CN104208891A - 酯化分离塔的下部温度控制系统 - Google Patents
酯化分离塔的下部温度控制系统 Download PDFInfo
- Publication number
- CN104208891A CN104208891A CN201310207792.5A CN201310207792A CN104208891A CN 104208891 A CN104208891 A CN 104208891A CN 201310207792 A CN201310207792 A CN 201310207792A CN 104208891 A CN104208891 A CN 104208891A
- Authority
- CN
- China
- Prior art keywords
- esterification
- separation column
- control system
- esterification separation
- heat exchanger
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Control Of Temperature (AREA)
Abstract
本发明涉及一种酯化分离塔的下部温度控制系统,包括酯化分离塔(1)以及酯化换热器(2),所述酯化分离塔(1)以及酯化换热器(2)之间连接有进料管道以及回料管道,其特征在于所述酯化分离塔(1)的下部设置有温度传感器(1.1),所述酯化换热器(2)的进料口连接有热媒进料管道(3),所述热媒进料管道(3)上设置有进料阀(3.1),所述温度传感器(1.1)以及进料阀(3.1)之间设置有控制线路(4),所述控制线路(4)上从前至后依次设置有温度控制器(4.1)以及压力控制器(4.2)。该酯化分离塔的下部温度控制系统具有温度控制精度较高,节省人工的优点。
Description
技术领域
本发明涉及一种酯化分离塔,尤其涉及一种酯化分离塔的下部温度控制系统,属于化工设备领域。
背景技术
在生产聚酯过程中,需要使用酯化分离塔,传统的酯化分离塔内的下部温度较难控制,需要人工手动调节热媒进料管道向酯化换热器中进料的速度。对于大型化生产线来说,如果需要工人手动操作,浪费大量的人工,且酯化分离塔内的下部温度控制精度较难把握。因此寻求一种温度控制精度较高,节省人工的酯化分离塔的下部温度控制系统尤为重要。
发明内容
本发明的目的在于克服上述不足,提供一种温度控制精度较高,节省人工的酯化分离塔的下部温度控制系统。
本发明的目的是这样实现的:
一种酯化分离塔的下部温度控制系统,包括酯化分离塔以及酯化换热器,所述酯化分离塔以及酯化换热器之间连接有进料管道以及回料管道,其特征是所述酯化分离塔的下部设置有温度传感器,所述酯化换热器的进料口连接有热媒进料管道,所述热媒进料管道上设置有进料阀,所述温度传感器以及进料阀之间设置有控制线路,所述控制线路上从前至后依次设置有温度控制器以及压力控制器。
与现有技术相比,本发明的有益效果是:
本发明通过控制线路的信号控制进料阀的开度,从而来控制热媒进料管道向酯化换热器中进料的速度,保证酯化分离塔温度得以精确控制。该酯化分离塔的下部温度控制系统具有温度控制精度较高,节省人工的优点。
附图说明
图1为本发明酯化分离塔的下部温度控制系统的结构示意图。
其中:
酯化分离塔1、温度传感器1.1
酯化换热器2
热媒进料管道3、进料阀3.1
控制线路4、温度控制器4.1、压力控制器4.2。
具体实施方式
参见图1,本发明涉及的一种酯化分离塔的下部温度控制系统,包括酯化分离塔1以及酯化换热器2,所述酯化分离塔1以及酯化换热器2之间连接有进料管道以及回料管道,所述酯化分离塔1的下部设置有温度传感器1.1,所述酯化换热器2的进料口连接有热媒进料管道3,所述热媒进料管道3上设置有进料阀3.1,所述温度传感器1.1以及进料阀3.1之间设置有控制线路4,所述控制线路4上从前至后依次设置有温度控制器4.1以及压力控制器4.2。
Claims (1)
1.一种酯化分离塔的下部温度控制系统,包括酯化分离塔(1)以及酯化换热器(2),所述酯化分离塔(1)以及酯化换热器(2)之间连接有进料管道以及回料管道,其特征在于所述酯化分离塔(1)的下部设置有温度传感器(1.1),所述酯化换热器(2)的进料口连接有热媒进料管道(3),所述热媒进料管道(3)上设置有进料阀(3.1),所述温度传感器(1.1)以及进料阀(3.1)之间设置有控制线路(4),所述控制线路(4)上从前至后依次设置有温度控制器(4.1)以及压力控制器(4.2)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310207792.5A CN104208891A (zh) | 2013-05-30 | 2013-05-30 | 酯化分离塔的下部温度控制系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310207792.5A CN104208891A (zh) | 2013-05-30 | 2013-05-30 | 酯化分离塔的下部温度控制系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104208891A true CN104208891A (zh) | 2014-12-17 |
Family
ID=52091043
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310207792.5A Pending CN104208891A (zh) | 2013-05-30 | 2013-05-30 | 酯化分离塔的下部温度控制系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104208891A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110652946A (zh) * | 2019-09-24 | 2020-01-07 | 安徽神剑新材料股份有限公司 | 一种聚酯树脂生产过程中顶温控制系统及方法 |
-
2013
- 2013-05-30 CN CN201310207792.5A patent/CN104208891A/zh active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110652946A (zh) * | 2019-09-24 | 2020-01-07 | 安徽神剑新材料股份有限公司 | 一种聚酯树脂生产过程中顶温控制系统及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203342419U (zh) | 酯化分离塔的下部温度控制系统 | |
CN104208893A (zh) | 酯化分离塔的温度控制系统 | |
CN104208891A (zh) | 酯化分离塔的下部温度控制系统 | |
CN203342418U (zh) | 酯化分离塔的温度控制系统 | |
CN203342753U (zh) | 酯化反应装置的热媒进料管道控制系统 | |
CN203342752U (zh) | 酯化分离塔的热媒进料管道控制系统 | |
CN203342420U (zh) | 酯化分离塔的上部温度控制系统 | |
CN203342754U (zh) | 酯化换热器的热媒进料管道控制系统 | |
CN104209059A (zh) | 酯化分离塔的热媒进料管道控制系统 | |
CN104215117A (zh) | 酯化换热器的热媒进料管道控制系统 | |
CN203540497U (zh) | 液料定量投料系统 | |
CN203342417U (zh) | 酯化分离塔的冷却控制系统 | |
CN104208894A (zh) | 酯化分离塔的冷却控制系统 | |
CN104209060A (zh) | 酯化反应装置的热媒进料管道控制系统 | |
CN104208892A (zh) | 酯化分离塔的上部温度控制系统 | |
CN203342787U (zh) | 放空收集罐液位控制系统 | |
CN203349694U (zh) | 水冷凝器冷却水控制系统 | |
CN104216421A (zh) | 酯化分离塔的冷却料回料管道控制系统 | |
CN203349520U (zh) | 热媒喂给罐液位控制系统 | |
CN203342424U (zh) | 用于热媒喂给罐供料的第一冷凝罐液位控制系统 | |
CN203350726U (zh) | 酯化分离塔的冷却料回料管道控制系统 | |
CN104215118A (zh) | 水冷凝器冷却水控制系统 | |
CN104216429A (zh) | 酯化eg罐液位控制系统 | |
CN104209063A (zh) | 浆料喂给罐液位控制系统 | |
CN203342769U (zh) | 浆料喂给罐管道控制系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20141217 |