CN104181043B - Tube bursting test apparatus with verification mechanism - Google Patents
Tube bursting test apparatus with verification mechanism Download PDFInfo
- Publication number
- CN104181043B CN104181043B CN201410077967.XA CN201410077967A CN104181043B CN 104181043 B CN104181043 B CN 104181043B CN 201410077967 A CN201410077967 A CN 201410077967A CN 104181043 B CN104181043 B CN 104181043B
- Authority
- CN
- China
- Prior art keywords
- path
- explosion
- casting
- channel
- test device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Examining Or Testing Airtightness (AREA)
Abstract
The invention relates to a tube bursting test apparatus with a verification mechanism, and solves the defects of the need of a pipeline system for providing a power medium by present bursting test apparatuses and the easy affection of bursting test structures by the sealing performance of the pipeline system. A test machine is a cast body structure, a channel is arranged in the test machine, the channel is provided with an inlet connected with the outside of the above cast body, the middle position of the channel is provided with a channel plugging head controlled by a controller to move and capable of blocking the channel, the channel connected with the opening of a bursting cavity is provided with a stopper or a connector, the stopper is connected with a test meter for verification, and the connector connected with a tube is used for bursting test. The overall test machine is the cast body structure, and the channel is arranged in the cast body, so the pipeline system needed by medium flow is omitted, and a pipeline connecting part is also omitted, thereby the leakage of the pipeline system is reduced; and the whole sealing performance of the channel can be verified when the channel plugging head does not work, and the sealing performance of each segment of the channel can be verified when the channel plugging head works.
Description
Technical field
The present invention relates to a kind of explosion bulge test device, it is primarily directed to tubing explosion bulge test, especially a kind of tape verifier
The tubing explosion bulge test device of structure.
Background technology
The working environment of automobile product oil pipe is more complicated, in addition to oil medium, also can bear high pressure, hyperpyrexia and strong
Power, if oil pipe quality does not pass a test, occurs the danger of oil pipe blast, once oil pipe explodes, high pressure in use
Fuel oil may spray out, the high temperature that the equipment of high-speed cruising produces is also possible to light fuel oil, and the phenomenon of vehicle burning occurs,
Injure the safety of passenger.And oil pipe burst, also can reduce the handling of vehicle, the vehicle especially run at high speed,
Become uncontrollable, easily cause serious vehicle accident, jeopardize other vehicles and pedestrian, therefore automobile product oil pipe makes in input
With front, it is required for through oil pipe explosion bulge test.
Existing oil pipe bursting test machine, when test, has two kinds of situations and causes oil pipe unqualified, and one kind is oil
Pipe sole mass is not up to standard to cause oil pipe unqualified, and another kind is that bursting test machine has leakage and causes oil pipe unqualified.But
All thinking during the underproof result of oil pipe, occurs in the mechanism that existing oil pipe bursting test machine does not all verify to bursting test machine
It is that oil pipe sole mass is not up to standard to cause that such result of the test and the larger difference of physical presence can cause oil pipe qualification rate
Degradation.
Patent Office of the People's Republic of China discloses a cn102645376a document, a kind of entitled oil pipe on the 22nd in August in 2012
Explosion bulge test device, including the storage box for accommodating test fluid, is provided with the experimental tank of petroleum pipeline fixation kit, for even
Logical storage box and the pipe-line system of petroleum pipeline, pipe-line system includes the runner pipe being connected with storage box and petroleum pipeline, and
It is connected and provides the high-pressure pump of hydraulic energy with runner pipe, be connected with high-pressure pump and control in high pressure pump startup or closing
Control system, central control system also includes recording the stress test assembly of oil pipe burst pressure.This explosion bulge test device, by runner pipe
Connect petroleum pipeline and storage box, during test, in the state of runner pipe is also in high pressure or strength all the time, the quality impact of runner pipe
Test structure, but this explosion bulge test device does not carry out the structure of self-inspection to the quality of runner pipe itself, also not to even
Socket part position carries out the structure of self-inspection, and the therefore accuracy of result of the test can have larger error.
