CN104197351A - Shell structure of high temperature flue gas baffle door - Google Patents

Shell structure of high temperature flue gas baffle door Download PDF

Info

Publication number
CN104197351A
CN104197351A CN201410480006.3A CN201410480006A CN104197351A CN 104197351 A CN104197351 A CN 104197351A CN 201410480006 A CN201410480006 A CN 201410480006A CN 104197351 A CN104197351 A CN 104197351A
Authority
CN
China
Prior art keywords
shell
upper shell
flue gas
upper cover
baffle door
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410480006.3A
Other languages
Chinese (zh)
Other versions
CN104197351B (en
Inventor
陆昕
黄燕萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI HUATONG ELECTRIC POWER EQUIPMENT CO Ltd
Original Assignee
WUXI HUATONG ELECTRIC POWER EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI HUATONG ELECTRIC POWER EQUIPMENT CO Ltd filed Critical WUXI HUATONG ELECTRIC POWER EQUIPMENT CO Ltd
Priority to CN201410480006.3A priority Critical patent/CN104197351B/en
Publication of CN104197351A publication Critical patent/CN104197351A/en
Application granted granted Critical
Publication of CN104197351B publication Critical patent/CN104197351B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Superstructure Of Vehicle (AREA)

Abstract

The invention belongs to the technical field of waste heat boilers, and particularly relates to a high-temperature flue gas damper shell structure which comprises a base, a lower shell and an upper shell, wherein the lower shell is fixedly connected to the base through a bottom plate, the upper shell is fixedly connected with the lower shell through a split connecting flange, the open end of the upper shell is connected with an upper sealing head, the upper shell is provided with a first sealing air inlet pipe communicated with an inner cavity of the shell, the upper sealing head is connected with a second sealing air inlet pipe, and a bearing seat is arranged at the joint of the upper sealing head and the upper shell. The product of the invention adopts a split structure design, is convenient for transportation and assembly operation, and is also convenient for the operations of filling the fiber board in the shell and covering the lining board on the fiber board.

Description

高温烟气挡板门壳体结构Shell structure of high temperature flue gas baffle door

技术领域 technical field

本发明属于余热锅炉技术领域,具体地说是一种高温烟气挡板门壳体结构。 The invention belongs to the technical field of waste heat boilers, in particular to a shell structure of a high-temperature flue gas baffle door.

背景技术 Background technique

余热锅炉,顾名思义是指利用各种工业过程中的废气、废料或废液中的余热及其可燃物质燃烧后产生的热量把水加热到一定工质的锅炉。具有烟箱、烟道余热回收利用的燃油锅炉、燃气锅炉、燃煤锅炉也称为余热锅炉,余热锅炉通过余热回收可以生产热水或蒸汽来供给其它工段使用。 Waste heat boiler, as the name implies, refers to a boiler that uses waste heat in waste gas, waste or waste liquid in various industrial processes and the heat generated by the combustion of combustible substances to heat water to a certain working medium. Oil-fired boilers, gas-fired boilers, and coal-fired boilers with smoke boxes and flue waste heat recovery are also called waste heat boilers. Waste heat boilers can produce hot water or steam for use in other sections through waste heat recovery.

余热锅炉在长期使用过程中,锅炉壳体裸露部分尤其是烟气挡板门常常会因为烟气中的硫化物与水汽作用产生液态硫酸而被腐蚀。烟气挡板门在被腐蚀后,其密封性能就无法得到保证,导致烟气外漏。目前,对于这种情况常用的对策是,一旦发现烟气挡板门壳体出现因壳体腐蚀而产生烟气外漏的现象,立即停机,对烟气挡板门进行更换作业,或者对烟气挡板门进行焊接维修等。由于烟气挡板门重量、体积均较大,不便于移动,在维修作业过程中,存在较大困难。 During the long-term use of the waste heat boiler, the exposed part of the boiler shell, especially the flue gas baffle door, is often corroded due to the action of sulfide in the flue gas and water vapor to produce liquid sulfuric acid. After the flue gas baffle door is corroded, its sealing performance cannot be guaranteed, resulting in the leakage of flue gas. At present, the commonly used countermeasures for this situation are, once the flue gas baffle door casing is found to have flue gas leakage due to casing corrosion, stop the machine immediately, replace the flue gas baffle door, or replace the flue gas baffle door. Gas damper door for welding repairs, etc. Due to the large weight and volume of the smoke baffle door, it is not easy to move, and there are great difficulties in the maintenance operation process.

