drowned flow artificial wet land;
Described horizontal drowned flow artificial wet land 2 internal filling gravel 7, horizontal drowned flow artificial wet land 2 lays water distributor 12, water distribution Pipe 12 connects described vertical current constructed wetland collector pipe 10, lays collector pipe 11, set bottom wetland 2 bottom horizontal subsurface flow wetland 2 Putting delivery port, delivery port side connects collector pipe 11, and opposite side connects a threeway, and threeway side connects a valve, threeway Top connecting water pipe, water pipe arranges valve, and is connected with tank 1;
Described tank 1 one side bottom is provided with outlet pipeline, outlet pipeline connecting tee, and threeway side connects circulating pump 4, Opposite side connects outlet pipe 13;The opposite side of tank 1 lays inlet pipeline 14;Water monitor is laid in described tank 1 5, described inlet pipeline and outlet pipeline are laid relay 15, relay 15 is controlled by electromechanical box 16.In Fig. 1, arrow is sewage Flow direction signal in the vertical wet field facilities for treating sewage of reverse-flow type.
For convenience of description, the present embodiment further provides for following design specification: the length and width of upper vertical artificial wetland 3 High respectively 80cm, 60cm, 65cm, the length, width and height of intermediate layer horizontal drowned flow artificial wet land 2 are respectively 80cm, 60cm, 50cm, the end The length, width and height of layer tank 1 are respectively 80cm, 60cm, 50cm.The aspect ratio horizontal drowned flow artificial wet land of vertical current constructed wetland With tank height 15cm, can better assure that sewage will not overflow after being quickly evacuated to vertical current constructed wetland by circulating pump.At steel Being combined into vertical structure under the support of support 18, the size of three pond bodies suitably can be amplified according to the ratio of its length, width and height With reduce, with pvc pipe (Ф 32mm) structure collector pipe and water distributor to connect three pond bodies, by water monitor 5 control circulate The startup of pump 4 and closedown, it is achieved the circular treatment of sewage, and relay 15 of arranging in pairs or groups with the single batch sewage load of control and regulation and The process time, the operating mode of relay 15 and circulating pump 4 is controlled by electromechanical box 16.
Described vertical current constructed wetland 3 can effectively remove SS, COD, the BOD in sewage5And NH4 +-N, its internal filling Gravel 7(ε=0.4~0.5) and haydite 8(ε=0.5~0.6), filling-material structure be gravel upper, haydite under, the dress of two kinds of fillers Raising degree is all 20cm, uses haydite and two kinds of fillers of gravel as combination, effectively plays the two complementation and synergistic effect, obtain Obtain beyond thought good result.Play the feature that haydite specific surface area is big, it is ensured that the effect of microorganism colonization, it is possible to fast prompt drop Solve COD, the BOD in sewage5、NH4 +~N and organic matter, and can the hydrophobic organic matter of strong adsorption, and due to haydite light weight, Itself and gravel are pressed on gravel bottom with the ratio of packed height 1:1;SS in gravel layer effectively catching sewage, for the life of plant Long offer rigid condition, will carry out quick Ammonia Nitrification effect and organic matter degradation process inside vertical current constructed wetland. At gravel surface grafting cyperus alternifolius 6 (12 strains/m2), the water distributor 9 of vertical current constructed wetland is the water pipe connecting circulating pump 4, connects One threeway, threeway both sides respectively connect one curved logical, lay " matrix pattern " collector pipe 10, collector pipe bottom vertical current constructed wetland 3 10 two bottom sides symmetrical 45Angle perforate, position of opening interval 5cm, aperture is 0.5cm, the water outlet of vertical current constructed wetland Mouth is located at body bottom right side middle position, pond, and left side connects collector pipe, and right side connects a threeway, and the right side of threeway connects valve Door, bottom connects the water distributor 12 of horizontal drowned flow artificial wet land.Described horizontal drowned flow artificial wet land 2 can effectively be removed in sewage SS, COD, BOD5And NO3 --N, its internal filling gravel 7(ε=0.4 ~ 0.5), filling height is inside 40cm, beneficially wetland Form amphimicrobian environment, improve device to NO3 -The removal ability of-N, sewage will alternately enter during flowing through device Aerobic and amphimicrobian environment.The right lateral surface of horizontal drowned flow artificial wet land lays water distributor 12, the middle position of water distributor 12 Put connect upper vertical artificial wetland 3 collector pipe 10 outlet pipe, the symmetrical 45° angle perforate of water distributor 12 two bottom sides, Pitch of holes is 5cm, and aperture is 0.5cm, and horizontal subsurface flow wetland 2 left bottom lays collector pipe 11, about collector pipe two bottom sides Symmetrical 45° angle