Content of the invention
It is an object of the invention to provide a kind of tubing explosion bulge test device of tape verifying mechanism, medium that testing machine uses by
Power source directly provides, and without other pipelines system, testing machine is internally provided with power source flow passage, and flow passage is arranged
Verification agency, verifies the sealing property of testing machine by verification agency, thus it is unqualified to exclude the testing machine oil pipe that causes of leakage
Phenomenon.
This invention also solves existing explosion bulge test device needs pipe-line system to be connected to provide dynamic medium, explosion
The defect that test structure is easily affected by the sealing of pipe-line system, provides a kind of tubing explosion bulge test of tape verifying mechanism to fill
Put, testing machine is an entirety, testing machine is internally provided with medium flow path, reduces pipe-line system, be especially that pipeline connects
Connect, thus preventing the unqualified phenomenon of oil pipe because occurring the reason pipe-line system.
This invention also solves existing explosion bulge test device does not have mechanism that testing machine is verified and is occurred because of test
The defect of the unqualified phenomenon of oil pipe that machine self reason causes, provides a kind of tubing explosion bulge test device of tape verifying mechanism, joins
There is a tank, tank can be integrally contained by testing machine, thus carrying out leakage test to the verification agency of testing machine, preventing from trying
Leaking occurs because of verification agency in machine of testing, and affects oil pipe test structure.
The technical solution adopted for the present invention to solve the technical problems is: a kind of tubing explosion bulge test dress of tape verifying mechanism
Put, including medium power source, the testing machine being connected with medium power source, testing machine is body of casting structure, and body of casting side is provided with
Explosion chamber by explosion-proof door termination, testing machine is internally provided with a path, this communication explosion chamber, path offers one even
Import outside the logical body of casting, the centre position of path is provided with one and controls path envelope that is mobile and can blocking path by controller
Plug, is furnished with blocking or union joint, blocking is connected with test table and is used for verifying at the opening in communication explosion chamber, connect
Head connecting tube timber-used is in explosion bulge test.Medium power source is used for producing the medium of the medium of explosion bulge test or verification, can
To be gas or liquid;Testing machine generally body of casting structure, the body of casting is internally provided with path, eliminates media flow needs
Pipe-line system, also eliminates pipeline connecting part, also just decreases the leakage of pipe-line system;Path block head and blocking constitute
Verification agency, when path block head controls inoperative by controller, the overall sealing of verification path, by the survey in blocking
Data of taking temperature contrasts, with the display data on medium power source, the overall tightness that can learn path, if path is integrally close
Envelope property problematic, then path block head blocks under controller action path make path formed two sections be not interconnected lead to
Road, then each section that blocking-up can be learnt by the test table data in blocking and the contrast of the display data on medium power source
The sealing of path, so passes through the leakage problem that verification just can exclude path itself, thus exclusion is made because path reveals
Become is unqualified.
Preferably, the path within testing machine is made up of three sections of straight-through roads vertical successively, wherein two parallel leading directly to
Road connects explosion chamber, and another straight-through road is in middle and vertical above-mentioned two parallel straight-through road, import be in two parallel wherein
Always on the extended line of path.The path processing of this structure is more convenient.
Preferably, being provided with auxiliary channel in testing machine on the extended line on middle straight-through road, auxiliary channel connects
To the outside of the body of casting and it is fixed with auxiliary plug in oral area, path block head is on auxiliary channel.Auxiliary channel is convenient to be processed
Middle straight-through road, is also convenient for installing and control access block head.
Preferably, path block head is connected with control bar, control bar is connected with drive mechanism, drive mechanism with described
Controller is connected, and the middle setting of auxiliary plug has through hole, control bar periphery is equipped with sealing ring, control bar is stretched through through hole
Go out to outside the body of casting, in control bar, sealing ring and through-hole wall seal.
Preferably, auxiliary plug intermediate throughholes one end within towards the body of casting is tapered, the correct position in control bar
Place is provided with the taper being matched with the tapering point of through hole and blocks up, and the conical surface that this taper is blocked up is provided with multiple-sealed groove, seal groove
Inside it is equipped with sealing ring, control bar moves, taper is blocked up with during tapering point cooperation, and the path in the body of casting belongs to opens shape.Taper is blocked up
Matched realization sealing with the tapering point of through hole, is formed multi-layer sealed in conjunction with the sealing ring in control bar.
Preferably, path block head is in cone shape, the taper seat of cone is provided with multiple-sealed groove, seal groove
Inside it is equipped with sealing ring, corresponding path is provided with the bellmouth being matched with path block head.
Preferably, being in the rectangular in cross-section of the seal groove at the big footpath of path block head cone, it is in rectangular seal
Sealing ring in groove has snapin part and the sealing of rectangle, and snapin part snaps onto in seal groove, and sealing is projected into this sealing
Outside groove, and the side of this sealing is provided with the curved recess of a ring cross-section, and sealing ring snaps onto seal groove, this recess court
Bigger diameter end to cone.Sealing ring with recess sealing when due to being acted on by pressure medium on path, recess
Edge can be adjacent to path inwall, improves sealing.
Preferably, this device also includes a tank, in tank, it is filled with water, the depth of water is more than the height of the body of casting, examination
The machine of testing is in tank.Testing machine is immersed the underwater of screw clamp, the sealing of testing machine verification agency can be verified, prevent
The leakage that testing machine exists because of the installation of verification agency.
Preferably, body of casting upper end is connected with elevating mechanism, elevating mechanism motoring ring test machine lifts to immerse in screw clamp
Or leaving tank, described elevating mechanism adopts hydraulic drive type elevating mechanism.
Preferably, described explosion proof door is transparent explosion proof door.The convenient mistake observing explosion bulge test of transparent explosion proof door
Journey.
The invention has the beneficial effects as follows: testing machine generally body of casting structure, the body of casting is internally provided with path, eliminates medium
The pipe-line system that flowing needs, also eliminates pipeline connecting part, also just decreases the leakage of pipe-line system;Path block head is not
Path overall tightness can be verified during work, the sealing of each section of path during the work of path block head, can be verified.
Brief description
Fig. 1 is that a kind of path of the present invention integrally verifies structural representation;
Fig. 2 is a kind of present invention path segmentation verification structural representation;
Fig. 3 is a kind of present invention testing machine overall tightness verification structural representation;
Fig. 4 is a kind of present invention tubing explosion bulge test structural representation;
Fig. 5 is a kind of present invention path plugging head structure schematic diagram;
In figure: 1, testing machine, 2, medium power source, 3, middle straight-through road, 4, path block head, 5, taper block up, 6, auxiliary
Help path, 7, auxiliary plug, 8, tank, 9, controller, 10, sealing ring, 11, through hole, 12, control bar, 13, parallel straight-through
Road, 14, test table, 15, blocking, 16, explosion chamber, 17, explosion proof door, 18, water, 19, union joint, 20, tubing, 21, snapin part,
22nd, sealing, 23, recess.
Specific embodiment
Below by specific embodiment, and combine accompanying drawing, technical scheme is described in further detail.
Embodiment: a kind of tubing explosion bulge test device (referring to accompanying drawing 1 accompanying drawing 2 accompanying drawing 3) of tape verifying mechanism, including medium
Power source 2, the testing machine 1 being connected with medium power source, medium power source is connected with pressure gauge.
Testing machine is body of casting structure, and body of casting side is provided with explosion chamber 16 and is closed by explosion proof door 17, and explosion proof door is transparent
Structure.Testing machine is internally provided with a path, this communication explosion chamber, and path is made up of three sections of straight-through roads vertical successively,
It is respectively two parallel straight-through roads 13 and middle straight-through road 3, middle straight-through road is in middle and vertical two parallel leading directly to
Road, two parallel straight communication explosion chambeies, and it is furnished with blocking 15 or union joint 19 at the opening of connection, blocking connects
Test table 14 is had to be used for verifying, union joint connects tubing 20 and is used for explosion bulge test.It is further opened with wherein one parallel straight-through road
Import outside the one connection body of casting, entrance closure has end socket, and medium power source connects end socket.The extended line on middle straight-through road
On be provided with auxiliary channel 6, auxiliary channel be communicated to the body of casting outside and oral area be fixed with auxiliary plug 7.At auxiliary channel
It is provided with one and path block head 4 that is mobile and can blocking middle straight-through road is controlled by controller 9.The centre of auxiliary plug sets
It is equipped with through hole 11, path block head is connected with control bar 12, and control bar is connected with drive mechanism, drive mechanism and described control
Device be connected, control bar periphery is equipped with sealing ring 10, control bar reaches outside the body of casting through through hole, in control bar sealing ring and
Through-hole wall seals.Through hole one end within towards the body of casting is tapered, is provided with and through hole at the correct position in control bar
The taper that tapering point matches blocks up 5, the conical surface that this taper is blocked up is provided with multiple-sealed groove, is equipped with sealing ring in seal groove,
Control bar moves, and taper is blocked up with during tapering point cooperation, and the path in the body of casting belongs to opens shape.
Path block head 4 is in cone shape (referring to accompanying drawing 5), and the taper seat of cone is provided with multiple-sealed groove, close
It is equipped with sealing ring in sealing groove, the straight-through road of corresponding centre is provided with the bellmouth matching with path block head.Path
The rectangular in cross-section of the seal groove at the big footpath of block head cone, the sealing ring being in rectangular seal groove has snapping in of rectangle
Portion 21 and sealing 22, snapin part snaps onto in seal groove, and sealing is projected into outside this seal groove, and the side of this sealing
It is provided with the curved recess of a ring cross-section 23, sealing ring snaps onto seal groove, this recess is towards the bigger diameter end of cone.
The upper end of testing machine is connected with elevating mechanism, and elevating mechanism adopts hydraulic drive type elevating mechanism, elevating mechanism band
Dynamic test machine lifting, to immerse in screw clamp or to leave tank, is filled with WATER AS FLOW MEDIUM 18 in tank, the depth of water is more than the height of the body of casting
Degree.
It is closed before testing machine test, path block head is in opening, two parallel straight communication are quick-fried
By blocking closure at the mouth in broken chamber, then pressed gas are filled with the path in the body of casting by medium power source, observe test table and show
Whether value is consistent with the gas gauge show value of medium power source, if unanimously, represents that body of casting internal duct is not revealed, can
Carry out explosion bulge test to connect tubing.
If test table show value and pressure gauge show value are inconsistent, illustrate that body of casting internal duct exists and reveal, now
By path block head by middle straight tunnel end closure, charged pressure gas again, observe test table show value and gas pressure
Whether power table show value is consistent, if unanimously, illustrates that the middle straight-through road straight-through road parallel with side exists and lets out
Dew, the blocking at now mainly parallel straight-through road port there may be leakage, carries out school after being changed or adjusting again
Test.If, by after middle straight-through road closing, test table show value and gas gauge show value are also inconsistent for path block head,
Then illustrate that this parallel straight-through road has leakage or auxiliary channel presence is revealed, now need to block up to blocking accordingly and assisting
Head is changed or is adjusted, and is verified again, and finally confirms.
When confirming that pipeline is revealed, testing machine can be immersed in screw clamp, observe which outlet has bubble, then accordingly
Adjust blocking or the auxiliary plug in this exit, and be again dipped into being confirmed in tank.
If it is confirmed that testing machine is not revealed, then by union joint connect tubing 20 to be tested carry out explosion bulge test (referring to
Accompanying drawing 4).
Embodiment described above is a kind of preferred version of the present invention, and not the present invention is made with any pro forma limit
System, also has other variants and remodeling on the premise of without departing from the technical scheme described in claim.