发明内容 Contents of the invention

本发明针对上述问题,提供一种高温烟气挡板门壳体结构,该壳体结构采用模块化设计,拆装灵活方便,便于后续维护保养。 In view of the above problems, the present invention provides a shell structure of a high-temperature smoke baffle door. The shell structure adopts a modular design, which is flexible and convenient for disassembly and assembly, and is convenient for subsequent maintenance.

按照本发明的技术方案:一种高温烟气挡板门壳体结构,其特征是:包括底座、下壳体、上壳体,所述下壳体通过底板固定连接于所述底座,上壳体通过分体连接法兰与下壳体固定连接,上壳体开口端连接有上封头,所述上壳体上设有连通壳体内腔的第一密封风入口管,在上封头上连接有第二密封风入口管,上封头与上壳体的连接处设置有轴承座。 According to the technical solution of the present invention: a high-temperature smoke baffle door shell structure is characterized by: comprising a base, a lower shell, and an upper shell, the lower shell is fixedly connected to the base through a bottom plate, and the upper shell The body is fixedly connected to the lower shell through the split connection flange, and the upper shell is connected to the upper head. A second sealed air inlet pipe is connected, and a bearing seat is arranged at the joint between the upper head and the upper casing.

作为本发明的进一步改进,所述上封头与上壳体的连接处设置有连接法兰加强筋,并在上壳体上端设置横加强筋,所述上封头的长度小于上壳体的长度,所述上封头与上壳体相连接的水平面上设置有平封板,上封头表面竖直向设置有竖封板;轴承座与上壳体及上封头的连接处均设置有加强筋。 As a further improvement of the present invention, the connection between the upper head and the upper casing is provided with connecting flange reinforcement ribs, and the upper end of the upper casing is provided with transverse reinforcement ribs, and the length of the upper head is shorter than that of the upper casing. length, the horizontal surface where the upper head is connected to the upper shell is provided with a flat sealing plate, and the surface of the upper head is vertically provided with a vertical sealing plate; the connection between the bearing seat and the upper shell and the upper There are ribs.

作为本发明的进一步改进,所述下壳体与上壳体表面均布设置有纵加强筋。 As a further improvement of the present invention, longitudinal reinforcing ribs are evenly distributed on the surfaces of the lower shell and the upper shell.

作为本发明的进一步改进,在所述上壳体表面与上封头的连接处设子有吊耳。 As a further improvement of the present invention, lifting lugs are provided at the connection between the upper shell surface and the upper head.

本发明的技术效果在于:本发明产品采用分体式结构设计,方便运输及组装作业,同时也便于在壳体内填装纤维板及在纤维板上覆盖内衬板的作业。 The technical effect of the present invention is that the product of the present invention adopts a split structure design, which is convenient for transportation and assembly operations, and at the same time facilitates the operations of filling fiberboards in the shell and covering the fiberboards with inner lining boards.

附图说明 Description of drawings

图1为本发明的结构示意图。 Fig. 1 is a structural schematic diagram of the present invention.

图2为图1的左视图。 Fig. 2 is a left side view of Fig. 1 .

具体实施方式 Detailed ways

下面结合附图对本发明的具体实施方式作进一步的说明。 The specific embodiments of the present invention will be further described below in conjunction with the accompanying drawings.