perforate, pitch of holes is 5cm, and aperture is 0.5cm, arranges delivery port in pond body left bottom centre, and delivery port is right Side connects collector pipe, and left side connects a threeway, connects a valve on the left of threeway, and top connects " day font " water pipe 11, water Flat current wetland 2 left view is as shown in Figure 2.Arranging valve at intermediate lateral water pipe, right side longitudinal direction water pipe accesses tank 1.The perforate at left side central portion distance bottom 5cm of described tank 1 connects pvc pipe, connects with threeway, and left side connects circulating pump 4(merit Rate is 370W), other one connects outlet pipe 13, and a water inlet pipe 14, additionally cloth in tank are laid in the right side of tank 1 If water monitor 5, setting high water level as 40cm, low water level is 10cm.Circulating pump 4 extracts the water yield of sewage every time and accounts for sewage The 4/5 of total amount.Laying relay 15 on the inlet pipeline 14 and outlet pipeline 13 of tank 1, relay 15 is by electromechanical box 16 Controlling, the operation principle of relay 15 is that sewage can pass through pipeline after powered up, and deenergization sewage is i.e. plugged.Work as tank Water level in 1 arrives at high level, and circulating pump 4 is started working, and is evacuated to by sewage at low liquid level, makes vertical current in 2~3 minutes Water level within artificial swamp exceeds stromal surface 10~20cm, and the outlet pipe valve of regulation vertical current constructed wetland, sewage is fast The lower bleed-through of speed is crossed collector pipe and is flow to horizontal drowned flow artificial wet land surface.
Electromechanical box 16 arranges outlet pipeline relay 15 working time t1=22 min, (time t1Water storage need to be ensured The sewage processed in pond 1 can be emitted at the minimum level of outlet pipe 11);Inlet pipeline relay 15 working time is set t2=8 min, (time t2Need to ensure that amount of inlet water can reach at high level, i.e. at 40cm);15 liang of tasks of relay are set Interval time be t3=330 min, (time t3According to the time point that pollutant removal is best);
S2 the present embodiment lays water monitor in tank, sets high level as 40cm, and low water level is 10cm.First Manual unlocking electromechanical box 16 switchs, and the relay 15 on outlet pipeline takes the lead in work, the sewage processed in need to ensureing tank 1 Can be emitted at the minimum level of outlet pipe, after the operation time terminates, the relay 15 that system is automatically switched off on outlet pipeline, Automatically open up the relay 15 on inlet pipeline simultaneously, need to ensure that amount of inlet water can reach at high level, the water in tank Position arrives high water level, connects circulating pump 4 power supply, and sewage is extracted to upper strata vertical current constructed wetland 3, water storage by circulating pump 4 automatically In pond 1, water level drops at low water level, and circulating pump 4 power supply disconnects, and sewage is dived through vertical current constructed wetland 3 and level from top to bottom Tank 1 is flowed into, when water level reaches to repeat this cyclic process at high level after artificial wetland 2.
The operation time: manual unlocking electromechanical box 16 switchs, the relay 15 on outlet pipeline takes the lead in work, runs time t1 After end, the relay 15 that system is automatically switched off on outlet pipeline, automatically open up the relay 15 on inlet pipeline simultaneously, work as fortune Row time t2After end, device will no longer be intake, and circulating pump 4 starts intermittent operation automatically, and sewage enters the shape of circular treatment State is until running time t3Terminate.
Single batch sewage disposal time t=t1 +t2 +t3= 360 min。
t3During=330min, reverse-flow type vertical wet land sewage treating process Inlet and outlet water water quality and elimination capacity are recorded in table 4.
Table 4 reverse-flow type vertical wet field facilities for treating sewage Inlet and outlet water water quality and elimination capacity
Note: n=14, every batch processed sewage 250L, the process time is 6h, can process 4 batch sewage every day.
The present embodiment routine water quality effluent index CODCr、SS、TN、NH4 +~N is far below municipal sewage treatment one-level A standard The concentration threshold (GB18918-2002) limited, water outlet pesticide concentration meets standards for drinking water quality (GB5749- 2006), water outlet content of beary metal reaches surface water II class water quality standard (GB3838-2002).
Being summed up by a large amount of long term tests and embodiment and find, present invention process is simple and clear, and operational management is simple, utilizes electromechanics The switch of case manipulation relay, automatically controls the turnover discharge of sewage, utilizes water monitor to realize circulating pump discontinuity simultaneously Open and close automatically, whole sewage disposal process, without manual operation, thoroughly realizes automation and intelligent runs, and having Effect reduces energy consumption, continuously-running.

