CN104196043B - 围瓮区规避悬河穿河隧道特殊风险方法 - Google Patents

围瓮区规避悬河穿河隧道特殊风险方法 Download PDF

Info

Publication number
CN104196043B
CN104196043B CN201410439883.6A CN201410439883A CN104196043B CN 104196043 B CN104196043 B CN 104196043B CN 201410439883 A CN201410439883 A CN 201410439883A CN 104196043 B CN104196043 B CN 104196043B
Authority
CN
China
Prior art keywords
tunnel
district
evaded
cofferdam
weng
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410439883.6A
Other languages
English (en)
Other versions
CN104196043A (zh
Inventor
董兰田
张峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QUANJIAO POWER MACHINERY CO Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410439883.6A priority Critical patent/CN104196043B/zh
Publication of CN104196043A publication Critical patent/CN104196043A/zh
Application granted granted Critical
Publication of CN104196043B publication Critical patent/CN104196043B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Revetment (AREA)

Abstract

本发明的围瓮区规避悬河穿河隧道特殊风险方法,属于路桥工程。包括遂道、围堰、围瓮区和路面。其特征是在悬河隧道的两端出口外修筑与河坝等高的围堰,形成封闭的围瓮区。由遂道延伸的路面通过坡道翻越围堰。本发明与现有技术相比,规避了穿河遂道发生透水,对悬河形同决堤的特殊风险,为悬河修筑穿河隧道消除了后顾之忧,提供了实施可能。因而,本发明具有很好的应用价值。

Description

围瓮区规避悬河穿河隧道特殊风险方法
一、技术领域:
本发明涉及路桥工程,具体的说涉及一种围瓮区规避悬河穿河隧道特殊风险方法。
二、背景技术:
穿河隧道以其全天候通行和不影响河面通航及疏洪等优势被广泛应用。但对于河床高出于两岸地平的悬河,则少有实施案例。究其原因,主要是在隧道发生意外透水情况下,一般隧道只造成淹没隧道的局部危害,且事后也易于修复重建。而在悬河隧道,则无疑于决堤,后果极其严重,事后也多无修复可能。
三、发明内容:
本发明的目的是针对以上问题,提供一种局限透水危害风险,便于事后修复的围瓮区规避悬河穿河隧道特殊风险方法。
本发明的目的是通过以下技术方案实现的:
一种围瓮区规避悬河穿河遂道特殊风险方法,包括遂道、围堰、围瓮区和路面,其特征是在悬河穿河遂道的两端出口外修筑与河坝等高的围堰,形成封闭的围瓮区,由遂道延伸的路面通过坡道翻越围堰。
本发明的围瓮区规避悬河穿河隧道特殊风险方法,通过修筑与河坝等高的围堰,将意外透水圈限于围瓮区范围内,通行车辆通过坡道翻越围堰,规避了修筑悬河隧道面临的特殊风险,为实施悬河隧道建设解除了后顾之忧,因而具有很好的实际应用价值。
四、附图说明:
图1为围瓮区规避悬河穿河隧道特殊风险方法的局部纵断面示意图。
图2为围瓮区规避悬河穿河隧道特殊风险方法的局部鸟瞰平面示意图。
图中:1河坝、2河床、3隧道、4围堰、5路面、6围瓮区
五、具体实施方式:
下面结合说明书附图对本发明的围瓮区规避悬河穿河隧道特殊风险方法作进一步详细说明:
如图所示,河床2下修筑隧道3穿越悬河,在隧道3的两个端口外修筑与河坝1等高的围堰4,与河坝1相切形成围瓮区6,在围瓮区6内修筑上坡道,围瓮区6外修筑下坡道,与隧道3延伸的路面5连接,形成翻越围堰4,穿越隧道3的顺畅通道。
除说明书所述的技术特征外,均为本专业技术人员的已知技术。

Claims (1)

1.一种围瓮区规避悬河穿河隧道特殊风险方法,包括遂道、围堰、围瓮区和路面,其特征是在悬河穿河隧道的两端出口外修筑与河坝等高的围堰,形成封闭的围瓮区,由遂道延伸的路面通过坡道翻越围堰。
CN201410439883.6A 2014-09-01 2014-09-01 围瓮区规避悬河穿河隧道特殊风险方法 Active CN104196043B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410439883.6A CN104196043B (zh) 2014-09-01 2014-09-01 围瓮区规避悬河穿河隧道特殊风险方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410439883.6A CN104196043B (zh) 2014-09-01 2014-09-01 围瓮区规避悬河穿河隧道特殊风险方法