图1中,包括底座1、下壳体2、上壳体3、分体连接法兰4、连接法兰加强筋5、轴承座6、上封头7、第一密封风入口管8、第二密封风入口管9、竖封板10、平封板11、纵加强筋12等。 In Fig. 1, it includes a base 1, a lower casing 2, an upper casing 3, a split connection flange 4, a connecting flange reinforcement rib 5, a bearing seat 6, an upper sealing head 7, a first sealing air inlet pipe 8, a second Two sealing air inlet pipes 9, vertical sealing plates 10, flat sealing plates 11, longitudinal ribs 12, etc.

如图1所示,本发明是一种高温烟气挡板门壳体结构,包括底座1、下壳体2、上壳体3,所述下壳体2通过底板5固定连接于所述底座1,上壳体3通过分体连接法兰4与下壳体2固定连接,上壳体3开口端连接有上封头7,所述上壳体3上设有连通壳体内腔的第一密封风入口管8,在上封头7上连接有第二密封风入口管9,上封头7与上壳体3的连接处设置有轴承座6。 As shown in Figure 1, the present invention is a high-temperature smoke baffle door shell structure, including a base 1, a lower shell 2, and an upper shell 3, and the lower shell 2 is fixedly connected to the base through a bottom plate 5 1. The upper casing 3 is fixedly connected to the lower casing 2 through the split connection flange 4, and the upper casing 3 is connected to the upper head 7 at the opening end, and the upper casing 3 is provided with a first The sealing air inlet pipe 8 is connected with the second sealing air inlet pipe 9 on the upper sealing head 7 , and the bearing seat 6 is arranged at the joint between the upper sealing head 7 and the upper casing 3 .

所述上封头7与上壳体3的连接处设置有连接法兰加强筋5,并在上壳体3上端设置横加强筋6,所述上封头7的长度小于上壳体3的长度,所述上封头7与上壳体3相连接的水平面上设置有平封板11,上封头7表面竖直向设置有竖封板10;轴承座6与上壳体3及上封头7的连接处均设置有加强筋。 The connection between the upper head 7 and the upper casing 3 is provided with a connecting flange reinforcing rib 5, and a transverse reinforcing rib 6 is arranged at the upper end of the upper casing 3, and the length of the upper sealing head 7 is less than that of the upper casing 3. length, the horizontal surface where the upper head 7 is connected with the upper casing 3 is provided with a flat sealing plate 11, and the surface of the upper head 7 is vertically provided with a vertical sealing plate 10; the bearing seat 6 is connected with the upper casing 3 and the upper The joints of the head 7 are all provided with reinforcing ribs.

所述下壳体2与上壳体3表面均布设置有纵加强筋12。 The surfaces of the lower shell 2 and the upper shell 3 are uniformly provided with longitudinal ribs 12 .

在所述上壳体3表面与上封头7的连接处设子有吊耳8。 Lifting lugs 8 are provided at the connection between the surface of the upper shell 3 and the upper head 7 .

本发明的工作过程如下:通过对壳体进行结构改进,将三通壳体分成上壳体3、下壳体2两段,在工地组装成套使用,各段结合面需在工地焊接,同时分别在上、下壳体内填装硅酸铝纤维板后顺气流方向覆盖内衬板,同时点焊内衬板上各螺母。本发明产品拆装、组合均较为方便,在将上壳体3与下壳体2进行连接时,可以通过吊装设备起吊上壳体3上的吊耳8,将上壳体3移送至下壳体2上方,然后下落对齐于下壳体2上,通过螺栓紧固连接即可。 The working process of the present invention is as follows: by improving the structure of the shell, the three-way shell is divided into two sections, the upper shell 3 and the lower shell 2, which are assembled and used on the construction site. The joint surfaces of each section need to be welded on the construction site, and simultaneously Fill the upper and lower shells with aluminum silicate fiber boards and cover the inner liner along the airflow direction, and spot-weld the nuts on the inner liner at the same time. The disassembly and assembly of the product of the present invention are relatively convenient. When the upper casing 3 is connected with the lower casing 2, the lifting lug 8 on the upper casing 3 can be lifted by the hoisting equipment, and the upper casing 3 can be transferred to the lower casing. body 2, and then fall and align on the lower housing 2, and fasten the connection by bolts.