Claims (10)

1. the vertical wet land sewage treating process that refluxes, it is characterised in that comprise the following steps:
The most from top to bottom vertical current constructed wetland, horizontal drowned flow artificial wet land and tank are combined into vertical sewage disposal system System;Vertical current constructed wetland, horizontal drowned flow artificial wet land and tank are connected by collector pipe and water distributor;
Described vertical current constructed wetland bottom arranges filler, filling surface planting plants;Described horizontal drowned flow artificial wet land is arranged Filler;
S2. sewage is drawn water by circulating pump from tank, realizes the oxygenation to sewage by single during being drawn water, and sewage is extracted out After the plant absorption in vertical current constructed wetland, the nutriment in absorption effluent;Plant secretes oxygen effect by rhizosphere will The oxygen that leaf photosynthesis produces is transported to root, and water body carries out oxygenation, promotes that rhizosphere microorganism is to organic aerobic Degraded and nitrification, NH4 +~N is converted into NO2 -~N and NO3 -~N, reduce the organic loading of sewage;Vertical current constructed wetland In filler retain, suspended particulate substance, heavy metal and difficult degradation class material in absorption effluent;Then, sewage is through horizontal drowned flow The suction-operated of artificial swamp and microorganism denitrification, by the NO in sewage2 -~N and NO3 -~N changes into nitrogen;
S3. sewage iterates through described vertical sewage disposal system and finally realizes the up to standard of effluent quality;
Wherein, described vertical sewage disposal system is Automated condtrol, and the implementation method of described Automated condtrol is: pass through water level Monitoring controls startup and the closedown of circulating pump, it is achieved the circular treatment of sewage, at the single batch sewage of Control regulation Reason amount and the time of process;
The implementation method of described Automated condtrol is: arrange tank outlet pipeline relay working time t by relay1, time Between t1The sewage processed in ensureing tank can be emitted at the minimum level of outlet pipe, arranges inlet pipeline relay work Make time t2, time t2Ensure that amount of inlet water reaches at the high level of tank;T is set1And t2Interval time be t3, time t3 The time of circular treatment is entered for sewage;
Manual unlocking switchs, and the relay on outlet pipeline takes the lead in work, runs time t1After end, system is automatically switched off water outlet Relay on pipeline, automatically opens up the relay on inlet pipeline simultaneously, when running between t2After end, device will no longer enter Water, circulating pump starts intermittent operation automatically, and sewage enters the state of circular treatment until running time t3Terminating, single batch is dirty Treatment time of water t=t1+t2+t3
The design of the water distributor of described vertical current constructed wetland be connect circulating pump water pipe at connect a threeway after reconnect Two curved logical.
The most according to claim 1, reflux vertical wet land sewage treating process, it is characterised in that described in S1, perpendicular flow artificial is wet Ground bottom filler is set, filling-material structure is gravel and two kinds of fillers of haydite, its cobble-stone upper, haydite under;The two is filled out The filling height ratio of material is 1:1.
The most according to claim 1, reflux vertical wet land sewage treating process, it is characterised in that horizontal drowned flow artificial described in S1 It is gravel that wetland arranges filler.
The most according to claim 1, reflux vertical wet land sewage treating process, it is characterised in that described in S1, plant is planted for very water Thing, the density of plantation emergent aquactic plant is 12 strains/m2
The most according to claim 1, reflux vertical wet land sewage treating process, it is characterised in that described time t3Be 300~ 360min。
6. according to the application of technique described in any one of claim 1 to 5, it is characterised in that be applied to sanitary sewage, by agricultural chemicals dirt The sewage of dye, the sewage by heavy metal pollution, the waste water control aspect polluted by antibiotic and/or incretion interferent.