Publications (2)

Publication Number Publication Date
CN104196043A CN104196043A (zh) 2014-12-10
CN104196043B true CN104196043B (zh) 2016-07-13

Family

ID=52081394

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410439883.6A Active CN104196043B (zh) 2014-09-01 2014-09-01 围瓮区规避悬河穿河隧道特殊风险方法

Country Status (1)

Country Link
CN (1) CN104196043B (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2569435A1 (fr) * 1984-08-21 1986-02-28 Leviel Christian Batardeau souple
US5277517A (en) * 1991-09-10 1994-01-11 The United States Of America As Represented By The Secretary Of The Army Mobile cofferdam
CN1773026A (zh) * 2004-11-08 2006-05-17 王毅 一种关于彻底治理黄河下游泥沙的方法
CN203113358U (zh) * 2013-01-07 2013-08-07 葛洲坝集团第五工程有限公司 一种粘土砂岩围堰结构

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2569435A1 (fr) * 1984-08-21 1986-02-28 Leviel Christian Batardeau souple
US5277517A (en) * 1991-09-10 1994-01-11 The United States Of America As Represented By The Secretary Of The Army Mobile cofferdam
CN1773026A (zh) * 2004-11-08 2006-05-17 王毅 一种关于彻底治理黄河下游泥沙的方法
CN203113358U (zh) * 2013-01-07 2013-08-07 葛洲坝集团第五工程有限公司 一种粘土砂岩围堰结构

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
大直径盾构隧道穿黄河关键技术研究;周鲁等;《第十三届海峡两岸隧道与地下工程学术及技术研讨会论文集》;20140831;第191页第1-2小节 *

Also Published As

Publication number Publication date
CN104196043A (zh) 2014-12-10

Similar Documents

Publication Publication Date Title
Ke Flood risk analysis for metropolitan areas–a case study for Shanghai
CN104196043B (zh) 围瓮区规避悬河穿河隧道特殊风险方法
CN203361095U (zh) 一种组合挡水坝结构
CN204225134U (zh) 防撞箱结构
Hamdan Controlling the surface water of Shatt Al Arab River by using sluice gates
CN209323464U (zh) 水工建筑物的分区止水结构
이진용 et al. Groundwater resources in Gangwon Province: Tasks and perspectives responding to droughts
Jayatillake et al. Design of a piano-key weir for giritale dam spillway in Sri Lanka
CN105178259A (zh) 一种面板堆石坝垫层与过渡层的联合设计方法
Pinto Coastal erosion and sediment management in Portugal
CN204849678U (zh) 一种新型的丁坝结构
Dumitrescu et al. The Lower Danube Green Corridor. Contributions to the analysis of the restoration opportunities for certain surveyed wetlands in the Danube floodplain, diversified by types of potential
Hong et al. Effect of engineering on the topographic evolution at Lianyungang sea areas.
CN209181964U (zh) 一种用于地下工程的渗水检测装置
MAO et al. Discussion on “Technical code for building slope engineering” second edition (2013)
Nacar The Investigation Of The Effect Of The Change Of Ceyhan River On The Property: The Case Of The Osmaniye
Simon et al. Effects of Dike Fields on Channel Characteristics of the Lower Missiszippi River
Jia et al. Study of Ecological Restoration Technique for Dam’s Downstream River
Tzanou et al. Pilot-scale application of mobile barrier systems for flood protection of urban areas. Assessment and evaluation of their interoperability in the urban area of Serres, Greece.
Yan et al. Study on optimization of anti-seepage and drainage system for high concrete sand-gravel dam
Ying-nan et al. Settlement control of Qiantang river embankments during undercrossing of EPB shield tunnels
Gilfedder et al. Bank storage buffers rivers from saline regional groundwater: an example from the Avon River Australia
Vasiliev et al. Ice-and cryogel-soil composites in water-retaining elements in embankment dams constructed in cold regions
Dimri Extreme events in Uttarakhand, India
CN104818695A (zh) 一种生态壅水型护滩结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191204

Address after: 239000 Chuquan Road, Xianghe Town, Quanjiao County, Chuzhou City, Anhui Province

Patentee after: Quanjiao Power Machinery Co., Ltd.

Address before: 250013 Shandong Province, Lixia District of Ji'nan City Luo River District No. 8 unit 4, Room 301

Patentee before: Dong Lantian

TR01 Transfer of patent right