Claims (10)
1. the tubing explosion bulge test device of a kind of tape verifying mechanism, including medium power source, the examination being connected with medium power source
Test machine it is characterised in that testing machine is body of casting structure, body of casting side is provided with explosion chamber and by explosion-proof door termination, inside testing machine
It is provided with a path, this communication explosion chamber, path offers the import outside a connection body of casting, the centre position of path
It is provided with one and path block head that is mobile and can blocking path is controlled by controller, be furnished with the opening in communication explosion chamber
Blocking or union joint, blocking are connected with test table and are used for verifying, union joint connecting tube timber-used is in explosion bulge test.
2. the tubing explosion bulge test device of tape verifying mechanism according to claim 1 is it is characterised in that within testing machine
Path is made up of three sections of straight-through roads vertical successively, and wherein two parallel straight communication explosion chambeies, during another straight-through road is in
Between and vertical above-mentioned two parallel straight-through road, it is parallel wherein always on the extended line of path that import is in two.
3. tape verifying mechanism according to claim 2 tubing explosion bulge test device it is characterised in that testing machine in
Between the extended line on straight-through road on be provided with auxiliary channel, auxiliary channel is communicated to the outside of the body of casting and is fixed with auxiliary in oral area
Plug, path block head is on auxiliary channel.
4. the tubing explosion bulge test device of tape verifying mechanism according to claim 3 is it is characterised in that path block head connects
It is connected to control bar, control bar is connected with drive mechanism, drive mechanism is connected with described controller, the middle setting of auxiliary plug
Have through hole, control bar periphery be equipped with sealing ring, control bar reaches outside the body of casting through through hole, in control bar sealing ring with logical
Hole inner wall sealing.
5. the tubing explosion bulge test device of tape verifying mechanism according to claim 4 is it is characterised in that assist in the middle of plug
Through hole one end within towards the body of casting is tapered, is provided with and matches with the tapering point of through hole at the correct position in control bar
Taper is blocked up, and the conical surface that this taper is blocked up is provided with multiple-sealed groove, is equipped with sealing ring in seal groove, and control bar moves, taper
During the stifled cooperation with tapering point, the path in the body of casting belongs to opens shape.
6. the tape verifying mechanism according to claim 1 or 2 or 3 or 4 or 5 tubing explosion bulge test device it is characterised in that
Path block head is in cone shape, the taper seat of cone is provided with multiple-sealed groove, is equipped with sealing ring in seal groove, right
The bellmouth being matched with path block head is provided with the path answered.
7. the tubing explosion bulge test device of tape verifying mechanism according to claim 6 is it is characterised in that be in path closure
Head the big footpath of cone at seal groove rectangular in cross-section, the sealing ring being in rectangular seal groove have rectangle snapin part and
Sealing, snapin part snaps onto in seal groove, and sealing is projected into outside this seal groove, and the side of this sealing is provided with one
The curved recess of ring cross-section, sealing ring snaps onto seal groove, and this recess is towards the bigger diameter end of cone.
8. the tape verifying mechanism according to claim 1 or 2 or 3 or 4 or 5 tubing explosion bulge test device it is characterised in that
This device also includes a tank, is filled with water in tank, and the depth of water is more than the height of the body of casting, and testing machine is in tank.
9. the tubing explosion bulge test device of tape verifying mechanism according to claim 8 is it is characterised in that body of casting upper end connects
There is elevating mechanism, elevating mechanism motoring ring test machine lifts to immerse in screw clamp or to leave tank, described elevating mechanism adopts
Hydraulic drive type elevating mechanism.
10. the tape verifying mechanism according to claim 1 or 2 or 3 or 4 or 5 tubing explosion bulge test device it is characterised in that
Described explosion proof door is transparent explosion proof door.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410077967.XA CN104181043B (en) | 2014-03-05 | 2014-03-05 | Tube bursting test apparatus with verification mechanism |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410077967.XA CN104181043B (en) | 2014-03-05 | 2014-03-05 | Tube bursting test apparatus with verification mechanism |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104181043A CN104181043A (en) | 2014-12-03 |
CN104181043B true CN104181043B (en) | 2017-01-18 |
Family
ID=51962269
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410077967.XA Expired - Fee Related CN104181043B (en) | 2014-03-05 | 2014-03-05 | Tube bursting test apparatus with verification mechanism |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104181043B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106769509A (en) * | 2016-12-16 | 2017-05-31 | 青岛宇通管业有限公司 | A kind of tubing pressure testing system and method for testing |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201615862U (en) * | 2010-01-09 | 2010-10-27 | 湖南吉利汽车部件有限公司 | Automobile high pressure oil pipe withstand voltage and blasting test device |
CN201740706U (en) * | 2010-08-12 | 2011-02-09 | 山东聚亿管业有限公司 | Pressure resistance and blasting experiment device for high pressure rubber pipe |
CN103364279A (en) * | 2013-07-24 | 2013-10-23 | 中国化工橡胶株洲研究设计院 | Method for calibrating sounding balloon bursting instrument and calibration device thereof |
-
2014
- 2014-03-05 CN CN201410077967.XA patent/CN104181043B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201615862U (en) * | 2010-01-09 | 2010-10-27 | 湖南吉利汽车部件有限公司 | Automobile high pressure oil pipe withstand voltage and blasting test device |
CN201740706U (en) * | 2010-08-12 | 2011-02-09 | 山东聚亿管业有限公司 | Pressure resistance and blasting experiment device for high pressure rubber pipe |
CN103364279A (en) * | 2013-07-24 | 2013-10-23 | 中国化工橡胶株洲研究设计院 | Method for calibrating sounding balloon bursting instrument and calibration device thereof |
Also Published As
Publication number | Publication date |
---|---|
CN104181043A (en) | 2014-12-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108181063B (en) | A kind of vehicle-mounted compound material hydrogen cylinder military service performance testing device and method | |
CN203848989U (en) | Detection apparatus | |
CN104122048A (en) | High-pressure gas tightness detection system | |
CN104122049B (en) | A kind of high pressure airtightness testing method | |
CN108088749A (en) | Pipeline pressure testing device and pipeline pressure pilot system | |
CN104502546A (en) | Experimental device and method for detecting sealing performance of sealing material of gas drainage drilling hole | |
CN109668056A (en) | A kind of underwater gas transportation pipeline Release and dispersion experimental simulation device and experimental method | |
CN104181043B (en) | Tube bursting test apparatus with verification mechanism | |
CN204266986U (en) | Carbon dioxide flooding oil field well head device | |
CN103670391B (en) | Displacement test fluid control method and experimental facilities | |
CN106644303B (en) | A kind of double medium detection devices of hydraulic buffer leakproofness and its detection method | |
CN103048092B (en) | Test device and test method for longitudinal air permeability performance of cable | |
CN104236938A (en) | Static pressure and bursting device of water treatment device | |
CN109975125A (en) | The pressure water experimental facilities and method detected based on coal body or rock-mass relaxing circle | |
CN206362506U (en) | The anhydrous pressure testing device of ball valve | |
CN104874067A (en) | Leakage detection method for respirator | |
CN203453168U (en) | Blowout preventer control device with pneumatic pressure testing function | |
CN109253845A (en) | A kind of precision valve device for detecting sealability | |
CN207687688U (en) | A kind of harmful influence non-stop plugging drilling system | |
CN108374915A (en) | A kind of automatic locking type charge valve | |
CN208595352U (en) | Pressure release plug | |
CN206378398U (en) | The nylon Liquid penetrant testing of resistance to refrigerant container | |
CN104180949A (en) | Air permeability valve detection device | |
CN206158898U (en) | Diesel engine low -pressure pipeline's oil pressure guarantee device | |
CN220366972U (en) | Hydraulic valve air tightness inspection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170118 Termination date: 20210305 |
|
CF01 | Termination of patent right due to non-payment of annual fee |