7. realize refluxing described in any one of claim 1 to 5 device of vertical wet land sewage treating process, and its feature exists In, including vertical current constructed wetland, horizontal drowned flow artificial wet land, tank, circulating pump and electromechanical box, utilize support from top to bottom Vertical current constructed wetland, horizontal drowned flow artificial wet land and tank are combined into vertical structure;
Described vertical current constructed wetland internal filling gravel and haydite, gravel upper, haydite under, gravel surface grafting windmill Grass, vertical current constructed wetland is provided with water distributor, and one end of water distributor connects circulating pump, and circulating pump connects tank, vertical person who lives in exile Laying collector pipe bottom work wetland, the delivery port of vertical current constructed wetland is located at bottom wetland, and the side of delivery port connects catchments Pipe, opposite side connects a threeway;The side connecting valve of threeway, the opposite side of threeway connects the cloth of horizontal drowned flow artificial wet land Water pipe;
Described horizontal drowned flow artificial wet land internal filling gravel, horizontal drowned flow artificial wet land laying water distributor, water distributor connects institute State vertical current constructed wetland collector pipe, lay collector pipe bottom horizontal subsurface flow wetland, delivery port, delivery port one are set bottom wetland Side connects collector pipe, and opposite side connects a threeway, and threeway side connects a valve, the top connecting water pipe of threeway, water pipe Valve is set, and is connected with tank;
Described tank one side bottom is provided with outlet pipeline, outlet pipeline connecting tee, and threeway side connects circulating pump, opposite side Connect outlet pipe;The opposite side of tank lays inlet pipeline;Water monitor, described inlet pipeline is laid in described tank With laying relay on outlet pipeline, relay is by electromechanical box control.
Device the most according to claim 7, it is characterised in that described vertical current constructed wetland underdrain pipe is " field word Shape ", the symmetrical 45° angle perforate of collector pipe two bottom sides, position of opening interval 5cm, aperture is 0.5cm;Perpendicular flow artificial is wet The delivery port on ground is located at the wetland lower center position of wetland and water distributor entrance wetland one end opposite side;
The delivery port that the water distributor of described horizontal drowned flow artificial wet land is laid in vertical current constructed wetland is positioned at the same side The surface of horizontal drowned flow artificial wet land, the medium position of water distributor connects the outlet pipe of upper vertical artificial wetland collector pipe, The symmetrical 45° angle perforate of water distributor two bottom sides, pitch of holes is 5cm, and aperture is 0.5cm, horizontal subsurface flow wetland and its water distribution Laying collector pipe bottom the wetland of pipe opposite side, the symmetrical 45° angle perforate of collector pipe two bottom sides, pitch of holes is 5cm, hole Footpath is 0.5cm, delivery port be arranged at the wetland bottom center of collector pipe the same side at.
The application of device the most according to claim 7, it is characterised in that be applied to sanitary sewage, by pollution by pesticides sewage, Sewage, the waste water control aspect polluted by antibiotic and/or incretion interferent by heavy metal pollution.
The application of device the most according to claim 8, it is characterised in that be applied to sanitary sewage, dirt by pollution by pesticides Water, the sewage by heavy metal pollution, the waste water control aspect polluted by antibiotic and/or incretion interferent.
CN201410434090.5A 2014-08-29 2014-08-29 Reflux vertical wet land sewage treating process and device and application Active CN104211182B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410434090.5A CN104211182B (en) 2014-08-29 2014-08-29 Reflux vertical wet land sewage treating process and device and application