Claims (4)

1. a high-temperature flue gas baffle door shell structure, it is characterized in that: comprise base (1), lower house (2), upper shell (3), described lower house (2) is fixedly connected on described base (1) by base plate (5), upper shell (3) is fixedly connected with lower house (2) by split adpting flange (4), upper shell (3) openend is connected with upper cover (7), described upper shell (3) is provided with the first sealing air inlet tube (8) that is communicated with housing inner chamber, on upper cover (7), be connected with the second sealing air inlet tube (9), upper cover (7) is provided with bearing block (6) with the junction of upper shell (3).
2. according to high-temperature flue gas baffle door shell structure claimed in claim 1, it is characterized in that: described upper cover (7) is provided with adpting flange reinforcement (5) with the junction of upper shell (3), and in upper shell (3) upper end, transverse stiffener rib (6) is set, the length of described upper cover (7) is less than the length of upper shell (3), on the horizontal plane that described upper cover (7) is connected with upper shell (3), be provided with flat shrouding (11), upper cover (7) surface is vertically to being provided with vertical closure plate (10); Bearing block (6) is provided with reinforcement with the junction of upper shell (3) and upper cover (7).
3. according to high-temperature flue gas baffle door shell structure claimed in claim 1, it is characterized in that: described lower house (2) and the uniform longitudinal rein forcement (12) that is provided with in upper shell (3) surface.
4. according to high-temperature flue gas baffle door shell structure claimed in claim 1, it is characterized in that: on described upper shell (3) surface, establishing son with the junction of upper cover (7) has hanger (8).
CN201410480006.3A 2014-09-18 2014-09-18 High-temperature flue gas baffle door shell structure Active CN104197351B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410480006.3A CN104197351B (en) 2014-09-18 2014-09-18 High-temperature flue gas baffle door shell structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410480006.3A CN104197351B (en) 2014-09-18 2014-09-18 High-temperature flue gas baffle door shell structure

Publications (2)

Publication Number Publication Date
CN104197351A true CN104197351A (en) 2014-12-10
CN104197351B CN104197351B (en) 2017-04-26

Family

ID=52082682

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410480006.3A Active CN104197351B (en) 2014-09-18 2014-09-18 High-temperature flue gas baffle door shell structure

Country Status (1)

Country Link
CN (1) CN104197351B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119412521A (en) * 2024-12-02 2025-02-11 中国船舶集团有限公司第七0三研究所 A three-way reversing valve for exhaust system of combined cycle unit

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61182404A (en) * 1985-02-06 1986-08-15 Hitachi Ltd damper device
CN2474917Y (en) * 2001-03-07 2002-01-30 无锡市华东电力设备有限公司 Combustion gas machine set combined circulation by-pass baffle door
CN201014470Y (en) * 2006-12-12 2008-01-30 丁建峰 Tandem type three axis seat double-vane shutter type desulfurizing baffler door
CN101216178A (en) * 2007-12-28 2008-07-09 杭州锅炉集团股份有限公司 Gas baffle door and seal device
CN101220959A (en) * 2007-12-28 2008-07-16 杭州锅炉集团股份有限公司 Smoke damper door
CN201100649Y (en) * 2007-06-19 2008-08-13 洛阳瑞昌石油化工设备有限公司 Flue blocking plate gemel four-pole sealing structure
CN201173491Y (en) * 2007-12-28 2008-12-31 杭州锅炉集团股份有限公司 Gas baffle door for three-way air flue
CN102352936A (en) * 2011-10-11 2012-02-15 无锡市华通电力设备有限公司 The driving mechanism of the waste heat boiler bypass reversing baffle
CN202227861U (en) * 2011-08-04 2012-05-23 杭州杭锅通用设备有限公司 Smoke baffle door driving transmission system
CN204063089U (en) * 2014-09-18 2014-12-31 无锡市华通电力设备有限公司 High-temperature flue gas baffle door shell structure

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61182404A (en) * 1985-02-06 1986-08-15 Hitachi Ltd damper device
CN2474917Y (en) * 2001-03-07 2002-01-30 无锡市华东电力设备有限公司 Combustion gas machine set combined circulation by-pass baffle door
CN201014470Y (en) * 2006-12-12 2008-01-30 丁建峰 Tandem type three axis seat double-vane shutter type desulfurizing baffler door
CN201100649Y (en) * 2007-06-19 2008-08-13 洛阳瑞昌石油化工设备有限公司 Flue blocking plate gemel four-pole sealing structure
CN101216178A (en) * 2007-12-28 2008-07-09 杭州锅炉集团股份有限公司 Gas baffle door and seal device
CN101220959A (en) * 2007-12-28 2008-07-16 杭州锅炉集团股份有限公司 Smoke damper door
CN201173491Y (en) * 2007-12-28 2008-12-31 杭州锅炉集团股份有限公司 Gas baffle door for three-way air flue
CN202227861U (en) * 2011-08-04 2012-05-23 杭州杭锅通用设备有限公司 Smoke baffle door driving transmission system
CN102352936A (en) * 2011-10-11 2012-02-15 无锡市华通电力设备有限公司 The driving mechanism of the waste heat boiler bypass reversing baffle
CN204063089U (en) * 2014-09-18 2014-12-31 无锡市华通电力设备有限公司 High-temperature flue gas baffle door shell structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119412521A (en) * 2024-12-02 2025-02-11 中国船舶集团有限公司第七0三研究所 A three-way reversing valve for exhaust system of combined cycle unit

Also Published As

Publication number Publication date
CN104197351B (en) 2017-04-26

Similar Documents

Publication Publication Date Title
CN104197351B (en) High-temperature flue gas baffle door shell structure
CN203518569U (en) Vault type rapid cooling safe water tank of tunnel kiln
CN204063089U (en) High-temperature flue gas baffle door shell structure
CN201903040U (en) External welded junction-type pyrite waste heat boiler
CN103256591A (en) Biomass circulating fluidized bed boiler capable of preventing platen super-heater from high-temperature corrosion
CN202485507U (en) Boiler flue gas waste heat recovery device
CN204756275U (en) Flue gas pipeline thermal energy compensation arrangement
CN204924011U (en) Sealing structure of heat exchange tubes and tube sheets
CN203869074U (en) Device for recovering waste heat of gas boiler
CN104329948B (en) A kind of device utilizing cement rotary kiln preheating air by flue gas afterheat
CN206094007U (en) Vapor generator
CN205192302U (en) But integral heat pipe exchanger of bank of tubes modularization quick replacement
CN103912888B (en) A kind of sealing device bottom boiler back end ductwork
CN209759492U (en) Flue connection structure
CN204401026U (en) A kind of hot air furnace hot air pipe flange structure
CN206556467U (en) A kind of air heat exchanger for ash-laden gas WHRS
CN205279784U (en) Two backpressures, double -current journey condenser sea water communicating pipe
CN205495160U (en) Steam congeals fluid recovery unit
CN206419933U (en) Converter gas heat recovery boiler
CN105157427B (en) Pipeline and wall socket join structure and its installation method for all types of industries stove
CN205957713U (en) Labyrinth seal sleeve pipe is imported and exported to tube heating furnace radiant coil
CN202692002U (en) L-shaped pyrite waste heat boiler with external fillet weld
CN204852749U (en) Socket joint formula antiseep expansion joint
CN203869071U (en) Chimney structure
CN204313474U (en) A kind of atmospheric energy-saving high efficient horizontal heating furnace

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 214000 zone a, Yangjian Town Industrial Park, Xishan District, Wuxi City, Jiangsu Province (No. 120, Jiaoyang Road)

Patentee after: WUXI HUATONG ELECTRIC POWER EQUIPMENT Co.,Ltd.

Address before: 214101, No. 1, spring road, East Industrial Park, Xishan District, Jiangsu, Wuxi

Patentee before: WUXI HUATONG ELECTRIC POWER EQUIPMENT Co.,Ltd.

CP02 Change in the address of a patent holder