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410434090.5A CN104211182B (en) 2014-08-29 2014-08-29 Reflux vertical wet land sewage treating process and device and application

Publications (2)

Publication Number Publication Date
CN104211182A CN104211182A (en) 2014-12-17
CN104211182B true CN104211182B (en) 2016-09-07

Family

ID=52093150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410434090.5A Active CN104211182B (en) 2014-08-29 2014-08-29 Reflux vertical wet land sewage treating process and device and application

Country Status (1)

Country Link
CN (1) CN104211182B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106007181A (en) * 2016-06-23 2016-10-12 张锦宇 Tidal mixed flow constructed wetland system and sewage treatment method
CN107215958B (en) * 2017-07-24 2022-09-27 中国科学院水生生物研究所 Application method and device of composite vertical tidal flow artificial wetland
CN108439605A (en) * 2018-05-03 2018-08-24 广州大学 Composite type artificial wetland garbage loading embeading percolation liquid filtration system
CN108911155B (en) * 2018-07-17 2019-11-12 江苏省环境科学研究院 A kind of hybrid constructed wetland system and its method for handling low-concentration heavy metal sewage
CN109354195B (en) * 2018-11-09 2024-07-02 上海勘测设计研究院有限公司 Subsurface flow wetland structure
CN111018266A (en) * 2019-12-31 2020-04-17 华南理工大学 Landscape type modularized biological carbon multistage artificial wetland automatic treatment system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101781060A (en) * 2010-03-02 2010-07-21 河北农业大学 Composite artificial wetland sewage treatment system
CN202881048U (en) * 2012-09-28 2013-04-17 中国科学院烟台海岸带研究所 Multi-medium constructed wetland water treatment system
CN203269659U (en) * 2013-05-28 2013-11-06 天津市环境保护科学研究院 High-efficiency nitrogen removal three-stage composite constructed wetland

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7314562B2 (en) * 2004-04-28 2008-01-01 3R Foam Llc Floating wetland structures for use in water remediation

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101781060A (en) * 2010-03-02 2010-07-21 河北农业大学 Composite artificial wetland sewage treatment system
CN202881048U (en) * 2012-09-28 2013-04-17 中国科学院烟台海岸带研究所 Multi-medium constructed wetland water treatment system
CN203269659U (en) * 2013-05-28 2013-11-06 天津市环境保护科学研究院 High-efficiency nitrogen removal three-stage composite constructed wetland

Also Published As

Publication number Publication date
CN104211182A (en) 2014-12-17

Similar Documents

Publication Publication Date Title
CN104211182B (en) Reflux vertical wet land sewage treating process and device and application
CN103803762B (en) A kind of organic composite soil efficient ecological water cleaning systems
CN205241356U (en) Ecological chinampa water treatment facilities of solar energy combined type
CN105236671B (en) A kind of ecological green land sewage disposal system and its method
CN104556378B (en) The integrated processing system of a kind of domestic sewage in rural areas and technique thereof
CN205616723U (en) Pool - ecological ditch canal non -point source pollution processing system
CN106082562B (en) Community sewage integrated treatment and reuse system and application
CN103332791A (en) Artificial wetland capable of strongly removing antibiotic and resistance gene from culture waste water
CN2786106Y (en) Potential energy-utilized oxygen-increasing ecological bed
CN105800771B (en) Biological filter wall system
CN105461071A (en) Green ecological floating island device
CN205442798U (en) Green ecological chinampa device
CN108911145A (en) Mixed flow constructed wetland-biofiltration compound sewage processing unit and its technique
CN204211541U (en) The vertical marsh sewage treatment system of a kind of backflow
CN105314797B (en) A kind of Worm biological filter tank of sewage sludge synchronization process and its application
CN208814729U (en) A kind of sewage treatment plant tail water advanced treatment system
CN105165678B (en) A kind of method of sturgeon breeding
CN104386876A (en) Household processing system for sewage
CN208218621U (en) A kind of rural sewage treatment recyclable device based on water plant
CN104591509A (en) Effective denitrification device of industrial aquaculture tail water
CN206136923U (en) Container farming systems
CN209039279U (en) A kind of organic pollution aquifer dystopy Ecosystem restoration system
CN204742224U (en) Ecological farming systems
CN208200655U (en) A kind of breeding wastewater ecological management system
CN104860486A (en) Combined type modular biofilter suitable for fish breeding and releasing station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant